Q_A MLM AMS_Amend 1.pdf
PDF 78 KB Posted
- Attached to
- Multi-Laser Metals-Based Powder Bed Fusion Additive Manufacturing System Federal contract opportunity
- Solicitation number
- NIST-RFQ-24-7301490
About this file
This document is a Questions & Answers document related to a Request for Quotations (RFQ) for a Multi-Laser Metals-Based Powder Bed Fusion Additive Manufacturing System, Solicitation No. NIST-RFQ-24-7301490.
The key details are: The system is to be located on the ground floor, with loading dock access, and no freight elevator is required. The period of performance is one year from date of award, with delivery within 4 months, installation within 30 days after delivery, and training within 30 days after installation. A firm fixed price purchase order is anticipated, with payment on a NET30 basis using milestone payments. The procurement is unrestricted, with both small and other than small businesses under NAICS code 334516 eligible to respond. The evaluation criteria include technical capability, demonstrated prior experience, delivery schedule, and price. The Contracting Officer intends to award without discussions but reserves the right to hold discussions if necessary.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Provisions and Clauses_MLM Final.pdf | ||
| CSS MLM System Final.pdf | ||
| Sample SBSP Format.docx | DOCX document | |
| Requirements_Multi-Laser AM Machine_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers
Solicitation No. NIST-RFQ-24-7301490 Multi-Laser Metals-Based Powder Bed Fusion Additive Manufacturing System
1. Please confirm whether there is loading dock access.
Yes, a loading dock is available. Note that, to pass through the doors after the loading dock, the system must meet the physical dimension limitations identified in the Required Specifications Document.
2. Is the system to be located on the ground floor?
Yes, the system will be located on the ground floor.
3. If the system is to be located on an upper floor, please confirm that there is a freight elevator and the capacity.
Not applicable. The system will be located on the ground floor.
- End of Document -
File details come from the government source that posted it. Updated .