Attachment_D_-_Model_Contract.docx

DOCX document 68 KB Posted

Attached to
NextSTEP-2 BAA Appendix G: Space Relay Partnership and Services Study Federal contract opportunity
Solicitation number
NNH16ZCQ001K-SRP
Issued by
National Aeronautics and Space Administration Glenn Research Center

View the file

Other files for this federal contract opportunity

Other files attached to NextSTEP-2 BAA Appendix G: Space Relay Partnership and Services Study, newest first.
File Type Posted
Source_Selection_Letter.pdf PDF
NNH16ZCQ001K-SRP_amendment_2.pdf PDF
NNH16ZCQ001K-SRP_amendment_1.pdf PDF
NextSTEP_BAA_Appendix_G_Q&A.pdf PDF
NextStep_Q&A.pdf PDF
NextSTEP-2_BAA-Appendix_G_Instructions_Final.pdf PDF
Attachment_E_-_Acronym_List.docx DOCX document
Attachment_A_ArchBackv10.pdf PDF
Attachment_C_SCaN-NextSTEP-BAA--DRAFT-Architecture-Requirements-R11.pdf PDF
Attachment_B_SCaN_Beacon_of_Light_Presentation_BAA_PDF.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Model Contract Appendix G Attachment D Section B - Supplies or Services and Prices/Costs

B.1 NFS 1852.216-78 FIRM FIXED PRICE (DEC 1988)

The total firm fixed price of this contract is estimated to be $OFI.

TOTAL FIRM FIXED PRICE

Estimated Cost
Profit Rate
Total Price
CLIN 1 – Space Relay Partnership and Services Study
$OFI

$OFI

$OFI

(End of clause)

[END OF SECTION]

Section C - Description/Specifications/Statement of Work

C.1 SUPPLIES AND/OR SERVICES TO BE PROVIDED

The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items or services specified in accordance with the Statement of Work, Attachment A.

(End of Text)

C.2 GSR 1-1 TECHNICAL DIRECTION (APR 2016)

(a) Performance of the work under this contract is subject to the technical direction of the Contracting Officer (CO) or the designated Contracting Officer’s Representative (COR).

(b) "Technical direction" means a directive to the Contractor that provides clarification of the contract’s general description of the scope of work, to include approaches, solutions, designs, refinements or shifts within tasks, or inquiries related to the general tasks and requirements in the statement of work or specifications.

(c) Technical Direction does not include any instruction that--

(1) Constitutes an assignment of additional work outside the statement of work (i.e. “new work”;

(2) Constitutes a change as defined in the changes clause;

(3) Constitutes a basis for any increase or decrease in the total price, any milestone price, or the time required for performance or delivery;

(4) Changes any of the expressed terms, conditions, or specifications of the contract;

(5) Interferes with the contractor's rights to perform the terms and conditions of the contract; or

(6) Changes any performance-based requirement.

(d) All technical direction will be issued in writing by the CO or the designated COR.

(e) The Contractor shall proceed promptly with the performance of technical direction issued by the CO or COR, unless, in the Contractor's opinion, any instruction or direction falls within any of the categories defined in paragraph (c) of this clause. In the latter event, the Contractor shall not proceed but shall within 5 working days notify the CO in writing of the basis for its opinion. Within 30 calendar days of receiving this notification, the CO will either amend the technical direction, request a proposal for an amendment to the contract or Task Order, advise the Contractor in writing that the technical direction is considered to be within the limits of this clause and that the Contractor should proceed promptly with its performance, or rescind the technical direction in its entirety.

(f) A failure of the Contractor and CO to agree that the instruction or direction is both within the requirements of the contract and does not constitute a change under the changes clause, or a failure to agree upon the contract action to be taken with respect to the instruction or direction, shall be subject to the Disputes clause of this contract.

(g) Any action(s) taken by the Contractor in response to any direction given by any person other than the CO or the designated COR shall be at the Contractor's risk.

(End of Text)

C.3 ENVIRONMENTAL

All work performed under this contract shall be in compliance with all applicable Federal, state, and local environmental regulations.

(End of Text)

C.4 SAFETY / HEALTH

All work performed under this contract shall be in compliance with 29 CFR 1910, OSHA standards. Any work performed at GRC shall comply with the Glenn Safety and Occupational Health Manuals. Any work performed at another NASA Center shall comply with the governance of that center.

(End of Text)

[END OF SECTION]

Section D - Packaging and Marking

D.1 NFS 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)

D.2 MARKING INSTRUCTIONS

(a) The Contractor shall mark each shipment, unless otherwise noted, with the following address:

NASA Glenn Research Center 21000 Brookpark Road Cleveland, OH 44135 Receiving ATTN: Contract #TBD

(b) In addition, the contract number and the number of each container in the shipment shall be marked in consecutive order, beginning with No. 1, on the opposite side of each container.

(c) Each container shall include a packing list.

Section E - Inspection and Acceptance

E.1 FAR 52.246-9 INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984)

E.2 FAR 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

E.3 GRC 52.246-92 INSPECTION AND ACCEPTANCE (JAN 1987)

Final inspection and acceptance of all work performed under this contract, including all deliverable items will be performed at NASA GRC, and will be determined by the end of the contract period of performance.

(End of Clause)

Section F - Deliveries or Performance

F.1 FAR 52.211-8 TIME OF DELIVERY (JUN 1997) ALTERNATE I (APR 1984)

The Government requires delivery to be made according to the following schedule (also outlined in the Statement of Work, Attachment A). All deliverables are due within 5 months of award as outlined in the SOW.

F.2 Deliverables (After receipt of order):

OFI

F.3 FAR 52.242-15 STOP-WORK ORDER (AUG 1989)

F.4 FAR 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

F.5 FAR 52.247-34 F.O.B. DESTINATION (NOV 1991)

F.6 LATE DELIVERABLES AND EXTENSION REQUEST

(a) In the event that the Contractor anticipates difficulty in complying with the contract delivery schedule, the Contractor shall notify the CO and COR immediately, in writing, giving pertinent details, including the date by which it expects to make delivery; provided, however, that this notification by itself does not constitute a waiver by the Government or approval of any contract delivery schedule. The Contractor has the opportunity to request an extension with a justification and consideration. Timeliness will be part of the past performance evaluation.

(b) If the Contractor determines a potential slippage of the contract delivery schedule, the Contractor has the opportunity to request an extension. The request shall be submitted electronically to the CO and COR and shall include the following information:

· Contract number

· CO name and email address

· COR name and email address

· New end date

· Type of extension (no-cost extension)

· Reason for extension (requires CO/COR Approval)

(End of text)

F.7 PERIOD OF PERFORMANCE – WITH REPORTS

The maximum total contract period of performance for the technical effort required under this contract is five months from the effective date of this contract, except that reports shall be delivered in accordance with the contract clauses related specifically to reports.

(End of Text)

F.8 PLACE OF PERFORMANCE - SERVICES

The services to be performed under this contract shall be performed at the following location:

OFI

The Contractor may provide occasional visits to NASA facilities as needed.

Section G - Contract Administration Data

G.1 NFS 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT REPRESENTATIVE (APR 2015)

(a) For purposes of administration of the clause of this contract entitled "New Technology-Other than a Small Business Firm or Nonprofit Organization" or "Patent Rights--Ownership by the Contractor," whichever is included, the installation New Technology and Patent Representatives identified at http://prod.nais.nasa.gov/portals/pl/new_tech_pocs.html are hereby designated by the Contracting Officer to administer such clause for the appropriate installation.

(b) Disclosures of reportable items and of subject inventions, interim new technology summary reports, final new technology summary reports, utilization reports, and other reports required by the applicable “New Technology” or “Patent Rights-Ownership by the Contractor” clause, as well as any correspondence with respect to such matters, shall be directed to the New Technology Representative unless transmitted in response to correspondence or request from the Patent Representative. Inquiries or requests regarding disposition of rights, election of rights, or related matters shall be directed to the Patent Representative. This clause shall be included in any subcontract hereunder requiring a "New Technology-Other than a Small Business Firm or Nonprofit Organization" clause or "Patent Rights--Ownership by the Contractor" clause, unless otherwise authorized or directed by the Contracting Officer. The respective responsibilities and authorities of the aforementioned representatives are set forth in 1827.305-270 of the NASA FAR Supplement.

