Q_A MLM AMS_Amend 1.pdf

PDF 78 KB Posted

Attached to
Multi-Laser Metals-Based Powder Bed Fusion Additive Manufacturing System Federal contract opportunity
Solicitation number
NIST-RFQ-24-7301490
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This document is a Questions & Answers document related to a Request for Quotations (RFQ) for a Multi-Laser Metals-Based Powder Bed Fusion Additive Manufacturing System, Solicitation No. NIST-RFQ-24-7301490.

The key details are: The system is to be located on the ground floor, with loading dock access, and no freight elevator is required. The period of performance is one year from date of award, with delivery within 4 months, installation within 30 days after delivery, and training within 30 days after installation. A firm fixed price purchase order is anticipated, with payment on a NET30 basis using milestone payments. The procurement is unrestricted, with both small and other than small businesses under NAICS code 334516 eligible to respond. The evaluation criteria include technical capability, demonstrated prior experience, delivery schedule, and price. The Contracting Officer intends to award without discussions but reserves the right to hold discussions if necessary.

View the file

Other files for this federal contract opportunity

Other files attached to Multi-Laser Metals-Based Powder Bed Fusion Additive Manufacturing System, newest first.
File Type Posted
Provisions and Clauses_MLM Final.pdf PDF
CSS MLM System Final.pdf PDF
Sample SBSP Format.docx DOCX document
Requirements_Multi-Laser AM Machine_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers

Solicitation No. NIST-RFQ-24-7301490 Multi-Laser Metals-Based Powder Bed Fusion Additive Manufacturing System

1. Please confirm whether there is loading dock access.

Yes, a loading dock is available. Note that, to pass through the doors after the loading dock, the system must meet the physical dimension limitations identified in the Required Specifications Document.

2. Is the system to be located on the ground floor?

Yes, the system will be located on the ground floor.

3. If the system is to be located on an upper floor, please confirm that there is a freight elevator and the capacity.

Not applicable. The system will be located on the ground floor.

- End of Document -

File details come from the government source that posted it. Updated .