or-fs-mal 16(1)_plans.pdf
PDF 16 MB Posted
- Attached to
- OR FS MAL 16(1) FOREST ROAD 16 REPAIRS Federal contract opportunity
- Solicitation number
- 69056720B000015
About this file
This notice is for a federal solicitation seeking bids to repair Forest Road 16. The Department of Transportation Federal Highway Administration issued solicitation number 69056720B000015 to repair Forest Road 16. Bids are due by the date specified in the attached solicitation documents. The work includes repairing sections of the road that have deteriorated. The selected contractor will be responsible for completing the repairs and restoring the road to a safe and usable condition.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OR FS Mal Tabulation of Bids.pdf | ||
| BidSum.pdf | ||
| OR FS MAL 16 IFB.pdf | ||
| OR SF MAL 16(1) FR 16 Pavement Memo.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
Project Location
Projects, FP-14 US Customary Units of Roads and Bridges on Federal Highway
Standard Specifications for Construction
APPROVED:
DATE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED FOR
OREGON
GRANT COUNTY
MALHEUR NATIONAL FOREST
PLANS FOR PROPOSED PROJECT
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
P A
C F
I C
I O
E C
A N
COLUMBIA R
IV
ER
S N
A K E
R
IV
E R
Lake
Malheur Lake
Harney
Lake
Summer
D
ES
C H
U T
E S
R I V
E R
Lake
Klamath
Upper
Abert
Lake
WASHINGTON
I D
A H
O
CALIFORNIA
OREGON KEY MAP
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.
Grants Pass
MEDFORD
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Falls
Klamath
Bend
North
City
Baker
Dalles
The
395101
395197
20 20
NEVADA
LENGTH 11.1 MILES
e (max)
V
ADT (2037)
ADT (2017)
C. SANDERS
Western Federal Lands Highway Division
Chief of Engineering, FR 16 ROAD REPAIRS
OR FS MAL 16(1)
26+03.17
BEGIN PROJECT
SENECA
END PROJECT
COUNTY
BAKER
JOHN DAY
CANYON CITY
FOREST
NATIONAL
MALHEUR
FR 1
COUNTY
GRANT
SCALE IN MILES
3 1.5 3 6 9
FOREST
NATIONAL
MALHEUR
MATCH EXISTING
45 MPH
65 (15% TRUCKS)
50 (15% TRUCKS)
AREA
STAGING
OPTIONAL
T O
B U
R N
S
M
IL
E S
NF-333
pavement, Aggregate surface course reconstruction, Asphalt concrete reclamation, Drainage, Shoulder
Asphalt pavement milling, Full depth
ENGINEERS
PLANNERS
SURVEYORS
GLADE PIT
SHOESTRING
A.1
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16(1)
:2
A
M
S e p te m b e r
F
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 a a .d g n
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
612+74.70
4/22/202106/09/2021
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
:4
F e b r u a r y
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2FS MAL 16(1)OR
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
VICINITY MAP
BEGIN PROJECT
END PROJECT
A.3
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:4
P
S e p te m b e r
F
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 a c .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
SENECA
SHOESTRING GLADE PIT
OPTIONAL MATERIAL SOURCE
26+03.17
FS MAL 16(1)
FOREST ROAD 16
612+74.70
FS MAL 16(1)
FOREST ROAD 16
PARISH CABIN PIT
OPTIONAL STAGING AREA
SCALE IN MILES
1 1/2 1 2
Sheet and Description
SECTION C SECTION D SECTION E SECTION G SECTION I
TYPICAL
SECTION
PLAN &
PLAN
APPROACH
ROADS
DRAINAGE
Temporary
Traffic
Control
ALLOWANCE
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LPSM ALL
A0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 1,300 100 1,400
A0160 20301-2400 REMOVAL OF SIGN EACH 7 7
A0180 20410-0000 SELECT BORROW CUYD 135 65 200
A0200 25101-0000 PLACED RIPRAP, METHOD A CUYD 10 2 12
A0220 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 120 15 135
A0240 30401-5300 FULL DEPTH RECLAMATION,
METHOD 2, 6-INCH DEPTH MILE 3.285 0.115 3.400
A0260 30401-5900 FULL DEPTH RECLAMATION,
METHOD 2, 12-INCH DEPTH MILE 7.827 0.073 7.900
A0280 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 24,723 253 524 25,500
