Atch 1 - Specifications.pdf
PDF 286 KB Posted
- Attached to
- Microwave Signal Generator Federal contract opportunity
- Solicitation number
- NB672010-25-02159
About this file
This Requirements / Specification Document is for a Microwave Signal Generator requested by the National Institute of Standards and Technology (NIST), specifically the Communications Technology Laboratory's Radio Frequency Technology Division. The document details requirements for a single microwave signal generator with precise technical specifications, including a frequency range of 100 kHz to 67 GHz, a 1.85 mm coaxial output connector, high output power (minimum 8 dBm), modulation capabilities (AM, FM, PM), low harmonic output, and remote control interfaces. The equipment will be delivered to the NIST-Boulder location within 60 days after order release, with on-site acceptance expected within 7 business days and no additional training, installation, or calibration requirements specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ NB672010-25-02159 - Microwave Signal Generator.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document TITLE: Microwave Signal Generator
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Radio Frequency Technology Division Guided wave electromagnetics Mail Stop 672.01
General Statement of Need:
The Communications Technology Laboratory (CTL) at the National Institute of Standards and Technology (NIST) enables science and industry by providing essential measurement methods, instrumentation, and standards to support all phases of communications technology development, from fundamental characterization and discovery to production.
The Radio Frequency Technology Division (RFTD) within CTL requires a microwave signal generator to perform research on power measurements and to perform calibrations of power sensors as a calibration service. The signal generator needs to generate a variety of power levels and offer low spurious harmonic content, among other requirements (see specifications).
Item Specifications and Quantities:
Item 1: Microwave Signal Generator Quantity: 1 Specifications: 1.1
1.2 1.3
1.4
1.5
1.6 1.7
1.8 1.9
Shall generate signals in a frequency range that spans a minimum of 100 kHz to 67 GHz.
Shall have a 1.85 mm coaxial output connector.
Shall have high output power. Minimum output power of 8 dBm across the frequency range from 100 kHz to 67 GHz.
Shall have a minimum settable power of -75 dBm or lower across the frequency range frequency range from 100 kHz to 67 GHz.
Shall include capabilities for amplitude modulation (AM), frequency modulation (FM), and phase modulation (PM).
Modulation must be controllable with an analog input.
Shall have a maximum harmonic output power of -25 dBc across the frequency range from 100 kHz to 67 GHz. Specification applies with filters turned on (if any). Specification applies at 10 dBm or maximum specified output power, whichever is lower.
Shall support remote control over USB and GPIB interfaces.
Shall include a rack mount flange kit.
Procurement Support Information and Ancillary Services:
[Provide input for each section Below or Mark Not Applicable (N/A)]
Section Requirements/Specifications
Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain Requirements.]
☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping & Delivery ☐ N/A
Shipping Address:
☒ NIST-Boulder
ATTN: TBD
Mail Stop: TBD 325 Broadway Boulder, CO 80305
☐ NIST-Gaithersburg
ATTN:
Mail Stop:
100 Bureau Dr Gaithersburg MD 20899
☐ [Alternate Shipping Address] Shipping Criteria:
☐ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.]
☐ Direct Delivery to OU Building Required [Explain Need for Requirement] Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement]
Delivery Date Criteria:
☒ Delivery Shall Be Competed No Later Than:
60 days After Release of Order (ARO) ☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media ☒ N/A
[Enter Electronic Media Requirements by Item.]
☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:
[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter Details] NOTE: SME shall be the coordination POC.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power Available
Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site
☒ Acceptance Not Expected to Exceed 7 Business Days
☐ Acceptance Expected to Exceed 7 Business Days:
[Duration]
☐ Inspection and Acceptance Plan:
[Explanation]
[Enter Other Requirements]
Training
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site
☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:
[Describe Materials] ☐ Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years]
What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns
☐ Other [Enter Other Requirements]
☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)
Calibration
[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Government Furnished Material / Equipment ☒ N/A
List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
NIST Property Number:
[Enter Description] [Enter Serial Number] [Enter NIST Property Number]
☐ Other: [Enter Other Details]
Travel
[Describe any Travel Requirements Per Item] ☐ Explain:
[Enter Justification / Requirement]
[Enter Other Requirements]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .