NEWCDRLTPTR.pdf
PDF 427 KB Posted
- Attached to
- TPS 75 ELECTRIC RING Federal contract opportunity
- Solicitation number
- SPRHA520Q0454
- Issued by
- Defense Logistics Agency Aviation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| cdrlcpp.pdf | ||
| 2962584_EI.pdf | ||
| 2962619_EDL_REPORT.pdf | ||
| SQS0454NEW.pdf | ||
| 3014974_ATTACH.pdf | ||
| SPRHA520Q0454.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
s
A NDTI
AN/TPS-75 Radar FD20202000454
A001 First Article Qualification Test Plan First Article Test Procedure
DI-NDTI-81307A USAF AFMC 260 Block 9C 415 SCMS/GUEA
DD
A D
ONE/R
N/A
See 16
N/A
415 SCMS/GUEA 1
FB2029 1
415 SCMS/EN 1
0 1 2
Changes to names and office symbols, when necessary, shall be made by letter through the CO/ACO without revision to this CDRL.
Block 9: Data submittal shall be marked with the following on the cover page:
Destruction Notice: Destroy by any means that will prevent disclosure of the contents or reconstruction of the document.
Block 12: The Contractor shall deliver the First Article Test Plan a minimum of 30 days prior to first article test. The contractor shall make any re-submittal NLT 15 days after receipt of government comments.
Block 14a: Electronic submission is acceptable. Addresses are:
jerry.bialek@us.af.mil 415SCMS.EN@us.af.mil
A002 Test/Inspection Report First Article Test Report
DI-NDTI-80809B USAF AFMC 260 Block 9E 415 SCMS/GUEA
DD
A D
ONE/R
N/A
See 16
N/A
415 SCMS/GUEA 1
FB2029 1
415 SCMS/EN 1
0 1 2
Changes to names and office symbols, when necessary, shall be made by letter through the CO/ACO without revision to this CDRL.
Block 9: Data submittal shall be marked with the following on the cover page:
Destruction Notice: Destroy by any means that will prevent disclosure of the contents or reconstruction of the document.
Block 12: The Contractor shall deliver the First Article Test Report NLT 15 days after first article test. The contractor shall make any re-submittal NLT 15 days after receipt of government comments.
Block 14a: Electronic submission is acceptable. Addresses are:
jerry.bialek@us.af.mil 415SCMS.EN@us.af.mil
BIALEK.JERRY.ALFRED.11951494
Digitally signed by
BIALEK.JERRY.ALFRED.1195149492
Date: 2020.05.02 14:07:16 -06'00'
05/04/2020
KENT.BRYSON.C.1385517986
Digitally signed by
KENT.BRYSON.C.1385517986
Date: 2020.05.04 09:49:38 -06'00'
05/04/2020
Adobe Professional 8.0
File details come from the government source that posted it. Updated .