NSSL Phase 3 Industry Day Briefing - for SAM.gov.pdf
PDF 13 MB Posted
- Attached to
- National Security Space Launch (NSSL) Phase 3 DRAFT Request for Proposals (RFPs) #1 and Industry Day Federal contract opportunity
- Solicitation number
- NSSL-Ph3-dRFP1
- Issued by
- Department of the Air Force
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT Ph3Ln2 RFP1 - 2 Mar 2023 for SAM.gov.zip | ZIP file | |
| DRAFT Ph3Ln1 RFP1 - 2 Mar 2023 for SAM.gov.zip | ZIP file | |
| DRAFT Ph3Ln1 RFP1 - 2 Mar 2023 for SAM.gov.zip | ZIP file | |
| DRAFT Ph3Ln2 RFP1 - 2 Mar 2023 for SAM.gov.zip | ZIP file | |
| Atch 1 - NSSL Ph3 Industry Day Participant Request Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSSL Phase 3 Industry Day
DISTRIBUTION STATEMENT A: Approved for public release. Distribution is unlimited.
DESTRUCTION: Comply with distribution statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.
28 February 2023
20230228 – NSSL Ph 3 Industry Day Briefing final v6.1
Industry Day Agenda
Day 1 Time Topic Speaker Duration
0730 Arrival / Check-In 30 min
0800 Intro / Admin Details Lt. Col. Nicholas Longo 5 min
0805 Rules of Engagement Ms. Kirsten Prechtl 10 min
0815 AATS Overview Maj. Gen. Stephen Purdy 15 min
0830 NSSL Overview Col. Douglas Pentecost 15 min
0845 Phase 3 Procurement Strategy Lt. Col. Nicholas Longo 30 min
0915 Phase 3 Lane 1 dRFP Lt. Col. Nicholas Longo 30 min
0945 Tiered Mission Assurance Lt. Col. Tae Kim 20 min
1005 Break 15 min
1020 Phase 3 Lane 2 dRFP Lt. Col. Nicholas Longo 15 min
1035 NSSL Requirements & Document Changes Lt. Col. Tae Kim 15 min
1050 Systems Engineering Data Maj. Will Deavor 15 min
1105 Spaceport of the Future Mr. Mark Bontrager 15 min
1120 Q&A / Closing Remarks Lt. Col. Nicholas Longo 30 min
1150 Break for Lunch
3Semper Supra
Industry Day Agenda (Cont’d)
Day 1 Time Topic Speaker Duration
1150 Break for Lunch
1300-1600 One-on-One Discussions Phase 3 Team TBD
1300-1500 Systems Engineering Data Demo/
Unclassified Threat Brief Maj. Will Deavor/
SMSgt Ronald Lerch
TBD
1500-1700 Systems Engineering Data Demo/ Unclassified Threat Brief (Repeat)
Maj. Will Deavor/ SMSgt Ronald Lerch
TBD
Day 2 Time Topic Speaker Duration
TBD One-on-One Discussions Phase 3 Team TBD
4Semper Supra
Administrative Details
• Security
• Unclassified general briefing
• No recording of general or one-on-one sessions
• No photos
• Note-taking is permissible
• SSC will provide charts after Industry Day for all attendees
Semper Supra 5
Semper Supra
Administrative Details (cont’d)
Rules of Engagement Ms. Kirsten Prechtl
Contracting Officer kirsten.prechtl@spaceforce.mil
Disclaimer
• Information presented is for planning purposes only and subject to change
• Government is not seeking proposals at this time
• Does not constitute a promise to issue a solicitation in the future
• Does not commit the Government to contract for any supply or service
• Government will not pay for any information or administrative costs incurred in response to this event;
costs are solely at responding party’s expense
Semper Supra 8
Disclaimer (cont’d)
• Participation in this industry day and one‐on‐one discussions constitutes consent to disclosure of information to companies contracted with Space Systems Command/Assured Access to Space (SSC/AA) to provide program office support
• The above companies are required to provide equal protection to non‐ public information as the Government
Semper Supra 9
• The Aerospace Corporation
• Alpha Omega Group (AOG)
• Axient
• Boecore, Inc
• Boyles Enterprises
• Figueroa and Associates
• Integrated Data Services (IDS)
• KBR (formerly Centauri)
• Liona Enterprises Inc.
• ManTech International Corporation
• Millennium
• Nynth Company California LLC
• OMNI Consulting Solutions
• Quantum Research International
• Science Applications International Corporation (SAIC)
• SAVI LLC
• Stellar Solutions
• Tecolote Research Incorporated
• Wallender and Associates
Questions / Comments
• When asking a question or providing comments, please state:
• Name
• Company
• Government accepting written questions or comments on the comment form provided (mark if proprietary)
• Comment forms with proprietary information must be clearly labeled
• Information marked proprietary will be handled accordingly and safeguarded in accordance with applicable Government regulations
• Government shall not be liable in any way for proprietary information that is not properly identified
• Government may review the validity of proprietary markings
• Proprietary questions will be addressed during one-on-one sessions or provided via email to the company POCs
• Non-proprietary questions /comments & Government responses during one-on-ones and the general session may be posted on the Bidder’s Library at the Government’s discretion
Semper Supra 10
Semper Supra 11
Role Name Email
Contracting Officer Kirsten Prechtl kirsten.prechtl@spaceforce.mil
Contract Specialist Lane 1 Tyler Davis tyler.davis.39@spaceforce.mil
Contract Specialist Lane 2 Capt. Bryan Smith bryan.smith.75@spaceforce.mil
Role Name
Program Manager Col. Douglas Pentecost
Senior Materiel Leader Col. Chad Melone
Materiel Leader Lt. Col. Nicholas Longo
NSSL Phase 3 Leadership
NSSL Phase 3 dRFP Contracting Team
Please include all Contracting Members in emails regarding dRFP related topics
Role Name Email
Technical Lead Lane 1 Jonathan Hernandez jonathan.hernandez.20@spaceforce.mil
Technical Lead Lane 1 Capt. Charles Guertler charles.guertler@spaceforce.mil
Technical Lead Lane 2 Gregory Pierson gregory.pierson@spaceforce.mil
Technical Lead Lane 2 Capt. Foster Davis foster.davis@spaceforce.mil
Range POC Scott Chappie scott.chappie@spaceforce.mil
NSSL Phase 3 dRFP Technical Team
Points of Contact
Purpose
• Provide Phase 3 Dual‐Lane Acquisition Strategy Overview and draft Request for Proposals (RFP) Overview
• Solicit and gather industry dRFP feedback and recommendations as well perspective on areas of interest
Semper Supra 12
Encourage open discussion regarding draft RFP approach
Assured Access to Space (AATS) Overview Maj. Gen. Stephen Purdy
Program Executive Officer
SPACE ACCESS
ORBITAL RESILIENCY
Mission Lifecycle Management
Sub‐Orbital Rapid Strategic Mobility
Rocket Cargo AFRL Vanguard Program;
Point‐to‐Point Rapid Global Mobility
RAPID DELIVERY
On‐Orbit Servicing, Maneuver, & Debris Removal Next‐Gen Range
Services & Mission Assurance
Operate Vandenberg SFB, Patrick SFB, Cape Canaveral SFS, Eastern and Western Ranges
SV Processing Management;
Building Capacity
Commercial Range Ops &
Business Models
AATS‐Level Ops Centers for Monitoring Hardware Movements and Assets
National Federation of Spaceports USG and State Spaceports
Collaborations
New Effort Currently Executing
Multi‐Use Range Facilities;
Complex Allocation
LTRS ‐ Range Sustainment;
Materiel and Services
Procurements;
NSSL, RSLP;
Multi‐Mission Manifesting
AATS Inherent Activities
2 USSF RANGES 2 ARMED SERVICES
3 TRACKING SITES 9 LOCATIONS
100+ MISSION PARTNERS 10K PERSONNEL
TacRS Provide responsive warfighter space capabilities on demand to maintain space superiority through all phases of conflict
Tactically Responsive Space
Pillar PointVSFB
LAAFB
OO‐ALC HAFB
Wake Atoll Kodiak PMRF
JBPHH
YPG
Camp Navajo
Fort Wingate
KAFB
WSMR
Centennial, CO
Decatur, AL
MDA
CCSFS PSFB
Ascension Island
San Juan, PR
Malabar
JDMTA
WFF
Operating Location AATS Personnel Assigned Tracking Site Storage Site Ancillary LocationAATS Controlled Locations
CAO 10 Aug 22
Assured Access to Space The Future of Assured Access to Space
Orbital Servicing Remove/Replace Payloads On‐Orbit;
Drive Common Standards;
Commercial Refueling Capability
Orbital Maneuver Leverage commercial industry for on‐orbit maneuvers;
Small‐launch to LEO, use on‐orbit stages to higher altitudes
Debris Removal Engage and Energize Industry Solutions
OPERATIONS INTEGRATION
Spaceports/Launch/Satellite Ops
AATS Policy, Requirements & Funding
SSC Spaceflight Worthiness & Certification
AATS Program Incubator
DoD Mission Manifesting
SSC/S3
AATS
AA3/5/
Enterprise Mission Assurance Team
COCOM Space Effect IntegratorOrbital/Sub‐Orbital Launches; Storage, Surveillance, and Refurbishment of Decommissioned ICBM Motors
UNCLASSIFIED
Supply Chain Risk Management
NSSL Overview Col. Douglas Pentecost
Program Manager, Space Systems Command/Assured Access to Space (SSC/AA)
100% Launch Success is Vital to Countering the Pacing Challenge
CAO 23 Jan 23
Launch Programs Key Enabler for the Space Domain
USSF launches the most critical National Security Space satellites
Falcon 9 (5 On Contract) Next: USSF-124
(17 Jul 23)
Delta IV Heavy (2 on Contract) Next: NROL-68
(28 Mar 23)
Falcon Heavy (1 On Contract) Next: USSF-52
(23 Jun 23)
Vulcan (8 On Contract) Next: USSF-106
(Nov 23)
Atlas V (2 On Contract)
Next: Silent Barker (21 Jul 23)
Nation’s Eyes & Ears
Positioning, Navigation & Timing
Secure Comms
Space Domain Awareness
Enables Resilient Space Order of Battle
>$82B in On-Orbit Capability
97 Successful NSSL Launches
Govt Mission Assurance = 100% Mission Success
Multi-Mission Manifesting
Launcher One Next: STP-28B
Late 2023
Minotaur Next: Mk21A-2
Late 2023 Ravn X
Next: ASLON-45
TBD
RS-1
Next: STP-AR1
Late 2023
23 of 25 Successful RSLP Launches since 2015
Alpha Next: TacRS-3
NET Apr 23
USSF Space Access Portfolio
Sounding Rocket Program – 4
Suborbital targets and experimental flights
- Unique/specialized msns
- IDIQ with 2 providers
- 9-18 month procurement
- 2018 through 2025
Small Rocket Program – Orbital LEO access through very small launch
- Compete every launch
- SBIR opportunities
- 9-18 month procurement
- 2019 through 2029
Orbital Services Program – 4
Small and medium launches to LEO
- Tailorable Msn Assurance
- 11 IDIQ providers
- 12-24 month procurement
- 2019 through 2028
National Security Space Launch
Highly reliable medium to heavy spacelift
- Phase 2: two providers
- 12-24 mo procurement
- 2020 through 2024
- Phase 3: 2025-TBD
Mission Manifest Office
- Coordinates all USSF missions and is single entry point for customers
- Utilizes excess launch vehicle performance to maximize on-orbit capability
- Demonstrated late-stage secondary payload swap as late as one month prior to launch
- MMO uses its Launch Enterprise; Launch Manifest Systems Integrator (LMSI) contract to integrate SVs onto auxiliary payload adapters
MDAPNon-MDAP Scope of Launch Enterprise Contracts
17Semper Supra
Trends Driving AATS
UNCLASSIFIED
UNCLASSIFIED
Multiple changes are driving the USSF from a Launch to a Logistics Model
18Semper Supra
NSSL Future Needs
• Transition to resilient space architecture
• Increase in higher energy missions
• More multi-manifested missions (dedicated / excess)
• Potential new orbits / mission areas
• Increase number and type of launch systems
• Increase number of and geographic dispersion of launch sites
• Operate through threats like weather, cyber, etc.
• Varied payload security requirements
• Ability to do traditional and rapid SV/LV integration
• Supporting anticipated launch tempo increase
• Harness innovative best practices
• No significant launch development RDT&E investment
Semper Supra 19
Mission Success!
Phase 3 Procurement Strategy Lt. Col. Nicholas Longo
Materiel Leader, Mission Procurement Branch
NSSL Phase 3 Lead
Long-term Program Schedule
22Semper Supra
EoQ: Economic Order Quantities IDIQ: Indefinite Delivery Indefinite Quantity LSP: Launch Service Provider
Phase 3 Dual-Lane Approach
Lane 2 Upfront Commitment
Lane 1 Rolling Competitions
Secures launch capacity/AATS
Provides consistent demand, gain EoQ
Addresses manifest flexibility
Ensures capability for hard missions
Dual Lane Advantages
Provides annual opportunities so systems in development can on-ramp when ready
Provide additional resiliency through new launch systems
• Operational Imperative: Launch must deliver national security space capability to the warfighter to deter/defeat current, emerging and future threats
• Approach to meet imperative: Provide assured access to space to the integrated space architecture at affordable prices
• Phase 3 Acquisition Strategy: Execute a dual-lane approach with two separate contract types to fulfill program requirements
Indefinite Delivery, Indefinite Quantity (IDIQ) contract to on-ramp new systems & emerging providers for missions that are more risk tolerant
Longer-term Indefinite Delivery, Requirements contracts - commitment to assure access to space for missions that cannot fail
Industry Perspective/Feedback
• Requesting Industry Feedback
• Lane 1 Tiered Mission Assurance Process
• Systems Engineering Data
• Launch acceleration (quantity for Lane 2)
• Timelines for Monte Carlo Orbital Parameter accuracy and mass to orbit
(MTO) analysis
• Integrated Master Schedule (IMS) format
• For Industry Information
• Range availability/agreements/leases
Semper Supra 24
Submit CRM with RFP Comments NLT 17 Mar 23 @ 1300PST
Lane 1
RFP
FY23 FY24 FY25
Industry Engagement
Release RFPs
Lane 1 Source Selection
On- Ramp
Lane 1 Annual
On-ramping Opportunities
Proposal Dev
Lane 2
RFP
Phase 2 Ordering
Period Ends
Proposal Dev
TO Source Selection
Lane 1 TO Award
Lane 1
TO RFP
Lane 1 Contract Awards
Lane 2 Source Selection
Lane 2 TO Award
Lane 1
RFP
Lane 2 Contract Awards
Today
Phase 3 Schedule
Proposal DevdRFPs #1 & 2 dRFPs #1 & 2
Industry Day
Industry Feedback on dRFPs
OY1 EISs
Proposals Received
Contract Award
Release RFP
Early Integration Studies (EIS) for First Ordering Year of Phase 3 Lane 2
• Early Integration Studies (EIS) is vital for first-time missions and/or new entrant launch vehicle configuration for first ordering year
• Risk reduction activity
• Informs Government on compatibility between launch vehicle (LV) and spacecraft
• Identifies space vehicle’s (SV’s) mission unique requirements
• Assesses LV’s ability to meet SV interfaces
• Offerors interested in conducting EIS for missions ordered in the first ordering year of Lane 2 must be:
• LSP with certified system; or
• LSP with approved certification plan for your proposed launch system
• If an Offeror is neither of these but is interested in conducting EIS
• LSP must submit a Statement of Intent (SOI) to initiate a certification plan for your proposed launch system
Please submit SOI for your proposed system by 1300 PDT on 9 March 2023
Phase 3 (dRFP) Lane 1 Overview Lt. Col. Nicholas Longo
Materiel Leader, Mission Procurement Branch
Phase 3 Dual Lane Approach Lane 1 Contract Parameters
Parameter Lane 1: ~27 Specified Missions Indefinite Delivery Indefinite Quantity Contracts
Contract Type Multi-award IDIQ contracts (Fixed Firm Price)
Order Period 5-yr Base + 5 yr Option (FY25-FY34)
PoP 13 years; covers launches FY27-37
# LSPs Multiple LSPs/Systems, Lane 2 awardees may compete/bid
Requirements Meet a subset of NSSL requirements
Certification None, LSPs must provide evidence demonstrating 1 successful launch in Task Order proposal
On-ramping Annual for new LSP/System
Ordering Procedures Annual task order competitions (individually or in-blocks), allows for non-standard (1 to 3-year) integration cycle
Launch Svc Support
(LSS)
None, pricing will be fully burdened; tiered Msn Assurance framework
Lane 1 1st Draft RFP (Released 16 Feb 23)
Model Contract (FA8811-23-R-0001)
Exhibit A Contract Data Requirements List (CDRL)
Attachment 1 Performance Work Statement (PWS)
Attachment 2 Ordering Guide
Attachment 3 Addendum to FAR 52.212-04, Contract T&Cs – Commercial Items
Attachment 4 Small Business Subcontracting Plan [cover page only]
Attachment 5 Small Business Participation Commitment Doc [cover page only]
Attachment 6 Government Property [cover page only]
Attachment 7 Organizational Conflicts of Interest (OCI) Plan [cover page only]
Attachment 8 Instructions to Offerors [solicitation only]
Attachment 9 Evaluation Criteria [solicitation only]
Lane 1 1st Draft RFP (Released 16 Feb 23)
Model Contract (FA8811-23-R-0001) (Cont’d) Model Launch System Readiness Study Task Order
Projected Manifest (non-public information; posted to Bidders Library only)
Compliance & Ref Docs (100+ including some non-public info; posted to Bidders Library)
Comment Resolution Matrices (CRMs)
Lane 1 CLIN Structure
CLIN Description Type
0002 Launch Service FFP
Launch Service Orders
Other Orders
CLIN Description Type
0001 Launch System Readiness Studies (Minimum Order) FFP
0003 Quick Reaction/Anomaly Resolution FFP
0004 Special Studies FFP
0005 Data And Reports NSP
Lane 1 dRFP Key Features
Basic Contract / On-Ramping
• Instructions of Offerors – Basic award and yearly on-ramping to receive min order and ability to compete for mission task orders
• Evaluation Criteria – Acceptable or Unacceptable
Min Order PWS – Launch System Readiness Study: Initial Risk Assessment, Technical Insight, Targeted EIS
Launch Service Task Order Level
• Ordering Guide – Contains task order level ITO; 1 successful flight;
Full NRDV not required; EC similar to Lane 2 (tailored to each msn)
• PWS – Tiered Mission Assurance approach, Commercial Rideshare, Systems Engineering, Fully burdened (No LSS), Tailored mission requirements
• Small Business Participation Plan – Maintain 4% of contract award
• CDRL’s – Tailored to msn; added CDRLs for Min Order and Tiered MA
IDIQ Base Contract Evaluation Criteria
IDIQ Task Order Evaluation Criteria
Lane 1 IDIQ Base & Task Order Criteria
Lane 1 TOs Could Utilize Several Options from Full Trade-off to LPTA
Lane 1 Tiered Mission Assurance Lt. Col. Tae Kim Systems and Logistics Branch Chief, AAE
Lane 1 IDIQ MA Glance
Semper Supra 35
IDIQ On-Ramp Eligibility
Domestic LSP
Lift 20klbs to LEO
Plan to 1st Launch Within 12 months
Plan for AS9100
CTR MA Plan for Targeted Lane 1
Tiers
IDIQ Minimum Order
Tailored NRDV Plan Development
Initial Tech, Schedule, & Risk
Assessments
Targeted EIS
Technical Insight
LSTO Bid Eligibility
1 Successful Flight
Meet Mission Requirements
Risk / Schedule Assessment
Complete AS9100 Audit w/ Plan to
Completion
Execute LSTO Mission Award
Tier 0 No MA
Tier 1 Minimal MA
Tier 2 Some MA
Tier 3 Moderate MA
Lane 1 IDIQ
LSP Tiered MA Plans
Tailored NRDV Plan Execution
Lane 1 Minimum Order Scope
• Technical Insight (e.g., vehicle design, test data, command media) provides support to USG’s monitoring of launch services (§ 5.3)
• Deliver Mission Assurance Plan to support mission specific assessments according to Tiered Mission Assurance framework (§ 5.4)
• Targeted Early Integration Studies to gain knowledge of LSP’s mission integration and launch execution activities (§ 5.5)
• LSP conducts Process and Launch System Design Review in support of USG’s initial technical, schedule, and risk assessments (§ 5.6 & 5.7)
• Tailored IDIQ NRDV plan development based on USG assessments (§ 5.8)
• Deliver data product list to support NRDV plan (§ 5.9)
Semper Supra
Launch System Readiness Study Provides Lane 1 LSPs, LVs, and CONOPS Capability Assessment to USG
Lane 1 LSTO Tiered MA Framework
Semper Supra 37
NSSL Phase 3 Lane 1 Tiered MA Framework to Tailor MA Efforts in PWS Appendix I (LSTO)
Tier 0
MA
Consistent w/ Commercial
Missions
(FAA
Licensing
Reqs)
Tier 1 Deviations from Engines and
Motors Qual Baseline
Deviations to MA Reqs Allowed w/ Risk Assessment
High risks must be mitigated to Medium
Review Top NCs;
QTP/ATP/NCs for Mission
Unique and FFI
Very Small DOL Ops Team w/o Gov MD
Tier 2 Deviations from Propulsion, Separation, Fairing, and Tank Systems Qual Baseline
Deviations to MA Reqs Allowed w/ Risk Assessment
Medium+ risks must be mitigated to Low-Medium
Review Top NCs; ATP/NCs for Flight Critical HW (1st Flt), then will reduce
Small DOL Ops Team w/ Gov
MD
Tier 3 Deviations from Flight
Critical Items Qual Baseline
Deviations to MA Reqs Allowed w/ Risk Assessment
Medium+ risks must be mitigated to Low-Medium
Review Top NCs; ATP/NCs for Flight Critical HW
Full DOL Ops Team
“Minimal” Space Flight Worthiness Certification
“Some” Space Flight Worthiness Certification
“Moderate” Space Flight Worthiness Certification
Lane 1 LSTO MA Framework Example
38Semper Supra
Full MA Scope
Hardware Reviews; Flight Mechanics, Guidance and
Navigation; Flight Controls, Dynamics and Loads;
Thermal, Fluids, and
Contamination; Software;
DOL Software Load
Verification; DOL; DOL Placards; DOL Winds Analysis;
Structures; Orbital Debris Mitigation Data; Booster
Propulsion Analysis; Upper Stage Propulsion Analysis;
Solid Rocket Booster; Rocket Engine(s); Avionics; Ground Software Baseline; Ground Support Equipment; and Launch Site Operations …
Tailored based on Tiered MA Framework
Tier 1 MA Hardware Reviews of Engines and Motors; …
Tier 2 MA Hardware Reviews of
Propulsion, Separation, Fairing, and Tank Systems;
Guidance and Navigation;
Dynamics and Loads; …
Tier 3 MA Hardware Reviews of Flight Critical Items; Mostly Review of Contractor Documentation; Targeted IV&V; …
Tier 0 MA
Break (15 min)
Day 1 Time Topic Speaker Duration
0730 Arrival / Check-In 30 min
0800 Intro / Admin Details Lt. Col. Nicholas Longo 5 min
0805 Rules of Engagement Ms. Kirsten Prechtl 10 min
0815 AATS Overview Maj. Gen. Stephen Purdy 15 min
0830 NSSL Overview Col. Douglas Pentecost 15 min
0845 Phase 3 Procurement Strategy Lt. Col. Nicholas Longo 30 min
0915 Phase 3 Lane 1 dRFP Lt. Col. Nicholas Longo 30 min
0945 Tiered Mission Assurance Lt. Col. Tae Kim 20 min
1005 Break 15 min
1020 Phase 3 Lane 2 dRFP Lt. Col. Nicholas Longo 15 min
1035 NSSL Requirements & Document Changes Lt. Col. Tae Kim 15 min
1050 Systems Engineering Data Maj. Will Deavor 15 min
1105 Spaceport of the Future Mr. Mark Bontrager 15 min
1120 Q&A / Closing Remarks Lt. Col. Nicholas Longo 30 min
Phase 3 dRFP Lane 2 Overview Lt. Col. Nicholas Longo
Materiel Leader, Mission Procurement Branch
Phase 3 Dual Lane Approach Lane 2 Contract Parameters
Lane 2 1st Draft RFP (Released 16 Feb 23)
Model Contract (FA8811-23-R-0002)
Exhibit A Contract Data Requirements List (CDRL)
Attachment 1 Performance Work Statement (PWS)
Attachment 2A DD 254 Contract Security Classification Specification
Attachment 2B DD 254 SCI Addendum (non-public info; posted to Bidders Library)
Attachment 2C DD 254 SAP Addendum (non-public info; posted to Bidders Library)
Attachment 3 Small Business Subcontracting Plan [cover page only]
Attachment 4 Small Business Participation Commitment Doc [cover page only]
Attachment 5 Acceptance Criteria
Attachment 6 Government Property [cover page only]
Attachment 7 Pricing Tables
Attachment 8 Payment Plan
Model Contract (FA8811-23-R-0002) (Cont’d)
Attachment 9 Cumulative Mission Success Incentive Plan
Attachment 10 Award Fee Plan
Attachment 11 Addendum to FAR 52.212-04 Contract T&Cs –Commercial Items
Attachment 12 NRO DD 254
Attachment 13 NRO Requirements Descriptions and CDRL
Attachment 14 Organizational Conflicts of Interest (OCI) Plan [cover page only]
Attachment 15 Instructions to Offerors [solicitation only]
Attachment 16 Evaluation Criteria [solicitation only]
Projected Manifest (non-public information; posted to Bidders Library only)
Compliance & Ref Docs (100+ including some non-public info; posted to Bidders Lib)
Comment Resolution Matrices (CRMs)
Lane 2 1st Draft RFP (Released 16 Feb 23)
Lane 2 CLIN Structure
CLIN Description Type
0001 Launch Service FFP
0003 Mission Unique Services – Procurement (if necessary) FFP
0004 Mission Unique Services – R&D (if necessary) FFP
0005 Mission Acceleration FFP
Launch Service Orders
Other Orders CLIN Description Type 0002 Launch Service Support (Annual) FFP 0006 Quick Reaction/Anomaly Resolution/Special Studies FFP 0007 Early Integration Studies/Special Studies FFP 0008 Data and Reports NSP 0009 Cumulative Mission Success Incentive FFP 0010 Award Fee Incentive FFP
Lane 2 dRFP Key Features
• CDRL’s - New CDRL for Business Management Review
• PWS - Systems Engineering Data, Enhanced Classified Operation Support and security requirements, Revised EIS categories, Multi-manifest enhancements, Fleet Surveillance revision
• Instructions of Offerors - Proposal must meet Minimum Gate, Approved Launch System Certification Plan required
• Evaluation Criteria - Increased fidelity in Past Performance use of confidence assessment rating
• Small Business Participation Plan – Maintain 4% of contract award
• Award Fee - $20 M per year for each Launch Provider; Performance based
• Cumulative Mission Success Incentive (CMSI) - $10M / per successful mission paid after 1st 3 successful missions then after every 5 missions thereafter
To increase competition, flight will not be required as a gate to advance in proposal evaluation When Combined Factors 1 thru 3 are significantly more important than Factor 4 Price
Best value tradeoff where technical is more important than price
Lane 2 IDR Base Evaluation Criteria
NSSL Lane 2 Requirements & Document Changes Lt. Col. Tae Kim Systems and Logistics Branch Chief, AAE
NSSL Requirements
Semper Supra 48
NSSL Requirements: System Performance Requirements Document (SPRD), Standard Interface Specification (SIS); Other Specs, Standards, Compliance items ….
Examples of Key NSSL Requirements:
• Mass to Orbit
• Orbital Insertion Accuracy
• Overflight
• GPS Key handling – “Zeroizing”
• Full ODMSP Compliance
• Vertical Integration
• Eastern & Western Ranges
• 5-m diameter Fairing (min)
• 62-in, 103-inch, and 173-in
Payload Interfaces
• Autonomous Flight Safety Sys
• Secure GPS / M-code
• End-to-end USSF Mission
Assurance Support: Data, Fleet Surveillance, & Risk Mitigation
NSSL Primary Payload Mass-to-Orbit Reference Orbits (SPRD Rev C, 2023)
Reference Orbit
Apogee Altitude (nmi)
Perigee Altitude (nmi)
Inclination (deg)
Mass‐to‐ Orbit (lbm)
Semimajor Axis (nmi) Eccentricity
LEO NS NS 63.40 15,000 3,944 0
Polar 1 NS NS 98.20 15,500 3,894 0 Polar 2 NS NS 98.20 37,500 3,894 0 MEO Direct NS NS 50.0 20,000 13,259 0
MEO Transfer 10,998 540.0 55.00 9,000 NS NS
GTO 19,323 100 27.00 18,000 NS NS
Molniya 21,150 650 63.4 11,500 NS NS
GEO 1 NS NS 0.0 5,000 22,767 0
GEO 2 NS NS 0.0 14,500 22,767 0
MEO Direct 2 NS NS 55.0 6,450 14,442 0
GEO 1.5 NS NS 0.0 8,000 22,767 0
Retrograde NS NS 120 15,000 7,444 0
Revisions
Noteworthy Updates in SPRD Revision C
Semper Supra 49
• Updated Mass to Orbit Reference Orbits and Orbital Parameter Accuracy limits based on recent SV mission survey
• Updated Overflight requirement to focus more on minimizing unintended disclosure of critical technology
• Updated Orbital Debris, Range Safety, Protected GPS, Disposals, and Cyber Security requirements
• Removed Category A Payload Envelope
• Added 103-inch (2624mm) diameter payload interface as standard service
• Added Payload Fairing Internal Pressure limits for venting and mitigating risks
• Added LV-to-Payload Shock levels for
LSP-provided separation systems
• Added tabular data for graphical data
• Updated routine access, SV mass properties, ground ops, electrical interfaces, environments, mission design, LV commands, RF attenuation, and MSE accommodations requirements
Noteworthy Updates in SIS Revision D
NSSL New Entrant (NE) Process Overview (Lane 2 Requirement)
Semper Supra 51
NSSL Program Manager Approval NECT Assessment / NE Feedback
CRADA = Cooperative Research and Development Agreement NECT = New Entrant Certification Team NRDV = Non-Recurring Design Validation SIS = Standard Interface Specification
NE meets Entry
Rqmts AND is Viable?
Yes Begin NRDV*/ Certification via CRADA
Entry Requirements: Proposed System Must
• Lift payload mass of 20,000 lbs to LEO of 100 nm altitude with 28.5 degrees inclination
• Meet 97.5% mission reliability **
• Provide 3-sigma orbit insertion accuracy **
• Meet interface requirements in SIS **
• Be a U.S. launch system and company
New Entrant Viability
• One or more launches of proposed launch system, or
• Previous experience as Launch Service Provider, or
• Established manufacturer of space launch propulsion systems
NECT
Interacts with NE
NE Contacts NSSL Program for NE Process
Info
NE Submits Statement of Intent
* NRDV includes meeting all NSSL requirements ** These are consistent with the SPRD rev C (2023) and SIS rev D (2023)
Note: See New Entrant Certification Guide (NECG) for details on Certification Process
NSSL Flight Worthiness Process
Semper Supra 52
New Entrant Certification occurs any time during NRDV
Space Flight Worthiness Cert of a single mission occurs just before launch
Non-Recurring Design Validation
(NRDV)
Qualify the Design (Margins & Reliability)
Qualify the Processes (Ability to Produce the Hardware Design)
Verify that Test Hardware Meets Qualification
Evaluate Build of Flight Hardware in Accordance with Qualified Design & Processes
Mission Specific
Verification
Mitigate All Issues to an Acceptable Risk Level for Flight
NRDV is Foundation of Mission Specific Verification & Flight Worthiness Certification
Systems Engineering Data Maj. Will Deavor Digital Innovation Chief, AAE
Digital Modernization Imperative
Semper Supra 54
The New Digital Acquisition Reality
(2020)
DoD Data Strategy (2020)
DoD Digital Engineering
Strategy (2018)
USSF Vision for a Digital Service
(2021)
DoD Digital Modernization Strategy (2019)
The USSF will become the world’s first fully Digital Service. We will be an interconnected, innovative, digitally dominant force.
– Gen Raymond, USSF Vision for a Digital Service (2021)
This Vision of a Digital Space Force is defined as: an interconnected, innovative, digitally dominant force
– USSF Vision for a Digital Service (2021)
DoD’s approach is to securely and safely connect people, processes, data, and capabilities across an end-to-end digital enterprise
– DoD Digital Engineering Strategy (2018)
[Digital Modernization] will enable increased lethality for the Joint warfighter, empower new partnerships that will drive mission success, and implement new reforms enacted to improve capabilities across the information enterprise.
– DoD Digital Modernization Strategy (2019)
AATS Digital Vision
Semper Supra 55
• AATS is establishing a Gov-owned secure digital ecosystem to modernize and streamline mission process and realize USSF vision for digital service
• AATS Digital Ecosystem will enable:
• Development of operational tools for high tempo Phase 3 execution
• Cross-organizational integration under one system and link current “silos of excellence”
• Information transfer with external parties
• Automation, streamlined processes, and rapid data driven decisions…
• ADE provides IL5 level security to handle CUI and proprietary data near-term and higher impact levels in future
AATS Digital Ecosystem (ADE)
AATS
Gov
Gov CTRs
FFRDCs Launch Service
Providers
SV
Partners
Msn Partners
AATS Gov ‐ Ecosystem owner and operator ManTech – System Admin/Infrastructure Architect Aerospace – System Admin/Tool Architect
New Systems Engineering Data Requirements
Systems Engineering Data to review qualification data in machine readable format
Data Analytics to perform focused MA tasks and analyze big dataDigital Twin to digitally exercise flight software and associated hardware Digital Mission
Milestone Reviews to review requirements verification in electronic dashboards
Digital Supply Chain Transparency to support capabilities in MA, risk assessments, and flight worthiness
Streamlined Cross-Platform Collaboration Across Industry Partners
Spaceport of the Future (SOTF) Mr. Mark Bontrager
Technical Director, SSC/S3
Spaceport Of The Future (SOTF) Overview
58UNCLASSIFIED
UNCLASSIFIED
Vision: “Preserve and advance national security interests through globally competitive Ranges with capacity to support launch and test operations on demand.”
- Gen. John “Jay” Raymond, USSF ROTF 2028 Strategic Intent
• Priority 1: Evolve Eastern and Western Range capabilities to support all phases of launch and test operations for multiple users simultaneously.
• Priority 2: Deliver streamlined, equitable access to Range resources while creating and improving upon public services and infrastructure at both the Eastern and Western Range.
• Priority 3: Transform Range Business Model to be agile and responsive to Commercial Space Industry while preserving DoD test capabilities.
• Priority 4: Evolve and integrate U.S. Space Force Ranges into national space transportation and commerce system.
The Time Is Now!
*Image from Google Image Search
SOTF Lines of Effort/Focus Areas
– Implement comm upgrades
– Provision PaaS & IaaS via RSHP
– Plug-and-play based on use cases
– Transition to DevSecOps delivery
Architecture
– Installation Planning and Roadmaps
– Vehicle and Spacecraft Processing
– Multi-user / maximize launch pads
Infrastructure
– LISC Follow-on
– Consistent ER/WR Processes
– Streamline Governance/Bureaucracy
Operations / Business Model
– AFSS Transition
– Legislative Proposal
– Policy changes (FMR, DoDI, etc.)
Policy / MRTFB
– Interagency Planning Group
– Management Structures
Spaceports
Operate as a Single, Innovative Enterprise & Address Unique Customer Needs
LTRS R&PC
SLD 30/45
SLD 30/45
SSC/S3
SSC/S3
Preserve and advance National Security interests by building globally competitive Ranges with capacity to support launch and test operations on demand
SOTF
Policy/MRTFB
Senior Steering Group
– DS3, SLD CV-Os, Sr Aerospace Advisor
– Monthly meetings, in-person quarterly, decisive vectors for ROTF IPTs, projects and emergent needs
UNCLASSIFIED
UNCLASSIFIED
SOTF Lines of Effort Architecture
• Modernized IP-based networks
• Enables modernized capabilities at the edge
• Enhanced data transport
• Removes critical obsolescence risk
• Modernized equipment at the edge
• Upgraded telemetry antennas for simultaneous pad coverage
• Improved weather sensor systems
• Enhanced tracking radar signal processing
• Range Services Hosting Platform (RSHP)
• Cyber hardened on-premise IT infrastructure
• Enables capability for data exchanges between ER & WR
• Steppingstone to hybrid cloud and data strategy
• Migrating capabilities to hybrid cloud for speed of delivery & break apart monolithic systems
UNCLASSIFIED
UNCLASSIFIED 60
SOTF Lines of Effort Infrastructure
• Infrastructure improvements -- mutually beneficial to government & industry
• Increased launch & landing locations
• Launch Pad Allocation Strategy / Multi-user sites
• Expand land development
• Increased capacity for SV processing facilities
• Power grid/water treatment/road upgrades
• Water transport: dock/harbor development and improvements
• Infrastructure funding:
• Combined ER/WR infrastructure project list FY24-28 → $1.268B
• Provided to OMB and SAC-D, per their request
• Both ranges partnering with state and local authorities
• Mutually beneficial investment opportunities
• Space Florida
• California GoBiz/Reach
UNCLASSIFIED
UNCLASSIFIED
AATS is positioning to Leverage Commercial Space-Lift Market Boom
• ER/WR transitioning from manual Flight Termination System (FTS) to AFSS
• Govt. standard identified (RCC 319); industry develops compliant systems
• Range Safety and FAA certify commercial systems
• 1 Oct 2025 implementation deadline set by CSO (Gen Raymond)
• AFSS is a key enabler for spaceport operations
• Increased throughput; allows parallel pre-launch, launch and test operations
• Reduces launch-on-time risk and increases flight-paths
• Provides significant cost savings to range and range users
• ~50% saving for commercial providers on an AFSS Range
• Allows divestment of range critical systems and manpower
• SSC/S3 monitoring launch service provider (LSP) progress
• Industry developing variety of vehicle specific and commercially available systems
• Current & projected ER/WR LSPs on track to meet mandate; NASA SLS currently at risk
AFSS key to increased range capacity/cadence
UNCLASSIFIED
UNCLASSIFIED
SOTF Lines of Effort - Policy Automated Flight Safety System (AFSS)
Global Spaceport Transition
DoD Range Model Port Model
Port Model Evaluation
• Targeted studies
• Aerospace assessment (Jan 2021)
• Arizona State University (Dec 2022)
• Phase 2 pending
• BCA underway to inform port model
• Working groups
• National Spaceport Interagency
Working Group
• Spaceport Directors Council
• Global Spaceport Alliance
• Commercial Spaceflight Federation
Infrastructure Planning
• Civil engineering assessments
• Infrastructure Development Plan
• Infrastructure Roadmap
• Conducting supply chain SWOT
• Optimizing property use
• Launch pad allocation strategy
Policy
• Legislative policy
• Phased approach
• Legislative Prop. (409) in interagency coord.
• Developing FY25 legislative proposal
• Spaceport Governance
• Informed by trade studies & working groups
Funding
• ROTF infrastructure funding
• Submitted prioritized funding requirements at OMB request
• Charging Model Study
• Spaceport Funding; indirect cost allocation
• Analysis informs future policy proposals
Architecture Modernization
• Modernize/replace/divest legacy systems
• IP-based networks
• Equipment at the Edge
• Hybrid cloud migration
• Range Service Hosting platform
• Transition to Autonomous Flight Safety System
Infrastructure Execution
• Executing Infrastructure Master Plan
• Paced/prioritized for resource constraints
• Roads, bridges, power, commodities
• Defend the mission
• Identify/mitigate vulnerabilities
• Launch thru degradation
Infrastructure Planning
Infrastructure Execution
FundingPolicy
Architecture Modernization
Port Model
Space Launch Delta POCs
UNCLASSIFIED
UNCLASSIFIED
• SLD 30 Plans and Programs Office
• Mr. William Prenot: SLD30.XPWORKFLOW@us.af.mil
• SLD 45 Plans and Programs Office –
• Ms. Shaunna Lovell: 45SWXP@us.af.mil
Questions & Answers
Lunch Break
Day 1 Time Topic Speaker Duration
0730 Arrival / Check-In 30 min
0800 Intro / Admin Details Lt. Col. Nicholas Longo 5 min
0805 Rules of Engagement Ms. Kirsten Prechtl 10 min
0815 AATS Overview Maj. Gen. Stephen Purdy 15 min
0830 NSSL Overview Col. Douglas Pentecost 15 min
0845 Phase 3 Procurement Strategy Lt. Col. Nicholas Longo 30 min
0915 Phase 3 Lane 1 dRFP Lt. Col. Nicholas Longo 30 min
0945 Tiered Mission Assurance Lt. Col. Tae Kim 20 min
1005 Break 15 min
1020 Phase 3 Lane 2 dRFP Lt. Col. Nicholas Longo 15 min
1035 NSSL Requirements & Document Changes Lt. Col. Tae Kim 15 min
1050 Systems Engineering Data Maj. Will Deavor 15 min
1105 Spaceport of the Future Mr. Mark Bontrager 15 min
1120 Q&A / Closing Remarks Lt. Col. Nicholas Longo 30 min
Systems Engineering Data Demonstration Maj. Will Deavor Digital Innovation Chief, AAE
Unclassified Threat Brief SMSgt Ronald Lerch Senior Enlisted Leader, Intel Directorate
One-on-One Discussions Phase 3 Team/Industry
File details come from the government source that posted it. Updated .