2._SOW.pdf
PDF 370 KB Posted
- Attached to
- Orion Assembly, Integration & Production Continuous Improvement Support Federal contract opportunity
- Solicitation number
- NNK17608643Q
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JOFOC.pdf | ||
| 1._RFQ_NNK17608643Q.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement Of Work
Orion AI&P Continuous Improvement Support
2017 – OPO Support for EM-1 CoFR
1.0 Background
The NASA Orion Production Office at KSC is responsible for building, testing and producing the Orion spacecraft at the
Operations & Checkout facility for NASA’s Exploration missions. OPO is an office under the Orion Program managed from NASA/JSC.
NASA’s first man rated flight vehicle for Orion will be the
Exploration Mission-1 (EM-1) planned in the 2018 to demonstrate operational capability to validate the Orion first crewed mission on EM-2. OPO seeks to demonstrate continuous improvements from lessons learned from EFT-1 and path find
Assembly, Integration & Production (AI&P) and test operations for the EM-1 experience to effectively apply to subsequent exploration missions to ensure subsequent missions are more effectively and efficiently processed for mission success assurance.
In 2016 an Orion “Material and Inspection Receiving Report or
DD250” and Certificate of Flight Readiness (CoFR) approach and implementation plan was approved by the Orion Program establishing an affordable process for OPO to support the EM-1 delivery to NASA’s Exploration Systems Development (ESD).
The DD250/CoFR plan consists of Incremental Acceptance
Reviews (IAR) as baselined in 2016 to support the EM-1 DD250 and System Acceptance Review (SAR) and will continue into
2017.
2.0 Scope
The Contractor shall support the execution of the Incremental
Acceptance Reviews (IAR) established in 2016 for EM-1 enabling OPO to effectively support the DD250 and CoFR process. This includes updating the plan during AI&P execution, coordinating results with OPO and Orion Program Office, execution of the plan with all OPO stakeholders, and documenting lessons learned.
3.0 Requirements
3.1 Update the EM-1 OPO DD250 Implementation Plan
The Contractor shall review and update the EM-1 OPO
DD250/CoFR Implementation Plan established in 2016 with
NASA’s OPO and Orion Vehicle Integration Office (VIO). The
Contractor will coordinate the implementation of this plan with the support of the AI&P process owners. This implementation will be based on priorities and available resources determined by
OPO to maximize the insight of high risk operations within program budget.
3.2 Coordinate and Integrate the EM-1 OPO DD250/CoFR
Implementation Plan with Orion Program and LM DD250 team.
The Contractor shall coordinate and integrate the EM-1 OPO
DD250/CoFR Implementation Plan with Orion VIO, program
Integrated Product Teams (IPTs) and the Lockheed Martin (LM)
DD250 Team. This plan includes the Incremental Acceptance
Review (IAR) process established in 2016 to review Acceptance
Data Packages (ADP) data during the AI&P operations to support the SAR expectations in a timely manner.
3.4 Execute the EM-1 OPO DD250/CoFR Implementation
Plan for 2016 operations
The Contractor shall manage the implementation of the EM-1
OPO Incremental Acceptance Review (IAR) process during the
AI&P and Test operations during the period of performance. The
Contractor shall integrate the plan milestones into the OPO monthly calendar, coordinate OPO staff to selected reviews, document results, and status results to OPO management.
3.5 Conduct a Lessons Learned Assessment of the OPO
DD250 Plan and recommend updates for Subsequent IARs leading to the SAR
The Contractor shall perform a lessons learned assessment of the
EM-1 OPO DD250 Implementation Plan during the period of performance and recommend plan updates to improve the
Incremental Acceptance Review (IAR) process leading to the
SAR. The Contractor shall update the Plan with OPO and MPCV approval.
4.0 Reporting
The Contractor shall submit reports as shown in the
Deliverables/Milestone Schedule Table in Section 6.0. Reports shall be in the narrative form, brief, and informal. They shall include the contract number, a quantitative description of progress, an indication of any current problems that may impede performance, proposed corrective action, and a discussion of the work to be performed during the next monthly reporting period.
The Contractor shall submit a final report that summarizes the results of the entire contract, including recommendations and conclusions based on the experience and results obtained.
5.0 Travel
The Contractor may be required to Travel with Contracting
Officer’s approval.
6.0 Deliverables or Deliverable Schedule
Deliverables shall be delivered electronically via M/S Word with face to face and/or teleconference briefings.
Deliverables/Milestone Schedule:
The contractor shall provide progress reports at the following dates:
Milestone Description Due Date
1 Updated EM-1 CPI Plan & Implementation Results 1-Mar-17
2 Follow-on Report 31-May-17
3 Follow-on Report 31-July-17
4 Follow-on Report 30-Sept-17
5 Final Comprehensive Report 30-Nov-17
7.0 Government-Furnished Equipment and Government-
Furnished Information
None- Contractor to provide all materials and equipment to perform this requirement.
8.0 Place of Performance
The contractor will perform work a Government site
(KSC/O&C).
9.0 Period of Performance
The period of performance will begin at time of award on
February 1, 2017 through November 30, 2017.