NY116-New Windsor-A1-CSS-15180 New Windsor Basins Inspection.pdf
PDF 5 MB Posted
- Attached to
- Storm Drain Federal contract opportunity
- Solicitation number
- W15QKN-20-Q-5253
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W15QKN20Q5253-0002.pdf | ||
| W15QKN20Q5253-0001.pdf | ||
| NY116-New Windsor-A1-CSS-15180 Photos 9 thru 12 POV lot.pdf | ||
| NY116-New Windsor-A1-CSS-15180 Numbered sketch and appendix.pdf | ||
| Form for Construction Format proposals.xls | XLS spreadsheet | |
| Solicitation W15QKN20Q5253.pdf | ||
| NY116-New Windsor-A1-CSS-15180 Photos 1 thru 4 POV lot.pdf | ||
| NY116-New Windsor-A1-CSS-15180 POV Parking lot overview.pdf | ||
| NY116-New Windsor-A1-CSS-15180 Photos 5 thru 8 POV lot.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Windsor Reserve Center
Catch Basin Cleaning & Inspection
Basin #1
Riser not grouted in place
Inlet pipe not grouted
Asphalt in basin(s)
Riser mortar decayed or missing
Basin #2
Basin #3
Inlet piping has moderate sag
Basin #4
Frame and grate set to low
Frame has loose shims installed to elevate grate
Slight separation on outlet pipe grout
Basin #5
Basin #6
Non standard cmu block riser deteriorated
Basin #7
Round frame and cover displaced from riser
Safety Issue
Basin #8
Basin #9
Masonry brick riser deteriorated
Basin #10
Concrete riser decayed
Basin #11
Concrete riser decayed
Basin #12
Riser deteriorated
Frame and grate below asphalt
| Basin #1 |
| Riser not grouted in place |
| Inlet pipe not grouted |
File details come from the government source that posted it. Updated .