NEW Exhibit B Schedule of Prices 032425.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- DEN Third Party Materials Manager State and local contract opportunity
- Solicitation number
- 202578283
- Issued by
- Colorado
About this file
The document is an Exhibit B Schedule of Prices for Denver International Airport (DEN), detailing pricing for recycling and materials processing services. The contract opportunity involves a Request for Proposal (RFP) for a third-party materials manager to operate and maintain two material recycling yards at DEN, with a minimum contract term of ten years. The yards primarily handle recycled asphalt and concrete products, focusing on processing, stockpiling, weighing, and inspecting incoming rubble and outgoing recycled materials.
The pricing schedule provides detailed unit rates for various services, including processing rubble of different sizes (< 24" and > 24"), handling structural and reinforced concrete, and producing different classes of recycled concrete and asphalt base materials for CDOT specifications. The pricing differentiates between rates with and without prevailing wages, offering flexibility for the potential operator. DEN seeks to transition the recycling yards from direct airport operation back to third-party management, with the goal of achieving an effective return on investment for stakeholders through an operational agreement that includes upgrading and improving the North and South Recycle Yards.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP 202578283 DEN Third Party Materials Manager 4325-1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
EXHIBIT B - SCHEDULE OF PRICES
| DEN Projects and DEN Maintenance (Excludes Applicable Taxes and Fees) | |||||
| Incoming Recyclable Rubble: | |||||
| Pre-Break, Size, Clean & Stockpile | With Prevailing Wages | Unit | Without Prevailing Wages | Unit | |
| Weigh & Inspect Incoming Rubble | per Ton | per Ton | |||
| < 24" Rubble Size | per Ton | per Ton | |||
| > 24" Rubble Size | per Ton | per Ton | |||
| Structural Reinforced Rubble | per Ton | per Ton | |||
| Reinforced Concrete Pipe | per Linear Foot | per Linear Foot | |||
| Others: | |||||
| Outgoing Recycled Material: | |||||
| Class 6-CDOT Recycled Concrete Base | per Ton | per Ton | |||
| Class 6-CDOT Recycled Asphalt Base | per Ton | per Ton | |||
| Class 5-CDOT Recycled Concrete Base | per Ton | per Ton | |||
| Class 5-CDOT Recycled Asphalt Base | per Ton | per Ton | |||
| Class 1-CDOT Structural Fill | per Ton | per Ton | |||
| 2" x 3/4" Concrete Dry Screened Stone | per Ton | per Ton | |||
| 4" x 2" Concrete Dry Screened Stone | per Ton | per Ton | |||
| ASTM (57#/67#) Concrete Dry Screened Stone | per Ton | per Ton | |||
| DIA Stone (6" & 12") | per Ton | per Ton | |||
| 3/8" Fines | per Ton | per Ton | |||
| Others: | |||||
| Load Recycled Materials (Out-going) | per Ton | per Ton | |||
| Weigh Recycled Materials (Out-going) | per Ton | per Ton | |||
| Others: |