Attachment_A_Delivery_Order_Bid_Sheet.pdf

PDF 29 KB Posted

Attached to
New_England_Region_Wide_Construction_IDIQ_Above_SAT Federal contract opportunity
Solicitation number
Not on record
Issued by
General Services Administration Public Buildings Service Region 1

About this file

Attachment A Delivery Order Bid Sheet

View the file

Other files for this federal contract opportunity

Other files attached to New_England_Region_Wide_Construction_IDIQ_Above_SAT, newest first.
File Type Posted
Q&A.pdf PDF
Amendment_0002_corrected.pdf PDF
Amendment_0002.pdf PDF
Pre-solicitation_Conference_Attendance_List.pdf PDF
Attachment_B_Revised_Contract_Price_Form_(4_3_2018).pdf PDF
Attachment_B_Revised_Contract_Price_Form_(4_3_2018).xlsx XLSX spreadsheet
Volume_I_IDIQ_Agreement_Above_$150k_DRAFT.pdf PDF
Volume_II_IDIQ_Attachments_Above_$150k.pdf PDF
Volume_IV_IDIQ_Reps_Certs_Above_$150k.pdf PDF
Attachment_B_Contract_Price_Form.pdf PDF
Attachment_E_Document_Security_Notice.pdf PDF
Attachment_A_Questions_Matrix.xlsx XLSX spreadsheet
Volume_III_IDIQ_Solicitation_Above_$150k.pdf PDF
Attachment_C_GSA527-15b.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY STATE

BUILDING PROJECT NO.

Included AMOUNTS $ TOTALS

Percent Div 2-32 subtotal

0% -$

AMOUNTS $

1 -$ 2 -$ 3 -$ 4 -$ reserved for future

Facility Services Subgroup

Facility Construction Subgroup

Site and Infrastructure Subgroup reserved for future Earthwork Exterior Improvements

TOTAL COSTS B

B. ALTERNATES or OPTION COSTS (Attach estimate)

TOTAL COSTS A

IDIQ

COST ESTIMATE

reserved for future reserved for future reserved for future reserved for future18

Equipment

C O

S T

O F

P R

IC

IN

G

D A

TA

R

E

FE

R E

N C

E

ESTIMATED COSTS

DIVISION NUMBER

Furnishings Special Construcion Conveying Equipment

Existing Conditions

DIVISION TITLES

Concrete (footings-foundations) Masonary (concrete-block) Metals (beams) Woods Plastics Composites(framing)

Integrated Automation Electrical Communications Electronic Safety and Security reserved for future reserved for future Fire Suppression Plumbing Heating Ventilation Air Conditioning reserved for future

COMPLETION IN WEEKS

DIVISIONS 2-32 SUBTOTAL

General Requirements Subgroup (general requirements priced as percentage of divisions 2-32)

PROJECT NAME:

A. DIVISIONAL COSTS

Thermal and Moisture Protection Openings (doorways) Finishes

Specialties

General Requirements

AMOUNTS $

1 -$ 2 -$ 3 -$ 4 -$

Rate Hours AMOUNTS

1 -$ 0.00 -$ 2 -$ 0.00 -$

SubTotal Percent Amount 1 -$ 0% -$ 2 -$ 0% -$

IDIQ CONTRACTOR FIRM NAME- ADDRESS E -$ -$

F -$ -$

G -$ Date APPROVED BY (Signature and Title) Date

GENERAL SERVICES ADMINISTRATION mich321

TOTAL COST TO GOVERNMENT

TOTAL COST A-B-C-D-E

Overhead Percentage (added to base bid)

TITLES

Profit Percentage (added to base with overhead)

C. NON DIVISIONAL DIRECT COSTS (list)

E. Overhead and Profit

TOTAL COSTS C

(DO NOT list Divisional costs. This section is reserved for specialty costs or fees, not fitting into any specific Division. Subcontractor quotations shall NOT BE be included here unless they meet this definition. Otherwise, they are to be broken down as appropriate and included in Section A.)

Bond

PREPARED BY (Signature and Title)

TOTAL COSTS D

Project Manager Superintendent

D. MANAGEMENT COSTS

Insurance

TOTAL BASE BID(A-B-C-D)

Total Cost E

IDIQ Bid Form