20-00577 SOW.pdf
PDF 121 KB Posted
- Attached to
- Closed-Cycle Cooling System Federal contract opportunity
- Solicitation number
- NB688000-20-00577
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20-00577 specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S t
Statement of Work: Closed-cycle cooling system for flow cryostat 1 Last Saved: 1/13/2020 11:02 AM Double-click on for further assistance.
Use this Statement of Work document to purchase an item and/or item-related services.
TITLE: Closed-cycle cooling system for flow cryostat Requesting Lab/Division/Group: PML/688/10 Requisition Number: NB688000-20-00577
Statement of Need The NIST Ion Storage Group requires a closed-cycle systems for cooling a flow cryostat to low temperature (4.2 K – 15 K) for use in experiments with trapped atomic ions. The group uses trapped ions as qubits for quantum computation and simulation in an existing experimental apparatus with a flow cryostat that relies on liquid helium. Closed-cycle cooling for existing flow cryostats offers a cost-effective replacement for liquid helium these setups.
Items and/or item-related services Section Requirements Related Information Items/Service (required)
One closed cycle cooling system to integrate with existing flow cryostat ☒ See attached document for detailed specifications
Enter related information here
Shipping & Delivery ☐ N/A
16 weeks or less after receipt of order ☐ Phased delivery is acceptable ☐ Software on USB / disk required ☐ Software electronic delivery acceptable Email address for software delivery
Enter related information here
Installation ☐ N/A
On-site installation required ☐ Site visit recommended
Inspection and Acceptance ☐ N/A
Inspection and acceptance is expected to take 14 days ☒ Government acceptance expected to take longer than 7 days
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable If you require an Extended Manufacturer Warranty, describe the warranty requirements.
Period Length:12 months
Enter related information here
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Training ☐ N/A
On site training expected Enter related information here
Maintenance
☒ N/A
Describe your maintenance requirements.
☐See attached document for detailed maintenance specifications Period Length: Ex. month, 6 month, year
S t
Statement of Work: Closed-cycle cooling system for flow cryostat 2 Last Saved: 1/13/2020 11:02 AM Double-click on for further assistance.
etc.
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Repair ☒ N/A
Choose an item.
Describe your repair requirements.
Period Length: Ex. month, 6 month, year etc.
Enter related information here
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Government Furnished Material / Equipment ☒ N/A
List any government furnished material/equipment here
Enter related information here
Travel ☒ N/A
Describe any travel requirements Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.).
Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
| Use this Statement of Work document to purchase an item and/or item-related services. |
| Use this Statement of Work document to purchase an item and/or item-related services. |
| TITLE: Closed-cycle cooling system for flow cryostat |
| TITLE: Closed-cycle cooling system for flow cryostat |
| Requesting Lab/Division/Group: PML/688/10 |
| Requesting Lab/Division/Group: PML/688/10 |
| Requisition Number: NB688000-20-00577 |
| Requisition Number: NB688000-20-00577 |
| Statement of Need |
| Statement of Need |
File details come from the government source that posted it. Updated .