02 - Specifications.pdf

PDF 301 KB Posted

Attached to
2. 4 mm Microcalorimeter Standards Federal contract opportunity
Solicitation number
NB6720102102051
Issued by
Department of Commerce National Institute of Standards and Technology

View the file

Other files for this federal contract opportunity

Other files attached to 2. 4 mm Microcalorimeter Standards, newest first.
File Type Posted
Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: 2.4 mm Microcalorimeter Standards

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Technology Division Radio Frequency Electronics Group (672.01)

General Statement of Need:

The Communications Technology Laboratory (CTL) at the National Institute of Standards and Technology (NIST) enables science and industry by providing essential measurement methods, instrumentation, and standards to support all phases of communications technology development, from fundamental characterization and discovery to production.

To support research and measurement services in radio frequency and microwave power, the Radio Frequency Technology Division in CTL requires 2.4 mm power transfer standards that are compatible with microcalorimeters. This instrumentation is needed for CTL to advance the state-of-the-art in microwave power measurements and to support 5G communication, spectrum sensing, and modulated-wave metrology.

Items and Ancillary Services:

Item 1: Impedance-Matched Power Transfer Standard Quantity: 4 Specifications:

1.1 1.2

1.3

1.4

1.5

1.6

1.7 1.8

1.9

1.10

1.11

1.12

1.13

Shall have a 2.4 mm coaxial connector.

Shall have a radiofrequency (RF) termination with an operating frequency range from DC to 50 GHz.

The RF termination shall have a reflection coefficient magnitude of less than 0.2 across the operating frequency range when referenced to a 50 Ω impedance.

The RF termination shall have a maximum input power of at least 20 dBm.

RF leakage from the transfer standard shall be at least 40 dBc below the RF input power across the operating frequency range.

Shall have a DC heater with a maximum input power of at least 20 dBm.

The DC heater shall have a four-wire lead configuration.

The DC heater shall have a DC resistance in the range of 50 Ω to 2 kΩ.

Shall have a thermopile to sense heating from RF power dissipation with a sensitivity of at least 100 mV/W and a thermopile to sense heating from DC power dissipation with a sensitivity of at least 100 mV/W. Heating from both RF and DC power may be sensed with a single thermopile or with one thermopile for the RF termination and one for the DC heater.

Shall have a DC connector that allows direct electrical connections to the DC heater, the thermopile(s), and any auxiliary temperature sensors.

If the transfer standard contains active readout or data storage electronics, it shall be possible to operate the transfer standard without supplying power to these electronics. The RF termination, DC heater, thermopile(s), and any auxiliary temperature sensors shall be operable without supplying power to active readout or data storage electronics.

Shall have dimensions of less than 100 mm × 50 mm × 50 mm (length × width × height).

Shall have a total mass of less than 100 g.

Item 2: Short-Circuit Power Transfer Standard Quantity: 1 Specifications: 2.1 Shall have the same design as the impedance-matched power transfer standard, with the exception that the element that dissipates RF power is replaced with a short-circuit termination designed to reflect RF power.

Item 3: Open-Circuit Power Transfer Standard

Specifications: 3.1 Shall have the same design as the impedance-matched power transfer standard, with the exception that the element that dissipates RF power is replaced with an open-circuit termination designed to reflect RF power.

Item 4: Mismatch-Circuit Power Transfer Standard

Specifications: 4.1 Shall have the same design as the impedance-matched power transfer standard, with the exception that the element that dissipates RF power is replaced with a termination designed to partially reflect RF power, and partially dissipate RF power.

[List any additional item(s) or service requirements using the same format.]

Service Requirements / Item Specifications:

[Provide input for each section]

Section Requirements/Specifications Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.] Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

ATTN: Christian Long 325 Broadway, MS 672.01 Boulder, CO 80305

☐ [Alternate Shipping Address] Shipping Criteria:

☐ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to Building Required [Explain Need for Requirement]

☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☐ Delivery of Goods, Installation, and Training shall be competed no later than: 60 days After Release of Order (ARO) ☐ Delivery No Earlier Than: Click or tap to enter a date.

☒ Other: Delivery of Goods shall be competed no later than August 1, 2022.

[List Other Shipping, Delivery or Special Requirements.] Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☐ Email address for Software Delivery:

[Enter Address] Installation ☒ N/A

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:

[Enter Details]

NOTE:

When installation is required, TPOC shall be the coordination point.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers] ☐ Power Available Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.] ☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).] ☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.] Warranty ☒ N/A

Extended Warranty Required

[If you require an Extended Manufacturer Warranty, describe the warranty requirements per item.]

What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns ☐ Other [Enter Other Requirements] ☐ Warranty Length: [i.e. 3 - Years]

Training ☒ N/A

[Training Requirements (Who, When, What, Where)] ☐ On-Site

Is Travel Required: [Choose Answer]

☐ Off-Site Location: [Enter Location(s)] ☐ Number of Trainees: [Enter Number of Trainees] Scope of Training ☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other [Enter Other Scope Requirements] ☐ Training materials to be provided:

[Describe Requirements] ☐ Other [Enter Other Training Requirements] NOTE: When training is required, TPOC shall be coordinator.

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site

[Inspection Requirements Per Item] ☒ Government Acceptance Expected to Not to Exceed 7 Business Days ☐ Government Acceptance Expected to Exceed 7 Business Days [Duration] ☐ Inspection and Acceptance Plan:

[Explanation] ☐ Other:

[Enter Other Requirements] Maintenance ☒ N/A

[Describe Maintenance Requirements Per Item] Service Plan Length: [i.e. 3 - Years]

What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel

☐ Cost and Liability for Returns ☐ Software Updates ☐ Manuals l

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum) Government Furnished Material / Equipment ☒ N/A

[List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

☐ Government Equipment which will leave Government Site (TPOC must coordinate with Division Property Custodian)

Description: [Enter Description] Serial Number: [Enter Serial Number]

NIST Property Number: [Enter NIST Property Number] ☐ Other:

[Enter Other Details] Travel ☒ N/A

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement] ☐ Other:

[Enter Other Requirements] NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .