NSWCPD IMS RFQ.pdf

PDF 1 MB Posted

Attached to
NSWCPD IMS Support Federal contract opportunity
Solicitation number
N6449823Q5004
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL SURFACE WARFARE CENTER PHILA

JOHN FOLEY

NSWC PHILADELPHIA DIVISION

NSLC DETACHMENT

1601 LANGLEY AVE BLDG 542

PHILADELPHIA PA 19112

TEL: FAX:

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

N6449823Q5004 06-Oct-2022

5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NO TE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA

FAR (48 CFR) 53.215-1(a)

THIS RFQ [ ] IS X[ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

NAVAL SURFACE WARFARE CENTER PHILA

CODE 0223, KEVIN OSHAUGHNESSY

215-897-1962, KEVIN.OSHAUGHNESSY1@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

14-Oct-2022(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

(215) 897-1962KEVIN OSHAUGHNESSY

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

N6449823Q5004

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot Task 1 - IMS

FFP

Task 1 – Integrated Master Schedule and Program/Project Management - IAW

SOW Section 3.1.1

FOB: Destination

PSC CD: R408

NET AMT

0002 1 Lot Task 2 - Cost Estimating

FFP

Task 2 - Cost Estimating IAW SOW Section 3.1.2

0003 1 Lot Task 3 - Tech Support

FFP

Task 3 - Tech Support, Recommendations, Briefing Support & Risk Analysis IAW

SOW Section 3.1.3

0004 1 Lot Travel

FFP

Travel Costs IAW SOW Section 7

0005 1 Lot Contract Deliverables

FFP

CDRLs A001 - A005

Section C - Descriptions and Specifications

STATEMENT OF WORK

Statement of Work

DDGX Land Based Test Site (LBTS) Program/Project Management

& Integrated Master Schedule (IMS) Support Services

1.0 INTRODUCTION

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of

Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles.

This requirement is for NSWCPD Code 211, which is responsible for Management of DDGX

Program requirements.

1.0.2 This contract is for non-personal services. It does not create employment rights with the

U.S. Government whether actual, inherent, or implied

1.0.3 Government/Contractor Relationship

1.0.3.1 The services to be delivered under this contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.

1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.0.3.3 Contractor personnel under this contract shall not engage in any of the inherently

Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.

1.0.4 Employee Relationship:

1.0.4.1 The services to be performed under this contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the

Contractor's personnel will act and exercise personal judgment and discretion on behalf of the

Contractor.

1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and

NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation.

This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.

1.0.4.3 Inapplicability of Employee Benefits: This contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.

1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor contract activities and notify the Contracting Officer if the Contractor believes that the intent of this

Section has been or may be violated.

1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.

1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:

(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,

(ii) Countermand any communication regarded as a violation,

(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or

(iv) In the event the notice is inadequate to make a decision, advise the

Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.

1.1 BACKGROUND Each year, Naval Surface Warfare Center Philadelphia Division

(NSWCPD) manages over 100 active projects supporting multiple NAVSEA and other federal customers, with an annual project budget for Cost Reimbursable funding (NSWCPD labor and non-labor) and Direct Cite funding (contracted) work in excess of $1 billion. In an effort to streamline efficiency and recognize cost savings for the government, NSWCPD intends to procure the services of an external consultant to conduct NSWCPD program/project management and business practices, with specific goals to:

Identify applicable program/project management standards and industry best-practices to be implemented at NSWCPD

Improve visibility into Program and project costs along with schedule performance, with stronger cost/schedule integration

Develop consistency in the application of business practices across the

NSWCPD project portfolio

Develop useful metrics and other management decision making tools to help the overall coordination and direction across the NSWCPD enterprise

Train and mentor NSWCPD program/project managers as part of the implementation of the best practices.

1.2 SCOPE OF WORK

This Statement of Work (SOW) for implementing program/project management practices at

NSWCPD shall be accomplished in support of the DDGX Land Based Test Site (LBTS).

2.0 APPLICABLE DOCUMENTS – N/A

3.0 REQUIREMENTS

3.1 Program/Project Management and Integrated Master Schedule (IMS) Support

Services

3.1.1 Task 1 – Integrated Master Schedule and Program/Project Management

3.1.1.1 The contractor shall use Oracle Primavera P6 to develop the IMS.

3.1.1.2 The contractor shall develop an Integrated Master Schedule (IMS) from program requirements documents that will serve as the baseline for execution of the DDGX testing program at NSWCPD. The IMS shall be a baseline industry-standard schedule documenting project requirements and constraints, to include progress tracking of partial and completed tasks, test schedule integration, and risk analysis and assessment. (CDRL

A003)

3.1.1.3 The contractor shall integrate development and execution of test plans and procedures into the IMS for the infrastructure and machinery integration projects listed in Section

1.2 above.

3.1.1.4 The contractor shall be responsible for maintaining configuration control of the IMS throughout the period of performance of this task.

3.1.1.5 The contractor shall document deviations from the baseline IMS including root cause and the resulting variances imposed on the schedule and staffing plans.

3.1.1.6 The contractor shall conduct analysis of process improvements to maintain schedule and determine program schedule critical path.

3.1.1.7 The contractor shall provide industry-standard program/project management artifacts documenting requirements definition, financial management, staffing, baseline establishment, etc. used to develop the IMS. (A003)

3.1.1.8 The Contractor shall train and mentor program/project management staff to build a foundation for future IMS efforts.

3.1.1.9 The contractor shall develop project management processes including requirements and constraints definition, staffing and baseline establishment, for the execution of the DDGX

LBTS program.

3.1.1.10 The contractor shall support NSWCPD program/project managers and shall provide monthly briefings to NSWCPD program/project managers of status and any significant findings during the course of executing all tasking. A significant finding shall be defined as any event/occurrence resulting in the following:

Inability to obtain required data to completely integrate development and execution of test plans and procedures into the overall IMS

Issues causing project schedule slippage beyond 3%

Contractor resource issues to adequately staff the task

3.1.1.11 The contractor shall support the DDGX/ LBTS program/project managers and provide monthly briefings to the DDGX/ LBTS project leadership of status and any significant findings during the course of executing this task. A significant finding shall be defined as any event/occurrence resulting in in the following:

Inability to obtain required data to create an IMS

Issues causing project schedule slippage beyond 10%

Contractor resource issues to adequately staff the task

3.1.1.12 The contractor shall create dashboards and metrics to track program progress through design, construction, and testing phases of program.

3.1.1.13 The contractor shall conduct program resource analysis to ensure resources are identified and available to meet program requirements.

3.1.1.14 The contractor shall provide technical support and recommendations in support of program briefs.

3.1.1.15 The contractor shall train and mentor program/project management staff to build a foundation for a subsequent enterprise-wide implementation effort.

Task 1- The hours below are provided as a baseline for estimation purposes:

Program/Project Manager III 150 hours

Program/Project Manager II 490 hours

Administrative Support 125 hours

3.1.2 Task 2 – Cost Estimating

3.1.2.1 The contractor shall provide subject matter expert support for program cost development practices.

3.1.2.2 The contractor shall develop a program management plan that supports cost estimating best practices, including methods for cost reliability, traceability, and tracking. The cost estimating practices shall be mapped to program work breakdown structure.

3.1.2.3 The contractor shall develop templates and methods for applying uncertainty and reliability to government developed cost estimates.

3.1.2.4 The contractor shall develop digital tools and templates for cost estimating, reliability, and tracking (CDRL A002).

3.1.2.5 The contractor shall provide instruction on the use of the developed tools/templates and mentor program/project management staff to build a foundation for a subsequent enterprise-wide implementation effort.

3.1.2.6 The contractor shall provide monthly briefings of status and any significant findings during the course of executing all tasking. A significant finding shall be defined as any event/occurrence resulting in in the following:

Inability to obtain required data to develop tools for cost reliability and traceability.

Issues causing project schedule slippage beyond 10%

Contractor resource issues to adequately staff the task

Task 2 - The hours below are provided as a baseline for estimation purposes:

Program/Project Manager III 60 hours

Program/Project Manager II 100 hours

Administrative Support 30 hours

3.1.3 Task 3 - Tech Support, Recommendations, Briefing Support & Risk Analysis

3.1.3.1 The contractor shall provide engineering support for technical requirements development.

3.1.3.2 The contractor shall develop a program plan document that supports requirements definition, requirements traceability and tracking, and requirements verification.

3.1.3.3 The contractor shall conduct risk analyses/assessment of overall project and IMS for the infrastructure and machinery integration projects listed in Section 1.2 above.

3.1.3.4 The contractor shall develop a functional requirements traceability matrix (CDRL

A004).

