Statement of Work.pdf

PDF 113 KB Posted

Attached to
Cryospot 4TS Cryogenic System Maintenance Federal contract opportunity
Solicitation number
NB6720602501102
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a Statement of Work (SOW) for maintenance of a Cryospot 4TS Cryogenic System at the National Institute of Standards and Technology (NIST) Boulder Campus. The primary requirements include servicing the cryogenic system, replacing the RDK-205D Cold Head with a refurbished unit, and providing a 6-month warranty. The maintenance must be completed within 21 days after order receipt, during regular business hours (Monday-Friday, 8:00 am to 5:00 pm).

The SOW includes extensive safety requirements, mandating the contractor provide a detailed safety plan, safety-related equipment, personnel training, health hazard assessments, and compliance with HSPD-12 security directives. The solicitation is a sources sought market research announcement targeting small businesses, with a NAICS code of 334516 and a small business size standard of 1000 employees. If at least two qualified small businesses are identified, the procurement will be set aside for small business competition. Interested vendors must submit a five-page capability statement including company profile, product specifications, lead times, and small business verification.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Cryospot 4TS Cryogenic System Maintenance

I. BACKGROUND:

NIST purchased a Photon Spot cryostat in 2022 for the Programmable Josephson Voltage Standard at NIST Boulder. After two years of operation, the RDK205 cold head requires maintenance.

II. PURPOSE:

Maintenance of Government owned Cryospot 4TS Cryogenic System.

Place of Performance: NIST-Boulder Campus

Regular Business Hours: Regular business hours are Monday through Friday, 8:00 am to 5:00 pm Local Time, excluding Federal holidays and NIST closures.

Delivery Date: 21 Days After Release of Order

III. SPECIFIC REQUIREMENTS:

Task 1 – Maintenance of Cryospot 4TS Cryogenic System The contractor shall provide the following required maintenance:

1.1 Service Cryospot 4TS Cryogenic System

1.2 Replace RDK-205D Cold Head with Refurbished RDK-205D Cold Head

1.3 6-month warranty on the entire product

Task 2 - Safety on the NIST Campus

NIST is committed to maintaining a work environment that safeguards the public and the environment, as well as personnel and property.

If the award requires construction, demolition, excavation, renovation, or other work for which the contractor directs and oversees contractor personnel (including subcontractors) at NIST-owned and operated sites, the contractor shall:

Provide a detailed, site-specific Safety Plan to the contracting officer within 7 days after award that describes how the contractor will maintain a safe work environment and comply with applicable Occupational Safety and Health Administration (OSHA) standards, as well as with applicable state and local laws, standards, and codes.

The Safety Plan shall specify how the company’s policies and practices will comply with each of the applicable standards, laws, and codes.

The contracting officer will provide written comments regarding the plan to the contractor within seven

(7) days of receipt and will require the contractor to submit a revised safety plan within seven (7) days after that to the contracting officer for their review. This cycle may be repeated, if necessary, until the contracting officer determines the safety plan to be acceptable.

Task 3 - Safety-Related Equipment The Contractor shall provide all safety-related equipment required to perform the work under this award, including personal protective equipment (PPE) and other equipment that is required or appropriate to protect contractor personnel and other personnel on the NIST campus. Contractor-provided personal protective equipment shall include, at a minimum, hard hats, safety shoes, safety glasses (prescription or standard), respiratory protection (powered air purifying respirator or full-face mask respirator), high visibility clothing and gloves that meet applicable OSHA standards for PPE.

Task 4 - Training The Contractor shall: Provide safety-related training required by applicable OSHA, state and local regulations or standards to affected contractor personnel (including subcontractor personnel) that perform work under this award. Such training may include, for example, training for proper use of PPE, respirator use, fall protection, crane operation, forklift operation; electrical safety, or other safety-related topics.

Maintain records of safety training provided to contractor personnel (including subcontractor personnel) that perform work on this award. The contractor shall make those records available to the contracting officer, contracting officer’s representative for the award, or other authorized personnel within 7 days of receipt of their written request, and annually thereafter or upon request.

Require contractor personnel (including subcontractors) to attend required NIST-specific health or safety training that is required by the award.

Task 5 - Health Hazard Assessments and Medical Evaluations The Contractor shall provide required health hazard exposure assessments, medical evaluations and screenings, and exposure monitoring required by applicable OSHA requirements.

Ensure PII information is protected.

Task 6 - Homeland Security Presidential Directive (HSPD)-12 (Required Task) The Contractor (and/or any subcontractor) and its employees who require physical access to NIST facilities or logical access to NIST IT networks or systems must comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; OMB M-05-24; OMB M-19-17; FIPS 201, Personal Identity Verification (PIV) of Federal Employees and Contractors; NIST HSPD-12 policy; and Executive Order 13467, Part 1 §1.2.

The Contractor (and/or any subcontractor) must submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s).

The roster must be submitted to the COR and/or CO within 14 days of the effective date of this contract.

Any revisions to the roster as a result of staffing changes must be submitted within 14 days of the change.

The COR will notify the Contractor of the appropriate level of investigation required for each staff member. If the employee is filling a new position, the Contractor must provide a position description, and the Government will determine the appropriate suitability level.

Position Sensitivity Designations Requirement

All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR).

The following position sensitivity designation levels apply to this solicitation/contact: Low Risk

IV. GENERAL REQUIREMENTS

Government Furnished Property

All property, data and information provided by the Government in the performance of this task remains the property of the Government and shall be surrendered to the government upon completion or termination of this requirement.

Item: Cryogenic System Model Number: Cryospot 4TS Serial Number(s): 3MD22002D

Inspection and Acceptance: In addition to the inspection and acceptance terms articulated in the specific FAR clause that allows the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.

Performance Tests:

Test Description Standard

1 Measurement of the cooling power available at 4 K Using the built in temperature controller

NIST may choose at its discretion to forego this part of acceptance testing.

A visual inspection of the equipment will be performed by the NIST POC to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.

The Government will test, inspect, and accept or reject the equipment within 7 DAYS of the receipt of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications. It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.

V. REQUIREMENTS FOR CONTRACTOR PERSONNEL

(1) Safety: The Contractor employee must be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.

(2) Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and is shown to the armed Security Police when entering the campus.

(3) Identification Badges: Contractor employees must comply with NIST identification and access requirements. Each Contractor employee must wear a visible identification badge provided by the NIST Security Office.

(4) Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued. The pass shall be displayed on the vehicle in accordance with NIST Security Office instructions.

VI. Warranty: 6-month warranty on the entire product

VII. Schedule of Deliverables:

Deliverable Description Due Date Quantity

1 Maintenance of Cryospot 4TS Cryogenic System.

Not later than 21 DAYS after receipt of order 1