(End of Clause)

G.2 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (APR 2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC’s Vendor Payment information web site at: https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract’s terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

G.3 NFS 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)

G.4 NFS 1852.245–82 OCCUPANCY MANAGEMENT REQUIREMENTS (JAN 2011)

(a) In addition to the requirements of the clause at FAR 52.245–1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:

(1) NPD 8800.14, Policy for Real Estate Management.

(2) NPR 8831.2, Facilities Maintenance and Operations Management.

(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor’s expense.

(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.

(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.

(End of clause)

G.5 APPROVALS BY THE NASA CONTRACTING OFFICER’S REPRESENTATIVE

(a) All required approvals (or disapprovals) shall be furnished by the NASA Contracting Officer’s Representative (COR) after receipt of the data to be approved. In the event the data is disapproved, the Contractor shall make the necessary corrections and resubmit the data to the NASA COR within ten (10) days after receipt of data to be corrected. The NASA COR’s disapproval or revision to the items submitted shall be within the general Scope of Work stated in the contract, and shall be in accordance with the "Technical Direction" clause of this contract.

(b) All requests for approval by the NASA COR shall be submitted in writing by the Contractor. Simultaneously with such submission, a copy of the transmittal letter shall be furnished to the Contracting Officer.

(c) If notification of approval or disapproval is not received within the time period set forth in paragraph (a) above, the Contractor shall assume that approval has been granted.

(End of Text)

G.6 MILESTONE DELIVERABLE/PAYMENT SCHEDULE

Deliverables shall be provided and invoices shall be submitted after receipt of each item as shown in the following schedules and in accordance with FAR clause 52.232-2 Payments under Fixed-Price Research and Development Contracts (APR 1984)

Milestone Description and Number

Due Date
Percentage of Invoice/Payment Plan
Invoice/Payment Plan Dollars
Kick-off Meeting
OFI
15%
$OFI
Mid-term Review
OFI
35%
$OFI

Contract Completion

50%

Totals
OFI
100%
$OFI

Section H - Special Contract Requirements

H.1 NFS 1852.223-72 SAFETY AND HEALTH (SHORT FORM) (JUL 2015)

H.2 NFS 1852.225-70 EXPORT LICENSES (FEB 2000)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at [insert name of NASA installation], where the foreign person will have access to export-controlled technical data or software.

(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

(End of clause)

H.3 NFS 1852.235-73 FINAL SCIENTIFIC AND TECHNICAL REPORTS (DEC 2006) - ALTERNATE II (DEC 2005)

H.4 NFS 1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)

H.5 NFS 1852.244-70 GEOGRAPHIC PARTICIPATION IN THE AEROSPACE PROGRAM (APR 1985)

H.6 GRC 52.235-90 FINAL REPORT - SUPPLEMENTAL REQUIREMENTS (OCT 2014)

The following requirements are in addition to those stated in the Final Scientific and Technical Reports clause (1852.235-73) of this contract.

(1) In addition to the requirements of NPR 2200.2, Requirements for Documentation, Approval, and Dissemination of NASA Scientific and Technical Information, the format and content of the Final Report shall also follow NASA-SP-2005-7602 "NASA Publications Guide for Authors", incorporated herein by reference and made a part hereof. These documents are available at http://www.sti.nasa.gov [Click on "Publish STI" and click on “Publication Guidance.”

(2) The Contractor shall submit an electronic copy of a DRAFT-FINAL REPORT to the NASA Contracting Officer (CO) within 30 days after completion of the technical effort. The CO shall submit the electronic copy of the draft-final report to the Contracting Officer’s Representative (COR) and review comments from the COR for acceptance or rejection of the report. The COR's review will address technical accuracy, conformance with applicable law, policy and publication standards, and a determination of the availability and distribution of NASA-funded documents containing scientific and technical information (STI), via the Web-based Electronic Document Availability Authorization (E-DAA)/NF-1676B. Acceptance or rejection (in part or in total) of the draft-final report will be accomplished by NASA within thirty (30) days after receipt. Rejected draft-final reports shall be resubmitted within 10 working days for review following correction of the cited deficiency, unless otherwise directed by the NASA CO or NASA COR.

