RFP_ATT_B_Special_Requirements.pdf

PDF 67 KB Posted

Attached to
CONTRACTOR SUPPORT FOR THE PURDUE ADVANCED REACTOR CORE SIMULATOR (PARCS) CODE SUITE Federal contract opportunity
Solicitation number
NRC-HQ-60-15-R-0009
Issued by
Nuclear Regulatory Commission Central Office

About this file

Attachment B - Special Requirements

View the file

Other files for this federal contract opportunity

Other files attached to CONTRACTOR SUPPORT FOR THE PURDUE ADVANCED REACTOR CORE SIMULATOR (PARCS) CODE SUITE, newest first.
File Type Posted
Amendment_1_Q As.pdf PDF
RFP_ATT_C_TRACE_Code_Update_Process.pdf PDF
RFP_ATT_A_PARCS-SOW_Jun_26_15.pdf PDF
NRC-HQ-60-15-R-0009_Jun_26_15.pdf PDF
RFP_ATT_1_PARCS_Performance_Questionnaire_Jun_26_15.pdf PDF
RFP_ATT_D_TRACE_Standard_F90.pdf PDF
RFP_ATT_E_MLSR_Instructions__Template.docx DOCX document
PARCS_Pre-SolicitationNotice_Jun_01_15.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B

Special Requirements

All code development activities must follow principles described in NUREG-1737 and adhere to the Programming Guidelines and Design Philosophies as outlined in Attachment D.

All code transmittal packages shall be generated using the buildTransmittal.pl perl script and shall include the following:

SQA documentation Patch files to the TRACE source in diff format Modified source files HTML summary file explaining the nature of the changes and testing Modified test input files (if any) Newly added test input decks (if any) HTML results of the testSummary.pl script (generated for the regression test set) AVScript input files (if applicable) Scripts or programming tools that might have been used/generated in the course of completing the update

If changes to the code manuals are required in conjunction with a particular update, the contractor may be asked by NRC to make those modifications in addition to the SQA documentation outlined in the SOW. Regarding this issue, it is NRC’s expectation that the contractor shall become familiar with the content of each chapter in each manual so that manual changes are applied comprehensively and at a level of detail similar to the content that surrounds the modified or added text. The contractor shall ensure that inconsistencies between various sections of content (either in thought or in nomenclature) are not introduced.

Changes to manuals shall generally be made to the on-line, official electronic files directly. In cases where this practice is either not prudent or not possible, the contractor shall use Framemaker’s built-in change bar feature to call out modifications to make it easier for NRC staff to integrate those changes into the official electronic files at the appropriate time.

The NRC will not consider it acceptable to submit graduate theses as the final product of research. All final assessment reports shall use NRC-supplied Framemaker templates and shall be in accordance with the specifications provided in the Statement of Work.

The development of all assessment input problems shall be accompanied by the

Attachment B development of a calculation notebook that justifies the use of every value provided in the model. For every value, the calculation notebook shall answer the following questions:

What is it?

Why was it chosen?

What was assumed?

How was it calculated? and/or Where did it come from?

File details come from the government source that posted it. Updated .