A0320 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 247 4 9 260
A0360 41201-0000 TACK COAT TON 64 2 4 70
A0380 41301-0000 ASPHALT PAVEMENT MILLING, 0
TO 2-INCH DEPTH SQYD 150 30 180
A0400 41301-0600 ASPHALT PAVEMENT MILLING,
2-INCH DEPTH SQYD 47,217 1,083 48,300
A0420 41301-0800 ASPHALT PAVEMENT MILLING,
3-INCH DEPTH SQYD 893 107 1,000
A0440 60201-0800 24-INCH PIPE CULVERT LNFT 158 4 162
A0460 60704-0000 CLEANING CULVERT IN PLACE EACH 1 1 2
A0480 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 16 16
A0500 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 16 16
A0520 62201-3000 HYDRAULIC EXCAVATOR HOUR 16 16
A0540 62301-0000 GENERAL LABOR HOUR 16 16
MileStone: 100% Final Design
Date Completed: In Progress
Report Date: 04/14/21
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES
-J u n -2
:1 P
M
Remarks and/or
Determination of
Estimated Quantity
Pay Item Description Unit
Estimated
Quantities
F
.0
W
F L H
D
F R
U p d a te
F in a l D e s ig n \D o c s \E s ti m a te
-Q u a n ti ti e s s u m m a ry
.x ls m
]S h e e t
STATE PROJECT
B.1FS MAL 16(1)OR
SHEET
NUMBER
Sheet and Description
SECTION C SECTION D SECTION E SECTION G SECTION I
TYPICAL
SECTION
PLAN &
PLAN
APPROACH
ROADS
DRAINAGE
Temporary
Traffic
Control
ALLOWANCE
Bid
Schedule
A0560 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 130 30 160
A0580 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 10 10 20
A0600 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 349 51 400
A0620 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 1,060 40 1,100
A0640 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 530 20 550
A0660 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 82 2 84
SUMMARY OF QUANTITIES
A
M
E
N
D
Line
Item
No.
Pay Item
Number
F
.0
W
F L H
D
F R
U p d a te
F in a l D e s ig n \D o c s \E s ti m a te
-Q u a n ti ti e s s u m m a ry
.x ls m
]S h e e t
(2
Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
-J u n -2
:1 P
M
MileStone: 100% Final Design
Date Completed: In Progress
Report Date: 04/14/21
STATE PROJECT
B.2FS MAL 16(1)OR
SHEET
NUMBER
QUANTITIES
TABULATION OF TYPICAL SECTION
C.1
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16(1)
:4
S e p te m b e r
F
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 c a .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e
Match existingMatch existing
LC
Edge of pavement (Typ)
NOTES:
3" compacted depth (Placed in 2 equal lifts) type III pavement roughness, aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete Pavement, Gyratory mix, SAFETY EDGE DETAIL pavement
Edge of proposed
1. Existing pavement width and depths may vary.
MAINLINE TYPICAL SECTION 1
existing ground
Approximate existing ground
Approximate existing ground
Approximate
See detail, this sheet
Safety Edge (Typ, both sides), C.2
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16(1)
:3
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 c b .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r method 2, 6" depth
Full depth reclamation, method 2, 6-inch depth
Full depth reclamation, 199+05 to 199+50 Transition
26+48.17 to 199+05
26+03.17 to 26+48.17 Transition
ROADWAY TYPICAL SECTIONS
Varies pavement (typ)
Edge of existing Varies, 24-26'
First lift of asphalt
Second lift of asphalt
(Between Lifts)
Tack Coat
LC
Varies, 24-26'
26+03.17 to 199+50
ASPHALT PAVEMENT MILLING SECTION
existing ground
Approximate
2-inch depth
Asphalt pavement milling, pavement milling
Top of asphalt
Match existing Match existing
NO SCALE
10' Traveled way
Varies
Match existingMatch existing
Edge of pavement (Typ)
SAFETY EDGE DETAIL
pavement
Edge of proposed
NOTES:
surface
Existing roadway
3" compacted depth (Placed in 2 equal lifts) type III pavement roughness, aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete Pavement, Gyratory mix,