3.1.3.5 The contractor shall support NSWCPD program/project managers and shall provide monthly briefings to NSWCPD program/project managers of status and any significant findings during the course of executing all tasking. A significant finding shall be defined as any event/occurrence resulting in the following:

A risk assessment of “RED” as determined by the risk cube measuring probability of occurrence versus severity of consequence of any program/project management product identified in this SOW

Contractor resource issues to adequately staff the task

3.1.3.6 The contractor shall develop a baseline industry standard risk analysis/assessment documenting the likelihood of project execution meeting requirements, schedule milestones, funding projections, and overall project completion. (CDRL A005)

3.1.3.7 The contractor shall develop a sustainment strategy to update the Risk

Analysis/Assessment and maintain configuration control and project projections throughout the life of the project. (CDRL A005)

3.1.3.8 The contractor shall train and mentor program/project management staff to build a foundation for a subsequent enterprise-wide implementation effort.

Task 3 - The hours below are provided as a baseline for estimation purposes:

Program/Project Manager III 65 hours

Program/Project Manager II 280 hours

Administrative Support 65 hours

3.2 Commonality of Systems, Subsystems, and Components – N/A

3.3 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and

Obsolete Materials or Components – N/A

3.4 Diminishing Manufacturing Sources and Material Shortages Management (DMSMS)

Contract Requirements – N/A

3.5 Parts Obsolescence – N/A

4.0 DATA REQUIREMENTS

4.1 Monthly Contract Status Report (CDRL A001)

4.1.1 Each status report shall cover one month’s performance. The report shall include but is not limited to a summary of tasking performed during the reporting period, progress of work performed, the status of all program assigned tasks, and any problems encountered during the reporting period.

4.1.2 The CDRL shall be delivered electronically, unless otherwise stated, and Contractor’s format is acceptable.

4.2 Cost Estimating (CDRL A002)

4.2.1 The CDRL shall be delivered electronically, unless otherwise stated, and Contractor’s

4.3 Integrated Master Schedule, Technical Reports & Artifacts (CDRL A003)

4.3.1 The CDRL shall be delivered electronically, unless otherwise stated, and Contractor’s format is acceptable.

4.4 Requirements Traceability Matrix (RTM) (CDRL A004)

4.4.1 The CDRL shall be delivered electronically, unless otherwise stated, and Contractor’s

4.5 Risk Assessment/Analysis (CDRL A005)

4.5.1 The CDRL shall be delivered electronically, unless otherwise stated, and Contractor’s

5.0 SECURITY REQUIREMENTS

5.1 SECURITY TRAINING. The Contractor is responsible for completing all required

Government mandated training to maintain security and network access to government sites and

IT systems to include but not limited to: Antiterrorism Level 1 Awareness; Records Management in the DON: Everyone's Responsibility; Training and Readiness: The Active Shooter; NAVSEA

Introduction to Controlled Unclassified Information; Operations Security (OPSEC); NAVSEA

Counterintelligence Training; Privacy and Personally Identifiable Information (PII) Awareness

Training; NAVSEA Physical Security training and Cybersecurity 101 Training. Certificates of successful completion shall be sent to the COR and as otherwise specified in the contract.

5.1.1 In accordance with the National Industrial Security Program Operating Manual (NISPOM)

(DoDM 5220.22), Contractor personnel that require access to Department of Navy (DON) information systems and/or work on-site require an open investigation or favorable adjudicated

Tier 3 by the Vetting Risk Operations Center (VROC). An interim clearance is granted by

VROC and recorded in the Defense Information System for Security (DISS). An open or closed investigation with a favorable adjudication is required prior to issuance of a badge providing access to NSWCPD buildings. Furthermore, if the Navy Central Adjudication Facility, have made an unfavorable determination access will be denied. For Common Access Card (CAC) you must have an open investigation and/or a favorably adjudicated investigation. Interim security clearance are acceptable for a CAC. Access will be denied for anyone that has eligibility pending in DISS. Vetting through the National Crime Information Center, Sex Offender

Registry, and the Terrorist screening database shall be process for a contractor that does not have a favorable adjudicated investigation.

