ATTACHMENT_2_DRAWINGS.pdf
PDF 40 MB Posted
- Attached to
- Replace USS Arizona Memorial Dock and Ramp Federal contract opportunity
- Solicitation number
- P15PS00149
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_3_PROJECT_INFORMATION.pdf | ||
| HI1_dvb.txt | TXT text file | |
| Sol_P15PS00149.pdf | ||
| ATTACHMENT_1_SPECIFICATIONS.pdf | ||
| ATTACHMENT_5_PERMITS.pdf | ||
| ATTACHMENT_4_SOILS_INVESTIGATION.pdf | ||
| ATTACHMENT_7_PAST_PERFORMANCE_QUESTIONNAIRE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. GENERAL
1.1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE
OSHA REGULATIONS.
1.2. THE CONTRACTOR SHALL HAVE A SUPERINTENDENT OR REPRESENTATIVE
ON SITE AT ALL TIMES DURING CONSTRUCTION.
1.3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL
CONDITIONS CONTAINED IN PROJECT RELATED PERMITS AND IN
OBTAINING ANY OTHER PERMITS THAT MAY BE REQUIRED.
1.4. CONTRACTOR SHALL CONDUCT FIELD REVIEW AND VERIFY ALL LINES,
LEVELS AND CONDITIONS PRIOR TO BEGINNING OF ANY WORK. SUBMIT
TO CONTRACTING OFFICER A LIST OF IDENTIFIED PROBLEM AREAS.
CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AND COORDINATE
WITH CONTRACTING OFFICER REGARDING THE RELOCATION OF EXISTING
UTILITIES AS NEEDED.
1.5. ALL MATERIALS, REQUIRED FOR THE COMPLETE EXECUTION OF THE
PROJECT, SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR
UNLESS OTHERWISE NOTED.
1.6. CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY
ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR SHALL
ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT,
INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS
REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE
LIMITED TO NORMAL WORKING HOURS.
1.7. EXISTING FACILITIES INCLUDING, BUT NOT LIMITED TO, THE U.S.S.
ARIZONA MEMORIAL, FORD ISLAND FACILITIES, THE PARK, ROADS, WALLS,
FENCES AND STRUCTURES DAMAGED BY CONTRACTOR'S OPERATIONS
SHALL BE RESTORED TO MATCH ORIGINAL CONDITION AND TO THE
SATISFACTION OF THE CONTRACTING OFFICER WITHOUT ADDITIONAL
COST TO THE GOVERNMENT.
1.8. NATIONAL PARK SERVICE POINTS OF CONTACT
CONTRACTING OFFICER:
JOHN O'DELL
NATIONAL PARK SERVICE
300 ALA MOANA BLVD., BOX 50165, ROOM 6-226
HONOLULU, HI 96850
(808) 541-2693 X740
JOHN_ODELL@NPS.GOV
PROJECT MANAGER:
SCOTT HENRICKSON, P.E.
NATIONAL PARK SERVICE
909 FIRST AVENUE, SUITE 500
SEATTLE, WA 98104
(206) 220-4258
SCOTT_HENRICKSON@NPS.GOV
PARK SUPERINTENDENT:
PAUL DEPREY
NATIONAL PARK SERVICE, U.S.S. ARIZONA MEMORIAL
1 ARIZONA MEMORIAL PLACE
HONOLULU, HI 96816
(808) 422-2771 X114
PAUL_DEPREY@NPS.GOV
PARK FACILITY MANAGER
NATIONAL PARK SERVICE, U.S.S. ARIZONA MEMORIAL
1 ARIZONA MEMORIAL PLACE
HONOLULU, HI 96816
(808) 422-4492
2. PARK NOTES
2.1. THE CONTRACTOR IS REMINDED THAT THE U.S.S. ARIZONA IS A GRAVE
SITE AND FINAL RESTING PLACE FOR SERVICEMEN WHO DIED ON
DECEMBER 7, 1941.
2.2. THE PROJECT SITE RESIDES WITHIN A NATIONAL PARK THAT ALSO
RESIDES WITHIN AN ACTIVE US NAVAL MILITARY INSTALLATION, THE
PEARL HARBOR NAVAL COMPLEX (PHNC) AND ENVIRONMENTALLY
PROTECTED WATERS OF PEARL HARBOR, HAWAII. U.S. NAVY
RESTRICTIONS MAY APPLY TO SITE ACCESS SUCH AS FORD ISLAND,
NAVIGATION THROUGH THE WATERS OF PEARL HARBOR, AND PASSAGE
BENEATH THE FORD ISLAND DRAWBRIDGE. CONTACT AND COORDINATE
WITH THE U.S. NAVY, U.S. COAST GUARD AND ANY OTHER GOVERNMENT
AGENCY HAVING JURISDICTION OVER THE NAVIGABLE WATERS OF PEARL
HARBOR. FOR U.S. NAVY FACILITY COORDINATION, CALL 808-471-9019.
FOR PORT OPERATIONS, CONTACT BOSN BRIAN ARCHER AT (808)
864-2456. FOR SECURITY CLEARANCES CONTACT LCDR MATTHEW CLARK
AT (808) 590-7686.
2.3. COORDINATE WITH THE CONTRACTING OFFICER ON THE SHUT-DOWN
CLOSURE SCHEDULE OF THE U.S.S. ARIZONA MEMORIAL SITE AS
REQUIRED. THE PARK WILL BE IN CONTINUOUS USE BY THE PUBLIC. THE
CONTRACTOR SHALL COOPERATE FULLY WITH THE NATIONAL PARK
SERVICE U.S.S. ARIZONA MEMORIAL PARK FACILITIES MANAGER.
2.4. BE AWARE THAT THE STRUCTURE OF THE U.S.S. ARIZONA IS A HABITAT
FOR AN ATTENUATED COMMUNITY OF REEF FISH THAT RESIDE ON OR
AROUND THE VESSEL. THE CONTRACTOR SHALL USE EXTREME CAUTION
WHEN WORKING NEAR THE HABITAT TO AVOID DISTURBANCE.
2.5. BE AWARE OF THE PRESENCE OF FUEL OIL ON THE WATER SURFACE
SURROUNDING THE PROJECT LOCATION. FUEL OIL IS CONTINUOUSLY
LEAKING FROM THE WRECK. THE CONTRACTOR SHALL USE ALL
NECESSARY CAUTION TO AVOID IGNITION OF FUEL OIL OR
CONTAMINATION.
2.6. UNFORESEEABLE FIRE, GEO-HAZARD CONDITIONS, HEAVY RAINS,
DISCOVERY OF NEW CULTURAL RESOURCE SITES OR OBJECTS, OR
PRESENCE OF SPECIAL STATUS SPECIES NOT PREVIOUSLY DOCUMENTED
COULD PROMPT CONTRACTING OFFICER TO SUSPEND CONSTRUCTION
ACTIVITIES FOR SAFETY REASONS AT NO COST TO THE GOVERNMENT, OR
THEIR REPRESENTATIVES.
2.7. THE CONTRACTOR SHALL RESTORE DAMAGE CAUSED BY HIS/HER
OPERATIONS TO ORIGINAL CONDITION OR BETTER AT HIS/HER OWN
EXPENSE. ALL RESTORATION WORK IS TO BE DONE IN ACCORDANCE
WITH THE SPECIFICATIONS.
3. CONSTRUCTION
3.1. SOME CONSTRUCTION ELEMENTS WILL REQUIRE PERFORMANCE OF
PRE-CONSTRUCTION CLEARANCE SURVEYS.
3.2. HOURS OF WORK
3.2.1. SEE SPECIFICATIONS.
3.3. HOURS FOR EQUIPMENT DELIVERY
3.3.1. EQUIPMENT DELIVERY, SUPPLY DELIVERY AND SERVICE/FUELING
VEHICLES SHALL ONLY ENTER AND EXIT SITE WORK AREAS BY THE
APPROVED ACCESS ROADS DURING NORMAL WORKING HOURS.
EQUIPMENT DELIVERY, SUPPLY DELIVERY OR SERVICE/FUELING
VEHICLES SHALL ONLY OCCUR BETWEEN 8:00 AM AND 6:00 PM,
MONDAY THROUGH FRIDAY.
3.4. DAILY COMMUNICATIONS
3.4.1. CONTRACTOR SHALL MAINTAIN FREQUENT COMMUNICATIONS, AT
LEAST DAILY, WITH THE ON-SITE CONTRACTING OFFICER OR HIS/HER
AUTHORIZED REPRESENTATIVE TO DISCUSS DETAILS OF
IMPLEMENTATION, ORDER OF WORK, METHODS OF MINIMIZING
ENVIRONMENTAL IMPACTS AND OTHER RELEVANT COMPONENTS OF
CONSTRUCTION. THERE WILL BE COMMUNICATION WITH THE
CONTRACTOR'S ENVIRONMENTAL MONITOR AT LEAST ONCE PER
WEEK EITHER IN A MEETING WITH THE CONTRACTING OFFICER AND
CONTRACTOR REPRESENTATIVE OR INDIRECTLY THROUGH THE
CONTRACTING OFFICER.
3.5. OFF-SITE TRAFFIC RESTRICTIONS AND SITE ACCESS
3.5.1. THE CONTRACTING OFFICER WILL DOCUMENT DESIGNATED ROUTES
AND ENTRY POINTS FOR ACCESS TO THE SITE BY PERSONNEL AND
EQUIPMENT. NO OTHER ROUTE MAY BE USED WITHOUT PRIOR
APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL
PROVIDE AND MAINTAIN ALL NECESSARY SIGNS, BARRICADES, AND
OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY
PRECAUTIONS FOR THE PROTECTION, CONVEYANCE, AND SAFETY OF
THE PUBLIC.
3.5.2. U.S. NAVY RESTRICTIONS MAY APPLY TO SITE ACCESS THROUGH
FORD ISLAND, PROTECTED WATERS OF PEARL HARBOR, AND/OR
PASSAGE BENEATH THE FORD ISLAND DRAWBRIDGE. CONTACT AND
COORDINATE WITH THE U.S. NAVY AS REQUIRED.
3.6. CLEANING, TRASH, DEBRIS, AND STORAGE
3.6.1. THE SITE SHALL BE KEPT FREE OF TRASH AT ALL TIMES. ALL ITEMS
USED FOR CONSTRUCTION PURPOSES SHALL BE REMOVED FROM
THE SITE AT THE COMPLETION OF CONSTRUCTION.
3.6.2. STORAGE OF CONSTRUCTION MATERIAL AND EQUIPMENT ON
STREETS WILL NOT BE PERMITTED.
3.6.3. CONSTRUCTION EQUIPMENT, TOOLS, ETC. SHALL NOT BE CLEANED
OR RINSED INTO A STREET, GUTTER OR STORM DRAIN.
3.6.4. A CONTAINED AND COVERED AREA ON-SITE SHALL BE USED FOR
STORAGE OF CEMENT BAGS, PAINTS, FLAMMABLE, OILS, FERTILIZERS,
PESTICIDES, OR ANY OTHER MATERIALS THAT HAVE POTENTIAL FOR
BEING DISCHARGED TO THE STORM DRAIN SYSTEM BY WIND OR IN
THE EVENT OF A MATERIAL SPILL.
3.6.5. ALL TEMPORARY ON-SITE CONSTRUCTION PILES SHALL BE SECURELY
COVERED WITH A TARP OR OTHER DEVICE TO CONTAIN DEBRIS.
3.6.6. CONCRETE TRUCKS AND CONCRETE FINISHING OPERATIONS SHALL
NOT DISCHARGE WASH WATER INTO THE STREET GUTTERS, OR THE
PROTECTED WATERS OF PEARL HARBOR.
3.7. UTILITY LOCATION
3.7.1. LOCATIONS OF ALL EXISTING UTILITIES MAY NOT BE SHOWN OR ARE
SHOWN AS APPROXIMATE ONLY, INCLUDING AN ELECTRICAL AND
COMMUNICATION SUBMARINE CABLE RUNNING BETWEEN FORD
ISLAND AND THE USS ARIZONA MEMORIAL. THE CONTRACTOR SHALL
USE EXTREME CAUTION WHEN WORKING NEAR THE UTILITIES. ANY
AND ALL DAMAGE SHALL BE IMMEDIATELY REPAIRED AND/OR
RESTORED TO ITS ORIGINAL CONDITION BY THE CONTRACTOR AT
HIS/HER EXPENSE. UTILITIES INCLUDE, BUT ARE NOT LIMITED TO
ELECTRICAL, SEWER, WATER, AND COMMUNICATION.
3.7.2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
LOCATION, DEPTH AND HEIGHT. THEIR VERIFICATION SHALL BE
COORDINATED BY THE CONTRACTOR WITH THE APPROPRIATE
UTILITY COMPANY. THE CONTRACTOR SHALL COOPERATE WITH
UTILITY OWNERS TO EXPEDITE THE RELOCATION OR ADJUSTMENT OF
THEIR UTILITIES TO MINIMIZE INTERRUPTION OF SERVICE AND
DUPLICATION OF WORK. THE CONTRACTOR SHALL EXERCISE CARE
WHEN WORKING NEAR EXISTING UTILITIES AND SHALL BE
RESPONSIBLE FOR ALL DAMAGE, BREAKS AND/OR LEAKS. IF DAMAGE
OCCURS, THE CONTRACTOR SHALL REPAIR UTILITY AT NO
ADDITIONAL EXPENSE TO THE GOVERNMENT.
3.8. PROPOSED MODIFICATIONS TO PLANS OR SPECIFICATIONS
3.8.1. ANY DEVIATIONS FROM PLANS AND SPECIFICATIONS NEEDS TO BE
COMPLETED AND/OR APPROVED BY DESIGN ENGINEER AND
CONTRACTING OFFICER PRIOR TO IMPLEMENTATION.
3.8.2. SHOULD DISCREPANCIES EXIST BETWEEN ANY ACTUAL ELEVATIONS
OR HORIZONTAL POSITIONS AND THESE PLANS, THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
4. PERMITTING
4.1. COMPLIANCE WITH REGULATORY PERMITS
4.1.1. THE CONTRACTOR SHALL COMPLETELY REVIEW, BE FAMILIAR WITH
AND ADHERE TO THE TERMS OF ALL PERMITS AND AGENCY
APPROVALS FOR THIS PROJECT. THE CONTRACTING OFFICER WILL
BE RESPONSIBLE FOR SECURING AND PROVIDING THE SECTION 10
PERMIT: U.S. ARMY CORPS OF ENGINEERS. COPIES OF ALL PERMITS
ARE AVAILABLE FROM THE CONTRACTING OFFICER AND WILL REMAIN
AT THE PROJECT SITE THROUGHOUT THE DURATION OF
CONSTRUCTION.
4.2. COMPLIANCE WITH COUNTY AND STATE PERMITS
4.2.1. CONTRACTOR IS RESPONSIBLE FOR ACQUISITION OF AND
COMPLIANCE WITH ANY RELEVANT COUNTY OR STATE PERMITS AS
NEEDED FOR THE PROPOSED CONSTRUCTION ACTIVITIES INCLUDING,
BUT NOT LIMITED TO, TRAFFIC AND ENCROACHMENT PERMITS
RELATED TO THE DELIVERY AND HAULING OF CONSTRUCTION
EQUIPMENT AND MATERIALS, AND TRAFFIC CONTROL MEASURES
(TRAFFIC SAFETY PLAN). THE CONTRACTOR MUST FOLLOW ALL
PERTINENT REQUIREMENTS FOR HAULING LARGE VEHICLES OR
EQUIPMENT TO THE PROJECT SITE. IF A COUNTY, STATE, OR CITY
ROAD IS USED FOR HEAVY EQUIPMENT TRANSPORT OR WIDE LOADS,
PERTINENT CLEARANCES MUST BE OBTAINED.
5. ENVIRONMENTAL
5.1. AIR QUALITY AND CONSTRUCTION NOISE RESTRICTIONS
5.1.1. THE CONTRACTOR AT HIS/HER OWN EXPENSE SHALL KEEP THE
PROJECT AREA AND SURROUNDING AREAS FREE FROM DUST
NUISANCE. THE WORK SHALL BE IN CONFORMANCE WITH THE AIR
POLLUTION STANDARDS AND REGULATIONS OF THE STATE OF
HAWAII, DEPARTMENT OF HEALTH. THE STATE SHALL INDICATE
SUPPLEMENTARY MEASURES IF REQUIRED.
5.1.2. THE CONTRACTOR SHALL IMPLEMENT MEASURES TO REDUCE
CONSTRUCTION NOISE INCLUDING: ENSURING THAT ALL
CONSTRUCTION EQUIPMENT HAS SOUND-CONTROL DEVICES AT
LEAST AS EFFECTIVE AS THOSE ORIGINALLY SUPPLIED BY THE
MANUFACTURER AND THAT NO EQUIPMENT WITH AN UNMUFFLED
EXHAUST IS OPERATED; LIMITING CONSTRUCTION ACTIVITIES TO
SPECIFIED TIMES; AND PROHIBITING UNNECESSARY WARMING UP,
IDLING, OR ENGINE REVVING OF GAS OR DIESEL POWERED
EQUIPMENT OR VEHICLES.
5.1.3. THE CONTRACTOR SHALL REFER TO CHAPTER 46 PUBLIC HEALTH
REGULATIONS, DEPARTMENT OF HEALTH, STATE OF HAWAII,
"COMMUNITY NOISE CONTROL" IN WHICH MAXIMUM ALLOWABLE
NOISE LEVELS HAVE BEEN SET. IF THE CONSTRUCTION ACTIVITIES
FOR THIS PROJECT WILL EXCEED THE ALLOWABLE NOISE LEVELS,
THE CONTRACTOR WILL BE REQUIRED TO OBTAIN A PERMIT FROM
THE DIRECTOR OF PUBLIC HEALTH. THE CONTRACTOR SHALL OBTAIN
A COPY OF CHAPTER 46 AND BECOME FAMILIAR WITH THE NOISE
LEVEL RESTRICTIONS AND THE PROCEDURES FOR OBTAINING A
PERMIT FOR CONSTRUCTION ACTIVITIES. APPLICATION AND
INFORMATION ON VARIANCES ARE AVAILABLE AT THE
ENVIRONMENTAL HEALTH SERVICES DIVISION, 591 ALA MOANA BLVD.,
HONOLULU, HI 96813 OR BY TELEPHONE (808) 586-4700.
5.2. CONTAMINATION PREVENTION RESTRICTIONS
5.2.1. THE CONTRACTOR SHALL TAKE PREVENTATIVE MEASURES TO AVOID
ANY SPILLS OR LEAKS ON THE SITE FROM PETROLEUM PRODUCTS.
THE CONTRACTOR SHALL PREPARE A SPILL PREVENTION AND
RESPONSE PLAN THAT WILL BE APPROVED BY THE CONTRACTING
OFFICER AND CONTRACTOR'S ENVIRONMENTAL MONITOR, AS WELL
AS LEAD AGENCIES. THIS SHALL BE IMPLEMENTED AND ADHERED TO
BY THE CONTRACTOR. AT A MINIMUM, THIS PLAN SHALL REQUIRE
THAT STAGING, STORAGE, AND REFUELING AREAS AND ANY
EQUIPMENT REPAIR OR SIMILAR ACTIVITY TAKE PLACE WHEN
EQUIPMENT IS AT LEAST 100-FEET FROM ANY HARBOR, WETLAND,
DITCH, POND, OR FENCED SENSITIVE AREA. REFUELING SHALL ONLY
OCCUR IN AREAS APPROVED BY THE CONTRACTING OFFICER OR
CONTRACTOR'S ENVIRONMENTAL MONITOR. STAGING AND STORAGE
AREAS SHALL OCCUR ONLY IN DESIGNATED AREAS: ANY STAGING OR
STORAGE IN WETLANDS OR OTHER SENSITIVE HABITATS WILL
REQUIRE PRIOR APPROVAL FROM THE CONTRACTING OFFICER OR
CONTRACTOR'S ENVIRONMENTAL MONITOR. PROTECTIVE TARPS
SHALL BE USED DURING REFUELING OR EQUIPMENT REPAIR. THE
CONTRACTOR SHALL INSPECT AND FULLY CLEAN UP ANY SUCH
LEAKS OR SPILLS THAT OCCUR ON THE SITE.
5.3. CULTURAL RESOURCE RESTRICTIONS
5.3.1. IF ANY ITEMS OF POTENTIAL CULTURAL OR ARCHEOLOGICAL
SIGNIFICANCE ARE ENCOUNTERED DURING EXCAVATION
OPERATIONS, CONSTRUCTION WITHIN THIS AREA SHALL BE HALTED
IMMEDIATELY, AND THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER.
5.4. WATER POLLUTION AND RESTRICTIONS
5.4.1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMANCE
WITH THE APPLICABLE PROVISIONS OF THE WATER QUALITY AND
WATER POLLUTION CONTROL STANDARDS CONTAINED IN THE HAWAII
ADMINISTRATIVE RULES, TITLE 11, CHAPTER 54, "WATER QUALITY
STANDARDS" AND TITLE 11, CHAPTER 55, "WATER POLLUTION
CONTROL", AS WELL AS CHAPTER 14 OF THE REVISED ORDINANCES
OF HONOLULU 1990, AS AMENDED. BEST MANAGEMENT PRACTICES
SHALL BE EMPLOYED AT ALL TIMES DURING CONSTRUCTION.
GENERAL NOTES
6. BEST MANAGEMENT PRACTICE NOTES (NOAA)
6.1. CONSTANT VIGILANCE SHALL BE KEPT FOR THE PRESENCE OF
ENDANGERED SPECIES ACT (ESA)-LISTED MARINE SPECIES INCLUDING
HAWAIIAN GREEN SEA TURTLE, MONK SEAL, LEATHERBACK TURTLE,
CORALS, DURING WATER ACTIVITIES SUCH AS BOAT OPERATIONS, TESTING
THE NEW DOCK, DIVING, INSTALLATION AND TESTING OF NEW MOORING
BLOCKS, AND REMOVAL OF EXISTING DOCK ANCHOR CHAINS. VIGILANCE
SHALL INCLUDE SURVEYS OF THE WATER SURFACE AND UNDERWATER
(DIVING) IN AREAS OF WATER ACTIVITIES.
6.1.1. THE CONTRACTOR SHALL DESIGNATE ONE (1) COMPETENT OBSERVER
TO SURVEY THE AREAS ADJACENT TO THE WATER ACTIVITIES FOR
ESA-LISTED MARINE SPECIES. THE CONTRACTOR'S COMPETENT
OBSERVER SHALL RECEIVE ORIENTATION FROM NPS AT THE
PRECONSTRUCTION CONFERENCE.
6.1.2. SURVEYS SHALL BE MADE PRIOR TO THE START OF WORK EACH DAY IN
WHICH WATER ACTIVITIES ARE SCHEDULED, AND PRIOR TO
RESUMPTION OF WORK FOLLOWING ANY BREAK OF MORE THAN ONE
HALF HOUR. PERIODIC ADDITIONAL SURVEYS THROUGHOUT THE WORK
DAY ARE STRONGLY RECOMMENDED.
6.1.3. ALL WORK SHALL BE POSTPONED OR HALTED WHEN ESA-LISTED
MARINE SPECIES ARE WITHIN 100 FEET OF THE PROPOSED WORK, AND
SHALL ONLY BEGIN/RESUME AFTER THE ANIMALS HAVE VOLUNTARILY
DEPARTED THE AREA. IF ESA-LISTED MARINE SPECIES ARE NOTICED
WITHIN 100 FEET AFTER WORK HAS ALREADY BEGUN, THAT WORK MAY
CONTINUE ONLY IF, IN THE BEST JUDGMENT OF THE CONTRACTOR, THE
ACTIVITY WOULD NOT ADVERSELY AFFECT THE ANIMAL(S). FOR
EXAMPLE; DIVERS PERFORMING SURVEYS OR LIGHT UNDERWATER
WORK WOULD LIKELY BE PERMISSIBLE, BUT OPERATION OF HEAVY
EQUIPMENT IS NOT.
6.1.4. CONTRACTOR SHALL VERIFY THAT ESA-LISTED MARINE ANIMALS ARE
NOT IN THE AREA AROUND THE WATER ACTIVITIES, OR WHERE
EQUIPMENT OR MATERIAL IS EXPECTED TO CONTACT THE SUBSTRATE
BEFORE THAT EQUIPMENT/MATERIAL MAY ENTER THE WATER.
6.1.5. ALL OBJECTS WILL BE PLACED IN THE WATER AND/OR LOWERED TO THE
BOTTOM IN A CONTROLLED MANNER. THIS CAN INCLUDE THE USE OF
BUOYANCY CONTROLS SUCH AS LIFT BAGS, OR THE USE OF CRANES,
WINCHES, OR OTHER EQUIPMENT THAT AFFECT POSITIVE CONTROL
OVER THE RATE OF DESCENT.
6.1.6. THIRTY (30) CALENDAR DAYS PRIOR TO CONTRACTOR REMOVING
EXISTING DOCK STRUCTURES AND EXISTING MOORING CHAINS FROM
THE WATER FOR UPLAND DISPOSAL, THE CONTRACTOR SHALL
CONFIRM WITH NPS THAT MARINE GROWTH ATTACHED TO THESE
STRUCTURES HAVE BEEN REMOVED AND RELOCATED PER
INSTRUCTIONS FROM NMFS HABITAT CONSERVATION DIVISION.
6.1.7. WHEN PILOTING VESSELS, VESSEL OPERATORS SHALL ALTER COURSE
TO REMAIN AT LEAST 100 YARDS FROM WHALES, AND AT LEAST 50
YARDS FROM OTHER MARINE MAMMALS AND SEA TURTLES.
6.1.8. REDUCE VESSEL SPEED TO 10 KNOTS OR LESS WHEN PILOTING
VESSELS AT OR WITHIN THE RANGES DESCRIBED ABOVE FROM MARINE
MAMMALS AND SEA TURTLES. CONTRACTOR SHALL BE VIGILANT TO
WATCH FOR TURTLES AT OR NEAR THE SURFACE IN AREAS OF KNOWN
OR SUSPECTED TURTLE ACTIVITY, AND IF PRACTICABLE, REDUCE
VESSEL SPEED TO 5 KNOTS OR LESS.
6.1.9. IF DESPITE EFFORTS TO MAINTAIN THE DISTANCES AND SPEEDS
DESCRIBED ABOVE, A MARINE MAMMAL OR TURTLE APPROACHES THE
VESSEL, PUT THE ENGINE IN NEUTRAL UNTIL THE ANIMAL IS AT LEAST 50
FEET AWAY, AND THEN SLOWLY MOVE AWAY TO THE PRESCRIBED
DISTANCE.
6.1.10. MARINE MAMMALS AND SEA TURTLES SHALL NOT BE ENCIRCLED OR
TRAPPED BETWEEN MULTIPLE VESSELS OR BETWEEN VESSELS AND
THE SHORE.
6.1.11. DO NOT ATTEMPT TO FEED, TOUCH, RIDE, OR OTHERWISE
INTENTIONALLY INTERACT WITH ANY ESA-LISTED MARINE SPECIES.
6.2. NO CONTAMINATION OF THE MARINE ENVIRONMENT SHALL RESULT FROM
PROJECT-RELATED ACTIVITIES.
6.2.1. A CONTINGENCY PLAN TO CONTROL TOXIC MATERIALS IS REQUIRED.
6.2.2. APPROPRIATE MATERIALS TO CONTAIN AND CLEAN POTENTIAL SPILLS
SHALL BE STORED AT THE WORK SITE, AND BE READILY AVAILABLE.
6.2.3. ALL PROJECT-RELATED MATERIALS AND EQUIPMENT PLACED IN THE
WATER SHALL BE FREE OF POLLUTANTS.
6.2.4. THE CONTRACTOR SHALL PERFORM DAILY PRE-WORK EQUIPMENT
INSPECTIONS FOR CLEANLINESS AND LEAKS. ALL HEAVY EQUIPMENT
OPERATIONS SHALL BE POSTPONED OR HALTED SHOULD A LEAK BE
DETECTED, AND SHALL NOT PROCEED UNTIL THE LEAK IS REPAIRED
AND EQUIPMENT CLEANED. SEE SECTION 01 11 40 FOR SPILL CLEAN UP
AND SECTION 01 50 00 FOR EQUIPMENT CLEANING.
6.2.5. FUELING OF LAND-BASED VEHICLES AND EQUIPMENT SHALL TAKE
PLACE AT LEAST 50 FEET AWAY FROM THE WATER, PREFERABLY OVER
AN IMPERVIOUS SURFACE. FUELING OF VESSELS SHALL BE DONE AT
APPROVED FUELING FACILITIES.
6.2.6. A PLAN SHALL BE DEVELOPED TO PREVENT DEBRIS AND OTHER
WASTES FROM ENTERING OR REMAINING IN THE MARINE ENVIRONMENT
DURING THE PROJECT.
6.2.7. CONTRACTOR SHALL DEVELOP AND MAINTAIN RECORDS OF
OBSERVATIONS OF PROTECTED SPECIES OBSERVED IN THE PROJECT
AREAS FOR THE DURATION OF IN-WATER ACTIVITIES SHALL BE
MAINTAINED AND SUBMITTED BY EMAIL TO CO AND COR AT THE CLOSE
OF IN-WATER ACTIVITIES.
6.2.8. CONTRACTOR SHALL IMMEDIATELY NOTIFY CO, COR AND MR. DON
HUBNER OF NOAA FISHERIES AT 808-725-5145 IF: 1) A KILL OR
HARASSING OCCURS; 2) NEW INFORMATION REVEALS EFFECTS OF THE
ACTION HAVE AFFECTED LISTED SPECIES IN A MANNER OR TO AN
EXTENT NOT PREVIOUSLY EVALUATED; 3) IF THE ACTION IS
SUBSEQUENTLY MODIFIED AND CAUSES EFFECTS TO LISTED SPECIES
IN A MANNER OR TO AN EXTENT NOT PREVIOUSLY CONSIDERED OR
EVALUATED; OR 4) A NEW SPECIES IS LISTED OR CRITICAL HABITAT IS
DESIGNATED THAT MAY BE AFFECTED BY THE AUTHORIZED WORK.
USS ARIZONA
MEMORIAL
EXISTING FLOATING DOCK
EXISTING BRIDGE TO MEMORIAL
EXISTING DOCK ANCHOR #6
EXISTING DOCK ANCHOR #5
EXISTING DOCK ANCHOR #4
EXISTING DOCK ANCHOR #1
EXISTING DOCK ANCHOR #2
EXISTING DOCK ANCHOR #3
SHEET NOTES
1. SOILS INVESTIGATION REPORT PREPARED BY HIRATA & ASSOCIATES,
ENTITLED "SOILS INVESTIGATION REPLACE USS ARIZONA MEMORIAL
DOCK AND RAMP, PMIS #175579, WORLD WAR II VALOR IN THE PACIFIC
NATIONAL MONUMENT, OAHU", W.O. 12-5399, APRIL 12, 2013.
2. SEE SHEET B1.2 FOR GEOTECHNICAL BORING LOGS.
3. TOPOGRAPHIC SURVEY AND BATHYMETRY PREPARED BY
CONTROLPOINT SURVEYING, INC., 9/25/2012.
4. NAVFAC PACIFIC HAS SAMPLED AND TESTED SEDIMENTS IN THE VICINITY
OF THE USS ARIZONA MEMORIAL. TESTING HAS DETERMINED THE
SEDIMENTS HAVE THE POTENTIAL TO CONTAIN PCBS AND SELENIUM IN
EXCESS OF THE CURRENT ACTION LIMITS. WORKERS WHO COME IN
CONTACT WITH SEDIMENT SHOULD USE PROPER HEALTH AND SAFETY
PRECAUTIONS, INCLUDING WASHING HANDS BEFORE EATING AND
DRINKING TO REDUCE INGESTION OF CONSTITUENTS IN SEDIMENT.
LEGEND
APPROXIMATE LOCATION AND IDENTIFICATION OF BORINGS
B1
B1
B2
EXISTING DOCK ANCHOR BLOCK (TYPICAL)
EXISTING DOCK ANCHOR CHAIN
(TYPICAL)
TRUE NORTH
SHEET NOTES
1. BORING LOGS REPRODUCED FROM SOILS INVESTIGATION REPORT
PREPARED BY HIRATA & ASSOCIATES, ENTITLED "SOILS INVESTIGATION
REPLACE USS ARIZONA MEMORIAL DOCK AND RAMP, PMIS #175579,
WORLD WAR II VALOR IN THE PACIFIC NATIONAL MONUMENT, OAHU", W.O.
12-5399, APRIL 12, 2013.
LEGEND
* "VAR" INDICATES THAT DETAIL IS REFERENCED FROM MULTIPLE DWGS
SECTION IDENTIFICATION
DETAIL IDENTIFICATION
LEGENDABBREVIATIONS
Ø DIAMETER
AB AGGREGATE BASE
ABDN ABANDONED
AC ACRE, ASPHALT CONCRETE
ACM ASBESTOS CONTAINING MATERIAL
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ASB AGGREGATE SUBBASE
ASPH ASPHALT
BC BEGIN CURVE
BFP BACK FLOW PREVENTER
BLDC BUILDING CORNER
BLDG BUILDING
BMP BEST MANAGEMENT PRACTICES
BOD BOTTOM OF DOCK
BOL BOLLARD
BSW, BW BACK OF SIDEWALK
BVC BEGIN VERTICAL CURVE
C CONCRETE OR CIVIL
CB CATCH BASIN
C&G CURB AND GUTTER
CG&S/W CURB, GUTTER & SIDEWALK
CI CAST IRON OR CURB INLET
CIP CAST IRON PIPE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
CONC CONCRETE
CONF CONFORM TO EXISTING
CONST CONSTRUCTION OR CONSTRUCT
CU CUBIC
CY CUBIC YARD
D= DELTA (CURVE)
DBE DESIGN BUILD ENTITY
DCDA DOUBLE CHECK DETECTOR ASSEMBLY
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIP DUCTILE IRON PIPE
DOM DOMESTIC
DW DOMESTIC WATER
DWG DRAWING
E EAST, ELECTRIC
EC END CURVE
EL, ELEV ELEVATION
EP EDGE OF PAVEMENT
EVA EMERGENCY VEHICLE ACCESS
EX EXISTING
EXIST, (E) EXISTING
F/C,FC FACE OF CURB
FD FOUND
FDC FIRE DEPARTMENT CONNECTION
FF,FFE FINISHED FLOOR ELEVATION
FG FINISH GRADE
FH FIRE HYDRANT
FL FLOW LINE
FOUND FOUNDATION
FS FINISHED SURFACE
FT FOOT, FEET
FW FIRE WATER
G GAS, GROUND ELEVATION
GB GRADE BREAK
GI GALVANIZED IRON
GRD, G GROUND
GV GATE VALVE
HCR HANDICAP ACCESSIBLE RAMP
HMA HOT MIX ASPHALT
HT HEIGHT
HP HIGH POINT
INV INVERT
INST INSTALL
JP JOINT POLE
JT JOINT TRENCH
L LEFT
L= LENGTH (CURVE)
LIP LIP OF GUTTER
LP LIGHT POLE, LOW POINT
LS LANDSCAPE
LSA LANDSCAPE ARCHITECT
MAX MAXIMUM
MEP MECHANICAL/ELECTRICAL/PLUMBING
MH MANHOLE
MIN MINIMUM
MON MONUMENT
MPVC MIDPOINT OF VERTICAL CURVE
MSL MEAN SEA LEVEL
N NORTH
(N) NEW
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
O.R. OFFICIAL RECORDS
P PAVEMENT ELEVATION
PA PLANTER AREA
PCC POINT OF COMPOUND CURVATURE
PORTLAND CEMENT CONCRETE
PED PEDESTRIAN
PH POTHOLE
PID POINT ID
PIV POST INDICATOR VALVE
PL PROPERTY LINE
PM PARKING METER
PMH POWER MANHOLE
POC POINT ON CURVE
POI POINT OF INTERSECTION
PP POWER POLE
PRC POINT OF REVERSE CURVATURE
PRUE PRIVATE UTILITY EASEMENT
PT POINT OF TANGENCY
PUE PUBLIC UTILITY EASEMENT
PVC POLYVINYL CHLORIDE PIPE
R RIGHT
R= RADIUS (CURVE)
RC RELATIVE COMPACTION
RCP REINFORCED CONCRETE PIPE
RP RADIUS POINT
RPPA REDUCED PRESSURE PRINCIPLE
ASSEMBLY
R/W, ROW RIGHT OF WAY
S SOUTH, SLOPE
S.A.D. SEE ARCHITECTURAL DRAWINGS
SB SEDIMENT BASIN
SD STORM DRAIN
SDI STORM DRAIN INLET
SDMH STORM DRAIN MANHOLE
S.E.D. SEE ELECTRICAL DRAWINGS
SF SILT FENCE
SG SUBGRADE
SHLDR SHOULDER
SL STREETLIGHT
S.L.D. SEE LANDSCAPE DRAWINGS
SMH SIGNAL MANHOLE
S.P.D. SEE PLUMBING DRAWINGS
SS SANITARY SEWER
SSCO SANITARY SEWER CLEANOUT
STA STATION
STD STANDARD
S/W SIDEWALK
T TELEPHONE
TC TOP OF CURB
TD TRENCH DRAIN
TFC TOP FACE OF CURB
TOD TOP OF DOCK
TOE TOE OF SLOPE
TS TOP OF SLAB
TW,TOW TOP OF WALL
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
U/G UNDERGROUND
VC VERTICAL CURVE
W WEST, WATER
WM WATER METER
WV WATER VALVE
WWF WELDED WIRE FABRIC
W/ WITH
YDS YARDS
ANNOTATION
IRRIGATION BOX
GAS METER
GAS VALVE
WATER METER
WATER VALVE
WATER VALVE
FIRE HYDRANT
FIRE DEPARTMENT CONNECTION
WATER TAPPING SADDLE
SEWER MANHOLE
SEWER CLEANOUT
SEWER LAMP HOLE
SEWER VENT
STORM DRAIN MANHOLE
CATCH BASIN
CURB INLET
DRAINAGE INLET
STORM DRAIN CLEANOUT
RAIN WATER LEADER
ELECTRIC VAULT COVER
ELECTRIC PULLBOX
TELEVISION PULLBOX
TELEPHONE PULLBOX
HIGH VOLTAGE ELECTRIC
TELEPHONE MANHOLE
POWER POLE
GUY WIRE & ANCHOR
JOINT POLE WITH (2) RISERS
JOINT POLE
STREET LIGHT
ELECTROLIER
TRAFFIC SIGNAL
TRAFFIC SIGNAL
PEDESTRIAN LIGHT
PEDESTRIAN PUSH BUTTON
CROSSWALK DETECTOR
STREET LIGHT PULLBOX
SIGN (AS NOTED)
WHEELCHAIR RAMP
6" CURB & GUTTER
EDGE OF AC PAVEMENT
6" VERTICAL CURB
OVERHEAD WIRES
OVERHEAD ELECTRIC WIRES
OVERHEAD TELEPHONE WIRES
UNDERGROUND ELECTRIC LINE
ELECTRIC LINE
STREET LIGHT CONDUIT
GAS LINE
SANITARY SEWER LINE
STORM DRAIN LINE
TELEPHONE LINE
TELEVISION LINE
WATER LINE
FIRE WATER MAIN
DOMESTIC WATER MAIN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HOT WATER SUPPLY
HOT WATER RETURN
STEAM LINE
SOFT WATER MAIN
CONDENSATE RETURN
MEDICAL AIR
IRRIGATION LINE
TRENCH DRAIN
METAL BEAM GUARD RAIL
SILT FENCE
CHAIN LINK FENCE
FLOW LINE
CONTOUR ELEVATION LINE
CENTER LINE
EXISTING PROPERTY LINE
MONUMENT LINE
EXISTING EASEMENT LINE
FINISH GRADE
SURFACE DRAINAGE SLOPE
SPOT ELEVATION
SYMBOLS
SECTION INDICATOR
SHEET NUMBER ON WHICH
SECTION WAS TAKEN
SECTION LETTER
SHEET NUMBER ON WHICH
SECTION APPEARS
DETAIL NUMBER
SHEET NUMBER ON WHICH
DETAIL WAS TAKEN *
DETAIL NUMBER
SHEET NUMBER ON WHICH
DETAIL APPEARS
SURVEYOR NOTES
BATHYMETRIC SURVEY
MULTI-BEAM BATHYMETRIC SURVEY PREPARED BY SEA ENGINEERING, INC.
VERTICAL DATUM IS MEAN SEA LEVEL REFERENCED TO CORNER OF PIER
LOCATED APPROXIMATELY N 71,394.96, E 1,656,673.12, ELEVATION = 10.525'.
HORIZONTAL DATUM IS HAWAII STATE PLANE COORDINATE SYSTEM, NAD 83,
ZONE 3, U.S. FEET.
SOUNDINGS REPRESENTED IN U.S. SURVEY FEET.
BATHYMETRIC DATA IS VALID ONLY WITHIN THE TIME IN WHICH IT WAS
COLLECTED.
STANDARD FIELD CALIBRATION PROCEDURES WERE PERFORMED.
EQUIPMENT: SURVEY VESSEL - 25-FOOT WHALER.
TOPOGRAPHIC SURVEY
TOPOGRAPHIC SURVEY PREPARED BY CONTROLPOINT SURVEYING, INC.,
SEPTEMBER /25, 2012.
ELEVATIONS ARE REFERRED TO STATION "BOB", BRASS DISK, LOCATED ON
FORD ISLAND ON NORTHERLY CORNER OF NORTHWEST DOCK AT OPPOSITE
END FROM THE U.S.S. UTAH, ELEV.=9.01 FT., MSL (PEARL HARBOR NAD 83
CONTROLS).
AZIMUTHS AND COORDINATES ARE REFERRED TO HAWAII STATE PLANE
COORDINATE SYSTEM, NAD 83, ZONE 3, U.S. FEET.
TRUE NORTH
EXISTING U.S.S. ARIZONA MEMORIAL
EXISTING FLOATING DOCK
F O R D I S L A N D
P E A R L H A R B O R
PROJECT SITE
STAGING AREA
SEE SHEET C1.3.1
SHEET NOTES
1. SECURITY PASSES FOR ACCESS TO NAVY PROPERTY SHALL BE IN
ACCORDANCE WITH SPECIFICATION SECTION 01 11 41 .
PEARL HARBOR VISITOR CENTER
U.S.S. ARIZONA MEMORIAL
TRUE NORTH
BOAT LAUNCH RAMP
CONSTRUCTION STAGING SITE
ACCESS ROUTE
ACCESS ROUTE
EXISTING DOCK ANCHOR CHAIN (TYPICAL)
EXISTING DOCK ANCHOR (TYPICAL)
U.S.S. ARIZONA
MEMORIAL
EXISTING FLOATING DOCK
EXISTING ACCESS BRIDGE TO MEMORIAL
EXISTING DOCK ANCHOR #6
EXISTING DOCK ANCHOR #5
(NOT SHOWN)
EXISTING DOCK ANCHOR #4
EXISTING DOCK ANCHOR #1
EXISTING DOCK ANCHOR #2
(NOT SHOWN)
EXISTING DOCK ANCHOR #3
DISPOSAL NOTES
1. REMOVE AND DISPOSE OF EXISTING ACCESS BRIDGE CONNECTING U.S.S.
ARIZONA MEMORIAL TO EXISTING FLOATING DOCK.
2. PROVIDE ADEQUATE STATION KEEPING FOR EXISTING FLOATING DOCK.
REMOVE AND DISPOSE OF EXISTING ANCHOR CHAINS FROM EXISTING
DOCK ANCHORS AND EXISTING FLOATING DOCK.
3. REMOVE AND PROPERLY DISPOSE OF EXISTING FLOATING DOCK, RAMPS,
UTILITIES AND APPURTENANCES FROM LOCATION.
4. CONTRACTOR SHALL DISCONNECT ELECTRICAL SERVICE TO EXISTING
DOCK AND REMOVE CONDUIT AND OTHER ITEMS.
5. EXISTING DOCK ANCHORS ARE TO BE ABANDONED IN PLACE. EXISTING
DOCK ANCHORS AS SHOWN ARE APPROXIMATE IN SIZE AND ASSUMED
LOCATIONS. CONTRACTOR SHALL VERIFY IN THE FIELD AS NECESSARY.
GENERAL SHEET NOTE
1. DO NOT DISTURB THE U.S.S. ARIZONA HULL, NEARBY WRECKAGE, OR
OCEAN BOTTOM THAT SUPPORTS THE SHIP.
2. DO NOT DISTURB EXISTING U.S.S. ARIZONA MEMORIAL.
3. THE LINE AS SHOWN DEPICTING AN EDGE OF THE U.S.S. ARIZONA IS AN
APPROXIMATION OF THE HULL AS IT APPEARS IN THE BATHYMETRY
SOUNDING IMAGE AS TAKEN ON AN UNKNOWN DATE OF THE SURVEY. THE
ACTUAL EDGE OF THE HULL AT THE MUDLINE MAY DIFFER AND
ADDITIONAL DEBRIS MAY BE PRESENT AND NOT APPEAR IN THE
TOPOGRAPHIC AND BATHYMETRIC SURVEY.
TRUE NORTH DOCKING DOCK
NORTH
U.S.S. ARIZONA HULL
U.S.S. ARIZONA HULL
APPROXIMATE EDGE OF U.S.S. ARIZONA HULL
SEE NOTE 3
NEW DOCK ANCHOR CHAIN (TYPICAL)
NEW DOCK ANCHOR (TYPICAL)
USS ARIZONA
MEMORIAL
FLOATING DOCK
SEE DRAWINGS S2.1 AND S2.2
ACCESS BRIDGE
SEE DRAWING S4.1
CORNER FLOATING DOCK
N 71916.45
E 1657559.33
CORNER FLOATING DOCK
N 71933.07
E 1657548.20
CORNER FLOATING DOCK
N 71874.65
E 1657460.95
CORNER FLOATING DOCK
N 71858.04
E 1657472.08
DAVIT
BID OPTION
TRUE NORTH DOCKING DOCK
NORTH
U.S.S. ARIZONA HULL
U.S.S. ARIZONA HULL
EXISTING DOCK ANCHOR
(TYPICAL 6 PLACES)
FIRE EXTINGUISHER (20-BC)
IN RED FIBERGLASS CABINET
MOUNTED TO RAMP
FIRE EXTINGUISHER (20-BC)
IN RED FIBERGLASS CABINET
MOUNTED TO RAILING
APPROXIMATE EDGE OF U.S.S. ARIZONA HULL
SEE NOTE 1
GENERAL SHEET NOTE
1. THE LINE AS SHOWN DEPICTING AN EDGE OF THE U.S.S. ARIZONA IS AN
APPROXIMATION OF THE HULL AS IT APPEARS IN THE BATHYMETRY
SOUNDING IMAGE AS TAKEN ON DATE OF THE SURVEY. THE ACTUAL EDGE
OF THE HULL AT THE MUDLINE MAY DIFFER AND ADDITIONAL DEBRIS MAY
BE PRESENT AND NOT APPEAR IN THE TOPOGRAPHIC AND BATHYMETRIC
SURVEY.
2. CONTRACTOR MAY ADJUST NEW ANCHOR ANGULAR LOCATION UP TO ± 15
DEGREES TO AVOID EXISTING ANCHOR LOCATIONS. A SYMMETRICAL
INSTALLATION LAYOUT ABOUT THE DOCK TRANSVERSE
(BRIDGE/MEMORIAL CENTERLINE) AND LONGITUDINAL AXIS IS PREFERRED.
CENTER NEW ANCHOR #1
N 71988.53
E 1657570.61
CENTER NEW ANCHOR #2
N 71968.65
E 1657593.00
CENTER NEW ANCHOR #3
N 71894.74
E 1657614.93
CENTER NEW ANCHOR #6
N 71875.06
E 1657401.14
CENTER NEW ANCHOR #5
N 71846.79
E 1657411.00
CENTER NEW ANCHOR #4
N 71798.36
E 1657470.98
MANWAY DECK HATCH
NEW DOCK ANCHOR CHAIN
NEW DOCK ANCHOR (TYPICAL)
USS ARIZONA
MEMORIAL
FLOATING DOCK
SEE DRAWINGS S3.1 AND S3.2
ACCESS BRIDGE
SEE DRAWING S4.1
CORNER FLOATING DOCK
N 71926.75
E 1657574.70
CORNER FLOATING DOCK
N 71943.36
E 1657563.57
CORNER FLOATING DOCK
N 71864.36
E 1657445.58
CORNER FLOATING DOCK
N 71847.74
E 1657456.71
142'-0"
DAVIT
BID OPTION
TRUE NORTH DOCKING DOCK
NORTH
EXISTING DOCK ANCHOR
(TYPICAL 6 PLACES)
FIRE EXTINGUISHER (20-BC)
IN RED FIBERGLASS CABINET
MOUNTED TO RAMP
FIRE EXTINGUISHER (20-BC)
IN RED FIBERGLASS CABINET
MOUNTED TO RAILING
APPROXIMATE EDGE OF U.S.S. ARIZONA HULL
SEE NOTE 1
CENTER NEW ANCHOR #1
N 72002.01
E 1657578.93
CENTER NEW ANCHOR #2
N 72002.01
E 1657578.93
CENTER NEW ANCHOR #3
N 71954.07
E 1657629.47
CENTER NEW ANCHOR #4
N 71926.33
E 1657635.04
CENTER NEW ANCHOR #8
N 71849.26
E 1657366.08
CENTER NEW ANCHOR #7
N 71836.02
E 1657391.26
CENTER NEW ANCHOR #6
N 71807.51
E 1657410.58
CENTER NEW ANCHOR #5
N 71788.73
E 1657444.67
GENERAL SHEET NOTE
1. THE LINE AS SHOWN DEPICTING AN EDGE OF THE U.S.S. ARIZONA IS AN
APPROXIMATION OF THE HULL AS IT APPEARS IN THE BATHYMETRY
SOUNDING IMAGE AS TAKEN ON DATE OF THE SURVEY. THE ACTUAL EDGE
OF THE HULL AT THE MUDLINE MAY DIFFER AND ADDITIONAL DEBRIS MAY
BE PRESENT AND NOT APPEAR IN THE TOPOGRAPHIC AND BATHYMETRIC
SURVEY.
2. CONTRACTOR MAY ADJUST NEW ANCHOR ANGULAR LOCATION UP TO ± 15
DEGREES TO AVOID EXISTING ANCHOR LOCATIONS. A SYMMETRICAL
INSTALLATION LAYOUT ABOUT THE DOCK TRANSVERSE
(BRIDGE/MEMORIAL CENTERLINE) AND LONGITUDINAL AXIS IS PREFERRED.
MANWAY DECK HATCH
STEEL IN SECTION
CONCRETE IN SECTION
GROUT IN SECTION
EARTH IN SECTION
VOID FORM IN SECTION
CMU IN PLAN
CMU IN SECTION
FOOTING
SLAB CONSTRUCTION JOINT
SLAB CONTROL JOINT
STRUCTURAL ABBREVIATIONS STRUCTURAL LEGEND
ANNOTATION SYMBOLS
AB ANCHOR BOLT
ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS
ABC AGGREGATE BASE COURSE
ABV ABOVE
AC AGGREGATE COURSE
ACI AMERICAN CONCRETE INSTITUTE
ADD'L ADDITIONAL
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION
ALT ALTERNATE
ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APA AMERICAN PLYWOOD ASSOCIATION
ARCH ARCHITECT/ARCHITECTURAL
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWS AMERICAN WELDING SOCIETY
B BOTTOM
B/ BOTTOM OF
BB BOTTOM BARS
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BN BOUNDARY NAIL
BO BOND
BRG BEARING
BS BOTH SIDES
BTWN BETWEEN
C CHANNEL
C/C CENTER TO CENTER
CANT CANTILEVER
CAP CAPACITY
CF CUBIC FEET
CHKD CHECKED
CI CONTRACTOR INSTALLED
CJ CONTRACTION/CONTROL JOINT
CL/C CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CTR/CTR'D CENTER/CENTERED
d PENNY (NAIL SIZE)
DBL DOUBLE
DEG DEGREES
DET DETAIL
DF DOUGLAS FIR
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISCONT DISCONTINUE
DL DEAD LOAD
DN DOWN
Do DITTO
DP DEEP
DSC DENVER SERVICE CENTER
DWG DRAWING
DWL DOWEL
(E) EXISTING
EA EACH
EF EACH FACE
EG FOR EXAMPLE
EL/ELEV ELEVATION
EMBED EMBEDMENT
EN EDGE NAIL
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
ETC ET CETERA
EW EACH WAY
EWEF EACH WAY EACH FACE
(E)/EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FF FINISHED FLOOR
FG FINISHED GRADE
FH FULL HEIGHT
FIN FINISH
FL FLOOR
FLG FLANGE
FN FACE NAIL
FND FOUNDATION
FO FACE OF
FOM FACE OF MASONRY
FOW FACE OF WALL
FRMG FRAMING
FS FAR SIDE
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GF GOVERNMENT FURNISHED
GR GRADE
GRT GROUT
GSN GENERAL STRUCTURAL NOTES
GYP GYPSUM
HAS HEADED ANCHOR STUDS
HD HAND
HEF HORIZONTAL EACH FACE
HIF HORIZONTAL INSIDE FACE
HK HOOK
HM HOLLOW METAL
HOF HORIZONTAL OUTSIDE FACE
HORIZ HORIZONTAL
HP HIGH POINT
HSS TUBE STEEL
HT HEIGHT
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IE THAT IS
INFO INFORMATION
INT INTERIOR
INTERMED INTERMEDIATE
INTERSECT INTERSECTION
INV INVERT
JST JOIST
JT JOINT
L ANGLE
LBS POUNDS
LG LONG
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LONGIT/LONGL LONGITUDINAL
LP LOW POINT
LT LEFT
LWR LOWER
MACH MACHINE
MAINT MAINTENANCE
MAS MASONRY
MAX MAXIMUM
MB MACHINE BOLT
MC CHANNEL
MCJT MASONRY CONTROL JOINT
MECH MECHANICAL
MFR MANUFACTURER
MHHW MEAN HIGHER HIGH WATER
MIN MINIMUM
MISC MISCELLANEOUS
MLLW MEAN LOWER LOW WATER
MNTG MOUNTING
MO MASONRY OPENING
MOD MODIFIED
MTL METAL
(N) NEW
NIC NOT IN CONTRACT
NO. NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OPG OPENING
OPP OPPOSITE
PEB PRE ENGINEERED BUILDING
PEMB PRE ENGINEERED METAL BLDG
PL/P PLATE
PLCS PLACES
PLYWD PLYWOOD
PNL PANEL
PREFAB PREFABRICATED
PT POINT, PRESSURE TREATED
PVMT PAVEMENT
QTY QUANTITY
R/RAD RADIUS
REF REFERENCE
REINF REINFORCING
REQD REQUIRED
RF ROOF
RM ROOM
SCHED/SCH SCHEDULE
SEC SECTION
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SP SPACE/SPACES
SPCG SPACING
SPEC SPECIFICATIONS
SST STAINLESS STEEL
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUCT STRUCTURAL
SYM SYMMETRICAL
T TOP
T/ TOP OF
T&B TOP AND BOTTOM
TB TOP OF BAR
THK THICK
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TYP TYPICAL
UFC UNITED FACILITIES CRITERIA
UHMW ULTRA HIGH MOLECULAR
WEIGHT
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UPR UPPER
UT ULTRASONIC TESTING
VEF VERTICAL EACH FACE
VERT VERTICAL
VIF VERTICAL INSIDE FACE
VOF VERTICAL OUTSIDE FACE
W/ WITH
W OR WF WIDE FLANGE (BEAM)
WGT WEIGHT
W/O WITHOUT
WP WORK POINT
WS WATERSTOP
WT TEE
& AND
@ AT
° DEGREE
Ø DIAMETER
' FEET
" INCHES
# NUMBER
± PLUS OR MINUS
1. ABBREVIATIONS ON THIS SHEET APPLY ONLY TO THE STRUCTURAL DRAWINGS, REFER TO
OTHER DISCIPLINES FOR APPLICABLE SYMBOLS NOT PROVIDED HERE.
2. THIS IS A STANDARD ABBREVIATION AND LEGEND SHEET, THEREFORE, SOME
ABBREVIATIONS AND LEGEND SYMBOLS MAY APPEAR ON THIS SHEET AND MAY NOT BE
UTILIZED ON THIS PROJECT.
3. DO NOT SCALE DRAWINGS.
GENERAL SHEET NOTES
GENERAL STRUCTURAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE TO CONSULT WITH NPS CONTRACTING OFFICER, SITE
SUPERINTENDENT, APPROPRIATE AGENCIES AND CONSTRUCTION DOCUMENTATION FOR THE
LOCATIONS OF ALL UNDERGROUND UTILITIES, PIPES AND STRUCTURES. CONTRACTOR SHALL
TAKE SOLE RESPONSIBILITY FOR ANY COST INCURRED DUE TO DAMAGE OF UTILITIES.
2. CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL EXISTING CONDITIONS OF THE SITE AND
SHOULD CONFIRM SURVEY INFORMATION BEFORE COMMENCING WORK.
3. CONTRACTOR SHALL NOT WILLFULLY PROCEED WITH CONSTRUCTION AS DESIGNED WHEN IT
IS OBVIOUS THAT UNKNOWN OBSTRUCTIONS, AREA DISCREPANCIES AND/OR GRADE
DIFFERENCES EXIST THAT MAY NOT HAVE BEEN KNOWN DURING DESIGN. SUCH CONDITIONS
SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE OWNER'S AUTHORIZED
REPRESENTATIVE. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL
NECESSARY REVISIONS DUE TO FAILURE TO GIVE SUCH NOTIFICATIONS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY COORDINATION WITH SUBCONTRACTORS AS
REQUIRED TO ACCOMPLISH ALL CONSTRUCTION OPERATIONS.
5. WRITTEN SPECIFICATIONS ARE PART OF THE CONSTRUCTION DOCUMENTATION PACKAGE.
CONTRACTOR IS RESPONSIBLE FOR BEING FAMILIAR WITH WRITTEN SPECIFICATIONS AND THE
DRAWING PACKAGE. CONTRACTOR IS RESPONSIBLE FOR BRINGING TO OWNER'S
AUTHORIZED REPRESENTATIVE'S ATTENTION ANY DISCREPANCIES OR CONFLICTS THAT
MIGHT EXIST IN THE DOCUMENTS FOR CLARIFICATION BEFORE PROCEEDING WITH WORK.
CONTRACTOR SHALL TAKE FULL RESPONSIBILITY FOR ANY COSTS, CONSTRUCTION DELAYS,
OR REVISION DUE TO FAILURE TO GIVE SUCH NOTIFICATIONS.
6. CONTRACTOR SHALL REMOVE FROM THE SITE ALL DEBRIS AND UNSUITABLE MATERIAL
GENERATED BY THE CONTRACTOR'S OPERATIONS. CONSTRUCTION SITE SHALL BE
MAINTAINED AT ALL TIMES SO THAT NO OBSTRUCTION, CONSTRUCTION EQUIPMENT OR
CONSTRUCTION PROCESS CAUSES POTENTIAL HARM OR DANGER TO PUBLIC OR
CONSTRUCTION SITE WORKERS. CONTRACTOR SHALL TAKE FULL RESPONSIBILITY FOR
NEGLIGENCE.
7. CONTRACTOR IS RESPONSIBLE TO CONFIRM LOCATIONS FOR ALL EXISTING UTILITIES AND
GRADES BEFORE COMMENCING WORK.
GOVERNING CODES
ALL WORK SHALL BE PERFORMED IN CONFORMANCE WITH ALL APPLICABLE LOCAL CODES &
ORDINANCES INCLUDING, BUT NOT LIMITED TO:
2012 INTERNATIONAL BUILDING CODE (IBC 2012)
NAVFAC UFC
* "VAR" INDICATES THAT DETAIL IS REFERENCED FROM MULTIPLE DWGS
SECTION IDENTIFICATION
DETAIL IDENTIFICATION
SECTION INDICATOR
SHEET NUMBER ON WHICH
SECTION WAS TAKEN
SECTION LETTER
SHEET NUMBER ON WHICH
SECTION APPEARS
DETAIL NUMBER
SHEET NUMBER ON WHICH
DETAIL WAS TAKEN *
DETAIL NUMBER
SHEET NUMBER ON WHICH
DETAIL APPEARS
STRUCTURAL GENERAL NOTES
D
D
D d b
90° b d d
O
R
M
I
N b
135°
4 d FOR #3, #4, #5
6 d FOR #6, #7, #8 b b
D=
12 d FOR #6, #7, #8
6 d FOR #3, #4, #5 b b
TYP 90° END HOOKTYP BAR BEND DIAMETER
10 d FOR #14, #18
8 d FOR #9, #10, #11
6 d FOR #3 TO #8
D
D= b b b d b
D dh d
2" MIN
TYP 180° END HOOK
4d OR b b b d
D dh
#14 38 33 29 27
#18 50 43 39 35
BAR
SIZE 3000 4000 5000 6000
#3 6 6 6 6
#4 8 7 6 6
#5 10 9 8 7
#6 12 10 9 9
#7 14 12 11 10
#8 16 14 12 11
#9 18 15 14 13
#10 20 17 16 14
#11 22 19 17 16 dh d
S S/2
L BAR
C
L
C
BAR
L
C
BAR
S/2
CONCRETE
SURFACE
CONCRETE
SURFACE
DEVELOPMENT LENGTH ( )
BAR 3000 PSI CONC (f'c) 4000 PSI CONC (f'c) 5000 PSI CONC (f'c)
SIZE TOP OTHER TOP OTHER TOP OTHER
s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6"
#3 13 22 12 17 12 19 12 15 12 17 12 13
#4 18 29 14 22 15 25 12 19 14 23 12 17
#5 22 36 17 28 19 31 15 24 17 28 13 22
#6 26 43 20 33 23 37 18 29 20 34 16 26
#7 38 63 29 48 33 54 25 42 29 49 23 38
#8 43 72 33 55 37 62 29 48 34 56 26 43
#9 49 81 37 62 42 70 33 54 38 63 29 48
#10 56 89 43 69 49 78 38 60 44 69 34 54
#11 68 98 52 76 59 85 45 66 53 76 41 59
TENSION LAP SPLICE LENGTH (CLASS 'B' SPLICE)
BAR
3000 PSI CONC (f'c) 4000 PSI CONC (f'c) 5000 PSI CONC (f'c)
SIZE TOP OTHER TOP OTHER TOP OTHER
s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6"
#3 17 28 16 22 16 25 16 19 16 22 16 17
#4 23 38 18 29 20 33 16 25 18 29 16 23
#5 28 47 22 36 25 41 19 31 22 36 17 28
#6 34 56 26 43 29 49 23 38 26 44 20 34
#7 49 82 38 63 43 71 33 55 38 63 30 49
#8 56 93 43 72 49 81 38 62 44 72 34 56
#9 63 105 49 81 55 91 42 70 49 81 38 63
#10 73 116 56 90 63 101 49 78 57 90 44 70
#11 88 128 68 99 76 111 59 85 68 99 53 76
NOTES:
LENGTHS SHOWN ARE FOR GRADE 60 UNCOATED BARS.
LENGTHS SHOWN ARE IN INCHES.
TOP BARS: HORIZONTAL BARS WITH MORE THAN 12” OF
FRESH CONCRETE CAST BELOW THEM.
THE QUANTITY ‘s’ IS DEFINED AS FOLLOWS:
2" MIN
NORMAL WEIGHT CONCRETE, f'c, PSI
FOR STANDARD END HOOKS ON REINFORCING BARS
MINIMUM TENSION EMBEDMENT LENGTHS (IN.)
PENETRATION
3" TYP
d, TYP
#5 DIAGONAL BARS x 3'-0" LONG
CENTERED ON PENETRATION,
SPACE AT 8" MAX THROUGHOUT
WALL THICKNESS
END MAIN BARS INTERUPTED BY
OPENING WITH STD HOOK
WHERE MAIN BARS ARE
INTERUPTED BY OPENING,
ADD ONE HALF THE
INTERUPTED BARS EACH
SIDE OF OPENING. (MIN 2-#5
BARS EACH SIDE)
CONTRACTOR STATEMENT OF RESPONSIBILITY
EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OR
FABRICATION OF A SYSTEM OR COMPONENT DESIGNATED ABOVE AS PART
OF THE MAIN WIND FORCE OR MAIN SEISMIC FORCE RESISTING SYSTEMS
ABOVE MUST SUBMIT A STATEMENT OF RESPONSIBILITY PER 1706.
THIS STATEMENT OF SPECIAL INSPECTIONS IS SUBMITTED AS A CONDITION
FOR PERMIT ISSUANCE IN ACCORDANCE WITH THE SPECIAL INSPECTION AND
STRUCTURAL TESTING REQUIREMENTS OF THE BUILDING CODE SECTIONS
1704 AND 1705.
THIS STATEMENT OF SPECIAL INSPECTIONS ENCOMPASS THE FOLLOWING
DISCIPLINES:
STRUCTURAL SPECIAL INSPECTIONS PER 1704 AND 1705
STRUCTURAL SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE
STRUCTURAL SPECIAL INSPECTIONS FOR WIND RESISTANCE
THE SCHEDULE OF SPECIAL INSPECTIONS SUMMARIZES THE SPECIAL
INSPECTIONS AND TESTS REQUIRED. SPECIAL INSPECTORS WILL REFER TO
THE APPROVED PLANS AND SPECIFICATIONS FOR DETAILED SPECIAL
INSPECTION REQUIREMENTS. ANY ADDITIONAL TESTS AND INSPECTIONS
REQUIRED BY THE APPROVED PLANS AND SPECIFICATIONS WILL ALSO BE
PERFORMED.
THE SPECIAL INSPECTIONS IDENTIFIED ARE IN ADDITION TO THOSE REQUIRED
BY OTHER SECTIONS OF THE BUILDING CODE. SPECIAL INSPECTION IS NOT A
SUBSTITUTE FOR INSPECTION BY THE BUILDING OFFICIAL/CONTRACTING
OFFICER HAVING JURISDICTION OR CONTRACTING OFFICER.
THE SPECIAL INSPECTION COORDINATOR SHALL KEEP RECORDS OF ALL
INSPECTIONS AND SHALL FURNISH INSPECTION REPORTS TO THE BUILDING
OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE
CHARGE. DISCOVERED DISCREPANCIES SHALL BE BROUGHT TO THE
IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF SUCH
DISCREPANCIES ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE BUILDING OFFICIAL/CONTRACTING
OFFICER AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE
CHARGE. THE SPECIAL INSPECTION PROGRAM DOES NOT RELIEVE THE
CONTRACTOR OF HIS OR HER RESPONSIBILITIES.
INTERIM REPORTS SHALL BE SUBMITTED TO THE BUILDING OFFICIAL OR
CONTRACTING OFFICER AND THE REGISTERED DESIGN PROFESSIONAL IN
RESPONSIBLE CHARGE IN ACCORDANCE WITH SECTION 1704.1.2.
A FINAL REPORT OF SPECIAL INSPECTIONS DOCUMENTING COMPLETION OF
ALL REQUIRED SPECIAL INSPECTIONS, TESTING AND CORRECTION OF ANY
DISCREPANCIES NOTED IN THE INSPECTIONS SHALL BE SUBMITTED PRIOR TO
ISSUANCE OF A CERTIFICATE OF USE AND OCCUPANCY PER SECTION
1704.1.2. THE FINAL REPORT WILL DOCUMENT THE REQUIRED SPECIAL
INSPECTIONS AND CORRECTION OF DISCREPANCIES NOTED IN INSPECTIONS.
JOB SITE SAFETY AND MEANS AND METHODS OF CONSTRUCTION ARE
SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.
THE CONTRACTOR IS REQUIRED TO COORDINATE ALL INSPECTIONS. THE
CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE AND THE
SPECIAL INSPECTOR A MINIMUM OF 24 HOURS PRIOR TO ANY SPECIAL
INSPECTIONS THAT ARE REQUIRED. THE CONTRACTOR SHALL NOTIFY THE
OWNER'S REPRESENTATIVE AND THE SPECIAL INSPECTOR A MINIMUM OF 24
HOURS PRIOR TO ANY CONCRETE TO BE POURED.
THE INSPECTORS AND TESTING AGENCIES SHALL BE ENGAGED BY THE
OWNER OR THE OWNER'S AGENT, AND NOT BY THE CONTRACTOR OR
SUBCONTRACTOR WHOSE WORK IS TO BE INSPECTED OR TESTED PER
SECTION 1704.1. ANY CONFLICT OF INTEREST MUST BE DISCLOSED TO THE
BUILDING OFFICIAL/CONTRACTING OFFICER, PRIOR TO COMMENCING WORK.
IF APPROPRIATE AGENTS ARE NOTED AS "TO BE DETERMINED (TBD), THE
OWNER IS RESPONSIBLE TO COORDINATE THE ASSEMBLY OF A SPECIAL
INSPECTION TEAM. ALL SPECIAL INSPECTORS AND TESTING LABORATORIES
SHALL BE SUBMITTED TO CONTRACTING OFFICER'S REPRESENTATIVE FOR
REVIEW.
SPECIALLY INSPECTED WORK THAT IS INSTALLED OR COVERED WITHOUT THE
APPROVAL OF THE BUILDING OFFICIAL/CONTRACTING OFFICER IS SUBJECT
TO REMOVAL OR EXPOSURE.
CONTINUOUS INSPECTION IS ALWAYS REQUIRED DURING THE PERFORMANCE
OF THE WORK UNLESS OTHERWISE SPECIFIED. WHEN WORK IN MORE THAN
ONE CATEGORY OF WORK REQUIRING SPECIAL INSPECTION IS TO BE
PERFORMED SIMULTANEOUSLY, OR THE GEOGRAPHIC LOCATION OF THE
WORK IS SUCH THAT IT CANNOT BE CONTINUOUSLY OBSERVED, IT IS THE
AGENT’S RESPONSIBILITY TO EMPLOY A SUFFICIENT NUMBER OF
INSPECTORS TO ASSURE THAT ALL THE WORK IS INSPECTED IN
ACCORDANCE WITH THE PROVISIONS OF THE BUILDING CODE.
STATEMENT OF SPECIAL INSPECTIONS
SEISMIC DESIGN CATEGORY: N/A
QUALITY ASSURANCE PLAN REQUIRED (Y/N): N
SEISMIC DESIGN CATEGORY
DESCRIPTION OF SEISMIC-FORCE-RESISTING SYSTEM AND DESIGNATED
SEISMIC SYSTEMS SUBJECT TO SPECIAL INSPECTIONS AS PER SECTION
1705.3: N/A
THE EXTENT OF THE SEISMIC-FORCE-RESISTING SYSTEM IS DEFINED IN
MORE DETAIL IN THE CONSTRUCTION DOCUMENTS.
QUALITY ASSURANCE FOR SEISMIC RESISTANCE
THE QUALIFICATIONS OF ALL PERSONNEL PERFORMING SPECIAL INSPECTION AND TESTING
ACTIVITIES ARE SUBJECT TO THE APPROVAL OF THE BUILDING OFFICIAL. THE CREDENTIALS
OF ALL INSPECTORS AND TESTING TECHNICIANS SHALL BE PROVIDED IF REQUESTED.
KEY FOR MINIMUM QUALIFICATIONS OF INSPECTION AGENTS:
WHEN THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE DEEMS IT
APPROPRIATE THAT THE INDIVIDUAL PERFORMING A STIPULATED TEST OR INSPECTION
HAVE A SPECIFIC CERTIFICATION OR LICENSE AS INDICATED BELOW, SUCH DESIGNATION
SHALL APPEAR BELOW THE AGENCY NUMBER ON THE SCHEDULE.
PE/SE STRUCTURAL ENGINEER - A LICENSED SE OR PE SPECIALIZING IN THE
DESIGN OF BUILDING STRUCTURES
PE/GE GEOTECHNICAL ENGINEER - A LICENSED GE OR PE SPECIALIZING IN
SOIL MECHANICS AND FOUNDATIONS
EIT ENGINEER-IN-TRAINING - A GRADUATE ENGINEER WHO HAS PASSED
THE FUNDAMENTALS OF ENGINEERING EXAMINATION
AMERICAN CONCRETE INSTITUTE (ACI) CERTIFICATION
ACI-CFTT CONCRETE FIELD TESTING TECHNICIAN - GRADE 1
ACI-CCI CONCRETE CONSTRUCTION INSPECTOR
ACI-LTT LABORATORY TESTING TECHNICIAN - GRADE 1&2
ACI-STT STRENGTH TESTING TECHNICIAN
AMERICAN WELDING SOCIETY (AWS) CERTIFICATION
AWS-CWI CERTIFIED WELDING INSPECTOR
AWS/AISC-SSI CERTIFIED STRUCTURAL STEEL INSPECTOR
INTERNATIONAL CODE COUNCIL (ICC) CERTIFICATION
ICC-SMSI STRUCTURAL MASONRY SPECIAL INSPECTOR
ICC-SWSI STRUCTURAL STEEL AND WELDING SPECIAL INSPECTOR
ICC-SFSI SPRAY-APPLIED FIREPROOFING SPECIAL INSPECTOR
ICC-PCSI PRESTRESSED CONCRETE SPECIAL INSPECTOR
ICC-RS CSI REINFORCED CONCRETE SPECIAL INSPECTOR
QUALIFICATIONS OF INSPECTORS AND TESTING TECHNICIANS
THIS STATEMENT OF SPECIAL INSPECTIONS / QUALITY ASSURANCE PLAN
INCLUDES THE FOLLOWING BUILDING SYSTEMS:
SOILS AND FOUNDATIONS WOOD CONSTRUCTION
CAST-IN-PLACE CONCRETE MECHANICAL & ELECTRICAL SYSTEMS
PRECAST CONCRETE ARCHITECTURAL SYSTEMS
MASONRY LEVEL 1 STRUCTURAL STEEL
MASONRY LEVEL 2 COLD-FORMED STEEL FRAMING
SPECIAL INSPECTION AGENCIES FIRM AND CONTACT INFO.
1. SPECIAL INSPECTION COORDINATOR TBD
2. INSPECTOR TBD
3. INSPECTOR TBD
4. TESTING AGENCY TBD
5. TESTING AGENCY TBD
6. OTHER TBD
SCHEDULE OF INSPECTION AND TESTING AGENCIES
BASIC WIND SPEED ( 3 SECOND GUST): 130 MPH
WIND EXPOSURE CATEGORY: D
QUALITY ASSURANCE PLAN REQUIRED: (Y/N) N
DESCRIPTION OF MAIN WIND-FORCE-RESISTING SYSTEM AND DESIGNATED
WIND RESISTING COMPONENTS SUBJECT TO SPECIAL INSPECTIONS IN
ACCORDANCE WITH SECTION 1705.4.2:
FLOATING DOCK ANCHORING SYSTEM
THE EXTENT OF THE MAIN WIND-FORCE-RESISTING SYSTEM AND WIND
RESISTING COMPONENTS IS DEFINED IN MORE DETAIL IN THE
CONSTRUCTION DOCUMENTS.
QUALITY ASSURANCE FOR WIND REQUIREMENTS
SECTION 1704.2, 1704.3 - STEEL
ITEM 1: TABLE 1704.3 - MATERIAL VERIFICATION OF
HIGH-STRENGTH BOLTS, NUTS, AND WASHERS.
SCOPE:
A. IDENTIFICATION MARKINGS TO CONFORM TO ASTM STANDARDS SPECIFIED IN THE
APPROVED CONSTRUCTION DOCUMENTS.
B. MANUFACTURER'S CERTIFICATE OF COMPLIANCE REQUIRED.
ITEM 2: TABLE 1704.3 - INSPECTION OF HIGH-STRENGTH
BOLTING:
SCOPE:
A. BEARING-TYPE CONNECTIONS.
B. SLIP-CRITICAL CONNECTIONS
ITEM 3: TABLE 1704.3 - MATERIAL VERIFICATION OF
STRUCTURAL STEEL
SCOPE:
ITEM 4: TABLE 1704.3 - MATERIAL VERIFICATION OF
WELD FILLER MATERIALS.
SCOPE:
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
A. IDENTIFICATION MARKINGS TO CONFORM TO ASTM STANDARDS SPECIFIED IN THE APPROVED
DOCUMENTS.
B. MANUFACTURER'S MILL TEST REPORTS
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
AGENCY # (QUALIF.):
AGENCY # (QUALIF.):
PE/SEAGENCY # (QUALIF.):
AGENCY # (QUALIF.):
A. IDENTIFICATION MARKINGS TO CONFORM TO AWS DESIGNATION LISTED IN THE WPS.
B. MANUFACTURER'S CERTIFICATE OF COMPLIANCE REQUIRED.
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
SCOPE:
A. STRUCTURAL STEEL
1) COMPLETE AND PARTIAL PENETRATION GROOVE WELDS.
2) MULTI-PASS FILLET WELDS.
3) SINGLE-PASS FILLET WELDS > 5/16".
4) SINGLE-PASS FILLET WELDS <= 5/16".
5) FLOOR AND ROOF DECK WELDS.
B. REINFORCING STEEL
1) VERIFICATION OF WELDABILITY OF REINFORCING STEEL OTHER THAN ASTM A706.
2) REINFORCING STEEL-RESISTING FLEXURAL AND AXIAL FORCES IN INTERMEDIATE AND
SPECIAL MOMENT FRAMES, AND BOUNDARY ELEMENTS OF SPECIAL REINFORCED CONCRETE
SHEAR WALLS, AND SHEAR REINFORCEMENT.
3) SHEAR REINFORCEMENT
4) OTHER REINFORCING STEEL
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
ITEM 6: TABLE 1704.3 - INSPECTION OF STEEL FRAME JOINT
DETAILS FOR COMPLIANCE WITH APPROVED
CONSTRUCTION DOCUMENTS:
SCOPE:
AGENCY # (QUALIF.):
INSPECTION OF STEEL FRAME JOINT DETAILS FOR COMPLIANCE WITH APPROVED CONSTRUCTION
DOCUMENTS:
A) DETAILS SUCH AS BRACING AND STIFFENING.
B) MEMBER LOCATIONS.
C) APPLICATION OF JOINT DETAILS AT EACH CONNECTION.
AWS/AISC-SSI, ICC-SWSI
AWS/AISC-SSI, ICC-SWSI
AWS-CWI, ASNT
AGENCY # (QUALIF.):
AWS-CWI, ASNT
ITEM 5: TABLE 1704.3 - INSPECTION OF WELDING:
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
PE/SE
ITEM 9: SECTION 1704.3 - WELDING OF STAIRS AND
RAILING SYSTEMS:
AGENCY # (QUALIF.):
AWS-CWI, ASNT
CONTINUOUSPERIODIC
TABLE 1704.4 - CONCRETE
ITEM 1: INSPECTION OF REINFORCING STEEL, INCLUDING
PRESTRESSING TENDONS AND PLACEMENT.
AGENCY # (QUALIF.):
ACI-CCI, ICC-RCSI
CONTINUOUSPERIODIC
ITEM 2: INSPECTION OF REINFORCING STEEL WELDING IN
ACCORDANCE WITH TABLE 1704.3, ITEM 5B.
AGENCY # (QUALIF.):
AWS-CWI
CONTINUOUSPERIODIC
ITEM 3: INSPECT BOLTS TO BE INSTALLED IN CONCRETE
PRIOR TO AND DURING PLACEMENT OF CONCRETE.
AGENCY # (QUALIF.):
CONTINUOUSPERIODIC
ACI-CCI, ICC-RCSI
ITEM 4: VERIFYING USE OF REQUIRED DESIGN MIX. AGENCY # (QUALIF.):
CONTINUOUSPERIODIC
ACI-CCI, ICC-RCSI
ITEM 5: AT TIME FRESH CONCRETE IS SAMPLED TO
FABRICATE SPECIMENS FOR STRENGTH TESTS,
PERFORM SLUMP AND AIR CONTENT TESTS AND
DETERMINE THE TEMPERATURE OF THE CONCRETE.
AGENCY # (QUALIF.):
CONTINUOUSPERIODIC
ACI-CFTT, ACI-STT
ITEM 6: INSPECTION OF CONCRETE PLACEMENT
FOR PROPER APPLICATION TECHNIQUES.
AGENCY # (QUALIF.):
ACI-CCI, ICC-RCSI
CONTINUOUSPERIODIC
ITEM 7: INSPECTION FOR MAINTENANCE OF SPECIFIED
CURING TEMPERATURE AND TECHNIQUES.
AGENCY # (QUALIF.):
ACI-CCI, ICC-RCSI
CONTINUOUSPERIODIC
ITEM 8:
INSPECTION OF PRESTRESSED AND
POST-TENSIONED CONCRETE.
SCOPE:
AGENCY # (QUALIF.):
A. APPLICATION OF PRESTRESSING FORCES.
B. GROUTING OF BONDED PRESTRESSING TENDONS IN THE SEISMIC FORCE-RESISTING SYSTEM.
CONTINUOUSPERIODIC
CONTINUOUSPERIODIC
ACI-CCI, ICC-RCSI
ERECTION OF PRECAST CONCRETE MEMBERS. AGENCY # (QUALIF.):
CONTINUOUS
ACI-CCI, ICC-RCSI
ITEM 9:
PERIODIC
ITEM 10:
VERIFICATION OF IN-SITU CONCRETE STRENGTH,
PRIOR TO STRESSING OF TENDONS IN POSTENSIONED
CONCRETE AND PRIOR TO REMOVAL OF SHORES AND
FORMS FROM BEAMS AND STRUCTURAL SLABS.
AGENCY # (QUALIF.):
CONTINUOUSPERIODIC
ACI-CFTT, ACI-STT
ITEM 11:
INSPECT FORMWORK FOR SHAPE, LOCATION, AND
DIMENSIONS OF THE CONCRETE MEMBER BEING
FORMED.
AGENCY # (QUALIF.):
ACI-CCI, ICC-RCSI
CONTINUOUSPERIODIC
ITEM 10: SECTION 1704.2.1 - INSPECT FABRICATORS
FABRICATION AND QUALITY CONTROL PROCEDURES.
AGENCY # (QUALIF.):
AWS-CWI, ASNT
CONTINUOUSPERIODIC
NOTE:
SPECIAL INSPECTION WILL BE PROVIDED BY THE
GOVERNMENT. THE CONTRACTOR SHALL
ACCOMMODATE THE INSPECTIONS BY PROVIDING SITE
ACCESS WHEN REQUIRED, AND SHALL ASSIST WITH
COORDINATION AND SCHEDULING OF THE INSPECTIONS.
FOR REINF. SEE
C DOCK
L
20'-0"
SLOPE 1% SLOPE 1%
FOR REINF. SEE
SLOPE 1%
C DOCK
L
20'-0"
SLOPE 1%
BALLAST
COMPARTMENTS
105'-0"
15'-0"15'-0" 15'-0"15'-0"15'-0"15'-0" 15'-0"
CENTERLINE
FLOAT
CAPSTAN
(2 PLACES)
MANWAY DECK
HATCH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .