P08 Bid Schedule.pdf
PDF 7 MB Posted
- Attached to
- Amendment 0004, Freeborn County, Minnesota WRP Management Federal contract opportunity
- Solicitation number
- 12FPC122R0003
About this file
This document outlines a solicitation for management activities on Wildlife Refuge Program properties in Freeman and Newry Townships, Freeborn County, Minnesota. Services required include scouting and treating woody vegetation and herbaceous weeds, preparing seeding sites, seeding specified grass areas, and providing post-seeding maintenance such as mowing and spraying. Site preparation may involve chemical or mechanical methods. The solicitation is issued by the USDA Natural Resources Conservation Service for Amendment 0004 under number 12FPC122R0003. The selected contractor will conduct brush control, herbaceous weed management, and prairie establishment across multiple sites in the specified townships over several years.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S01 12FPC122R0003.pdf | ||
| S01 12FPC122R0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Mobilization/De‐mobilization 14 Job Newry Project Area
2022 2 Brush Management YR 1 1 Job
2023 3 Brush Management YR 2 1 Job
2024 4 Brush Management YR 3 (option) 1 Job
2022 5 Herbaceous Weed MGMT YR 1 1 Job
2023 6 Herbaceous Weed MGMT YR 2 1 Job
2023 7
Herbaceous Weed Control
(Clipping) 17 Ac 1 Job
2023 8 Critical Area Planting 17 ac. 1 Job
2023 9
Post sedding weed Control ‐
Clipping (17 ac.) 4 Job
Vegetative Work Freeman Project Area
2022 10 Brush Management YR 1 1 Job
2023 11 Brush Management YR 2 1 Job
2024 12 Brush Management YR 3 (option) 1 Job
2022 13 Herbaceous Weed MGMT YR 1 1 Job
2023 14 Herbaceous Weed MGMT YR 2 1 Job
2022 15
Herbaceous Weed MGMT
Hemlock 87 ac. 2022 1 Job
2023 16
Herbaceous Weed Control
(Clipping) 87 ac. 1 Job
2023 17 Critical Area Plannting 87 ac, 1 Job
2023 18
Post Seeding Weed Control
(Clipping) 87 ac 4 Job
2023 19
Herbaceous Weed MGMT
Hemlock 87 ac. 2023 1 Job
Total Bid Name WRP
Bid Schedule Freeborn WRP Management
Work Year Item No Description
Estimated
Quantity Unit Unit Price Amount
Vegetative Work
NEST#
Practice(s)
Landowner
Address
County Freeborn Twp. Name T N, R W, Sec.
COR
Planner
Date:
Date:
Date:
Date:
Date
Landowner: JK 11/15/2021
County: JK 11/15/2021 Sheet
11/15/2021
Jeff Koster Telephone #
Landowner Phone #
Freeborn WRP Maintenance Implementation Plan 314 ‐ Brush Management
315 ‐ Herbaceous Weed Control
342 ‐ Critical Area Planting
507‐405‐3585 0
Natural Resource Conservation Service
Designed by:
Planned by:
Checked by:
Approved by:
Freeborn
Jeff Koster 507‐774‐9572 C
Landowner Acceptance: On file
Gopher State One Call
Call 3 Work Days Before
You Dig!
Toll Free
1‐800‐252‐1166
Telephone #
Designed by: Jeff Koster
USFWS:
Checked by:
Approved by:
Moscow
OaklandHayward
Riceland
London
Bancroft
Freeman Shell Rock
Bath
Albert Lea
NewryGeneva
Glenville
Clarks Grove Hollandale
MyrtleFreeman_Project_area
Newry FC site
11/15/2021
U.S. DEPARTMENT OF AGRICULTURE
UNIT QUANTITY
Job 7
Job 7
Job 1
Job 1
Job 1
Job 1
Job 1
Job 1
Acres 17
Job 4
Job 1
Job 1
Job 1
Job 1
Job 1
Job 1
Job 1
Acres 87
Job 4
Job 1
Date
Landowner: Designed by: 11/15/2021
County: Freeborn Planned by: 11/15/2021 Sheet
Practice(s) #: 314 315 342 Checked by:
Approved by: 2 of 26
Post Seeding Weed Control
Freeman TWP Project Site
FREEBORN WRP MANAGEMENT ACTIVITIES--ESTIMATED QUANTITIES
ITEM
SHEET
NUMBER
CONSERVATION PRACTICE, JOB
SHEET, OR NOTE NUMBER
Mob/Demobilization Newry Project Site MNCS -8
Freeman Project Site
CPS 314
Brush Mgmt YR 3
Herbaceous Weed Mgmt YR 1
Herbaceous Weed Mgmt YR 2
Herbaceous Weed Mgmt(Seeding area)
Seeding
CPS 314
CPS 315
NATURAL RESOURCES CONSERVATION SERVICE
Natural Resource Conservation Service
Newry TWP Project Site Brush Mgmt YR 1 CPS 314
Vegetation Management
MNCS -8
Brush Mgmt YR 2
Herbaceous Weed Mgmt(Seeding area)
Herbaceous Weed Mgmt (Hemlock) 2022
JK
JK
Brush Mgmt YR 1
Brush Mgmt YR 2
Seeding (No-Till)
Brush Mgmt YR 3
Herbaceous Weed Mgmt YR 1
Herbaceous Weed Mgmt YR 2
CPS 342
CPS 315
CPS 315
CPS 315
CPS 315
CPS 315
CPS 314
Post Seeding Weed Control
Herbaceous Weed Mgmt (Hemlock) 2023
CPS 315
CPS 315
CPS 342
CPS 315
CPS 314
CPS 314
CPS 314
3-9 3-9
Option 3-9 10-13 10-13 16-18 19-23 24-26
3-9 3-9 3-9 10-13 10-13 16-18 14-15 19-23 24-26 14-15
Option
NATURAL RESOURCES CONSERVATION SERVICE
4-9
Timeline:
TBD
TBD
TBD
Total acres: TBD
Date
Landowner: Designed by: 11/1512021
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 3 of 26
TBD
U.S. DEPARTMENT OF AGRICULTURE
314 ‐ Brush Management
Summer 2022
See Map Pages:
Total Acres:
Natural Resource Conservation Service
Brush Management with regrowth control
The objective of the tree/brush management is to control all undesired woody vegetation from the easement.
* Oak trees and mature trees will not be treated. Willow trees/shrubs and dogwood shrubs do not require treating, but may be treated as neceassry when treating targeted trees. The contractor will submit a work plan including planned control methods, work sequence, and work schedule for Tree/Brush Control to the NRCS COR or Representative a minimum of 3 business days prior to commencement of work.
* Tree/brush control shall consist of scouting the project site and chemically spot treating (i.e. Basal Bark, Foliar Spray...) 95% of all undesired trees less than 20 ' tall within the designated areas, with minimal disturbance to the ground surface and surrounding vegetation. Contractor is responsible for re‐seeding any surface vegetation destroyed during the brush control process.
*Targeted species include but are not limted to Ash, Box Elder, Honeysuckle, Buckthorn (Common and Glossy), Juniper, non‐ native (asian) Elms, cottonwoods
* Tree/brush management shall be considered successfully completed when a 95% of targeted trees less than 20' tall are treated.
* The contractor will contact the NRCS representative to meet on site to evaluate the extent of the vegetation regrowth in the first two weeks of July 2023 and July 2024
* The contractor will submit a work plan including planned chemical treatment method, work sequence, and work schedule for Vegetation/Regrowth Control to the NRCS COR or Representative a minimum of 3 days prior to commencement of work.
* Vegetation/Regrowth Control shall consist of chemically treating tree sprouts
* Chemical techniques; Foliar or basal herbicide appropriate for site will be applied according to manufacturer's label
* Vegetation/regrowth control shall be considered successfully completed when the regrowth sprouts are killed and will succumb to fire from a prescribed burn.
* The contractor will contact the NRCS COR or Representative to meet on site to evaluate the success of the foliar chemical treatment in the first two weeks of September 2022 and September 2023..
Acres of trees/brush less than 2" in diameter:
Acres of trees greater than 6" in diameter:
Acres of trees 2" ‐ 6" in diameter:
JK
Freeborn JK
314 315 342
* Vehicles and equipment must be free of vegetative debris and seed upon arrival at the easement. The contractor must do everything possible to clean all vegetative debris and seed off of equipment and vehicles before moving to a different site. Vegetation and seed pieces should be removed, while paying special attention for plant debris on bumpers, radiators and underneath the vehicle.
Date
Landowner: Designed by: 11/1512021
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 4 of 26Natural Resource Conservation Service
Brush Management Map
JK
Freeborn JK
314 315 342
Copy & paste map from ArcGIS ‐ Map mode
Freeborn County by: Jeffery.Koster
1/6/2022
Newry314
Management No Treatment
1:8,4001 inch = 700 feet
0 660 1,320330 Feet
ACCESS
ACCESS
ACCESS
81.6 ac.
36.9 ac.
34.2 ac.
Newry
Brush Management 314 Newry Project Area
6663220200G6X, 6663220900WB8, 66632212017V3
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 5 of 26Natural Resource Conservation Service
Brush Management Map
JK
Freeborn JK
314 315 342
Brush Management 314 Newry Project Area
6663220200G6X, 66632212017V3
Copy & paste map from ArcGIS ‐ Map mode
ACCESS
ACCESS
36.9 ac.
34.2 ac.
Newry314
Management No Treatment
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 6 of 26Natural Resource Conservation Service
Brush Management Map
JK
Freeborn JK
314 315 342
Newry Project Area
6663220900WB8
Copy & paste map from ArcGIS ‐ Map mode
ACCESS
81.6 ac.
Newry
Newry314
Management No Treatment
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 7 of 26Natural Resource Conservation Service
Brush Management Map
JK
Freeborn JK
314 315 342
Freeman Project Area
6663229800G6X, 6663220700GPD 6663220500GJ8
6663220800MSH
Copy & paste map from ArcGIS ‐ Map mode
6663220700GPD 76.7 ac.
6663229800GXJ 86.8 ac.
6663220500GJ8 185.3 ac.
6663229800GXJ 76.5 ac.
6663220800MSH 38.8 ac.
Freeman Shell Rock
26 30
Management
314 Brush Management
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 8 of 26Natural Resource Conservation Service
Brush Management 314 Map Freeman
JK
Freeborn JK
314 315 342
Freeman Project Area
6663220700GPD 6663220500GJ8
6663220800MSH
Copy & paste map from ArcGIS ‐ Map mode6663220700GPD 76.7 ac.
6663220500GJ8 185.3 ac.
6663220800MSH 38.8 ac.
Freeman
Shell Rock
24 19
25 30
Brush
Brush Management no
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 9 of 26Natural Resource Conservation Service
Brush Management 314 Map Freeman
JK
Freeborn JK
314 315 342
Freeman Project Area
6663229800GXJ
Copy & paste map from ArcGIS ‐ Map mode
Brush
Brush Management no
162.4 ac.
1.9 ac.
1.2 ac.
0.9 ac.
Freeman
11-13
Timeline:
Date
Landowner: Designed by: 11/1512021
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 10 of 26
Weed Control ‐ Spot Spray
* Noxious weeds will be controlled via spot spraying. Noxious weeds identified on the map will be controlled using a broadleaf chemical labeled for the target species. Application of chemical will follow label recommendations and occur prior to the target species going to seed. Timing of each application will be planned for the greatest impact on the target species.
* Herbaceous control shall consist of scouting the project site, mapping areas and types of weeds and chemically spot treating
95% of all identified noxious weeds within the designated areas, with minimal disturbance to the surrounding vegetation.
Contractor is responsible for re-seeding any areas of excessive surface vegetation destroyed during the control process.
* Targeted species include but are not limited to Canada Thistle, wild parsnip, crown vetch, giant ragweed and other noxious weeds on the MN DNR control list.
* Herbaceous weed control shall be considered successfully completed when a 95% of targeted weeds are treated and controlled.
* The contractor will contact the NRCS representative to meet on site to evaluate the extent of the vegetation regrowth in the last weeks of July 2022 and July 2023
* The contractor will submit a work plan including planned chemical treatment method, work sequence, and work schedule for
Vegetation/Regrowth Control to the NRCS COR or Representative a minimum of 3 days prior to commencement of work.
* Vegetation/Regrowth Control shall consist of chemically treating the weds not controlled(killed) previously.
* Chemical techniques; Spot spray herbicide appropriate for site and target weeds Herbicide will be applied according to manufacturer's label.
* Vegetation/regrowth control shall be considered successfully completed when the regrowth sprouts are killed.
* Herbicides to be used are Aminopyralid, clopyralid or an approved equivalent, (must check with NRCS prior to use).
* Vehicles and equipment must be free of vegetative debris and seed upon arrival at the easement. The contractor must do everything possible to clean all vegetative debris and seed off of equipment and vehicles before moving to a different site. Vegetation and seed pieces should be removed, while paying special attention for plant debris on bumpers, radiators and underneath the vehicle.
Natural Resource Conservation Service
JK
Freeborn JK
314 315 342
TBD
U.S. DEPARTMENT OF AGRICULTURE
315 ‐ Herbaceous Weed Control See Map Pages
Total Acres:
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 11 of 26Natural Resource Conservation Service
Herbaceous Weed Control Map
JK
Freeborn JK
314 315 342
Copy & paste map from ArcGIS ‐ Map mode
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 12 of 26Natural Resource Conservation Service
Herbaceous Weed Control Map
JK
Freeborn JK
314 315 342
Weed Control 315 Freeman Project Area
6663220100G4F, 6663220700GPD 6663220500GJ8
6663220800MSH
Copy & paste map from ArcGIS ‐ Map mode
Weed Control 79 ac.
Weed Control 77.7 ac.
Weed Control 189.6 ac.
Weed Control
38.8 ac.
Freeman Shell Rock
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 13 of 26Natural Resource Conservation Service
JK
Freeborn JK
314 315 342
Copy & paste map from ArcGIS ‐ Map mode
Herbaceous Weed Control Map Herbaceous Weed control -315
(Giant Ragweed)
6663221301DJJ 6663220900WB8
Landowner: Designed by: 11/1512021
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 14 of 26
Weed Control ‐ Chemical treatment
Poison Hemlock will be controlled using a selective broad-leaf chemical labeled for control of Poison Hemlock. Herbicide will be applied to the rosettes following label recommendations and occur prior to the target species going dormant. Timing of each application will be planned for the greatest impact on the target species and to allow for planting the following year.
* Herbaceous control shall consist of scouting the project site, mapping areas of poison Hemlock and chemically treating
95% of designated area.
* Herbaceous weed control shall be considered successfully completed when a 95% of targeted weeds are treated and controlled.
* The contractor will contact the NRCS representative to meet on site to evaluate the extent of the vegetation regrowth in
August of 2022 and September 2023
* The contractor will submit a work plan including planned chemical treatment method, work sequence, and work schedule for Vegetation/Regrowth Control to the NRCS COR or Representative a minimum of 3 days prior to commencement of work.
* Vegetation/Regrowth Control shall consist of chemically treating the weds not controlled(killed) previously.
* Chemical techniques; apply herbicide appropriate for site and target weeds. Herbicide will be applied according to manufacturer's label.
* Vegetation/regrowth control shall be considered successfully completed when the regrowth sprouts are killed.
* Spraying of the hemlock rosettes in year 2 will occur after the new grass seeding has become established.
Herbicides for control: Clopyralid, Triclopyr, Metasulfuron or an approved equvalent.
* Vehicles and equipment must be free of vegetative debris and seed upon arrival at the easement. The contractor must do everything possible to clean all vegetative debris and seed off of equipment and vehicles before moving to a different site. Vegetation and seed pieces should be removed, while paying special attention for plant debris on bumpers, radiators and underneath the vehicle.
Natural Resource Conservation Service
JK
Freeborn JK
314 315 342
87.5
See Map Page
U.S. DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
315 ‐ Herbaceous Weed Control
(Poison Hemlock)
Timeline: Mid‐Late August Total Acres:
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 15 of 26Natural Resource Conservation Service
Herbaceous Weed Control 315 Map
JK
Freeborn JK
314 315 342
Freeman Project Area
6663229800GXJ
Copy & paste map from ArcGIS ‐ Map mode Weed Control
44 ac.
Weed Control Poison Hemlock - Giant Ragweed
87.5 ac.
Weed Control
19.7 ac.
Weed Control
13.7 ac.
Weed Control
1.6 ac.
Freeman
Weed Control
Weed Control Poison Hemlock - Giant Ragweed
17 & 18
Timeline:
Date
Landowner: Designed by: 11/1512021
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 16 of 26 314 315 342
Natural Resource Conservation Service
315 ‐ Herbaceous Weed control
Prior to seeding grasses the area may be clipped as close as possible to the ground surface using a rotary mower.
This will control newly germinated weeds and reduce the amount of residues prior to planting with the no-till/ rangeland drill.
* Vehicles and equipment must be free of vegetative debris and seed upon arrival at the easement. The contractor must do everything possible to clean all vegetative debris and seed off of equipment and vehicles before moving to a different site. Vegetation and seed pieces should be removed, while paying special attention for plant debris on bumpers, radiators and underneath the vehicle.
JK
Freeborn JK
104.0
U.S. DEPARTMENT OF AGRICULTURE
315 ‐ Herbaceous Weed Control See Map Page
Immediately prior to seeding. Total Acres:
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 17 of 26Natural Resource Conservation Service
Weed Control Map
JK
Freeborn JK
314 315 342
Post Seeding Weed Control
6663220900WB8 6663221301DJJ
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 18 of 26Natural Resource Conservation Service
Weed Control Map
JK
Freeborn JK
314 315 342
Post Seeding Weed Control
6663229800GXJ
Copy & paste map from ArcGIS ‐ Map mode
Freeman
87.5 Acres87.5 Acres
22 - 23
Timeline:
104 8
Seeding:
Date
Landowner: Designed by: 11/1512021
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 19 of 26
104.0
Mix 1
July & August
June & August
U.S. DEPARTMENT OF AGRICULTURE
342 ‐ Critical Area Planting See Map Pages:
Total Acres:
* Provide a firm and adequate seedbed for drilling the native grasses/forbs. If the surface is not suitable for drilling, contractor must use the minimal amount of tillage necessary to prepare the seedbed. No‐till or Range drill prefered.
* Site prep shall be considered successfully completed when a seedbed exists that is suitable for drilling native grasses and forbs directly into exisiting vegetation without tillage. These conditions shall exist at time of seeding.
Seed Selection: Area shall be seeded with the following mix (quantities shown are PLS)
JK
Acres =
Follow the specification for origin of seed. Seed shall be true to species, packed separately and labeled with scientific name, PLS weight, common name, percent purity, and percent germination. Seed shall be free of non‐seed debris and free of noxious weeds. Seed quantities and quality shall be verified by NRCS prior to seeding application. Substitutions are only allowed if approved by NRCS prior to the commencement of the seeding. Substitution guidance is shown on the following page.
Sowing shall be accomplished by the method stated below:
Drilling: Contractor shall use a specialized native grass, no-till drill designed to handle a wide variety of seed, low seed rates and surface residue. Plant seed to a depth of 1/4 to 1/2 inch.
Seeding Dates: Seeding shall occur within the following window:
* Warm season: 5/15 ‐ 6/30
The estimated mowing times (2023):
The estimated mowing times (2024):
Post‐seeding Maintenance:
Post seeding clippings shall occur when height of existing vegetation is approximately 12‐18 inches. Mowing height shall be no lower than
6 inches. Rotary mower is required.
See page
Natural Resource Conservation Service
Freeborn JK
314 315 342
22 - 23
Date
Landowner: Designed by: 11/1512021
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 20 of 26
25.00
104.0
Mix 1
Minimum seeds/sq foot ‐ forbs/legumes
Minimum Grass/sedge seeding rate (lbs/acre)
100.0
U.S. DEPARTMENT OF AGRICULTURE
342 ‐ Critical Area Planting See Map Pages
Total Acres:
Maximum % total grass seeds/sq foot
No forb species shall be >% of total forb seeds/sq ft
Seeding Guidelines
Minimum Forb seeding rate (oz/acre)
Total
Mix 1
93.7
* Vehicles and equipment must be free of vegetative debris and seed upon arrival at the easement. The contractor must do everything possible to clean all vegetative debris and seed off of equipment and vehicles before moving to a different site.
Vegetation and seed pieces should be removed, while paying special attention for plant debris on bumpers, radiators and underneath the vehicle.
314 315 342 Natural Resource Conservation Service
Allowable Parameters for Species Substiutions:
‐ Any substitutions must be approved by NRCS prior to commencement of the seeding
Final Mix (with approved substitutions) shall meet the follow requirements:
Number of species:
JK
Freeborn JK
Grass
Forbs
Minimum seeds/sq foot ‐ grasses/sedge
3.00
3.00
7.00
5.00
7.00
0.00
Date
Landowner: Designed by: 11/1512021
County: Planned by: 11/15/2021
Practice(s) #: Checked by:
Approved by:
Total Oz
Required
312.00
520.00
728.00
#N/A 0.00
Oz Per
Acre
Natural Resource Conservation Service
Seed selection: Area shall be seeded with the following mix (quantities shown are PLS)
Common Name
Lbs Per
Acre
Total Lbs
RequiredScientific Name
JK
Freeborn JK
Slender Wheatgrass
314 315 342
U.S. DEPARTMENT OF AGRICULTURE
See Map Pages 22 - 23
Species List Total Acres: 104.0
Elymus trachycaulus
Elymus canadensis
312.00Prairie Cordgrass
728.00
Panicum virgatum
Scientific Name
Canada Wildrye
Total grass lbs.
2600.00
Total forb oz.
0.00
Sheet
Spartina pectinata
Pascopyrum smithii
Switchgrass
Western Wheatgrass
Common Name
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 6663220 22 of 26Natural Resource Conservation Service 666
Seeding Map
JK
Freeborn JK
314 315 342
Critical Area Seeding 342
6663229800GXJ
Copy & paste map from ArcGIS ‐ Map mode
Freeman
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 66632209 23 of 26Natural Resource Conservation Service 666
Seeding Map
JK
Freeborn JK
314 315 342
Critical Area Seeding 342
6663220900WB8 6663221301DJJ
Timeline:
Date
Landowner: Designed by: 11/1512021
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 24 of 26 314 315 342
Natural Resource Conservation Service
315 ‐ Herbaceous Weed control
When weeds are 12-18 inches tall, they will be clipped to a height of 6-8" tall.
Seeded area will be clipped using a rotary mower for weed control in July/August and
September 2023.
The seeded area will be clipped using a rotary mower for weed control June/July and
August/ September 2024.
* Vehicles and equipment must be free of vegetative debris and seed upon arrival at the easement. The contractor must do everything possible to clean all vegetative debris and seed off of equipment and vehicles before moving to a different site. Vegetation and seed pieces should be removed, while paying special attention for plant debris on bumpers, radiators and underneath the vehicle.
JK
Freeborn JK
104.0
U.S. DEPARTMENT OF AGRICULTURE
315 ‐ Herbaceous Weed Control See Map Page
As needed post seeding. Total Acres:
25-26
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 25 of 26Natural Resource Conservation Service
Weed Control Map
JK
Freeborn JK
314 315 342
Post Seeding Weed Control
6663229800GXJ
Copy & paste map from ArcGIS ‐ Map mode
Freeman
87.5 Acres87.5 Acres
County: Planned by: 11/15/2021 Sheet
Practice(s) #: Checked by:
Approved by: 26 of 26Natural Resource Conservation Service
Weed Control Map
JK
Freeborn JK
314 315 342
Post Seeding Weed Control
6663220900WB8 6663221301DJJ