HaloSat-SOW-0008_Rev-Final_2016_06_13tp.pdf
PDF 622 KB Posted
- Attached to
- HaloSat Spacecraft Bus Federal contract opportunity
- Solicitation number
- NNG16579115Q
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A_for_HaloSat_NNG16579115Q.pdf | ||
| Pricing_Exhibit_Halosat_revised_6-8-16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHECK http://traviata.physics.uiowa.edu/mediawiki/index.php
TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE.
Statement Of Work
HaloSat Spacecraft
HaloSat-SOW-0008
Revision -
Effective Date: May 18, 2016
Prepared By: Tom Johnson/800
Goddard Space Flight Center
Wallops Flight Facility http://traviata.physics.uiowa.edu/mediawiki/index.php
HALOSAT-SOW-0008
ii
CM FOREWORD
This document is a HaloSat Project controlled document. Changes to this document require prior approval of the HaloSat Project Configuration Control Board (CCB) chairperson or designee. Proposed changes shall be submitted per HaloSat Configuration Management Plan (HaloSat-PLAN-0004)
Questions or comments concerning this document should be addressed to:
Thomas Johnson HaloSat Project Manager Wallops Flight Facility Wallops Island, VA 23337 iii
Review/Approval Page
Prepared by:
/s/
Thomas Johnson
HaloSat Project Manager
NASA/GSFC/WFF Code 800
Date
Reviewed by
Luis Santos
HaloSat Systems Engineer
NASA/GSFC Code 599
Michael Mathews
HaloSat Systems Engineer
NASA/GSFC/WFF Code 589
Approved by:
Philip Kaaret
HaloSat Principal Investigator
University of Iowa
Date Keith Jahoda
HaloSat Scientist
NASA/GSFC Code 662 iv
HaloSat Project
DOCUMENT CHANGE RECORD
REV
LEVEL
DESCRIPTION OF CHANGE
DATE
APPROVED
Rev. -
Baseline Release. Approved by CCR - 001
5/18/2016 v
Table of Contents
1.0 Introduction
1.1 Purpose
1.2 Scope
1.3 Applicable Documents
1.4 Reference Documents
2.0 Spacecraft Description
2.1 Spacecraft Development Plan
3.0 Period of Performance, Frequency, and Duration for Requirements, Option, Meetings, Reviews, and Associated Data Deliverables
4.0 Deliverables
4.1 Contractor Data Deliverables
4.2 Contractor Support for HaloSat Project Documentation and Deliverables
4.3 Contractor Hardware Deliverables
4.4 NASA Deliverables to Contractor
5.0 Safety and Mission Assurance
vi
List of Figures
Figure 1: HaloSat Conceptual Design
List of Tables
Table 1: Applicable Documents
Table 2: Reference Documents
Table 2.1: Spacecraft Description
Table 3.1: Period of Performance, Frequency, and Duration for Requirements, Option, Meetings, and Reviews
Table 4.1: Contract Data Requirements List
Table 4.2: Contractor Support of HaloSat Mission Deliverables
Table 4.3: Contractor Hardware Deliverables
Table 4.4: NASA Deliverables
Appendix A. List of Acronyms
1.0 Introduction
The objective of the HaloSat mission is to help resolve the missing baryon problem by mapping the hot gas in the Milky Way to determine if the halo is extended or compact.
This objective will be accomplished by using a commercially available 6U CubeSat spacecraft bus and commercially available X-ray detectors to minimize cost and development risk. Figure 1 shows a conceptual design of HaloSat
Figure 1. Conceptual design of HaloSat using a 6U CubeSat and three X-ray detectors
HaloSat is a Principal Investigator (PI) led mission and the PI resides at the University of
Iowa. A team from the University of Iowa, GSFC, and Johns Hopkins will be developing the science instrument, which has three identical X-Ray detectors and will fly on a 6U
CubeSat Spacecraft. Wallops Flight Facility will provide management support, mission systems engineering, and is responsible for procuring a commercial 6U CubeSat
Spacecraft.
1.1 Purpose
NASA Goddard’s Wallops Flight Facility seeks a commercially available 6U CubeSat
Spacecraft for the HaloSat mission.
1.2 Scope
This Statement of Work (SOW) describes the 6U CubeSat Spacecraft that is required to implement the HaloSat Mission. The spacecraft shall provide a 6U mechanical structure, power system, attitude determination and control, command and data handling, communication, and be capable of supporting three identical science instruments. The spacecraft bus is allocated 2U of the overall 6U volume and the science instruments are allocated the remaining 4U.
The HaloSat Requirements Document (HaloSat-RQMT-0002) references a “spacecraft bus” and “observatory”. The “observatory” is the spacecraft bus with a Government furnished payload integrated to the spacecraft bus.
1.3 Applicable Documents
The HaloSat Spacecraft shall meet all requirements as defined in the following applicable documents.
Document Title Document Number
HaloSat Mission Requirements Document HaloSat-RQMT-0002
HaloSat Instrument Interface Control Document HaloSat-ICD-0007
NASA General Safety Program Requirement NPR 8715.3
NASA Research and Technology Program and
Project Management Requirements
NPR 7120.8
Table 1: Applicable Documents
1.4 Reference Documents
The following table includes a list of documents referenced throughout this document.
Document Title Document Number
NASA Procedural Requirements for Limiting Orbital
Debris
NPR 8715.6A
Launch Services Program Program Level Dispenser and CubeSat Requirements Document
LSP-REQ-317.01 Rev B
ICD Between NanoRacks CubeSats and NanoRacks
CubeSat Deployer
NR-SRD-029
HaloSat Concept of Operations HaloSat-PLAN-0003
HaloSat Configuration Management Plan HaloSat-PLAN-0004
CubeSat Design Specification (Cal Poly SLO) Latest Revision
GSFC System Engineering Requirements GPR 7123.1B
GSFC Rules for the Design, Development, Verification and Operation of flight Systems
GSFC-STD-1000
NASA General Environmental Verification Standard GSFC-STD-7000
Planetary Systems Corporation 6U Payload
Specification
2002367 Rev A
Standard Materials and Processes Requirements for
Spacecraft
NASA-STD-6016
Configuration Management GPR 1410.2
Table 2: Reference Documents
2.0 Spacecraft Description
The HaloSat Spacecraft Bus will be procured from a commercial vendor. A science instrument with three identical detectors will be designed, developed, integrated, and tested by the Instrument Team based at the University of Iowa. The baseline plan is for the Wallops Flight Facility to perform integration and subsequent testing of the science instruments to the spacecraft bus. However, an option has been included in this SOW for commercial vendors to bid on performing this requirement.
The spacecraft bus shall provide a 6U (2Ux3U) form factor mechanical structure, power system, attitude determination and control, command and data handling, communication, and be capable of supporting the science instrument. The spacecraft bus is allocated approximately 2U of the overall 6U volume and the science instrument is allocated the remaining 4U.
The 6U spacecraft bus shall meet the requirements specified in HaloSat-RQMT-0002, HaloSat Mission Requirements Document.
The operational scenario for the mission is provided in the HaloSat Concept of
Operations, HaloSat-PLAN-0003.
2.1 Spacecraft Development Plan
The HaloSat 6U Spacecraft Bus should be based on a mature design and all subsystems shall have prior spaceflight or development heritage. Table 2.1 below defines the requirements and option that are proposed for the HaloSat Mission.
Table 2.1 – Spacecraft Requirements Descriptions
Period DESCRIPTION SECTION
Base Requirements Phase: ATP-SRR 2.1.1
Base Design Phase: CDR 2.1.2
Base Implementation Phase: PER 2.1.3
Base Environmental Testing Phase: PSR 2.1.4
Base Launch Vehicle Integration Support 2.1.5
Base Engineering and Operations Support 2.1.6
Option 1 Spacecraft Bus and Science Instrument Integration and Testing
2.1.7
2.1.1 Requirements Phase: Authority To Proceed (ATP) – Systems Requirements
Review (SRR)
An Authority to Proceed (ATP) kick-off meeting shall be held at the Contractor facility no more than two weeks following contract award. The NASA project manager and systems engineer shall present a project overview, HaloSat requirements and project milestones. The Contractor shall present an overview of their design approach, processes and systems in place for Safety and Mission Assurance, Configuration Management and
Risk Management to ensure that the processes that the Contractor has in place meet the intent of NASA policies and procedures. The Contractor shall provide an overall project schedule and a facility tour.
At the Systems Requirements Review NASA assumes that the Contractor will present a mature spacecraft bus design that complies with the applicable documents listed in
Section 1.3, Table 1. Alternative solutions that meet the intent of the requirements will be considered. Particular attention should be given to areas requiring new development or modification and risks associated with the allocated requirements. A summary of the systems engineering process that generated the allocated technical requirements and the systems engineering planning for the next phase will be included. Analyses or trade studies associated with meeting the project requirements shall be presented. Since the applicable documents will be made available to the contractor well in advance of the
ATP, the SRR could be held in conjunction with the ATP. If the SRR is not held in conjunction with the ATP it shall be held no later than one month following the ATP.
2.1.2 Design Phase - Spacecraft Bus Critical Design Review
Upon completion of the ATP and SRR, the Contractor shall proceed to the design phase.
A long lead procurement status shall be provided as well as a flight hardware delivery receipt and acceptance process. The Contractor shall refine the design and the corresponding verification matrix, resolve any TBD’s, close out any SRR actions, and demonstrate a solution that meets mission requirements with acceptable margins.
Since it is expected that the spacecraft design is very mature, a single Critical Design
Review (CDR) will be held. At the CDR the contractor shall demonstrate that the design is sufficiently mature to support proceeding with full-scale fabrication, assembly, integration, flight software coding, and testing. At this review, the Contractor shall establish that it is on track to complete flight spacecraft development and that the spacecraft meets science instrument interface requirements.
2.1.3 Implementation Phase: Pre-Environmental Review (PER)
Upon successful completion of the Critical Design Review the Contractor shall proceed to the implementation phase. The Contractor shall begin fabrication of test and flight article components, assemblies and subsystems, close out any CDR actions and finalize test plans and procedures. A HaloSat Team Member shall be allowed at the Contractor facility during this phase to develop familiarity with spacecraft operations.
At the PER, the Contractor shall demonstrate that the flight spacecraft bus is ready for environmental testing. An initial comprehensive systems test shall have been performed successfully and the spacecraft bus (hardware/software), test facility, support personnel, and procedures are ready for testing. All procurements, GFE and GSE should be received, and facilities ready for use. Through a complete and comprehensive evaluation of the project status, the PER establishes readiness to proceed with environmental testing of the integrated flight spacecraft bus. The PER shall also demonstrate that the project is on track to complete flight and ground system development and to perform mission operations within the allocated cost and schedule resources.
2.1.4 Environmental Testing Phase: Pre-Ship Review (PSR)
Upon successful completion of the PER the Contractor shall proceed to the environmental testing phase. In this phase, the flight spacecraft bus shall be environmentally tested as specified in HaloSat-RQMT-0002, HaloSat Mission
Requirements. This shall include vibration testing and four thermal vacuum cycles. All flight hardware and software shall be verified to function as required before, during, and following environmental testing. This includes the deployment of all mechanisms following vibration and turn on at cold survival temperature. The flight-qualified system shall be delivered in place for storage at the Contractor facility for up to 30 days.
At the PSR the Contractor shall establish that all flight and applicable ground system verification activities have been successfully completed. The PSR examines the flight spacecraft bus, its end products, documentation, test data and support verification. It also ensures that the system has sufficient flight readiness to authorize its shipment to the designated storage facility or launch site. The PSR is conducted after successful completion of all verification activities, including environmental and functional performance testing as well as ground system and network compatibility testing. The contractor shall provide a shipping plan and the required shipping containers for the spacecraft.
The Contractor shall be responsible for final shipment of the spacecraft bus to a location within the continental United States as specified by NASA.
2.1.5 Launch Vehicle Integration Support
The contractor shall provide engineering support for test and integration of the spacecraft with the selected launch dispenser. This shall include two weeks of support, including travel, at a launch site in the United States. The launch will be provided by NASA’s
CubeSat Launch Initiative (CSLI) program. Depending upon the launch provider this support may not be required and this requiredment and associated funding would be descoped.
2.1.6 Engineering and Operations Support
The Contractor shall provide 320 hours of engineering and operations support as approved by the NASA Contracting Officer and assigned by the NASA Project Manager.
Examples of subject matter expert support can include mission unique trade studies, engineering and operational readiness test support, mission simulations, on-console support, on-orbit calibration and checkout support and anomaly resolution.
The Contractor shall budget travel costs for four (4) 1-week trips to NASA WFF by subject matter experts for engineering and operations support.
2.1.7 Option #1 – Spacecraft Bus and Science Instrument Integration and Testing
Perform integration of the government furnished science instrument to the spacecraft bus and perform functional and environmental testing of the full flight system. If the vendor is awarded this option, environmental testing of the spacecraft bus can be deferred to full system level (spacecraft bus and science instrument). The combination of the spacecraft bus and science instrument (i.e. payload) is defined as the observatory.
3.0 Period of Performance, Frequency, and Duration for Requirements, Option, Meetings, Reviews, and Associated Data Deliverables
The period of performance, frequency, and duration for the requirements, option, meetings, reviews, and associated data deliverables detailed in section 2.1 are defined in
Table 3.1.
Table 3.1 - Period of Performance, Frequency, and Duration for Requirements, Option, Meetings, Reviews, and Data Deliverables
Period DESCRIPTION PERIOD OF
PERFORMANCE
OF
REQUIREMENT/
REVIEW
FREQUENCY/
DURATION
OF
REVIEW/MTG
MTG
LOCATION
Base Project Kick-Off
Mtg
ATP + 1 week Once/1 day Contractor
Base Monthly Status
Mtg/Report-
Shall include technical progress, technical budgets and margins, risks (technical and schedule), schedule
(including top three critical paths and schedule variances), concerns, and issues.
Monthly/ 1 hour Telecom/Web
Ex
Weekly Report-
Provide accomplishments for the week, plan for the week ahead, concerns, issues, and risks.
Base Requirements
Phase: ATP-SRR
Presentation:
ATP + 1 month
Delivered 1 week prior to date of review
Once/1 day
Contractor
Base Design Phase:
CDR:
Presentation:
ATP + 2 months
ATP + 3 months
Delivered 1 week
Once/1 day
Base Implementation
Phase:
PER:
Presentation
ATP + 7 months
ATP + 10 months
Once /1 day
Base Environmental
Testing Phase:
PSR:
Presentation:
2 months
ATP +1 year
Once/1 Day
Base Launch Vehicle
Integration
Support
2 weeks
Base Engineering and
Operations
Support
ATP – Launch + 2 months
Option 1 Science
Instrument
Integration and
Testing
4 months
The overall period of performance for the delivery of the spacecraft bus shall be one year or less. The period of performances for requirements listed above are guidelines and the contractor can adjust the durations as desired as long as the overall period of performance for the requirements up through the environmental testing phase is less than or equal to 1 year.
4.0 Deliverables
4.1 Contractor Data Deliverables
The Contractor shall deliver the items shown in the Contract Data Requirements List
(CDRL) provided in Table 4.1
Table 4.1 - Contract Data Requirements List
CDRL Deliverable Description
01 Configuration
Management Plan
Provide a configuration management plan as defined in Section 7 of this SOW
02 Spacecraft EIDP End Item Data Package. Draft due at CDR and
Final at PSR. Shall include the following:
1. Spacecraft Systems Specification
2. Spacecraft System Interface Control Document
3. Spacecraft drawings including MICD and EICD
4. Spacecraft System Limitations and Constraints
5. Spacecraft Handling Procedure
6. Spacecraft Requirements Verification Matrix
7. Spacecraft System CMD/TLM Database
8. Spacecraft System Test Plans, Procedures, and
Reports
9. Spacecraft System Test Flow Chart
10. Spacecraft System Operations Manual
11. Spacecraft Configuration Item Data List
12. Spacecraft Flight Software Build
13. Limited Life/Age Sensitive Item List and
Records
14. Flight Connector Mating Records
15. Spacecraft Non-Conformance Reports
16. List of all Request for Waivers/Deviations
17. Record of Open and Deferred Work
18. Red Tag/Green Tag Items
19. Photo documentation
20. Declared Materials, Processes, and Parts List
21. Spacecraft Fault Management Document
22. Qualification and/or Acceptance Testing Report for all spacecraft components
23. Spacecraft DD250 Delivery Document
4.2 Contractor Support for HaloSat Project Documentation and Deliverables
The Contractor shall provide inputs and technical support for HaloSat Mission level deliverables as listed in Table 5.2.
Table 4.2 – Contractor Support of HaloSat Mission Deliverables
Required Input Contractor Support
ODAR Spacecraft Input for the Orbital Debris Assessment
Report. Draft due at SRR and final due at CDR
Safety Data Package Draft inputs due LRD – 6 months (TBD)
Final inputs due LRD – 3 months
NTIA License Required technical inputs required for submittal of NTIA license by NASA
Concept of Operations Technical inputs for the Missions Concept of Operations
4.3 Contractor Hardware Deliverables
The Contractor shall deliver the items listed in Table 4.3
Table 4.3 – Hardware Deliverables
Deliverable Description
Spacecraft Interface Simulator One Spacecraft Interface Simulator (SIS) to test the science instruments and support mission operation development. NASA anticipates that the contractor has a Commercial Off The Shelf (COTS) SIS available and will provide a description and cost of the SIS in the response to this SOW. Due CDR + 4 months
Spacecraft Bus Flight Spacecraft Bus to be delivered at PSR
Spacecraft Bus EGSE Electrical Ground Support Equipment that is required to perform functional testing of the Spacecraft bus. Due at
PSR.
Spacecraft Bus MGSE Mechanical Ground Support Equipment, including handling fixtures and shipping container. Due at PSR
Flight Spare Hardware In the event of flight hardware malfunction, the contractor shall provide flight spare hardware within 30 days of request by NASA. As an alternative, the vender can provide a repair and warranty plan. The contractor shall provide the associated cost of each of these options.
Launch Vehicle Integration
GSE
Spacecraft GSE that is required to support launch vehicle integration. Due at launch vehicle integration
Full Scale Spacecraft Models Two full-scale rapid prototype (3D printed) models for project reviews, presentations, outreach, and technical assistance. Deployables should be provided in deployed position. Due at CDR + 2 months
4.4 NASA Deliverables to Contractor
NASA shall deliver the items listed in Table 4.4 to the contractor
Table 4.4 – NASA Deliverables
Deliverable Description
Instrument Simulator One Instrument Simulator. Due Mission CDR + 4 months
3D model of instrument 3D model of the instrument. Model to include mass properties. First version due at Spacecraft kick-off, Final due at Mission CDR
Instrument Thermal Model Thermal model of the instrument. First version due at
Spacecraft kick-off, Final due at Mission CDR
Deployer test unit Deployer to be used for vibration testing of the spacecraft bus
5.0 Safety and Mission Assurance
As noted in section 1.3 of this document, the HaloSat Spacecraft Contractor is required to comply with NPR 8715.3 NASA General Safety Program Requirement. The primary objective of this Program Requirement for the HaloSat Mission is to ensure the safety of the employees supporting HaloSat and to have a positive effect on the overall success of the HaloSat Mission.
6.0 Configuration Management
The spacecraft contractor shall perform configuration management (CM) of flight hardware, mission-critical ground support equipment (GSE), and associated documents and drawings for the HaloSat Mission. This includes configuration baselines, configuration item identification, controlling changes to configuration items and controlled documents, maintaining status tracking/accounting records, and information dissemination.
The contractor shall provide NASA a plan on how they will perform configuration management for the HaloSat spacecraft. The HaloSat Configuration Management Plan
(HaloSat-PLAN-004) can be used as a guideline in developing this plan.
Appendix A – Acronyms
ATP Authority To Proceed
C
CDR
CDRL
CM
Celsius
Critical Design Review
Contract Data Requirements List
Configuration Management
CMD
CMO
Command
Configuration Management Office
COTS
CSLI
EIDP
EO
Commercial Off The Shelf
CubeSat Launch Initiative
End Item Data Package
Engineering Order
FRR
HaloSat
ISS
GPR
Flight Readiness Review
CubeSat mission to measure the oxygen line emissions from the hot Galactic halo
International Space Station
Goddard Procedural Requirements
GSE
GSFC
Ground Support Equipment
Goddard Space Flight Center
ICD Interface Control Document
I&T Integration and Test
N/A
NASA
NPR
Not Applicable
National Aeronautics and Space Administration
NASA Procedural Requirements
NTIA
ODAR
PDR
PER
PG
National Telecommunications and Information Administration
Orbital Debris Assessment Report
Preliminary Design Review
Pre-Environmental Review
Procedures and Guidelines
PIP
PSR
Project Implementation Plan
Pre-Ship Review
QA
QE
Quality Assurance
Quality Engineer
RFA
SOW
SRR
Request For Action
Statement of Work
Systems Requirements Review
SE Systems Engineer
File details come from the government source that posted it. Updated .