1. Existing pavement width and depths may vary.
existing ground
Approximate existing ground
Approximate existing ground
Approximate
12-inch depth
Full depth reclamation, method 2, MAINLINE TYPICAL SECTION 2
See detail this sheet
Safety Edge (Typ, both sides), method 2, 12-inch depth
Full depth reclamation, 199+50 to 612+74.70
C.3
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16(1)
:1
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 c c .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
ROADWAY TYPICAL SECTIONS
Tack Coat (Between Lifts) pavement (typ) Edge of existing
Varies, 28-32'
First lift of asphalt
Second lift of asphalt
NO SCALE
12' Traveled way 12' Traveled way
Varies Varies
Varies
TRANSITION DETAILS
C.4
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16(1)
:3
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 c d .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
PLAN
PROFILE
TRANSITION DETAIL
26+03.17 to 26+48.17
Finished pavement
Existing pavement method 2, 6" depth Full depth reclamation, 3" compacted depth (Placed in 2 equal lifts) type III pavement roughness, aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size Asphalt Concrete Pavement, Gyratory mix, .1
.1
NO SCALE
15' Transition
Edge of pavement
.1
.1
2-inch depth Asphalt pavement milling, 45' Transition
TRANSITION DETAILS
PLAN
Edge of pavement method 2, 6" depth Full depth reclamation, method 2, 12" depth Full depth reclamation, 3" compacted depth (Placed in 2 equal lifts) type III pavement roughness, aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size Asphalt Concrete Pavement, Gyratory mix, PROFILE
TRANSITION DETAIL
match existing End pavement, Existing pavement existing asphalt Saw cut
Tack Coat method 2, 12" depth Full depth reclamation, 3" compacted depth (Placed in 2 equal lifts) type III pavement roughness, aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size Asphalt Concrete Pavement, Gyratory mix, CONNECTION DETAIL
612+29.70 TO 612+74.70
C.5
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16(1)
:3
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 c d .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
199+05 TO 199+50
Finished pavement
0 to 2-inch depth Asphalt pavement milling, 45' Transition milling, 2-inch depth Asphalt pavement
.7
.7
PROFILE
45' Transition
NO SCALE
.7
.7
Edge of pavement
PLAN
Existing pavement
N F
-1
N F
-1 pavement Edge of existing
Finished pavement
45' Transition
45' Transition
TABULATION OF PLAN QUANTITIES
D.1
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:1
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 f a .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r and Placed Riprap, Method A.
1. See detail sheets D.12 abd D.13 for Select Borrow
NOTES:
NF-16
NF-16
M a tc h
M a tc h
M a tc h
M a tc h
M P existing pavement
Approximate edge of existing pavement
Approximate edge of of road
Approximate centerline of road
Approximate centerline
See sheet E.3
Asphalt Turnout
74+27 to 77+77, LT pavement
Edge of proposed pavement
Edge of proposed
26+03.17 TO 84+00
PLAN AND PLAN
UTILITY OWNER CONTACTS
541-385-0220 Steve Coker, Engineer 2
CENTURYLINK
BEGIN PROJECT
26+03.17
FOREST ROAD 16
FS MAL 16(1)
E 8605280.370
N 174312.243
D.2
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 f b .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control
541-575-0161 John Day, OR, 97845 PO Box 575 400 Patterson Bridge Road
OREGON TRAIL ELECTRIC
P T
.5
P C
.6
D
R= 1,250.00' T= 155.71' L= 309.83'
BH#3
P C
.0
P T
.7
P C
.0
D
R= 1,600.00'
T= 333.55'
L= 657.68'
R ,6 .3 0'
T= .3 6'
L= .6 4'
BH#4
NF-1
NF-16
N F -1
M a tch
M P
See sheet D.13
Shoulder Reconstruction
125+50 to 127+95
See sheet D.12
Shoulder Reconstruction
115+08 to 115+53 of road
Approximate centerline existing pavement
Approximate edge of of road
Approximate centerline existing pavement
Approximate edge of pavement
Edge of proposed pavement
Edge of proposed
D.3
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:5
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 f c .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
84+00 TO 148+00
PLAN AND PLAN
at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control
P C .0
P C C
.7
P T
.8
D
R= 4,629.30'
T= 138.36'
L= 276.64'
D
R= 1,450.00'
T= 921.79'
L= 1,642.18'
T
BH#5
BH#6
C
.0
P T
.1
P C
.8
P T
.6
P C
.7
P T
.6
P C
.5
P T
.4
P C
.0
D
R= 5,000.00' T= 77.56' L= 155.10'
D
R= 800.00'
T= 129.55'
L= 256.86' D
R= 25,000.00'
T= 389.47'
L= 778.88'
D
R= 4,000.00'
T= 160.00'
L= 319.82'
BH#7
NF-16
NF-16
M a tc h
M P
M a tc h
M a tc h
M at ch1 existing pavement
Approximate edge of existing pavement
Approximate edge of of road
Approximate centerline of road
Approximate centerline pavement
Edge of proposed
148+00 TO 209+00
PLAN AND PLAN
D.4
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:1
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 f d .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control pavement
Edge of proposed at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control
P C
.0
P T
.2
5 1
P C
.1
P R
C
.5
P T
.3
P C
.8
P R
C
.0
P R
C
.2
P T
.1
D
R= 900.00'
T= 284.03'
L= 550.25'
D
R= 2,000.00'
T= 48.19'
L= 96.37'
D
R= 721.16'
T= 41.42'
L= 82.75'
D
R= 4,000.00'
T= 209.29'
L= 418.20'
D
R= 3,365.84'
T= 120.65'
L= 241.19'
D
R= 3,875.00'
T= 67.97'
L= 135.93'
BH#8
C
.9
P T
.8
P C
.0
P T
.0
D
R= 1,850.00'
T= 362.47'
L= 715.86'
R= 2,000.00'
T= 18.52'
D
L= 37.03'
NF-16
NF-16
N F -6
M a tc h
M a tc h
M P
M a tc h
Removal of sign
Removal of sign
Removal of sign existing pavement
Approximate edge of existing pavement
Approximate edge of of road
Approximate centerline of road
Approximate centerline
Bear Creek pavement
Edge of proposed pavement
Edge of proposed
209+00 TO 268+00
PLAN AND PLAN
D.5
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:2
S e p te m b e r
F
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 f e .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r at culvert, see Sheet F.3
Soil erosion control control, fiber roll
Soil erosion
0 P C
.9
R= 3, 800.
00'
T= 4 13.2
1'
L= 8 23.1
9'
BH#9
P T
.1
P C
.0
D
R= 3,800.00'
T= 413.21'
L= 823.19'
D
R= 5,400.00'
T= 406.81'
L= 812.08'
NF-16
NF-16
NF-
M P
M a tc h
M a tc h
M a tc h
Mat ch
5+
Removal of sign
Removal of sign
Removal of sign
Removal of sign
Removal of sign existing pavement
Approximate edge of of road
Approximate centerline existing pavement
Approximate edge of of road
Approximate centerline pavement
Edge of proposed pavement
Edge of proposed
268+00 TO 329+00
PLAN AND PLAN
D.6
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:2
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 f f .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
P T
.1
P C
.2
P T
.7
R= 5 ,400
.00'
T= .81'
L= .08'
D
R= 1,100.00'
T= 384.31'
L= 739.45'
BH#10
5 P
C
.6
D
R= 5,650.00'
T= 1,344.27'
L= 2,639.47'
NF-16
NF-16
N F -4
M a tc h
M a tc h
M a tc h
M a tc h
M a tc h
M P
M P of road
Approximate centerline existing pavement
Approximate edge of existing pavement
Approximate edge of of road
Approximate centerline pavement
Edge of proposed pavement
Edge of proposed
329+00 TO 389+00
PLAN AND PLAN
D.7
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:2
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 f g .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r at culvert, see Sheet F.3
Soil erosion control
5 3
0 P
T
.1
BH#11
P C
.1
5 3
P T
.6
P C
.7
P T
.7
D
R= 5,650.00'
T= 502.05'
L= 1,001.46'
D
R= 5,650.00'
T= 604.32'
L= 1,204.05'
NF-16
NF-16
N F
N F
M a tc h
M a tc h
M a tc h
M P
(18-inch)
Cleaning culvert in place
398+09 existing pavement
Approximate edge of of road
Approximate centerline of road
Approximate centerline existing pavement
Approximate edge of
B e a r
C re e k
Be ar
Cre ek
See sheet E.3
Asphalt Turnout
408+95 to 412+01 pavement
Edge of proposed pavement
Edge of proposed
389+00 TO 452+00
PLAN AND PLAN
D.8
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:2
S e p te m b e r
F
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 f h
.d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control control, fiber roll
Soil erosion
P C
.2
P T
.8
5D
R= 1,900.00'
T= 488.71'
L= 956.68'
BH#12
P C
.9
P T
.0
P C
.2
D
R= 980.00'
T= 482.75'
L= 897.11'
D
R= 1,420.00'
T= 623.93'
L= 1,175.75'
NF-16
NF-16
N F
N F
M P
M a tc h
M a tc h existing pavement
Approximate edge of of road
Approximate centerline
Bear Cree k
Bear Cre ek of road
Approximate centerline existing pavement
Approximate edge of pavement
Edge of proposed pavement
Edge of proposed
452+00 TO 512+00
PLAN AND PLAN
D.9
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:5
S e p te m b e r
F
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 f i.
d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
Replace existing
24-inch pipe culvert
505+10 at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control
P T
.9
P C
.7
P T
.9
D
R= 2,800.00'
T= 463.26'
L= 918.20'
BH#13
P C
.4
P T
.6
P C
.5
D
R= 2,800.00'
T= 389.57'
L= 774.18'
BH#14
NF-16
NF-16
M a tc h
M P existing pavement
Approximate edge of of road
Approximate centerline existing pavement
Approximate edge of of road
Approximate centerline
Bear Creek
Bear Creek pavement
Edge of proposed pavement
Edge of proposed
512+00 TO 572+00
PLAN AND PLAN
D.10
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:4
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 f j.
d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
Replace existing
24-inch pipe culvert
514+69 at culvert, see Sheet F.3
Soil erosion control
P T
.4
P C
.0
D
R= 1,900.00'
T= 377.28'
L= 744.88'
P T
.9
P C
.2
D
R= 2,800.00'
T= 490.88'
L= 971.89'
R= ,5 .0 0'
T= .8 3'
BH#15
NF-16
NF-16
N F
-1
N F -9
M a tc h
M a tc h
M a tc h
M a tc h
M P
M a tc h
M a tc h
M a tc h
E: 8658133.03 N: 191595.98
END PROJECT
existing pavement
Approximate edge of existing pavement
Approximate edge of
B e a r
C re e k of road
Approximate centerline of road
Approximate centerline pavement
Edge of proposed pavement
Edge of proposed
612+74.70
OR FS MAL 16(1)
572+00 TO 612+74.70
PLAN AND PLAN
D.11
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:4
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 f k .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r see Sheet F.3 control at culvert, Soil erosion at culvert, see Sheet F.3
Soil erosion control at culvert, see Sheet F.3
Soil erosion control
P T
.9
D
R= 1,500.00'
T= 445.83'
L= 866.70'
BH#16
NF-16
115+08 TO 115+53
of road centerline
Approximate
SHOULDER RECONSTRUCTION PLAN
1 limits excavation
Approximate existing ground
Approximate
A
A
SHOULDER RECONSTRUCTION
SECTION A-A
finish grade
Approximate finish grade
Approximate
LOOKING FORWARD ALONG SLOPE
VIEW C-C
LOOKING DOWN EMBANKMENT SLOPE
VIEW B-B
excavation limit
Approximate excavation limit
Approximate
C
C B B protect in place
Existing culvert, pavement
Edge of existing pavement
Edge of proposed existing pavement
Approximate edge of
SCALE IN FEET
20 10 20 40
Select Borrow
C o n s tr u c ti o n
L im it s
12" depth
Placed Riprap, Method A, typical section 1 see mainline
Roadway section
D.12
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:2
S e p te m b e r
F
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 g a .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r fiber roll
Soil erosion control, SHOULDER RECONSTRUCTION DETAILS excavation limit
Approximate grade
Finish
1. Perform work in accordance with Section 152.
Excavation limit
12.5' t y p
2' min.
2'
NF-16
125+50 TO 127+95
1 limits excavation
Approximate
SHOULDER RECONSTRUCTION
SECTION A-A
SHOULDER RECONSTRUCTION PLAN
of road centerline
Approximate
A existing pavement
Approximate edge of
A on embankment slope
Remove existing asphalt finish grade
Approximatefinish grade
Approximate
SCALE IN FEET
20 10 20 40 pavement
Edge of existing
LOOKING BACK ALONG LINE
VIEW B-B
LOOKING BACK ALONG LINE
VIEW C-C
LC
excavation limit
Approximate limit excavation
Approximate excavation limit
Approximate protect in place
Existing culvert, pavement
Edge of proposed
C
CB
B
C o n s tr u c ti o n
L im it s
Select Borrow typical section 1
See mainline
Roadway section
D.13
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:2
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 g b .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r fiber roll
Soil erosion control, SHOULDER RECONSTRUCTION DETAILS
Place conserved topsoil
Turf establishment grade
Finish
1. Perform work in accordance with Section 152.
NOTES:
ground existing
Approximate
Limit
Excavation t y p
2' min.
12.5'
2'
QUANTITIES
TABULATION OF APPROACH ROAD
E.1
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:1
S e p te m b e r
F
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 ia .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e
NO SCALE
TYPE 2 APPROACH
ROAD APPROACH SYMBOL
C L o f a p p r o a c h
E d g e o f s h o u ld e r
E d g e o f s h o u ld e r
E n d p a v e m e n t
See Note 1
End pavement
CL
Edge of shoulder
TypeMainline station of highway
(UNPAVED)
TYPE 1 APPROACH
Width of approach
C L o f a p p r o a c h
Edge of shoulder
TYPE 4 APPROACH
TYPE 3 APPROACH
E d g e o f s h o u ld e r
TYPE 4 APPROACH
E d g e o f s h o u ld e r
E n d p a v e m e n t
TYPE 1, 2 & 3 APPROACH
Match existing surfacing
Match existing surfacing pavement
Asphalt concrete
Roadway base
Roadway base Roadway base
Roadway base
M a tc h e x is ti n g
M a tc h e x is ti n g
E n d p a v e m e n t
M a tc h e x is ti d a g g r e g a te pavement
Asphalt concrete
Existing asphalt approach
3" depth
Aggregate surface course approach
Existing aggregate approach
Existing aggregate
Asphalt concrete pavement required to place 3" depth of
Mill approach asphalt as
Asphalt concrete pavement required to place 3" depth of
Mill approach asphalt as pavement concrete
Asphalt pavement concrete
Asphalt
Asphalt concrete pavement required to place 3" depth of
Mill approach asphalt as
Existing asphalt approachM a tc h e x is ti n g
Typ Typ
See Note 1
End pavement
CL of Road CL of Road
M a tc h otherwise shown on plans access road connection, unless
Grade to match existing
Apply tack coat
Apply tack coat
Match approach radius 'R' of the existing approach compatible with adjacent roadway construction.
Construct side slope ratio and degree of finish of approaches
2.
1.
3" compacted depth (Placed in 2 equal lifts) aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete Pavement, Gyratory mix, 3" compacted depth (Placed in 2 equal lifts) aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete Pavement, Gyratory mix, 3" compacted depth (Placed in 2 equal lifts) aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete Pavement, Gyratory mix, TACK COAT DETAIL existing ground
Approximate
(Between Lifts)
Tack Coat of asphalt
First lift of asphalt
Second lift
Milled surface
APPROACH ROAD DETAILS
STATE PROJECT
NUMBER
SHEET
FS MAL 16(1)OR E.2
STATE PROJECT
NUMBER
SHEET
U
C
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 ib .d
:0 p r il
/2
/2
C h e c k e d b y
P D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e
R
W
R1
P
10'
10' of flared radius P=Dimension to end
10'
NOTE:
existing pavement
Approximate edge of
Edge of existing turnout
NF-16
NF-16
existing pavement
Approximate edge of
Edge of existing turnout
Protect in place
Existing sign
TURNOUT PLAN AND PLAN
BEAR C
REEK
of road
Approximate centerline of road
Approximate centerline
NSee detail sheet E.2
Construct per Type 3 approach, Turnout
See detail sheet E.2
Construct per Type 3 approach, Turnout
ASPHALT TURNOUT
ASPHALT TURNOUT
pavement
Edge of proposed pavement
Edge of proposed
E.3
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:3
S e p te m b e r
F
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 ic .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is
74+27 to 77+77
408+95 to 412+01 existing turnout
Match edge of existing turnout
Match edge of existing turnout
Match edge of existing turnout
Match edge of
37.8'
266.5'
23.3' 22.4'
282.8'29.7'
6%
5%
4%
3%
2%
NO SCALE
6%
5%
4%
3%
2%
5%
4%
3%
2%
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Drive stakes into undisturbed soil of trench bottom.
stakes. Drive stakes at each end of the fiber roll and at
Install check dams in ditches perpendicular to the flowline.
installation.
Repair all rills or gullies and properly compact prior to functional requirements of the check dam device.
gravel bags as approved by the CO, to meet the
Construct check dams from fiber rolls, filter rock, or
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
W157-15
MODERATE GRADES
CHECK DAM
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
F.1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS MAL 16 (1)OR
U
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 d a .d g n
:4
S e p te m b e r
Se e N ote
Flow
F lo w m in m in
"6 m in m in .6
CROSS SECTION
V-DITCH
CROSS SECTION
FLAT-BOTTOM DTICH
CROSS SECTION
CROSS SECTION
STAKING DETAIL
FIBER ROLL
PLAN
are similar for flat-bottom ditches
Check dam installation details
V-ditch design shown.
Flow line
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
GRAVEL BAG
Gravel bag the ends. See Note 6 to prevent flow around
Curve ends upstream
Filter rock
Filter rock
FIBER ROLL CHECK DAM
GRAVEL BAG CHECK DAM
SPACING (max.)
CHECK DAM
See Note 5
NOTE:
GRADE
DITCH
SPACING (max.)
CHECK DAM
(See Note 7)
CHECK DAM SPACING
FILTER ROCK
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
SPACING (max.)
CHECK DAM
FILTER ROCK CHECK DAM
uphill side of fiber roll trench material on
Place excavated on ditch grades steeper than 5%.
Do not use fiber roll check dams
* Spacing calculated based on on ditch grades steeper than 6%.
* Do not use gravel bag check dams
(FT)
(FT)
(FT)
Trench 2" (min.)
Fiber roll 9" Ø (min.)
Trench 2" (min.)
-inch wood 8 1-inch x 18
1Stake fiber rolls in place with 1
Expose stakes 2-inches (min.) above top of fiber roll.
2-foot (max.) spacing.
9" Ø minimum fiber roll.
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Existing ground (typ.)
Flow direction
Slope
Direction of runof f from distur bed area s ff o n ur f o n oi t c er i
D
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted wood stakes. See Note 2.
Stagger joints (typ.)
permanent installations. Do not crush wattle while staking.
wattle is secure to slope. Live stakes may be used for
2.
1.
PROPERLY STAKED AND ENTRENCHED SEDIMENT WATTLE
SLOPE PROTECTION INSTALLATION
ALTERNATE SEDIMENT WATTLE JOINT DETAIL
WATTLE SPACING
Wattle length
SEDIMENT WATTLE STAKING DETAIL
SEDIMENT WATTLE LAPPING DETAIL
Sediment wattle
Sediment wattle larger than wattle and install sediment wattles
Step 1: Excavate trench Step 2: Backfill soil against sediment wattles for each wattle
Stakes required uphill side of sediment wattle
Place excavated material on
Sediment wattle along contours
Install wattles
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
(FT)
(FT)
W157-20
Excavate trench 2"
Drive stakes at each end and at 4-foot spacing until
1" x 1" or 1" Ø
1" x 1" Wood stake
SEDIMENT WATTLE
wattles and space stakes at 4-foot max.
6-inches from wattles end angles towards the adjacent
Overlap wattles 12-inch minimum. Drive stakes at
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
F.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS MAL 16 (1)OR
U
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 d b
.d g n
:2
F e b r u a r y
Flow
Pay lim its
Pay lim its
S pa ci ng c ha rt
S ee W at tl e
2" (min.)
ove rlap
12" (m in.)
t o m in m in as specified in plans
3' min. or
3' (min.)
FlowFlow lo w
Centerline of road
EROSION CONTROL DETAILS
Soil erosion control, fiber roll
SOIL EROSION CONTROL AT CULVERT
F.3
STATE PROJECT
NUMBER
SHEET
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 d c .d g n
OR FS MAL 16(1)
:0 e p te m b e r
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
NOTE:
NO SCALE
Ditch line
Top of ditchslope
Proposed or existing culvert
Soil erosion control, fiber roll (approx. 10', typ.)
m in fiber roll at outlet
Install soil erosion control, FOOTNOTE:
water from running around the ends.
inlets and outlets, curve ends of fiber rolls upgrade to prevent
Where fiber rolls are installed for soil erosion control at culvert
See Sheet F.1 for fiber roll staking requirements.
2.
1.
outlet locations specified on the plans or as directed by the CO.
Do not install at culvert outlets with high flows. Install at culvert 1
10' min.10' min.
Seneca
SHOESTRING GLADE PIT - LIMITS
SHOESTRING GLADE PIT - LOCATION MAP
No Scale
Shoestring Glade Pit
Optional Material Source
FR 16
area
Allowed mining
G.1
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:5
D e c e m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 m a .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
OPTIONAL MATERIAL SOURCE
BEGIN PROJECT
END PROJECT
SCALE IN MILES
1 1/2 1 2
Optional material source
Noxious weeds
1. Address noxious weed conflicts per Subsection 107.10
G.2
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:3
S e p te m b e r
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 m b .d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
SCALE IN MILES
1 1/2 1 2
N
Seneca
PARISH CABIN PIT - LIMITS
PARISH CABIN PIT - LOCATION MAP
No Scale
OPTIONAL STAGING AREA PLAN
Parish Cabin Pit
Optional Staging Area
Optional staging and stockpile area only
FR 16
575+56
FR 467
FR 468
FR 16
BEGIN PROJECT
END PROJECT
10.4 x 16
60103
-0180
60201
-0800
60704
-0000
Station E S T
IM
A T E D
M A X
IM
U M
C O
V E R
S T R U
C T U
R A L E
X C A V A T
IO
N
R E M
O V A L O
F P
IP
E C
U L V E R T
C O
N C R E T E
H E A D
W A L L F
O R
IN
C H
P
IP
E C
U L V E R T
-I
N C H
P
IP
E C
U L V E R T
C L E A N
IN
G
C U
L V E R T I
N P
L A C E
S K E W
A N
G L E
A ll o w a b le
P ip e M a te ri a l
(S e e k e y b e lo w
B E V E L S
V :n
H
B E V E L S
V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH LNFT EACH Lt Rt
398+09 1
505+10 1 80 x/C,P
514+69 1 78 x/C,P
PROJECT TOTAL 0 2 0 158 1
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the thickness required AS Aluminized steel by the Std. 602-1 fill height table. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the thickness (blank) Any appropriate material required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
F
.0
W
F L H
D
F R
U p d a te
F in a l D e s ig n \d g n \d g n \o r-f-m a l0
F
R
\o r-f-m a l0 e a .x ls x
-M a r-
:1 P
M D
L a u tz e n h e is e r
/2
P
D ru y v e s te in /2
D e s ig n e d b y
C h e c k e d b y
STATE PROJECT
H.1
SHEET
NUMBER
FS MAL 16(1)OR
Note: The quantities shown hereon are approximate and are subject to field adjustments.
SCALE IN FEET
10 5 10 20
N
CULVERT PLAN AND PLAN
existing pavement
Approximate edge of existing pavement
Approximate edge of
N F -1
B E
A R C
R E E
K
B E A R C
R E E K of road centerline
Approximate
24-INCH PIPE CULVERT
24-INCH PIPE CULVERT
NF-492
of road centerline
Approximate
N F of the pipe prior to removing the existing culvert.
reference points to invert elevation at both ends vertical location as the existing pipe culvert. Set
1) Place new pipe culverts in the same horizintal and
NOTES:
pavement
Edge of proposed pavement
Edge of proposed
514+69
505+10
Replace existing
24-inch pipe culvert
Replace existing
24-inch pipe culvert
H.2
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
/8
/2
:3 :2
P
M F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 e b
.d
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e r
80'
78'
1.
2.
3.
4.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
H.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS MAL 16 (1)OR
U
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 e c .d g n
:0
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
BoltsBand
602-2
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
rerolled with 3" × 1" pipe corrugations.
COUPLING BAND
METAL PIPE CULVERT
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.
diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
STATE PROJECT
NUMBER
SHEET
H.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS MAL 16 (1)OR
U
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 e d
.d g n :1
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
W
WWW
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
Half diameter or whichever is less section
Metal endMetal end section
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2017
REVISED: 4/1994 6/2005
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth; or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
12" (min.), 24" (max.)
"/foot of cover,2
STATE PROJECT
NUMBER
SHEET
H.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS MAL 16 (1)OR
U
.0
W F
L H
D
F R
U p d a te
F in a l
D e s ig n \d g n
\d g n \o r f m a l0
F R
\o r f m a l0 e e .d g n
:1
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
H
Width
H H
H H
H H
H H
H
H
H
H
HH
H
(see table)
Minimum spacing or Span
Diameter or Span
Diameter
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
minimum
1'-0"
TRAFFIC CONTROL QUANTITIES
TABULATION OF TEMPORARY
I.1
STATE PROJECT
NUMBER
SHEET
F
.0
W
F L
H D
F
R
U p d a te
F in a l
D e s ig n \d g n \d g n \o r f m a l0
F
R
\o r f m a l0 n a .d g n
OR FS MAL 16(1)
:0 e p te m b e r
/2
/2
C h e c k e d b y
P
D r u y v e s te in D e s ig n e d b y
D
L a u tz e n h e is e
PROJECT LIMIT SIGNING
TEMPORARY TRAFFIC CONTROL PLAN
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
FR 16
ROAD WORK
NEXT 11 MILES
WORK
ROAD
200 feet
MPH
WORK
ROAD
350 feet
ROAD WORK
NEXT 11 MILES
WORK
ROAD
700 feet
'100
'100
MPH
WORK
ROAD
100 feet BUMP
BUMP
DO
NOT
PASS
NO
CENTER
LINE
DO
NOT
PASS
0NO
CENTER
LINE
DO
NOT
PASS
along both sides of the road within project limits.
2. Place NO CENTER LINE signs every 2 miles sides of the road within the project limits.
1. Place DO NOT PASS signs every mile along both
NOTES:
ROAD WORK
END
I.2
STATE PROJECT
NUMBER
SHEET
OR FS MAL 16 (1)
:5
S e p te m b e r
F .0
W
F L H
D
F R
U p d a te
F in a l D e s ig n \d g n \d g n \o r-f-m a l0
F
R
\o r-f-m a l0 n b .d
/2
/2
C h e c k e d b y
P
D ru y v e s te in D e s ig n e d b y D
L a u tz e n h e is e r
NO
CENTER
LINE
DO
NOT
PASS
FR 16
100'
350' 350'
100'
G20-2
W20-1 MUTCD No.
612+74.70
FA MAL 16(1)
MP 0.30 TO 11.42
FOREST ROAD 16
END PROJECT
FR 16
G20-2
G20-2
W16-8P W20-1 over
W16-8P W20-1 over
BEGIN PROJECT
26+03.17
FS MAL 16(1)
MP 0.30 TO MP 11.42
FOREST ROAD 16
G20-1
W20-1
W13-1P W20-1 over
G20-1
W20-1
W13-1P W20-1 over W8-1
W8-1
R4-1 W8-12 over
G20-2
R4-1 W8-12 over
R4-1
R4-1 W8-12 over
FR 15
FR 15
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P (optional)
W13-1P (optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
For…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .