RFP_HV-2017-02-TK_ _attachments.pdf
PDF 2 MB Posted
- Attached to
- Atherosclerosis Risk in Communities (ARIC) Study Coordinating Center (CC) Federal contract opportunity
- Solicitation number
- NHLBI-ECB-HV-2017-02-TK
About this file
Solicitation NHLBI-ECB-HV-2017-02-TK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NHLBI-ECB-HV-2017-02-TK_Amend_2_11.16.15.pdf | ||
| RFP_HV-2017-02-TK_ _attachments_10.01.15.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 -
SOLICITATION
SECTION A - SOLICITATION/CONTRACT FORM
1. Requisition or other Purchase Authority: Public Health Service Act (42 USC 301)
2. Request for Proposal (RFP) Number:
NHLBI-ECB-HV-2017-02-TK
3. Issue Date:
September 28, 2015
4. Set Aside:
[X] No
[ ] Yes See Part IV Section L
5. Title : Atherosclerosis Risk in Communities (ARIC) Study - Renewal for Coordinating Center
6. ISSUED BY:
Office of Acquisitions National Heart, Lung and Blood Institute National Institutes of Health Rockledge II, Room 6016 6701 Rockledge Drive, MSC 7902 Bethesda, MD 20892-7902
7. SUBMIT OFFERS TO:
See Part III, Section J, "Packaging and Delivery of the Proposal," ATTACHMENT 1 of this Solicitation.
8. Proposals for furnishing the supplies and/or services in THE SCHEDULE will be received at the place specified in, and in the number of copies specified in Attachment 1, "Packaging and Delivery of the Proposal," until 3:00 PM local time on December 18, 2015. Offers will be valid for 120 days unless a different period is specified by the offeror on the Attachment entitled, "Proposal Summary and Data Record, NIH 2043.
9. This solicitation requires delivery of proposals as stated in ATTACHMENT 1, "PACKAGING AND DELIVERY OF THE PROPOSAL." If proposals are required to be delivered to two different locations, the OFFICIAL POINT OF RECEIPT for determining TIMELY DELIVERY is the address provided for the OFFICE OF ACQUISITIONS.
IF YOUR PROPOSAL IS NOT RECEIVED BY THE CONTRACTING OFFICER OR HIS DESIGNEE AT THE PLACE AND TIME SPECIFIED FOR THE OFFICE OF ACQUISITIONS, THEN IT WILL BE CONSIDERED LATE AND HANDLED IN ACCORDANCE WITH HHSAR Clause 352.215-70, "Late Proposals and Revisions"
LOCATED IN SECTION L.1. OF THIS SOLICITATION.
10. Offeror must be registered in the Central Contractor Registry (CCR) prior to award of a contract. Offerors must access the CCR through The System for Award Management (SAM) at http://www.sam.gov
11. FOR INFORMATION CALL: Amrana Ali
PHONE: 301-435-0338
e-MAIL: NHLBIExtramuralContractsBranch@mail.nih.gov
COLLECT CALLS WILL NOT BE ACCEPTED.
Forward all technical and business questions to Tara Knox and Amrana Ali at NHLBIExtramuralContractsBranch@mail.nih.gov. All questions must be received via email by 3:00 PM local time on October 28, 2015.
Tara Knox Contracting Officer Office of Acquisitions National Heart, Lung and Blood Institute http://www.sam.gov
RFP Number : NHLBI-ECB-HV-2017-02-TK
- 2 -
RFP TABLE OF CONTENTS
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION D - PACKAGING, MARKING AND SHIPPING
SECTION E - INSPECTION AND ACCEPTANCE
SECTION F - DELIVERIES OR PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION H - SPECIAL CONTRACT REQUIREMENTS
PART II - CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
SOLICITATION ATTACHMENTS
TECHNICAL PROPOSAL ATTACHMENTS
BUSINESS PROPOSAL ATTACHMENTS
INFORMATIONAL ATTACHMENTS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. GENERAL INFORMATION
a. INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION
b. NAICS CODE AND SIZE STANDARD
c. TYPE OF CONTRACT AND NUMBER OF AWARDS
d. TASK ORDERS UNDER MULTIPLE AWARD INDEFINITE DELIVERY CONTRACTS
e. COMMITMENT OF PUBLIC FUNDS
f. PROMOTING EFFICIENT SPENDING
g. COMMUNICATIONS PRIOR TO CONTRACT AWARD
h. RELEASE OF INFORMATION
i. PREPARATION COSTS
j. SERVICE OF PROTEST
k. LATE PROPOSALS AND REVISIONS
2. INSTRUCTIONS TO OFFERORS
a. GENERAL INSTRUCTIONS
1. Contract Type and General Clauses
2. Authorized Official and Submission of Proposal
3. Proposal Summary and Data Record (NIH-2043)
4. Separation of Technical and Business Proposals
5. Uniform Resource Locators (URLs) in Contract Proposals
6. Page and Formatting Limitations
7. Alternate Proposals
8. Evaluation of Proposals
9. Potential Award Without Discussions
- 3 -
10. Use of the Metric System of Measurement
11. Standards for Privacy of Individually Identifiable Health Information
12. Privacy Act - Treatment of Proposal Information
13. Selection of Offerors
14. Institutional Responsibility Regarding Investigator Conflicts of Interest
15. ROTC Access and Federal Military Recruiting on Campus
16. Certification of Filing and Payment of Taxes
17. Past Performance Information
18. Information and Physical Access Security
19. Solicitation Provisions Incorporated by Reference
b. TECHNICAL PROPOSAL INSTRUCTIONS
1. Technical Discussions
2. Other Considerations
3. Technical Evaluation
4. Human Subjects
Notice to Offerors of Requirements of 45 CFR Part 46, Protection of Human Subjects, HHSAR 270-4(a)
Instructions to Offerors Regarding Protection of Human Subjects
Required Education in the Protection of Human Research Participants
Inclusion of Women and Minorities in Research Involving Human Subjects
Inclusion of Children in Research Involving Human Subjects
Research Involving Human Fetal Tissue
Human Embryonic Germ Cell (HEGC) Research
Human Embryonic Stem Cell (HESC) Research
5. Obtaining and Disseminating Biomedical Research Resources
6. Electronic and Information Technology Accessibility, HHSAR 352.239-73(a)
c. BUSINESS PROPOSAL INSTRUCTIONS
1. Basic Cost/Price Information
2. Cost and Pricing Data
3. Requirements for Cost or Pricing Data or Information Other than Cost and Pricing Data
4. Salary Rate Limitation
5. Small Business Subcontracting Plan
6. Mentor Protege Program, HHSAR 352.219-70
7. HUBZone Small Business Concerns
8. Total Compensation Plan
9. Other Administrative Data
10. Qualifications of the Offeror
11. Subcontractors
12. Proposer's Annual Financial Report
13. Travel Costs/Travel Policy
SECTION M - EVALUATION FACTORS FOR AWARD
1. GENERAL
2. COST/PRICE EVALUATION
3. HUMAN SUBJECT EVALUATION
- 4 -
4. EVALUATION OF OPTIONS
5. EVALUATION OF DATA SHARING PLAN
6. EVALUATION OF PLAN FOR SHARING MODEL ORGANISMS FOR BIOMEDICAL RESEARCH
7. TECHNICAL EVALUATION FACTORS
8. EVALUATION OF ELECTRONIC AND INFORMATION TECHNOLOGY ACCESSIBILITY- SECTION
9. PAST PERFORMANCE FACTOR
- 5 -
PART I - THE SCHEDULE
THE INFORMATION SET FORTH IN SECTION A - SOLICITATION/CONTRACT FORM, HEREIN CONTAINS IMPORTANT INFORMATION FOR ANY OFFEROR INTERESTED IN RESPONDING TO THIS SOLICITATION.
ANY CONTRACT RESULTING FROM THIS SOLICITATION WILL INCLUDE IN ITS SECTION A - SOLICITATION/ CONTRACT FORM, ACCOUNTING, APPROPRIATION AND GENERAL INFORMATION APPLICABLE TO THE
CONTRACT AWARD.
THE CONTRACT SCHEDULE SET FORTH IN SECTIONS B THROUGH H, HEREIN, CONTAINS CONTRACTUAL INFORMATION PERTINENT TO THIS SOLICITATION. IT IS NOT AN EXACT REPRESENTATION OF THE CONTRACT DOCUMENT THAT WILL BE AWARDED AS A RESULT OF THIS SOLICITATION. THE CONTRACT COST OR PRICE AND OTHER CONTRACTUAL PROVISIONS PERTINENT TO THE OFFEROR (i.e., those relating to the organizational structure [e.g., Non-Profit, Commercial] and specific cost authorizations unique to the Offeror's proposal and requiring Contracting Officer Prior Approval) WILL BE DISCUSSED IN THE NEGOTIATION PROCESS AND WILL BE INCLUDED IN THE RESULTANT CONTRACT. THE ENCLOSED CONTRACT SCHEDULE IS
INTENDED TO PROVIDE THE OFFEROR WITH THE NECESSARY INFORMATION TO UNDERSTAND THE
TERMS AND CONDITIONS OF THE RESULTANT CONTRACT.
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
ARTICLE B.1. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES
The Coordinating Center's scientific objectives are to (1) enhance statistical power to perform analyses of predictors of clinical events, particularly in informative subgroups; (2) study the progression of subclinical to clinical cardiovascular disease (CVD); (3) identify new risk factors or interactions among factors that inform disease pathophysiology; and
(4) evaluate the feasibility and validity of surveillance for myocardial infarction (MI) and heart failure (HF) using electronic health record (EHR) technology. The operational goals are to (1) support continued cohort follow-up and data collection on clinical events; (2) continue to foster scientific collaborations; (3) support conduct of a limited clinical examination of the ARIC participants as a platform for ancillary study examination components.
ARTICLE B.2. PRICES/COSTS
The final contract will contain the price/cost provisions agreed upon by the Government and the Offeror.
ARTICLE B.3. PRICES/COSTS
a. This is an Indefinite Quantity contract as contemplated by FAR 16.504. The Contractor shall be reimbursedby the Government in an amount not less than a total of $500 (minimum) nor more than a total of$20,663,000 (maximum) for successful performance of this contract.
b. The costs set forth in this ARTICLE will cover the contract period November 15, 2016 through November 14,2022.
Tasks Activities Task Area 1 November 15, 2016 - November 14, 2021
(60 months)
Non-severable (12 months) Severable (48 months)
• Support for field centers' participant follow-up
• Support for field centers' clinical events investigation and review
• Clinical events classification
• Core study operations
• Data analysis, manuscript writing Task Area 2 November 15, 2016 - December 31, 2018
(25.5 months)
Cohort Visit 6
- 6 -
Tasks Activities Non-severable Task Area 2.A November 15, 2016 - May 31, 2017
(6.5 months)
Visit 6 preparation:
• Protocol development and review
• Staff training and certification
• Pilot testing Task Area 2.B June 1, 2017 - December 31, 2018
(19 months)
• Support for field centers' examination of up to approximately 5,300 ARIC participants
• Visit 6 closeout
Task Area 3 November 15, 2016 - November 14, 2019
(36 months)
Non-severable
Community surveillance feasibility and calibration study
Task Area 3.A.
November 15, 2016 - May 31, 2017
(6.5 months)
• Quality control activities for 2014 community surveillance
• Preparation of analytic data files and report of surveillance trends through 2014 for MI, CHD death, and HF hospitalization
Task Area 3.B November 15, 2016 - November 14, 2019
(36 months)
• Feasibility and Calibration study
• Final report
Task Area 4 November 15, 2020 - November 14, 2021
(12 months)
Non-severable
Study closeout
Task Area 5 November 15, 2016 - November 14, 2021
(60 months)
Non-severable
Mentoring through diversity supplements
c. The Government will issue Task Orders based on the work described in SECTION C of this contract.
d.
CLIN Task Area Description Type November 15, 2019 through
November 14, 2020
(12 months)
5 One Core Study Operations and Participant
Follow-up Option Four (4)
November 15, 2020 through
November 14, 2021
(12 months)
Cost Reimbursement
TBD Two Cohort Visit 6
November 15, 2016 through
December 31, 2018
(25.5 months)
Cost Reimbursement
TBD Three Study Closeout
November 15, 2020 through
November 14, 2021
Cost Reimbursement
- 7 -
CLIN Task Area Description Type (12 months)
TBD Four Mentoring through diversity supplements
November 15, 2016 through
November 14, 2021
(60 months)
Cost Reimbursement
ARTICLE B.4. ESTIMATED COST - OPTION
*This ARTICLE is applicable to Task Area One (1) only.
a. The estimated cost of the Base Period of this contract is To Be Negotiated.
b. The Base Period of this Task Order is To Be Negotiated. Payment shall be subject to the witholding provisions of the clauses ALLOWABLE COST AND PAYMENT referenced in the General Clause Listing in Part II, ARTICLE I.1. of this contract.
c. The total estimated amount of the Task Order, represented by the estimated cost for the Base Period is To Be Negotiated.
d. If the Government exercises its option pursuant to the OPTION PROVISION Article in SECTION H of this contract, the Government's total estimated Task Order amount represented by the estimated cost will be increased as follows:
Estimated Cost ($) Base Period: November 15, 2016 - November 14, 2017 To Be Negotiated (minimum) Option Periods:
November 15, 2017 - November 14, 2018 To Be Negotiated November 15, 2018 - November 14, 2019 To Be Negotiated November 15, 2019 - November 14, 2020 To Be Negotiated November 15, 2020 - November 14, 2021 To Be Negotiated
ARTICLE B.5. PROVISIONS APPLICABLE TO DIRECT COSTS
This article will prohibit or restrict the use of contract funds, unless otherwise approved by the Contracting Officer. The following is a list of items that may be included in the resultant contract as applicable. 1) Conferences & Meetings, 2) Food for Meals, Light Refreshments & Beverages, 3) Promotional Items, 4) Acquisition, by purchase or lease, of any interest in real property; 5) Special rearrangement or alteration of facilities; 6) Purchase or lease of any item of general purpose office furniture or office equipment regardless of dollar value; 7) Travel Costs including Foreign Travel; 8) Consultant Costs; 9) Subcontract Costs; 10) Patient Care Costs; 11) Accountable Government Property; 12) Printing costs; and 13) Research Funding.
ARTICLE B.6. ADVANCE UNDERSTANDINGS
Specific elements of cost, which normally require prior written approval of the Contracting Officer before incurrence of the cost (e.g., foreign travel, consultant fees, subcontracts) will be included in this Article if the Contracting Officer has granted his/her approval prior to contract award.
- 8 -
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
ARTICLE C.1. STATEMENT OF WORK
a. Independently and not as an agent of the Government, the Contractor shall be required to furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government, as needed to perform the Statement of Work, dated July 13, 2015, attached hereto and made a part of this Solicitation (See SECTION J - List of Attachments).
ARTICLE C.2. REPORTING REQUIREMENTS
All reports required herein shall be submitted in electronic format.
All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including guidance and specific checklists, by application, can be found at: http://www.hhs.gov/web/508/index.html under "Making Files Accessible."
a. Technical Progress Reports
1. In addition to the required reports set forth elsewhere in this Schedule, the preparation and submission of regularly recurring Technical Progress Reports will be required in any contract resulting from this solicitation. These reports will require descriptive information about the activities undertaken during the reporting period and will require information about planned activities for future reporting periods. The frequency and specific content of these reports will be determined prior to contract award. [Note: Beginning May 25, 2008, the Contractor shall include the applicable PubMed Central or NIH Manuscript Submission reference number when citing publications that arise from its NIH funded research.]
For proposal preparation purposes only, it is estimated that only electronic versions of these reports will be required as follows:
[ ] Monthly [ ] Quarterly [X] Semi-Annually [ ] Annually [ ] Annually (with a requirement for a Draft Annual Report) [X] Final - Upon final completion of the contract [ ] Final - Upon final completion of the contract (with a requirement for a Draft Final Report)
2. Summary of Salient Results
The Contractor will be required to prepare and submit, with the final report, a summary (not to exceed 200 words) of salient results achieved during the performance of the contract. This report will be required on or before the expiration date of the contract.
3. Additional Reporting Requirements
Additional required reports are listed in Article F.2. Deliverables and Section J, Attachment #3 - Statement of Work and Deliverables.
http://www.hhs.gov/web/508/index.html
- 9 -
b. Other Reports/Deliverables
1. Reporting of Financial Conflict of Interest (FCOI)
All reports and documentation required by 45 CFR Part 94, Responsible Prospective Contractors including, but not limited to, the New FCOI Report, Annual FCOI Report, Revised FCOI Report, and the Mitigation Report, shall be submitted to the Contracting Officer in Electronic format. Thereafter, reports shall be due in accordance with the regulatory compliance requirements in 45 CFR Part 94.
45 CFR Part 94 is available at: http://www.ecfr.gov/cgi-bin/text-idx?
c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45.
See Part 94.5, Management and reporting of financial conflicts of interest for complete information on reporting requirements.
(Reference subparagraph g. of the INSTITUTIONAL RESPONSIBILITY REGARDING INVESTIGATOR FINANCIAL CONFLICTS OF INTEREST Article in SECTION H of this contract.)
2. Information Security and Physical Access Reporting Requirements
The Contractor shall submit the following reports as required by the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract. Note: Each report listed below includes a reference to the appropriate subparagraph of this article.
a. Roster of Employees Requiring Suitability Investigations
The Contractor shall submit a roster, by name, position, e-mail address, phone number and responsibility, of all staff (including subcontractor staff) working under the contract who will develop, have the ability to access, or host and/or maintain a Federal information system(s). The roster shall be submitted to the Contracting Officer's Representative (COR), with a copy to the Contracting Officer, within 14 calendar days of the effective date of the contract. (Reference subparagraph A.e. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)
b. IT Security Plan (IT-SP)
In accordance with HHSAR Clause 352.239-72, Security Requirements For Federal Information Technology Resources, the contractor shall submit the IT-SP within thirty
(30) days after contract award. The IT-SP shall be consistent with, and further detail the approach to, IT security contained in the Contractor's bid or proposal that resulted in the award of this contract. The IT-SP shall describe the processes and procedures that the Contractor will follow to ensure appropriate security of IT resources that are developed, processed, or used under this contract. If the IT-SP only applies to a portion of the contract, the Contractor shall specify those parts of the contract to which the IT-SP applies.
The Contractor shall review and update the IT-SP in accordance with NIST SP 800-53A, Guide for Assessing the Security Controls in Federal Information Systems and Organizations, on an annual basis.
(Reference subparagraph D.c.1. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)
http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45 http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45
- 10 -
c. IT Risk Assessment (IT-RA)
In accordance with HHSAR Clause 352.239-72, Security Requirements For Federal Information Technology Resources, the contractor shall submit the IT-RA within thirty
(30) days after contract award. The IT-RA shall be consistent, in form and content, with NIST SP 800-30, Risk Management Guide for Information Technology Systems, and any additions or augmentations described in the HHS-OCIO Information Systems Security and Privacy Policy.
The Contractor shall update the IT-RA on an annual basis.
(Reference subparagraph D.c.2. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)
d. FIPS 199 Assessment
In accordance with HHSAR Clause 352.239-72, Security Requirements For Federal Information Technology Resources, the Contractor shall submit a FIPS 199 Assessment within thirty (30) days after contract award. The FIPS 199 Assessment shall be consistent with the cited NIST standard.
(Reference subparagraph D.c.3. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECITON H of this contract.
e. IT Security Certification and Accreditation (IT-SC&A)
In accordance with HHSAR Clause 352.239-72, Security Requirements For Federal Information Technology Resources, the Contractor shall submit written proof to the Contracting Officer that an IT-SC&A was performed within three (3) months after contract award.
The Contractor shall perform an annual security control assessment and provide to the Contracting Officer verification that the IT-SC&A remains valid.
(Reference subparagraph D.c.4. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)
f. Reporting of New and Departing Employees
The Contractor shall notify the Contracting Officer's Representative (COR) and Contracting Officer within five working days of staffing changes for positions that require suitability determinations as follows:
a. New Employees who have or will have access to HHS Information systems or data: Provide the name, position title, e-mail address, and phone number of the new employee. Provide the name, position title and suitability level held by the former incumbent. If the employee is filling a new position, provide a description of the position and the Government will determine the appropriate security level.
b. Departing Employees: 1) Provide the name, position title, and security clearance level held by or pending for the individual; and 2) Perform and document the actions identified in the "Employee Separation Checklist", attached in Section J, ATTACHMENTS of this contract, when a Contractor/Subcontractor employee
- 11 -terminates work under this contract. All documentation shall be made available to the COR and/or Contracting Officer upon request.
(Reference subparagraph E.3.a-c. of the INFORMATION AND PHYSICAL ACCESS
g. Contractor - Employee Non-Disclosure Agreement(s) The contractor shall complete and submit a signed and witnessed "Commitment to Protect Non-Public Information
- Contractor Agreement" form for each contractor and subcontractor employee who may have access to non-public Department information under this contract. This form is located at: https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/ Nondisclosure.pdf.
(Reference subparagraph E.3.d. of the INFORMATION AND PHYSICAL ACCESS
h. Vulnerability Scanning Reports
The Contractor shall report the results of the required monthly special vulnerability scans no later than 10 days following the end of each reporting period. If required monthly, this report may be included as part of the Technical Progress Report. Otherwise, this report shall be submitted under separate cover on a monthly basis.
(Reference subparagraph E.5. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)
3. Section 508 Annual Report
The contractor shall submit an annual Section 508 report in accordance with the schedule set forth in the ELECTRONIC AND INFORMATION TECHNOLOGY ACCESSIBILITY Article in SECTION H of this contract. The Section 508 Report Template and Instructions for completing the report are available at: http://www.hhs.gov/web/508/contracting/technology/vendors.html under "Vendor Information and Documents."
4. Multiple Principal Investigators Leadership Plan The Contractor shall submit a revised/updated Leadership Plan in the event of a change in any of the Principal Investigators named in the Key Personnel Article in SECTION G of this contract. The revised plan is subject to review and approval by the Contracting Officer.
5. NHLBI Data Repository of Epidemiology and Clinical Trials
The Contractor shall provide data sets for the study with full documentation. The data set and documentation shall be prepared in accordance with the NHLBI's Data Set policy at https:// biolincc.nhlbi.nih.gov/home/.
ARTICLE C.3. INVENTION REPORTING REQUIREMENT
All reports and documentation required by FAR Clause 52.227-11, Patent Rights-Ownership by the Contractor including, but not limited to, the invention disclosure report, the confirmatory license, and the Government support certification, shall be directed to the Division of Extramural Inventions and Technology Resources (DEITR), OPERA, OER, NIH, 6705 Rockledge Drive, Suite 310, MSC 7980, Bethesda, Maryland 20892-7980 http://www.hhs.gov/web/508/contracting/technology/vendors.html https://biolincc.nhlbi.nih.gov/home/ https://biolincc.nhlbi.nih.gov/home/
- 12 -
(Telephone: 301-435-1986). In addition, one copy of an annual utilization report, and a copy of the final invention statement, shall be submitted to the Contracting Officer. The final invention statement (see FAR 27.303(b)(2)(ii)) shall be submitted to the Contracting Officer on the expiration date of the contract.
The annual utilization report shall be submitted in accordance with the DELIVERIES Article in SECTION F of this contract. The final invention statement (see FAR 27.303(b)(2)(ii)) shall be submitted on the expiration date of the contract. All reports shall be sent to the following address:
Contracting Officer National Institutes of Health National Heart, Lung and Blood Institute Office of Acquisition 6701 Rockledge Drive Rockledge II, Room 6124 Bethesda, Maryland 20892- 7902
If no invention is disclosed or no activity has occurred on a previously disclosed invention during the applicable reporting period, a negative report shall be submitted to the Contracting Officer at the address listed above.
To assist contractors in complying with invention reporting requirements of the clause, the NIH has developed "Interagency Edison," an electronic invention reporting system. Use of Interagency Edison is required as it streamlines the reporting process and greatly reduces paperwork. Access to the system is through a secure interactive Web site to ensure that all information submitted is protected. Interagency Edison and information relating to the capabilities of the system can be obtained from the Web ( http://www.iedison.gov), or by contacting the Extramural Inventions and Technology Resources Branch, OPERA, NIH.
SECTION D - PACKAGING, MARKING AND SHIPPING
All deliverables required under this contract shall be packaged, marked and shipped in accordance with Government specifications. At a minimum, all deliverables shall be marked with the contract number and Contractor name. The Contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.
SECTION E - INSPECTION AND ACCEPTANCE
a. The Contracting Officer or the duly authorized representative will perform inspection and acceptance of materials and services to be provided.
b. For the purpose of this SECTION, TBD is the authorized representative of the Contracting Officer.
c. Inspection and acceptance will be performed at:
National Institutes of Health National Heart, Lung and Blood Institute Office of Acquisition 6701 Rockledge Drive Rockledge II, Room 6124 Bethesda, Maryland 20892-7902
Acceptance may be presumed unless otherwise indicated in writing by the Contracting Officer or the duly authorized representative within 30 days of receipt.
http://www.iedison.gov
- 13 -
The Government reserves the right to an Inspection period of 30 calendar days, unless a different time period is stated when (the Record of Call/elsewhere in the contract). The receiving report, completed and signed by the appropriate official, constitutes acceptance and shall be acknowledged to the payment office (OFM).
d. This contract incorporates the following clause by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available.
FAR Clause 52.246-9, Inspection of Research and Development (Short Form) (April 1984).
SECTION F - DELIVERIES OR PERFORMANCE
ARTICLE F.1. PERIOD OF PERFORMANCE
a. The period of performance of this contract shall be from November 15, 2016 through November 14, 2022 with a five year ordering period from November 15, 2016 through November 14, 2021.
Item b. is applicable to Task Area One (1) only.
b. If the Government exercises its option(s) pursuant to the OPTION PROVISION Article in Section H of this contract, the period of performance will be increased as listed below:
Option Option Period One (1) November 15, 2017 - November 14, 2018 Two (2) November 15, 2018 - November 14, 2019
Three (3) November 15, 2019 - November 14, 2020 Four (4) November 15, 2020 - November 14, 2021
This pertains to the Task Orders only and not the IDIQ.
ARTICLE F.2. DELIVERIES
Satisfactory performance of the final contract shall be deemed to occur upon performance of the work described in the Statement of Work Article in SECTION C of this contract and upon delivery and acceptance by the Contracting Officer, or the duly authorized representative, of the following items in accordance with the stated delivery schedule:
a. The items specified below as described in the REPORTING REQUIREMENTS Article in SECTION C of this contract will be required to be delivered F.o.b. Destination as set forth in FAR 52.247-35, F.o.b. DESTINATION, WITHIN CONSIGNEES PREMISES (APRIL 1984), and in accordance with and by the date(s) specified below :
Item Description Quantity Delivery Schedule
(1) See Section J (Attachment
#3 SOW and Deliverables)
(2) (3)
b. The above items shall be addressed and delivered to:
Addressee Deliverable Item No Quantity See Section J (Attachment #3 SOW and Deliverables)
- 14 -
ARTICLE F.3. CLAUSES INCORPORATED BY REFERENCE, FAR 52.252-2 (FEBRUARY
1998)
This contract incorporates the following clause(s) by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.acquisition.gov/far .
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSE:
52.242-15, Stop Work Order (August 1989)
Alternate I (April 1984) is applicable to this contract.
SECTION G - CONTRACT ADMINISTRATION DATA
ARTICLE G.1. CONTRACTING OFFICER'S REPRESENTATIVE (COR)
The following Contracting Officer's Representative (COR) will represent the Government for the purpose of this contract:
To be specified prior to award.
The COR is responsible for: (1) monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the statement of work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting in the resolution of technical problems encountered during performance.
The alternate COR is responsible for carrying out the duties of the COR only in the event that the COR can no longer perform his/her duties as assigned.
The Contracting Officer is the only person with authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of this contract; (5) otherwise change any terms and conditions of this contract; or (6) sign written licensing agreements. Any signed agreement shall be incorporated by reference in Section K of the contract
The Government may unilaterally change its COR designation.
ARTICLE G.2. KEY PERSONNEL, HHSAR 352.242-70 (January 2006)
The key personnel specified in this contract are considered to be essential to work performance. At least 30 days prior to diverting any of the specified individuals to other programs or contracts (or as soon as possible, if an individual must be replaced, for example, as a result of leaving the employ of the Contractor), the Contractor shall notify the Contracting Officer and shall submit comprehensive justification for the diversion or replacement request (including proposed substitutions for key personnel) to permit evaluation by the Government of the impact on performance under this contract. The Contractor shall not divert or otherwise replace any key personnel without the written consent of the Contracting Officer. The Government may modify the contract to add or delete key personnel at the request of the Contractor or Government.
(End of Clause)
The following individual(s) is/are considered to be essential to the work being performed hereunder:
http://www.acquisition.gov/far
- 15 -
Name Title
TBD
ARTICLE G.3. TASK ORDER PROCEDURE
This contract provides for the issuance of Task Orders on a negotiated basis as follows:
a. General
Only the Contracting Officer may issue Task Orders to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the Statement of Work. Unless specifically authorized by the Contracting Officer, the Contractor shall not commence work until a fully executed Task Order has been awarded. The Contractor may incur costs under this contract in performance of task orders and task order modifications issued in accordance with this ARTICLE.
No other costs are authorized unless otherwise specified in the contract or expressly authorized by the Contracting Officer.
b. Requesting Task Order Proposals.
The Contracting Officer or a designated individual may solicit responses to requirements from Contractors within a technical area covered by a task order requirement in writing. A Task Order Request for Proposals (TORFP) will be prepared and issued for each task order requirement.
Generally, the Task Order Request for Proposal (TORFP) will include but is not limited to the following:
1. Statement of Work;
2. Reporting Requirements and Deliverables;
3. Proposal Due Date and Location to Deliver Proposals;
4. Period of Performance of Task Order;
5. Anticipated type of Task Order;
6. Technical Proposal Instructions;
7. Business proposal Instructions
8. Evaluation Factors for Award
All contract clauses contained this contract shall be incorporated in the TORFP and the resultant task order.
If conflicts exist between the contract clauses and the information outlined in the task order, the contract language takes precedence over the information in the task order.
c. Evaluation and Award of Task Order Proposals
The Government will evaluate the Task Order proposals against the requirements of the TORFP.
Specifically, the technical evaluation factors, cost/price, past performance and any other factor specifically identified in the TORFP will be used for evaluation of each proposal. In addition, the TORFP will identify the basis for selecting a contractor for award. Generally, technical factors will be significantly more important than cost or price However, each TORFP will specify how the award decision will be made.
Upon completion of evaluations, the Contracting Officer will issue a task order to the Contractor.
- 16 -
ARTICLE G.4. INVOICE SUBMISSION
a. Invoice Submission/Contract Financing Request and Contract Financial Reporting, NIH(RC)-4for NIH Cost- Reimbursement Type Contracts are attached and made part of this contract. The Contractor shall follow the attached instructions and submission procedures specified below to meet the requirements of a "proper invoice" pursuant to FAR Subpart 32.9, Prompt Payment.
1. Payment requests shall be submitted to the offices identified below. Do not submit supporting documentation (e.g., receipts, time sheets, vendor invoices, etc.) with your payment request unless specified elsewhere in the contract or requested by the Contracting Officer.
a. The original invoice shall be submitted to the following designated billing office:
National Institutes of Health Office of Financial Management Commercial Accounts 2115 East Jefferson Street, Room 4B-432, MSC 8500 Bethesda, MD 20892-8500
b. One copy of the invoice shall be submitted to the following approving official:
Contracting Officer Office of Acquisitions National Heart, Lung and Blood Institute 6701 Rockledge Drive Room 6124 Rockledge II MSC 7902 Bethesda, MD 20892- 7902
E-mail: tara.knox@nih.gov
The Contractor shall submit an electronic copy of the payment request to the approving official instead of a paper copy. The payment request shall be transmitted as an attachment via e-mail to the address listed above in one of the following formats: MSWord, MS Excel, or Adobe Portable Document Format (PDF). Only one payment request shall be submitted per e-mail and the subject line of the e-mail shall include the Contractor's name, contract number, and unique invoice number.
[Note: The original payment request must still be submitted in hard copy and mailed to the designated billing office to meet the requirements of a "proper invoice."]
Central Point of Distribution: nhlbi_branchcinvoice@nhlbi.nih.gov
The Contractor shall submit an electronic copy of the payment request to the Central Point of Distribution mailbox. The payment request shall be transmitted as an attachment via e-mail to the address listed above in one of the following formats: MSWord, MS Excel, or Adobe Portable Document Format (PDF). Only one payment request shall be submitted per e-mail and the subject line of the e-mail shall include the Contractor's name, contract number, and unique invoice number.
[Note: The original payment request must still be submitted in hard copy and mailed to the designated billing office to meet the requirements of a "proper invoice."]
2. In addition to the requirements specified in FAR 32.905 for a proper invoice, the Contractor shall include the following information on the face page of all payment requests:
a. Name of the Office of Acquisitions. The Office of Acquisitions for this contract is the National Heart, Lung and Blood Institute .
- 17 -
b. Federal Taxpayer Identification Number (TIN). If the Contractor does not have a valid TIN, it shall identify the Vendor Identification Number (VIN) on the payment request. The VIN is the number that appears after the Contractor's name on the face page of the contract. [Note: A VIN is assigned to new contracts awarded on or after June 4, 2007, and any existing contract modified to include the VIN number.] If the Contractor has neither a TIN, DUNS, or VIN, contact the Contracting Officer.
c. DUNS or DUNS+4 Number. The DUNS number must identify the Contractor's name and address exactly as stated in the contract and as registered in the Central Contractor Registration (CCR) database. If the Contractor does not have a valid DUNS number, it shall identify the Vendor Identification Number (VIN) on the payment request. The VIN is the number that appears after the Contractor's name on the face page of the contract. [Note: A VIN is assigned to new contracts awarded on or after June 4, 2007, and any existing contract modified to include the VIN number.] If the Contractor has neither a TIN, DUNS, or VIN, contact the Contracting Officer.
d. Invoice Matching Option. This contract requires a two-way match.
e. Unique Invoice Number. Each payment request must be identified by a unique invoice number, which can only be used one time regardless of the number of contracts or orders held by an organization.
f. The Contract Title is:
Atherosclerosis Risk in Communities (ARIC)
g. Contract Line Items as follows:
Line Item # Line Item Description
TBD
b. Inquiries regarding payment of invoices shall be directed to the designated billing office, (301) 496-6452.
c. The Contractor shall include the following certification on every invoice for reimbursable costs incurred with Fiscal Year funds subject to HHSAR Clause 352.231-70, Salary Rate Limitation in SECTION I of this contract.
For billing purposes, certified invoices are required for the billing period during which the applicable Fiscal Year funds were initially charged through the final billing period utilizing the applicable Fiscal Year funds:
"I hereby certify that the salaries charged in this invoice are in compliance with HHSAR Clause 352.231-70, Salary Rate Limitation in SECTION I of the above referenced contract."
ARTICLE G.5. PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS
SUBCONTRACTORS, FAR 52.232-40 (December 2013)
a. Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
b. The acceleration of payments under this clause does not provide any new rights under the prompt Payment Act.
c. Include the substance of this clause, include this paragraph c, in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
- 18 -
(End of Clause)
ARTICLE G.6. INDIRECT COST RATES
In accordance with Federal Acquisition Regulation (FAR) (48 CFR Chapter 1) Clause 52.216-7 (d)(2), Allowable Cost and Payment incorporated by reference in this contract in PART II, SECTION I, the cognizant Contracting Officer representative responsible for negotiating provisional and/or final indirect cost rates is identified as follows:
Director, Division of Financial Advisory Services Office of Acquisition Management and Policy National Institutes of Health
6011 EXECUTIVE BLVD, ROOM 549C, MSC-7663
BETHESDA MD 20892-7663
These rates are hereby incorporated without further action of the Contracting Officer.
ARTICLE G.7. GOVERNMENT PROPERTY
If this RFP will result in the acquisition or use of Government Property provided by the contracting agency or if the Contracting Officer authorizes in the preaward negotiation process, the acquisition of property (other than real property), this ARTICLE will include applicable provisions and incorporate the HHS Publication, entitled, "HHS Contracting Guide for Contract of Government Property," which can be found at: http://oamp.od.nih.gov/sites/default/ files/appendix_q_hhs_contracting_guide.pdf.
ARTICLE G.8. POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE
a. Contractor Performance Evaluations
Interim and Final evaluations of Contractor performance will be prepared on this contract in accordance with FAR Subpart 42.15. The Final performance evaluation will be prepared at the time of completion of work. In addition to the Final evaluation, Interim evaluation(s) will be prepared Annually as follows on a date TBD.
Interim and Final evaluations will be provided to the Contractor as soon as practicable after completion of the evaluation. The Contractor will be permitted thirty days to review the document and to submit additional information or a rebutting statement. If agreement cannot be reached between the parties, the matter will be referred to an individual one level above the Contracting Officer, whose decision will be final.
Copies of the evaluations, Contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.
b. Electronic Access to Contractor Performance Evaluations
Contractors may access evaluations through a secure Web site for review and comment at the following address:
http://www.cpars.gov
SECTION H - SPECIAL CONTRACT REQUIREMENTS
ARTICLE H.1. PROTECTION OF HUMAN SUBJECTS, HHSAR 352.270-4(b) (January 2006)
a. The Contractor agrees that the rights and welfare of human subjects involved in research under this contract shall be protected in accordance with 45 CFR Part 46 and with the Contractor's current Assurance of Compliance on file with the Office for Human Research Protections (OHRP), Department of Health and Human Services. The Contractor further agrees to provide certification at least annually that the Institutional Review Board has reviewed and approved the procedures, which involve human subjects in accordance with 45 CFR Part 46 and the Assurance of Compliance.
http://oamp.od.nih.gov/sites/default/files/appendix_q_hhs_contracting_guide.pdf http://oamp.od.nih.gov/sites/default/files/appendix_q_hhs_contracting_guide.pdf http://www.cpars.gov
- 19 -
b. The Contractor shall bear full responsibility for the performance of all work and services involving the use of human subjects under this contract and shall ensure that work is conducted in a proper manner and as safely as is feasible. The parties hereto agree that the Contractor retains the right to control and direct the performance of all work under this contract. The Contractor shall not deem anything in this contract to constitute the Contractor or any subcontractor, agent or employee of the Contractor, or any other person, organization, institution, or group of any kind whatsoever, as the agent or employee of the Government. The Contractor agrees that it has entered into this contract and will discharge its obligations, duties, and undertakings and the work pursuant thereto, whether requiring professional judgment or otherwise, as an independent contractor without imputing liability on the part of the Government for the acts of the Contractor or its employees.
c. If at any time during the performance of this contract, the Contracting Officer determines, in consultation with OHRP that the Contractor is not in compliance with any of the requirements and/or standards stated in paragraphs (a) and (b) above, the Contracting Officer may immediately suspend, in whole or in part, work and further payments under this contract until the Contractor corrects the noncompliance. The Contracting Officer may communicate the notice of suspension by telephone with confirmation in writing. If the Contractor fails to complete corrective action within the period of time designated in the Contracting Officer's written notice of suspension, the Contracting Officer may, after consultation with OHRP, terminate this contract in whole or in part, and the Contractor's name may be removed from the list of those contractors with approved Human Subject Assurances.
(End of clause)
ARTICLE H.2. HUMAN SUBJECTS
Research involving human subjects shall not be conducted under this contract until the protocol developed in Task Area 2 has been approved by NHLBI, written notice of such approval has been provided by the Contracting Officer, and the Contractor has provided to the Contracting Officer a properly completed "Protection of Human Subjects Assurance Identification/IRB Certification/Declaration of Exemption", Form OMB No. 0990-0263 (formerly Optional Form 310) certifying IRB review and approval of the protocol. The human subject certification can be met by submission of the Contractor's self designated form, provided that it contains the information required by the "Protection of Human Subjects Assurance Identification/IRB Certification/Declaration of Exemption", Form OMB No.
0990-0263 (formerly Optional Form 310).
When research involving Human Subjects will take place at collaborating sites or other performance sites, the Contractor shall obtain, and keep on file, a properly completed "Protection of Human Subjects Assurance Identification/IRB Certification/Declaration of Exemption", Form OMB No. 0990-0263 (formerly Optional Form 310) certifying IRB review and approval of the research.
ARTICLE H.3. REQUIRED EDUCATION IN THE PROTECTION OF HUMAN RESEARCH
PARTICIPANTS
NIH policy requires education on the protection of human subject participants for all investigators receiving NIH contract awards for research involving human subjects. For a complete description of the NIH Policy announcement on required education in the protection of human subject participants, the Contractor should access the "NIH Guide for Grants and Contracts Announcement" dated June 5, 2000 at the following website:
http://grants.nih.gov/grants/guide/notice-files/NOT-OD-00-039.html.
The information below is a summary of the NIH Policy Announcement:
The Contractor shall maintain the following information: (1) a list of the names and titles of the principal investigator and any other individuals working under the contract who are responsible for the design and/or conduct of the research; (2) the title of the education program(s) in the protection of human subjects that has been completed for each named personnel and; (3) a one sentence description of the educational program(s) listed in (2) above. This requirement extends to investigators and all individuals responsible for the design and/or conduct of the research who are working as subcontractors or consultants under the contract.
http://grants.nih.gov/grants/guide/notice-files/NOT-OD-00-039.html
- 20 -
Prior to any substitution of the Principal Investigator or any other individuals responsible for the design and/or conduct of the research under the contract, the Contractor shall provide the following written information to the Contracting Officer: the title of the education program and a one sentence description of the program that has been completed by the replacement.
ARTICLE H.4. DATA AND SAFETY MONITORING IN CLINICAL TRIALS AND
EPIDEMIOLOGICAL STUDIES
For informational purposes, the Contractor is directed to the full text of the NHLBI policies regarding Data and Safety Monitoring Boards and Observational Study Monitoring Boards, which may be found at:
http://www.nhlbi.nih.gov/funding/ethics.htm
1. Establishing Data and Safety Monitoring Boards and Observational Study Monitoring Boards
2. Data Quality Assurance in Clinical Trials and Observational Studies-Guidelines
3. Responsibilities of DSMBs Appointed by the NHLBI
4. Responsibilities of OSMBs Appointed by the NHLBI
ARTICLE H.5. HUMAN MATERIALS (ASSURANCE OF OHRP COMPLIANCE)
The acquisition and supply of all human specimen material (including fetal material) used under this contract shall be obtained by the Contractor in full compliance with applicable State and Local laws and the provisions of the Uniform Anatomical Gift Act in the United States, and no undue inducements, monetary or otherwise, will be offered to any person to influence their donation of human material.
The Contractor shall provide written documentation that all…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .