Attachment 5 - Technical Evaluation Criteria.pdf

PDF 103 KB Posted

Attached to
Thermosensory Stimulators and Digital Thermal Calibration Kit Federal contract opportunity
Solicitation number
NIMH-CSS-21-001818
Issued by
Department of Health and Human Services National Institutes of Health National Institute on Drug Abuse

View the file

Other files for this federal contract opportunity

Other files attached to Thermosensory Stimulators and Digital Thermal Calibration Kit, newest first.
File Type Posted
Attachment 1 - Purchase Description_updated 03March2021.pdf PDF
Attachment 4 - Interim Electronic Invoice Instructions.pdf PDF
Attachment 1 - Purchase Description_final.pdf PDF
Attachment 3 - Invoice Instructions.pdf PDF
Attachment 2 - FAR 52.204-24 Representation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASE OF TWO TSA2 THERMOSENSORY CHEPS STIMULATORS

ATTACHMENT 2: TECHNICAL EVALUATION CRITERIA

FAR clause 52.212-2, Evaluation – Commercial Items applies to this acquisition and the specific evaluation criteria to be included in paragraph (a) of that provision are as follows:

The Government will award a contract or purchase order resulting from this requirement on the basis of best value, technical factors and price considered. Technical factors together shall be considered more important than price. The technical evaluation factors are as follows, in order of importance:

1. Factor 1: Technical Approach

The Contractor’s proposal shall address each area of the Purchase Description requirements in sufficient detail to demonstrate a clear understanding of the specific characteristics needed to purchase the product. The proposed technical approach shall be evaluated for the appropriateness and effectiveness of the overall product. Specifically, the product should be of the highest caliber and applicable to youth and psychiatric populations. The product should have: 1) a thermode of size 24 x 24 millimeters (this size allows distribution of thermal stimulation on arms of children which have restricted size); 2) thermode allows heating and cooling from 0 to 54 degrees centigrade at a rate of approximately 40 degrees per second change; 3) device is capable of interfacing with physiology recording devices so that other data can be acquired while pain is being manipulated; and .

2. Factor 2: Approach to Delivery and Warranty

The Offer shall detail in its technical proposal how it shall meet the delivery and warranty requirements. All materials and shipping are to be provided by the offeror. A minimum of at least an 18-month comprehensive warranty from delivery.

3. Factor 3: Past Performance

The offeror shall provide a list of two (2) past performance references completed during the past five (5) years, similar in size and scope to the requirements outlined in the Purchase Description. Offerors shall include the following information for each contract identified:

• Name of Contracting Organization

• Contract Number

• Contract Type

• Total Contract Value

• Description of Requirement and Specific Responsibilities of the Offeror as they relate to this Purchase Description

• Contract Period of Performance

Technical proposals will be evaluated using a summary adjectival rating in accordance with the following scale:

Excellent The proposal has exceptional merit and reflects an excellent approach which will clearly result in the superior attainment of all requirements and objectives. The risk of unsuccessful performance is very low as the proposal provides a clear understanding of the requirements and demonstrates the offerors ability to meet the requirement. Risk Level: Very Low

Good The proposal demonstrates an approach which is expected to meet all requirements and objectives. This approach includes advantageous characteristics of substance, and few relatively minor disadvantages, which collectively can be expected to result in satisfactory performance. The risk of unsuccessful performance is low as the proposal contains alternative solutions which are considered feasible and practical. These solutions are further considered to reflect low risk in that they are clear and precise, supported, and demonstrate an understanding of the requirements. Risk Level: Low

Acceptable The proposal demonstrates an approach which is capable of meeting all requirements and objectives. The approach includes both advantageous and disadvantageous characteristics of substance, where the advantages are not outweighed by the disadvantages. Collectively, the advantages and disadvantages are likely to result in acceptable performance. The risk of unsuccessful performance is moderate, as the proposal solutions are generally feasible and practical. These solutions may also be considered to reflect moderate risk in that they may be somewhat clear and precise, partially supported, and/or demonstrate a general understanding of the requirements. Risk Level: Neutral

Marginal The proposal demonstrates an approach which may not be capable of meeting all requirements and objectives. The approach has disadvantages of substance and advantages, which if they exist, are outweighed by the disadvantages. Collectively, the advantages and disadvantages present a low or questionable likelihood of resulting in satisfactory performance. The risk of unsuccessful performance is high as the proposal contains solutions which may not be feasible and practical. These solutions may also be considered to reflect high risk in that they lack clarity and precision, are generally unsupported, and/or do not demonstrate a complete understanding of the requirements. Risk Level: High

Unacceptable The proposal demonstrates an approach which, based on a very high risk, will very likely not be capable of meeting all requirements and objectives. This approach has several disadvantages of substance, and advantages which, if they exist, are outweighed by disadvantages.

Collectively, the advantages and disadvantages are unlikely to result in satisfactory performance. The risk of unsuccessful performance is very high as the proposal contains solutions which are not feasible and practical. The solutions may also be considered to reflect very high risk in that they lack any clarity or precision. Risk Level: Very High

File details come from the government source that posted it. Updated .