NIFC_110-TRN_Fire_Suppression_A1_-_ACM_report.pdf

PDF 4 MB Posted

Attached to
NIFC 110 TRN Fire Suppression System Federal contract opportunity
Solicitation number
140L3722R0016
Issued by
Department of the Interior Bureau of Land Management Idaho Region

About this file

This document package includes asbestos and lead testing reports for the NIFC 110 TRN Fire Suppression System project. The reports document asbestos and lead testing conducted between 2019 and 2022 at the National Interagency Fire Center Building 110, with areas on the first floor, basement, and auditorium tested for asbestos. Detected asbestos was abated in 2019 and 2020. Tests in 2020 and 2021 were negative in areas previously marked. The related federal contract opportunity is for the NIFC 110 TRN Fire Suppression System project solicited by the Department of the Interior Bureau of Land Management Idaho Region under solicitation number 140L3722R0016.

View the file

Other files for this federal contract opportunity

Other files attached to NIFC 110 TRN Fire Suppression System, newest first.
File Type Posted
Site_Visit_Roster_0002.pdf PDF
Sol_140L3722R0016_Amd_0002.pdf PDF
Sol_140L3722R0016_Amd_0001.pdf PDF
CertificationVaccination.pdf PDF
NIFC_110-TRN_Fire_Suppression_-_Specs.pdf PDF
SF1442_Example_Completion-Instructions.pdf PDF
NIFC_110-TRN_Fire_Suppression_-_Bid_Schedule.pdf PDF
Wage_Determination_ID20220025_02-25-2022.pdf PDF
NIFC_110-TRN_Fire_Suppression_-_Drawings.pdf PDF
NIFC_110-TRN_Fire_Suppression_A2_-_Partial_Set_1969.pdf PDF
NIFC_110-TRN_Fire_Suppression_-_Prologue.pdf PDF
Sol_140L3722R0016.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NIFC 110-TRN Fire Suppression Replacement

Attachment A1: Asbestos Containing Materials and Lead Reports

4/15/2022

Summary

Page Result

Date p.3 Lead in silver paint less than 50 ppm threshold

3/21/2022 p.4 Asbestos less than 1%

3/21/2022 p.6 No asbestos detected in hard lid ceiling texture or base

9/29/2020 p.9 No asbestos detected in ceiling

6/19/2020 p.12 Asbestos areas tested and abated

9/23/2019 (with 2020 annotation) p.16 Asbestos detected in Thermal System Insulation for hydronic piping

5/29/2019 m1johnson Text Box

18AUG2021 TESTS NEGATIVE IN AREA MARKED

Rectangle m1johnson Rectangle m1johnson Typewritten Text

ABATED 2020

m1johnson Typewritten Text

ABATED 2020

Rectangle m1johnson Typewritten Text

ABATED 2020

Scan0034 NIFC Paint Chip.pdf
NIFC_110-TRN_Fire_Suppression_A2_-_ACM_pipe dope.pdf
NIFC_110-TRN_Fire_Suppression_A2_-_ACM_reports.pdf
Scan0034 NIFC Report.pdf
NIFC 110-TRN Fire Suppression A1 - ACM reports.pdf
110-TRN ACM Report S. Bldg 1st Floor offices & hall bsmt 9-18-19.pdf
110-TRN FP NIFC Bldg 110 Basement 9-18-19.pdf
110-TRN FP NIFC Bldg 110 1st Floor offices & hall bsmt 9-18-19.pdf
110 Auditorium June-2020 Scan0027 NIFC 20-90-16 Results.pdf
Scan0027 NIFC Report 19 90 13 5-29-2019.pdf
Scan0029 NIFC Bildg 110_29SEPT2020.pdf
Scan0029 NIFC Bldg 110 Map_29SEPT2020.pdf

Blank Page

File details come from the government source that posted it. Updated .