5.1.2 Within 30 days after contract award, the contractor shall submit a list of all contractor personnel, including subcontractor employees, who will have access to DON information systems and/or work on-site at one of the NSWCPD sites to the appointed Contracting Officer

Representative (COR) via email. The contractor shall provide each employee's first name, last name, contract number, the NSWCPD technical code, work location, whether or not the employee has a CAC and or Standard Access Control Badge (SACB), the systems the employee can access (i.e., NMCI, RDT&E), and the name of the Contractor's local point of contact, phone number and email address. Throughout the period of performance of the contract, the Contractor shall immediately provide any updated information to the COR when any Contractor personnel changes occur including substitutions or departures.

5.2 ON SITE WORK – N/A

5.3 DD254 REQUIREMENT – N/A

5.4 OPERATIONS SECURITY (OPSEC)

5.4.1 The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NSWC Philadelphia Division's (NSWCPD) Critical Information

List (CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted.

Performance under this contract requires the contractor to adhere to OPSEC requirements. The

Contractor may not impose OPSEC requirements on its subcontractors unless NSWCPD approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NSWCPD’s CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign

Ownership, Control, or Influence (FOCI) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency. Questions concerning these requirements shall be directed to the PCO.

5.4.2 CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting

Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.

Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.

5.4.3 NSWCPD’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NSWCPD Public Release

Authority for review.

5.4.4 Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or;

incidents of loss/compromise of government Classified or CI, Business Sensitive, Company

Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal

Investigative Service, and the NSWC PD Security Division (Code 105).

5.5 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED

INFORMATION (CUI)

All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of

Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per

NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.

5.6 PLANNING, PROGRAMMING, BUDGETING AND EXECUTION (PPBE) DATA.

When contractor employees, in the performance of their duties, are exposed to Planning, Programming, Budgeting and Execution (PPBE) data, a Non-Disclosure Agreement (NDA) with all affected contactor personnel must be executed in coordination with the COR and PCO to ensure safeguarding disclosure of this data.

5.7 U-NNPI SECURITY REQUIREMENTS – N/A

5.8 U-NNPI – N/A

6.0 PLACE OF PERFORMANCE

6.1 The contractor's primary place of performance shall be at the contractor facilities; it is estimated that 90% of the work will occur off-site at the contractor facility with an additional 10% at NSWCPD.

7.0 TRAVEL

7.1 The Contractor may be required to travel from the primary performance location when supporting this requirement; the estimated number of trips is six (6).

The contractor shall be required to travel CONUS (any state in USA) to accomplish the tasks contained in this contract. Travel in support of this requirement is anticipated to include, but may not be limited to, the following alternate performance locations:

CONUS/

OCONUS:

ORIGIN: DESTINATION:

Number of

Days Per

Trip

Number of

Trips

Number of

People

CONUS TBD Philadelphia PA 2 6 2

7.2 The number of times the Contractor may be required to travel to each location cited above may vary as program requirements dictate, provided that the total estimated travel cost is not exceeded. The numbers of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements. All travel shall be approved before travel occurs. Approval may be via email by the Contracting Officer (PCO) or the fully executed

Technical Instruction (TI) signed by the Contracting Officer.

7.2.1 N/A

7.3 All travel shall be conducted in accordance with FAR 31.205-46, Travel Costs, and B-231-

H001 Travel Cost (NAVSEA) and shall be pre-approved by the COR (CDRL A002).

7.4 Travel Costs

7.4.1 The current “maximum per diem” rates are set forth in the (i) Federal Travel Regulations for travel in the Continental United States; (ii) Joint Travel Regulations for Overseas Non-

Foreign areas (e.g., Alaska, Hawaii, Guam, Puerto Rico, etc.); and (ii) Department of State

(DOS) prescribed rates for foreign overseas locations.

8.0 GOVERNMENT FURNISHED PROPERTY – N/A

9.0 GOVERNMENT FURNISHED INFORMATION – N/A

10.0 PURCHASES – N/A

11.0 COUNTERFEIT MATERIAL PREVENTION

12.0 PERSONNEL

12.1 Personnel Requirements. All persons proposed in key and non-key labor categories shall, at the time of proposal submission be U.S. citizens.

12.2 Clause 52.222-2 "Payment for Overtime Premiums" will provide for the total approved dollar amount of overtime premium or will state “zero” if not approved. If overtime premium has not been approved under this contract in accordance with Clause 52.222-2, overtime effort to be performed shall be requested from the Contracting Officer prior to performance of premium overtime. For overtime premium costs to be allowable costs; the Contracting Officer is required to approve the performance of overtime prior to the actual performance of overtime. The dollar amount in FAR 52.222-2 shall equal overtime premium negotiated between the Government and the prime contractor. This overtime premium amount shall equal the prime contractor's unburdened premium OT labor costs plus the subcontractors' fully-burdened premium OT labor costs.

12.3 The period of performance of the resultant contract is 8 months. The hours provided are based on the following labor categories and hours per year for estimating pruposes as notated above.

Title Resumes

Required

GOVT-Site

/KR-Site Total Hours

Program/Project Manager III* 1 KR 275

Program/Project Manager II* 1 KR 870

Administrative Support 0 KR 220

Total Hours: 1,365

* Key Personnel

12.4 Key Personnel

12.4.1 The Contractor shall allow as many personnel as practicable to remain on the job to help the successor maintain the continuity and consistency of the services required by this Contract in accordance with Clause 52.237-3 Continuity of Services (Jan 1991) in the basic SeaPort contract.

The Contractor also shall disclose necessary personnel records and allow the successor to conduct on-site interviews with these employees. If selected employees are agreeable to the change, the

Contractor shall release them at a mutually agreeable date and negotiate transfer of their earned fringe benefits to the successor.

12.4.2 In accordance with C-237-H002 Substitution of Key Personnel, the following labor categories are designated as the target Key Personnel for this contract. Resumes will be submitted for each category in the quantities indicated by the key category description.

Target qualifications are listed below for each education and work experience qualifications for each key personnel labor category. The proposed combined expertise of all proposed key personnel shall cover at a minimum all requirements for task areas 3.1.1, 3.1.2, and 3.1.3 in the performance work statement.

12.4.3 The Contractor shall provide individuals to fill the key positions identified below.

12.4.4 The Contractor shall indicate within the personnel section of its proposal, and/or indicate within individual submitted resume(s), any personnel security clearance requirements as stipulated in section 12.1 above.

Program/Project Manager III: (One Resume)

Minimum Education: Bachelor of Science from an accredited college or university in any technical or managerial discipline.

Minimum Experience: Twenty (20) years of experience in program/project management;

experience in Ship Design, Construction and Test; shipboard-representative land- based test site construction and ship machinery integration. Experience in creating technical requirements development from ship design documentation and experience in development of program plan documentation that supports requirements definition, requirements traceability and tracking, and requirements verification.

Program/Project Manager II: (One Resume)

Minimum Education: Bachelor of Science from an accredited college or university in any technical or managerial discipline.

Minimum Experience: Ten (10) years of experience in program/project management; experience in Ship Design, Construction and Test; shipboard-representative land- based test site construction and ship machinery integration. Experience with risk assessment, risk identification and mitigation.

12.5 Non-Key Personnel

In the performance of this effort, the Contractor shall fully staff the non-key positions listed below with qualified individuals. The Contractor shall provide individuals to fill the non-key positions identified below:

Administrative Assistant:

Minimum Education: Associates Degree in a business or technical field.

Minimum Experience: Three (3) years of experience working in engineering/science management, operations research or financial/cost analysis, ability to produce senior level presentations exported from the IMS built in Oracle Primavera P6.

12.6 DON Cyberspace IT (Information Technology) / Cybersecurity & Information

Assurance Functions and Personnel Requirements – N/A

13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING

(ECRAFT) SYSTEM – N/A

14.0 SPECIAL REQUIREMENTS – N/A

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the

Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National

Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item

Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring

Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the

Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal TBD dated TBD in response to Solicitation No.

N6449823Q5004.

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form

1423, Exhibit(s) A001-A005, attached hereto.

(End of Text)

C-227-H014 PROTECTION OF DEPARTMENT OF NAVY TRADEMARKS - BASIC (NAVSEA) (JUL 2021)

(a) The contractor shall not assert any claim, in any jurisdiction, based on trademark or other name or design-based causes of action that are based on rights the contractor believes it has in the term(s) TBD (the “Designation(s)”), against the Government or others authorized by the Government to use the Designation(s) (including the word(s), name, symbol, or design) acting within the scope of such authorization (i.e. claims for trademark infringement, dilution, trade dress infringement, unfair competition, false advertising, palming off, passing off, or counterfeiting). Such authorization shall be implied by the award of a Government contract to any party for the manufacture, production, distribution, use, modification, maintenance, sustainment, or packaging of the products and services identified under this contract, and the scope of such implied authorization is defined as the use of the Designation(s) in performance under such contract by the prime contractor and its subcontractors and suppliers at any tier. In all other cases, the scope of the authorization will be defined by the Government in writing.

(b) The contractor shall notify the contracting officer at least 30 days before asserting rights in, or filing an application to register, any one of the Designation(s) in any jurisdiction within the United States. Any such notification shall be in writing and shall identify the Designation(s) (including the word(s), name, symbol, or design), provide a statement as to its intended use(s) in commerce, and list the particular classes of goods or services in which registration will be sought.

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

Section D - Packaging and Marking

D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial

Security Program Operating Manual (NISPOM), 32 CFR Part 117.

D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:

(1) name and business address of the Contractor

(2) contract number

(3) sponsor: Jonathan Foley

(Name of Individual Sponsor)

Naval Suface Warfare Center Philadelphia Division

(Name of Requiring Activity)

Philadelphia, PA

(City and State)

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-4 Inspection Of Services--Fixed Price AUG 1996

E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form

1423.

E-246-H014 INSPECTION AND ACCEPTANCE OF ENGINEERING SERVICES (NAVSEA) (OCT 2018)

Item(s) 0005 - Inspection and acceptance shall be made by the Contracting Officer’s Representative (COR) or a designated representative of the Government.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 24-OCT-2022 TO

23-JUN-2023

N/A NAVAL SURFACE WARFARE CENTER

PHILA

JOHN FOLEY

NSWC PHILADELPHIA DIVISION

NSLC DETACHMENT

1601 LANGLEY AVE BLDG 542

PHILADELPHIA PA 19112

N64498

0002 POP 24-OCT-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 24-OCT-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 24-OCT-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 24-OCT-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018)

All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.

Section G - Contract Administration Data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of

Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-

7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s): COMBO

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting

Officer.

https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the

Contracting Officer.

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N64500

Issue By DoDAAC N64498

Admin DoDAAC** N64498

Inspect By DoDAAC N64498

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) N64498

Service Acceptor (DoDAAC) N64498

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or

Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS

Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

Kimberly Villano – Kimberly.Villano@Navy.Mil

NSWCPD_WAWF_GAM@navy.mil

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT

OFFICE (NAVSEA) (JUN 2018)

(a) The following table of payment office allocation methods applies to the extent indicated.

mailto:Kimberly.Villano@Navy.Mil

For Government Use Only

Contract/Order Payment

Clause

Type of Payment

Request

S u p p ly

S er v ic e

C o n st ru ct io n

Payment Office

Allocation Method

52.212-4 (Alt I), Contract

Terms and Conditions—

Commercial Items

52.216-7, Allowable Cost and Payment

52.232-7, Payments under

Time-and-Materials and

Labor-Hour Contracts

Cost Voucher X X N/A Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each

ACRN on the deliverable line or deliverable subline item for which payment is requested.

52.232-1, Payments Navy

Shipbuilding

Invoice (Fixed

Price)

X N/A N/A Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-1, Payments;

52.232-2, Payments under

Fixed-Price Research and

Development Contracts;

52.232-3, Payments under

Personal Services Contracts;

52.232-4, Payments under

Transportation Contracts and

Transportation-Related

Services Contracts; and

52.232-6, Payments under

Communication Service

Contracts with Common

Carriers

Invoice X X N/A Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each

ACRN on the deliverable line or deliverable subline item for which payment is requested.

Contract/Order Payment

Clause

Type of Payment

Request

S u p p ly

S er v ic e

C o n st ru ct io n

Payment Office

Allocation Method

52.232-5, Payments Under

Fixed-Price Construction

Contracts

Construction

Payment Invoice

N/A N/A X Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-16, Progress

Payments

Progress

Payment*

X X N/A Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR

32.501-3.

52.232-29, Terms for

Financing of Purchases of

Commercial Items;

52.232-30, Installment

Payments for Commercial

Items

Commercial Item

Financing*

X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and

32.1007(b)(2).

52.232-32, Performance-

Based Payments

Performance-

Based Payments*

X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and

32.1007(b)(2).

252.232-7002, Progress

Payments for Foreign

Military Sales Acquisitions

Progress

Payment*

X X N/A Allocate costs among line items and countries in a manner acceptable to the

Administrative Contracting Officer.

*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).

(b) This procurement contains the following contract type(s):

Item Type*

0001-0003 FP

*CR – Cost-Reimbursement

FP – Fixed Price

G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN 2019)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal.

Subcontractors may email encryption code information directly to the Contracting…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .