Attachment_A_Delivery_Order_Bid_Sheet.pdf
PDF 29 KB Posted
- Attached to
- New_England_Region_Wide_Construction_IDIQ_Above_SAT Federal contract opportunity
- Solicitation number
- Not on record
About this file
Attachment A Delivery Order Bid Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A.pdf | ||
| Amendment_0002_corrected.pdf | ||
| Amendment_0002.pdf | ||
| Pre-solicitation_Conference_Attendance_List.pdf | ||
| Attachment_B_Revised_Contract_Price_Form_(4_3_2018).pdf | ||
| Attachment_B_Revised_Contract_Price_Form_(4_3_2018).xlsx | XLSX spreadsheet | |
| Volume_I_IDIQ_Agreement_Above_$150k_DRAFT.pdf | ||
| Volume_II_IDIQ_Attachments_Above_$150k.pdf | ||
| Volume_IV_IDIQ_Reps_Certs_Above_$150k.pdf | ||
| Attachment_B_Contract_Price_Form.pdf | ||
| Attachment_E_Document_Security_Notice.pdf | ||
| Attachment_A_Questions_Matrix.xlsx | XLSX spreadsheet | |
| Volume_III_IDIQ_Solicitation_Above_$150k.pdf | ||
| Attachment_C_GSA527-15b.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY STATE
BUILDING PROJECT NO.
Included AMOUNTS $ TOTALS
Percent Div 2-32 subtotal
0% -$
AMOUNTS $
1 -$ 2 -$ 3 -$ 4 -$ reserved for future
Facility Services Subgroup
Facility Construction Subgroup
Site and Infrastructure Subgroup reserved for future Earthwork Exterior Improvements
TOTAL COSTS B
B. ALTERNATES or OPTION COSTS (Attach estimate)
TOTAL COSTS A
IDIQ
COST ESTIMATE
reserved for future reserved for future reserved for future reserved for future18
Equipment
C O
S T
O F
P R
IC
IN
G
D A
TA
R
E
FE
R E
N C
E
ESTIMATED COSTS
DIVISION NUMBER
Furnishings Special Construcion Conveying Equipment
Existing Conditions
DIVISION TITLES
Concrete (footings-foundations) Masonary (concrete-block) Metals (beams) Woods Plastics Composites(framing)
Integrated Automation Electrical Communications Electronic Safety and Security reserved for future reserved for future Fire Suppression Plumbing Heating Ventilation Air Conditioning reserved for future
COMPLETION IN WEEKS
DIVISIONS 2-32 SUBTOTAL
General Requirements Subgroup (general requirements priced as percentage of divisions 2-32)
PROJECT NAME:
A. DIVISIONAL COSTS
Thermal and Moisture Protection Openings (doorways) Finishes
Specialties
General Requirements
AMOUNTS $
1 -$ 2 -$ 3 -$ 4 -$
Rate Hours AMOUNTS
1 -$ 0.00 -$ 2 -$ 0.00 -$
SubTotal Percent Amount 1 -$ 0% -$ 2 -$ 0% -$
IDIQ CONTRACTOR FIRM NAME- ADDRESS E -$ -$
F -$ -$
G -$ Date APPROVED BY (Signature and Title) Date
GENERAL SERVICES ADMINISTRATION mich321
TOTAL COST TO GOVERNMENT
TOTAL COST A-B-C-D-E
Overhead Percentage (added to base bid)
TITLES
Profit Percentage (added to base with overhead)
C. NON DIVISIONAL DIRECT COSTS (list)
E. Overhead and Profit
TOTAL COSTS C
(DO NOT list Divisional costs. This section is reserved for specialty costs or fees, not fitting into any specific Division. Subcontractor quotations shall NOT BE be included here unless they meet this definition. Otherwise, they are to be broken down as appropriate and included in Section A.)
Bond
PREPARED BY (Signature and Title)
TOTAL COSTS D
Project Manager Superintendent
D. MANAGEMENT COSTS
Insurance
TOTAL BASE BID(A-B-C-D)
Total Cost E
IDIQ Bid Form
File details come from the government source that posted it.