(3) Within thirty (30) calendar days after notification of approval of the Contractor's draft-final report, the Contractor shall distribute the approved Final Report electronically and in hardcopy format as follows: 3 copies to the CO (M.S. 60-1). Each hardcopy Final Report shall consist of one reproducible copy of the Final Report itself, one set of glossy continuous tone prints of all photographic materials included in the Final Report, and 1 DVD with the searchable .PDF file electronically.

(4) Printing, duplicating, binding and other reproduction required under this contract is subject to the provisions of the Government Printing and Binding Regulations published by the Joint Committee on Printing, Congress of the United States and the clause at NFS 1852.208-81 entitled "Restrictions on Printing and Duplicating".

(5) The Contractor is solely responsible for managing the technical effort, the schedule, and the contract funds to ensure delivery of the Draft-Final Report and the Final Report on time. Failure to deliver the Final Report as scheduled, or a request that additional funding be provided by the government to ensure delivery of the Final Report, may result in a Performance Evaluation of "Unsatisfactory” or a reduction in profit/fee equal to the additional cost associated with delivery of the Final Report, or both.

H.7 GRC 52.237-91 CONTRACTORS' DUTIES AND RESPONSIBILITIES ON-SITE (DEC 2016)

(a) BADGES AND PASSES

(i) Badge and Pass Issuance

Support Service Contractor personnel having a need to enter areas of the Glenn Research Center Lewis Field or Plum Brook Station shall have an identification badge or pass. This badge or pass shall be obtained at the Badge Control Office or Visitor Control Office located at the Main Gate of either Lewis Field or Plum Brook Station.

Permanent Badge (Personal Identify Verification (PIV) Credential) Requirements

a. It is recommended that the contractor complete the new employee hiring process at least 10 work days prior to the employee’s start date.

b. Upon the selection of a new employee, the contractor’s Human Resource (HR) representative shall create an identity in the Identity and Access Management Tool (IdMAX).

c. The contractor’s HR representative shall also complete NASA Form 1760, Position Risk Designation for Non-NASA Employee and GRC 1760, Position Risk Designation Cover sheet. Once completed, both forms shall be signed by the NASA COTR and sent to the Office of Protective Services POC for Non-Government Investigations.

d. At the time of the Center visit or the Entry-on-Duty appointment, the new employee shall complete the Enroll for PIV credential process at the Main Gate Badge Control Office.

e. During this activity the new employee shall provide verification of their identity by providing two forms of I-9 documentation and fingerprints.

f. Upon Entry-on-Duty, the employee shall be issued a temporary credential (badge) for access to the Center until a Permanent Credential (badge) is created.

Please reference the GRC Office of Protective Services web site for the Permanent Support Service Contractor (SSC) New Hire Identity Creation Process (https://security.grc.nasa.gov/im_ssc_new_hire.cfm), and for additional information.

(1) Temporary Pass Requirements

· Short Term Visitors (1-29 days) shall receive a Visitor Pass. Please reference the GRC Office of Protective Services web site (https://security.grc.nasa.gov/form_visit_information.cfm) to complete the on-line visitor request form.

· NASA GRC Service and Vendor Personnel shall receive a Service / Vendor Personnel Pass which will allow only physical access to NASA GRC. Please reference the GRC Office of Protective Services web site (https://security.grc.nasa.gov/crm_grc_serv_vend_pers.cfm) for complete information.

The contractor shall ensure that, for badging purposes, each contractor employee is in possession of GRC 9975 (Construction Contractor Registration & ID Badge), prior to reporting to work. Contractor employees not in possession of the above mentioned form will be delayed at the gate until the contractor supervisor/foreman or that individual’s representative reports to the Main Gate with the appropriate paperwork for badging

· Temporary workers are defined as those employees that are on Center for more than 29 days and less than 180 days. Please reference the GRC Office of Protective Services web site (https://security.grc.nasa.gov/crm_temporary_worker.cfm) for complete information.

All lost or stolen badges or passes shall be reported immediately to the GRC Office of Protective Services.

(ii) Employee Separation

(1) When an employee terminates and/or resigns employment, the contractor shall issue to the employee GRC 10087, Non-NASA Separation Clearance Record. The contractor shall be responsible for making an inquiry of all offices listed on the form to see if the employee has any outstanding Government items. The employee shall then take this form to all offices that list he/she as having outstanding items. The employee's last stop is for the return of their Government issued I.D. badge. The contractor is also required to send a notice to the Grc-Ssc-Separations@Lists.Nasa.Gov within 1 day of employees' separation.

(2) The contractor shall ensure that the terminated and/or resigned employee has returned his/her badge to the Main Gate Badge Clerk. Final clearance of a contractor upon completion of a contract will depend in part upon accounting for all badges issued to employees during the performance of the contract. Security badges are Government property and any alteration or misuse of these badges may be prosecuted as a violation of Section 499, Title 18, U.S. Code.

(3) The contractor's on-site manager shall comply with the Badge and Property Regulations a copy of which will be given to the contractor's supervisors at the time of the Construction Site Showing.

(4) Upon termination of duties, each employee's badge will be collected and returned to the Main Gate by the contractor. Final clearance of a contractor upon completion of a contract will depend in part upon the accounting for all badges issued to employees during the performance of the contract. Security badges are Government property and any alteration or misuse of these badges may be prosecuted as a violation of Section 499, Title 18, U.S. Code.

(b) PERSONNEL LOCATION AND IDENTIFICATION

The contractor shall:

(1) Ensure that office space occupied by its personnel is clearly labeled with the name of the company.

(2) Ensure, to the extent practicable, that external correspondence signed by its personnel is on company letterhead. Internal correspondence, including e-mail and memoranda, must include the name of the company in the signature line or in another clearly identifiable location.

(3) Ensure that its onsite personnel, when receiving or placing telephone calls, identify their employer, in addition to whatever other appropriate greeting is used.

(4) When participating in meetings with Government and/or other contractor personnel, ensure that its personnel properly identify themselves as contractor employees so that their actions will not be construed as acts of Government officials.

(5) EMERGENCY PREPAREDNESS

(1) Emergencies are defined as incidents involving serious personal injury or damage, incidents that cause possible hazardous conditions, or incidents that require immediate attention of the Plant Protection Department or Security. The contractor shall ensure that its employees are informed that Emergency, Fire, Medical, Safety, and Security assistance can be summoned by dialing 911 from a NASA phone, or 216-433-8888 from a cell phone.

(2) For incidents not classified as an emergency, contractor personnel shall be instructed to immediately notify the Contracting Officer's Representative (COR) (rather than dialing 911 from a NASA phone, or 216-433-8888 from a cell phone).

(3) In the event of any accident investigation activity, the contactor shall cooperate fully with the Government Accident Investigator and the Center Accident Investigation Board. This cooperation shall include interviews at the accident site and/or at a Board meeting.

(4) The contractor shall provide written guidance to its employees in the event of an emergency, an incident other than an emergency, a Center closure, a building closure, a fire alarm, or tornado alarm. The contractor is encouraged to include in this guidance pre-established instructions, when feasible, to employees such that unnecessary delays and confusion may be avoided by employees who may otherwise be awaiting management instructions. For example, the contractor is encouraged to address what actions employees should immediately take in the event of fire, building closure, Center closure (i.e. late Center opening or early center dismissal) for snow or other causes.

(c) TRAFFIC

The contractor agrees to comply, and agrees to require that all of its personnel will comply with all posted traffic signs, signals and instructions of personnel assigned for traffic control and parking purposes and with the provisions of the NASA Glenn Research Center Safety Manual (GLM-QS-1700.1), Chapter 19, Vehicle & Pedestrian Safety, incorporated herein by reference and made a part hereof.

(d) PROHIBITION OF FIREARMS

Firearms or weapons of any kind are strictly prohibited at the Glenn Research Center.

(e) SECURITY INCIDENTS

Theft of Property, Bomb threats, malicious damage and any other threat or violent situations shall be immediately reported to the GRC Office of Protective Services.

AFTER-HOUR ACCESS

During normal working hours, 6:00 a.m. to 6:00 p.m. Monday through Friday, the guards at the gates will permit contractor entrance and departure. At any other time, advance clearance is required. Advance clearance may be obtained through the Glenn/Plum Brook COR, who will make the request to the Main Gate Officer (3-2204 at Glenn and 3-3221 at Plum Brook). After-hour clearances, as approved by the COR, are certification to the guards as authority for admittance of a contractor during off hours, including Saturdays, Sundays, and Holidays. This procedure ONLY applies to temporary contractors who are on-site at Glenn for 1 - 179 days within 365 day timeframe and are issued temporary badges (non-smartcard credentials). NOTE: Per Plum Brook management ALL Plum Brook Station employees are required to follow the after-hour access procedures.

(f) GOVERNMENT PROPERTY ACCOUNTABILITY

(1) Government property and material is subject to the requirements of Federal Acquisition Regulation (FAR) Part 45 and NASA FAR Supplement (NFS) Part 1845. All NASA contractors are required to follow all applicable FAR and NFS regulations as well as applicable NASA Directives. Removal of NASA property from GRC and Plum Brook Station without prior authorization is strictly prohibited and is subject to denial of Center access and criminal prosecution. Contractors shall ensure that their employees are familiar with the requirements of the contract with regard to Government Property, including the disposal and removal of scrap and residual materials. The removal of scrap and residual job materials from GRC requires written approval from the NASA COR or authorized representative. The appropriate documentation must be completed and signed by the COR or authorized representative before exiting the Center. Each driver is required to surrender the completed documentation to the security officer at the security control point upon departure. Each vehicle is then subject to inspection prior to departure from the Center to check the contents of the respective vehicle against the information listed on the documentation authorizing removal of the property.

(2) In addition to the above, Municipal Waste, Recyclables, and Hazardous Materials must also be properly disposed of utilizing the appropriate containers and collection points for each type of scrap and residual material. Failure to adhere to the proper disposal of these materials or unauthorized use of municipal waste or recycling containers may result in the denial of Center access and possible civil or criminal prosecution for the offender.

(3) Property movement and disposal shall be coordinated through the Logistic and Technical Information Division’s (LTID) Supply and Equipment Management Officer/Property Disposal Officer in accordance with the requirements in NASA Policy Document (NPD) 4200.1, Equipment Management, NPD 4300.1, NASA Personal Property Disposal Policy, NPR 4200.1, NASA Equipment Management Procedural Requirements, and NPR 4300.1, NASA Personal Property Disposal.

(4) Questions concerning the proper removal and disposal of property, scrap, waste or other residual job materials should be forwarded to the NASA COR, or the GRC Supply and Equipment Management Officer (SEMO).

(End of Clause)

H.8 GRC MODIFICATION (1/14) TO NFS 1852.235-74 -- ADDITIONAL REPORTS OF WORK - RESEARCH AND DEVELOPMENT (JAN 2014)

In addition to the final report required under this contract, the Contractor shall submit the following report(s) to the Contracting Officer:

(a) Monthly progress reports. The Contractor shall submit separate monthly reports of all work accomplished during each month of contract performance. Reports shall follow the formatting and content guidelines identified in paragraph (c) below.

(b) Report Format. All reports shall follow the format and content requirements described below.

(i) Cover page containing:

(A) Contract number, Task Order Number (if applicable), and title.

(B) The type of report ("Monthly Progress Report" or “Quarterly Progress Report"), and the period being reported.

(C) Contractor's name, address, and organizational segment generating the report.

(D) Signature of Contractor's cognizant Project Manager (or, if submitted electronically, an unambiguous indicator that the Project Manager has generated/reviewed the report)

(E) Date of issuance.

(F) Inclusion of the following statement: "Prepared for NASA Glenn Research Center, Cleveland, OH 44135."

(ii) Section I -- Technical Progress Summary: A description of the work performed during the report period and the overall technical progress achieved. The current schedule status shall also be addressed in this summary.

(iii) Section II -- Current Problem(s): A description of any current problem(s) which may impede technical, schedule and/or cost performance, along with proposed corrective action(s). Include an explanation of how the problems could affect the cost and schedule of the reporting categories in the financial and schedule reports if applicable, as well as the effects at the total contract level.

(iv) Section III -- Risk Management: Include a list of Significant Open Risks and associated Mitigation Plans. Significant Open Risks are those that have the potential to affect major development milestones & goals, such as a delivery delay, a design-freeze date, a cost ceiling, a safety or health concern, environmental impacts, a technical trade-off decision, etc. Further guidance, if needed, is available in the following Risk Management reference documents, which are available through the NASA Online Directives Information System (NODIS):

(A) NPR 8000.4, "Agency Risk Management Procedural Requirements"

(B) GLPR 8000.1, “Risk Management"

Submission dates. Monthly and quarterly reports shall be submitted by the 15th day of the month following the month or quarter being reported. If the contract is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report shall be submitted within 30 days after the completion of the effort under the contract.

(End of Clause)

H.9 APPLICABILITY OF CONFERENCES, CONFERENCE-RELATED TRAVEL AND OTHER TRAVEL

(a) This is further detailed guidance related to the New Policies in Response to Direction in OMB Memorandum-13-05 "Agency Responsibilities for Implementation of Potential Joint Committee Sequestration" issued on March 13, 2013. With respect to conference attendance, conference travel, and all other travel, the guidance is applicable to all circumstances where NASA requires or directs conference attendance, participation and travel.

(b) Contractors are required to report on and obtain approval from the Contracting Officer for conferences and conference related travel to the extent NASA requires or directs conference participation or attendance.

· "requires or directs" includes SOW requirements, or any oral or written direction/approval resulting in a direct charge to a contract.

Note: The term "conference" is defined in NASA Interim Directive {NID) 9700.1 Contractors, grantees, and cooperative agreement holders are expected to exercise due diligence when approving conference attendance, conference travel, and all other travel. However, travel related to performance on contracts, grants and cooperative agreements and any other circumstances related to performance should continue. This Agency-wide guidance does not alter any contracts, cooperative agreements or grants. Any questions should be directed to the appropriate Contracting Officer.

(End of Text)

H.10 REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

The completed provision 52.204-8, Annual Representations and Certifications, including any amended representation(s) made at paragraph (b) of the provision, and the certification required by section 3.2.4, Assurance of Compliance – China Funding Restriction, of the omnibus Broad Agency Announcement NNH16ZCQ001K, are hereby incorporated by reference in this resulting contract.

H.11 Organizational Conflicts of Interest (OCI)

NASA has determined that the receipt of a contract from this appendix will not constitute an OCI based on biased ground rules. An OCI based on biased ground rules could prevent the recipients from proposing on subsequent solicitations regarding the SRP. NASA based this determination on section 9.505-2 (b) (1) (iii) which provides an exception for preparing specifications or work statements. This exception applies when more than one contractor has been involved in preparing the statement of work. NASA intends to award two or more contracts for studies. Additionally, the studies will provide valuable information for the Statement of Work, but are not to write the specifications or work statement.

(End of Text)

[END OF SECTION]

Section I - Contract Clauses

I.1 FAR 52.202-1 DEFINITIONS (NOV 2013)

I.2 FAR 52.203-3 GRATUITIES (APR 1984)

I.3 FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

I.4 FAR 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

I.5 FAR 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

I.6 FAR 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

I.7 FAR 52.203-10 PRICE OF FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

I.8 FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)

I.9 FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)

I.10 FAR 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)

I.11 FAR 52.204-2 SECURITY REQUIREMENTS (AUG 1996)

I.12 FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)

I.13 FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

I.14 FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2016)

I.15 FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)

I.16 FAR 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

I.17 FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)

(a) Definitions. As used in this clause–

“Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

“Safeguarding” means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

(End of clause)

I.18 FAR 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)

I.19 FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)

I.20 FAR 52.215-2 AUDIT AND RECORDS—NEGOTIATION (OCT 2010)

I.21 FAR 52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT (OCT 1997)

I.22 FAR 52.215-17 WAIVER OF FACILITIES CAPITAL COST OF MONEY (OCT 1997)

I.23FAR 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
I.24FAR 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009) ALTERNATE I (OCT 2009)
I.25FAR 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (NOV 2016)

I.26 FAR 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)

[Paragraph (g) insert: The Contractor represents that it is a small business concern under NAICS Code 541715 assigned to contract number TBD.

Authorized Contractor Signature: _____________________________OFI____________________________

Date: ____________________________ OFI _______________________

Authorized Contractor Signer’s Printed Name: ________ OFI ____________

Authorized Contractor Signer’s Title: ____________________ OFI ______________]"

(End of Clause)

I.27 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

I.28 FAR 52.222-3 CONVICT LABOR (JUN 2003)

I.29 FAR 52.222-17 NONDISPLACEMENT OF QUALIFIED WORKERS (MAY 2014)

I.30 FAR 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

I.31 FAR 52.222-26 EQUAL OPPORTUNITY (SEP 2016)

I.32 FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)

I.33 FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

(End of clause)

I.34 FAR 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

I.35 FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)

I.36 FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

I.37 FAR 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

I.38 FAR 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)

I.39 FAR 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

I.40 FAR 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011)

I.41 FAR 52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS (MAY 2011)

FAR 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

I.42 FAR 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) - ALTERNATE I (APR 1984)

I.43 FAR 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)

I.44 FAR 52.227-10 FILING OF PATENT APPLICATIONS—CLASSIFIED SUBJECT MATTER (DEC 2007)

I.45 FAR 52.227-11 PATENT RIGHTS—OWNERSHIP BY THE CONTRACTOR (MAY 2014) AS MODIFIED BY NFS 1852.227-11 (APR 2015)

I.46 FAR 52.227-14 RIGHTS IN DATA—GENERAL (MAY 2014)

I.47 FAR 52.227-16 ADDITIONAL DATA REQUIREMENTS (JUN 1987)

I.48 FAR 52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)

Except for data contained on pages _OFI____, it is agreed that as a condition of award of this contract, and notwithstanding the conditions of any notice appearing thereon, the Government shall have unlimited rights (as defined in the “Rights in Data-General” clause contained in this contract) in and to the technical data contained in the proposal dated ___OFI_________, upon which this contract is based.

(End of clause)

I.49 FAR 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

I.50FAR 52.228-7 INSURANCE-LIABILITY TO THIRD PERSONS (MAR 1996)
I.51FAR 52.229-4 FEDERAL, STATE, AND LOCAL TAXES (STATE AND LOCAL ADJUSTMENTS) (FEB 2013)

I.52 FAR 52.232-2 PAYMENTS UNDER FIXED-PRICE RESEARCH AND DEVELOPMENT CONTRACTS (APR 1984)

I.53 FAR 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

I.54 FAR 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)

I.55 FAR 52.232-11 EXTRAS (APR 1984)

I.56 FAR 52.232-17 INTEREST (MAY 2014)

I.57 FAR 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

I.58 FAR 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

I.59 FAR 52.232-25 PROMPT PAYMENT (JAN 2017)

I.60 FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

I.61 FAR 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

I.62 FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

I.63 FAR 52.233-1 DISPUTES (MAY 2014)

I.64 FAR 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I.65 FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

I.66 FAR 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)

I.67 FAR 52.239-1 PRIVACY OR SECURITY SAFEGUARDS (AUG 1996)

I.68FAR 52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)
I.69FAR 52.242-13 BANKRUPTCY (JUL 1995)

I.70 FAR 52.243-1 CHANGES—FIXED PRICE (AUG 1987) - ALTERNATE V (APR 1984)

I.71 FAR 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)

I.72 FAR 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)

I.73 FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2017)

I.74 FAR 52.246-25 LIMITATION OF LIABILITY—SERVICES (FEB 1997)

I.7552.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICED) (MAY 2004)
I.76FAR 52.249-9 DEFAULT (FIXED-PRICE RESEARCH AND DEVELOPMENT) (APR 1984)

I.77 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

For Federal Acquisition Regulation (FAR) provisions, see https://www.acquisition.gov/?q=browsefar

For NASA FAR Supplement (NFS) provisions, see http://www.hq.nasa.gov/office/procurement/regs/nfstoc.htm

(End of clause)

I.78 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the date of the clause.

(b) The use in this solicitation or contract of any NASA FAR Supplement clause with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation.

I.79 FAR 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

I.80 NFS 1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHITSTLEBLOWER RIGHTS (AUG 2014)

I.81 NFS 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES (JAN 2011)

I.82 NFS 1852.215-84 OMBUDSMAN (NOV 2011)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and contractors during the preaward and postaward phases of this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman is not to diminish the authority of the contracting officer, the Source Evaluation Board, or the selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of formal contract disputes.