N6893618R0066
Section A - Solicitation/Contract Form
CLAUSES INCORPORATED BY FULL TEXT
FOR YOUR INFORMATION:
The following addresses and points of contact are provided:
Name: Melinda Childs Phone: (760) 939-1932
DSN: 437-1932
Email address: melinda.childs@navy.mil
U.S. Postal Service Mailing Address:
COMMANDER
CODE 254230D (M. CHILDS – 760-939-1932)
NAVAIRWARCENWPNDIV
1 Administration Circle, MAIL STOP 1303
CHINA LAKE, CA 93555-6108
Direct Delivery Address (UPS, FedEx, etc.):
COMMANDER
CODE 254230D (M. CHILDS)
NAVAIRWARCENWPNDIV
BLDG 02334, MAIL STOP 1303
CHINA LAKE, CA 93555-6108
CONTRACTING OFFICER:
Name: Agapito Santana Phone: (760) 939-2866
DSN: 437-2866
Email address: agapito.santana@navy.mil
U.S. Postal Service Mailing Address:
COMMANDER
CODE 254200D (A. SANTANA – 760-939-2866)
NAVAIRWARCENWPNDIV
1 Administration Circle, MAIL STOP 1303
CHINA LAKE, CA 93555-6108
Direct Delivery Address
COMMANDER
CODE 254200D (A. SANTANA – 760-939-2866)
NAVAIRWARCENWPNDIV
BLDG 02334, MAIL STOP 1303
CHINA LAKE, CA 93555-6108
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Forging Sets
FP-EPA
21 sets in accordance with Attachment 1, Statement of Work (SOW).
1 set for Desctructive Testing by contractor (DT) 20 sets for Non-Destructive Test inspection by contractor (NDT)
Note: The contractor shall not begin production of CLIN 0002 Housings until receipt of written PCO authorization based upon successful Forging First Article Inspection and Test (FFAIT).
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Warhead Housings - Pre-Production
The contractor shall provide 10 warhead housings (Housing Pre-Production) in accordance with Attachment 1, SOW.
These Housings shall utilize GFM inserts and Forgings accepted under CLIN 0001.
Note: The contractor shall not begin production of CLIN 0003 Housings until receipt of written PCO authorization based upon successful HFAI (Housing First Article Inspection).
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Warhead Housings - Low Rate Initial Prod
The contractor shall provide 10 warhead housings (Low Rate Initial Production) in accordance with Attachment 1, SOW.
These Housings shall utilize GFM inserts and forgings accepted under CLIN 0001.
Note: The contractor shall not begin production of CLIN 0004 Housings until receipt of written PCO authorization based upon successful WFAT (Warhead First Article Testing).
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Warhead Housings - Year 1
The contractor shall provide 90 warhead housings (Full Rate Production - Year 1) in accordance with Attachment 1, SOW.
20 of these Housings shall utilize GFM inserts. 70 of these Housings shall utilize CFM inserts.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Warhead Housings - Year 2
The contractor shall provide 90 warhead housings (Full Rate Production - Year 2) in accordance with Attachment 1, SOW.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Warhead Housings - Year 3
The contractor shall provide 90 warhead housings (Full Rate Production - Year 3) in accordance with Attachment 1, SOW.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Warhead Housings - Year 4
The contractor shall provide 90 warhead housings (Full Rate Production - Year 4) in accordance with Attachment 1, SOW.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Warhead Housings - Year 5
The contractor shall provide 90 warhead housings (Full Rate Production - Year 5) in accordance with Attachment 1, SOW.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Warhead Housings - Year 6
The contractor shall provide 90 warhead housings (Full Rate Production - Year 6) in accordance with Attachment 1, SOW.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Warhead Housings - Year 7
The contractor shall provide 90 warhead housings (Full Rate Production - Year 7) in accordance with Attachment 1, SOW.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Warhead Housings - Year 8
The contractor shall provide 90 warhead housings (Full Rate Production - Year 8) in accordance with Attachment 1, SOW.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Data
FFP
The Contractor shall provide Technical Data in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A.
NSP = Not Separately Priced. The cost for data shall be included in CLIN 0001.
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
Work under this contract shall be in accordance with the Statement of Work (SOW), provided as Attachment 1.
| 5252.204-9501 | NATIONAL STOCK NUMBERS (NAVAIR)(MAR 2007) |
| (a) This clause applies to supplies that are stock numbered under Federal Catalog System procedures. |
| (b) Unless otherwise authorized by the Contracting Officer, in writing, the Contractor shall not deliver any supplies until the supplies have been marked with a National Stock Number. All available National Stock Numbers will be furnished by the Government. If National Stock Numbers are not furnished by the Government in time to meet the delivery schedule for the supplies, the Contractor may present the supplies that are scheduled for delivery to the Contracting Officer for acceptance. The Contracting Officer may accept such supplies without National Stock Numbers and the Government will pay the Contractor, provided that title to the supplies is vested in the Government. |
| (c) The term "Federal Stock Number" (FSN), which may be referred to in the specifications of this contract or elsewhere in this contract, shall mean "National Stock Number" (NSN), and the term "Federal Item Identification Number", wherever it appears, shall mean "National Item Identification Number". |
(As used in the foregoing clause, the term "Contracting Officer" shall mean the "Administrative Contracting Officer" (ACO) with respect to provisioned items and other supplies ordered by the ACO.)
Section D - Packaging and Marking
| 5252.247-9507 | PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005) | |
| (a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M. | |
| (b) The contractor shall prominently display on the cover of each report the following information: | |
| | (1) Name and business address of contractor. |
| | (2) Contract Number/Delivery/Task order number. |
| | (3) Contract/Delivery/Task order dollar amount. |
| | (4) Whether the contract was competitively or non-competitively awarded. |
| | (5) Name of sponsoring individual. |
| | (6) Name and address of requiring activity. |
| 5252.247-9508 | PROHIBITED PACKING MATERIALS (NAVAIR)(JUN 1998) |
| The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use. |
| 5252.247-9509 | PRESERVATION, PACKAGING, PACKING AND MARKING (NAVAIR)(JUL 1998) |
| (a) Preservation, packaging and packing shall conform to prevailing industry standards for the type of commodity purchased under this contract. |
| (b) All packages will be clearly marked with applicable contract number/delivery order number, and will contain appropriate packing slip. |
| (c) In the event of any discrepancy in material shipped (overage, technical rejection, damage), the contractor shall, immediately upon request of the Contracting Officer, furnish disposition instructions. Normally, such disposition instruction shall be a properly completed Commercial Bill of Lading, which includes, but is not limited to, the mode of shipment, routing, special handling, and so forth. |
| (d) If the contractor is required to install equipment upon delivery, then the contractor shall inform the Government of the date of shipment from the contractor's facilities and the anticipated date of arrival at the site. This report shall be made no later than the actual date that the shipment is made from the contractor’s facilities. The report may be made by facsimile or e-mail, to the point of contact listed in Section G. All transportation, rigging, drayage, packing, unpacking, and handling necessary to accomplish the installation shall be the responsibility of the contractor. |
| 5252.247-9510 | PRESERVATION, PACKAGING, PACKING AND MARKING FOR FOREIGN MILITARY SALES (FMS) REQUIREMENTS (NAVAIR)(OCT 2005) | |
| (a) Unless specified elsewhere in the contract, packing and packaging shall comply with MIL-STD-129 and other applicable DoD regulations. Packing and packaging materials shall provide protection from abuse during handling and from environmental, magnetic, and electrical damage during handling and subsequent future storage, possibly under less than desirable conditions. | |
| (b) Marking: All unit and exterior containers/packs shall as a minimum be marked as follows: | |
| | (1) FMS Case Number. |
| | (2) Part Number (with CAGE Code). |
| | (3) For - the organization/address the material is shipped to. |
| | (4) The applicable MILSTRIP number (identified separately for each line item of the contract/delivery order) |
| | (5) Project Code number. |
| | (6) Project Directive Line Item (PDLI) Number. |
| | (7) Requisition Serial Number (RSN). |
| | (8) Quantity. |
| | (9) From - the contractor's address shipped from. |
| | (10) Ship to - the shipping address provided in the contract. |
| | (11) Transportation Priority |
| | (12) Required Delivery Date |
| (c) The contractor shall affix labels to the outside of each external pack warning all handlers that fragile, delicate, etc., equipment is contained within and to warn against particular improper handling and storage procedures/conditions as may be applicable to the item(s) ordered. | |
| 5252.247-9514 | TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999) |
| Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M. |
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Origin |
| Government |
| Origin |
| Government |
| 0002 |
| Origin |
| Government |
| Origin |
| Government |
| 0003 |
| Origin |
| Government |
| Origin |
| Government |
| 0004 |
| Origin |
| Government |
| Origin |
| Government |
| 0005 |
| Origin |
| Government |
| Origin |
| Government |
| 0006 |
| Origin |
| Government |
| Origin |
| Government |
| 0007 |
| Origin |
| Government |
| Origin |
| Government |
| 0008 |
| Origin |
| Government |
| Origin |
| Government |
| 0009 |
| Origin |
| Government |
| Origin |
| Government |
| 0010 |
| Origin |
| Government |
| Origin |
| Government |
| 0011 |
| Origin |
| Government |
| Origin |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
| 5252.246-9514 | INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995) |
| Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250. |
| 5252.246-9528 | INSPECTION AND ACCEPTANCE (SPECIAL CONDITIONS)(NAVAIR) (OCT 2005) |
| (a) Initial inspection of the supplies to be furnished hereunder shall be made by Defense Contract Management Agency (DCMA) at the contractor's or subcontractor's plant located 1425 Commerce Blvd. Anniston, AL. Final inspection and acceptance shall be made by DCMA with support from the NAWCWD SLAM-ER Technical Project Office within 10 working days after notification from the contractor that the units are ready for final inspection. |
| (b) Initial inspection shall consist of quality assurance at point of manufacture and/or assembly and check/test prior to shipment. Final inspection and acceptance will be made by the Receiving Activity after installation/check out testing of the supplies. |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| 30-SEP-2019 |
| 21 |
| GENERAL DYNAMICS OTS (DRI), INC. |
AARON CAMP
1425 COMMERCE BLVD
ANNISTON AL 36207-9449
(256) 832-1019
54865
| 0002 |
| 28-FEB-2020 |
| 10 |
| NAVAIR WARFARE WEAPONS DIVISION |
RECEIVING OFFICER
CODE FLCSD400G
BLDG 1024, BLANDY AVE
CHINA LAKE CA 93555-6100
760-939-2305
N68936
| 0003 |
| 30-SEP-2020 |
| 10 |
| (SAME AS PREVIOUS LOCATION) |
N68936
| 0004 |
| 31-DEC-2021 |
| 90 |
| (SAME AS PREVIOUS LOCATION) |
N68936
| 0005 |
| 31-DEC-2022 |
| 90 |
| (SAME AS PREVIOUS LOCATION) |
N68936
| 0006 |
| 31-DEC-2023 |
| 90 |
| (SAME AS PREVIOUS LOCATION) |
N68936
| 0007 |
| 31-DEC-2024 |
| 90 |
| (SAME AS PREVIOUS LOCATION) |
N68936
| 0008 |
| 31-DEC-2025 |
| 90 |
| (SAME AS PREVIOUS LOCATION) |
N68936
| 0009 |
| 31-DEC-2026 |
| 90 |
| (SAME AS PREVIOUS LOCATION) |
N68936
| 0010 |
| 31-DEC-2027 |
| 90 |
| (SAME AS PREVIOUS LOCATION) |
N68936
| 0011 |
| 30-APR-2028 |
| 30 |
| (SAME AS PREVIOUS LOCATION) |
N68936
| 52.211-17 |
| Delivery of Excess Quantities |
| SEP 1989 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-30 |
| F.O.B. Origin, Contractor's Facility |
| FEB 2006 |
| 52.247-55 |
| F.O.B. Point For Delivery Of Government-Furnished Property |
| JUN 2003 |
| 52.211-8 | TIME OF DELIVERY (JUN 1997) - ALT I (APR 1984) | |
| (a) The Government requires delivery to be made according to the following schedule: | |
| | REQUIRED DELIVERY SCHEDULE |
| ON OR BEFORE | |
| ITEM NO. | QUANTITY | NOT SOONER/LATER THAN |
CLIN 0001 - NLT 30 Sept 2019 CLIN 0002 - NLT 28 Feb 2020 CLIN 0003 - NLT 30 Sept 2020 CLIN 0004 - NLT 31 Dec 2021 CLIN 0005 - NLT 31 Dec 2022 CLIN 0006 - NLT 31 Dec 2023 CLIN 0007 - NLT 31 Dec 2024 CLIN 0008 - NLT 31 Dec 2025 CLIN 0009 - NLT 31 Dec 2026 CLIN 0010 - NLT 31 Dec 2027 CLIN 0011 - NLT 30 Apr 2028
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
| ON OR BEFORE | |
| ITEM NO. | QUANTITY | NOT SOONER/LATER THAN |
(b) The delivery dates or specific periods above are based on the assumption that the Government will make award by 31 January 2019. Each delivery date in the delivery schedule above will be extended by the number of calendar days after the above date that the contract is in fact awarded. Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror results in a binding contract. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails.
| 5252.247-9505 | TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995) | |
| Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit A, attached hereto, and the following: | |
| (a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423. | |
| | (1) Agapito Santana, PCO |
| | (2) Melinda Childs, CS |
| | (3) William McCarter, TPOC |
| | (4) Lorraine Alonge |
| | (5) Jeannie Price |
| (b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO. |
| (c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6. |
| (d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above. |
| (e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government. |
| (f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection. |
| (g) DD Form 1423, Block 14 Mailing Addresses: agapito.santana@navy.mil, melinda.childs@navy.mil, william.mccarter@navy.mil, lorraine.alonge@navy.mil , jeannie.price@navy.mil. |
| F-TXT-03 | PLACE OF DELIVERY/FOB ORIGIN (MAR 2003) | |
| (a) The articles furnished hereunder shall be delivered free of expense to the Government at or near Contractor's plant at: | |
| | *(1) 1425 Commerce Blvd., Anniston, AL 36207 |
| | Location of the offeror's actual shipping point(s) (Street address, City, State and ZIP code) from |
| | which supplies will be delivered to the Government. |
| | *(2) |
| | Exact location of offeror's private railroad siding and name of rail carrier serving it or names and |
| | addresses of the nearest public rail siding and of the carrier serving it. |
| | *(3) |
| | Quantity of supplies to be shipped from each shipping point. |
For shipment at Government expense as specified in contract clause(s) ** to: ** .
| (b) The method of shipment shall be specified by the cognizant Government transportation officer when material is ready for shipment. |
| (c) The Government shall have the right to change the destination(s) specified herein. Any adjustment in the contract price or time of delivery due to resulting change in packing or marking shall be subject to the clause of this contract entitled "Changes". |
* Contractor to complete as applicable.
| F-TXT-04 | DELIVERY OF DATA (MAR 2003) |
| Data shall be delivered per the schedules and to the destinations listed in the Contract Data Requirements List, DD Form 1423, Exhibit A. |
Section G - Contract Administration Data
| 252.204-7006 |
| Billing Instructions |
| OCT 2005 |
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
COMBO
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
N68936
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF
| Pay Official DoDAAC | | HQ0338 | |
| Issue By DoDAAC | | N68936 | |
| Admin DoDAAC | | | S0107A |
| Inspect By DoDAAC | | N68936 | |
| Ship To Code | | | N68936 |
| Ship From Code | | | N/A |
| Mark For Code | | | N/A |
| Service Approver (DoDAAC) | N/A | | |
| Service Acceptor (DoDAAC) | N/A | | |
| Accept at Other DoDAAC | N/A | | |
| LPO DoDAAC | | | N/A |
| DCAA Auditor DoDAAC | | N/A | |
| Other DoDAAC(s) | | N/A | |
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
william.mccarter@navy.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
N/A
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
| 5252.201-9500 | TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012) |
| (a) The Technical Point of Contact (TPOC) for this contract is: William McCarter, 47340MD, 760-939-6369 |
| (b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order. Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO). |
| (c) The contractor may use this technical POC for technical questions related to the existing contract or order. Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires. |
| (d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract. |
| 5252.204-9503 | EXPEDITING CONTRACT CLOSEOUT (NAVAIR) (JAN 2007) |
| (a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party might be considered to the extent permitted by law. |
| (b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered. |
| 5252.242-9511 | CONTRACT ADMINISTRATION DATA (NAVAIR)(NOV 2017) | |
| (a) Contract Administration Office. | |
| | (1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order. |
| (b) Special Instructions (see FAR 42.202(b) and (c)): | |
| | (1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)): |
| | Functions Retained |
| Retained for Performance By: | |
| (2) The following additional contract administration functions are assigned (see FAR 42.302(b)): |
| Additional Functions |
| Retained for Performance By: |
None
(c) Inquiries regarding payment should be referred to: MyInvoice through the Wide Area Workflow eBusiness Suite: https://wawf.eb.mil.
Section H - Special Contract Requirements
ECONOMIC PRICE ADJUSTMENT
H-TXT Economic Price Adjustment – 6AL-4V Titanium Alloy
(a) The Contractor shall notify the Contracting Officer if, at any time during contract performance, the price for 6AL-4V Titanium Alloy either increases or decreases. The Contractor shall furnish this notice within 60 days after the increase or decrease, or within any additional period that the Contracting Officer may approve in writing, but not later than the date of final payment under this contract. The notice shall include the Contractor’s proposal for an adjustment in the contract unit prices to be negotiated under paragraph (b) of this clause, and shall include, in the form required by the Contracting Officer, supporting data explaining the cause, effective date, and amount of the increase or decrease and the amount of the Contractor’s adjustment proposal.
(b) Promptly after the Contracting Officer receives the notice and data under paragraph (a) of this clause, the Contracting Officer and the Contractor shall negotiate a price adjustment in the contract unit prices and its effective date. However, the Contracting Officer may postpone the negotiations until an accumulation of increases and decreases in the price of 6AL-4V Titanium Alloy results in an adjustment allowable under subparagraph (c)(3) of this clause. The Contracting Officer shall modify this contract:
(1) to include the price adjustment and its effective date and
(2) to revise the unit prices as shown in the Schedule to reflect the increases or decreases resulting from the adjustment. The Contractor shall continue performance pending agreement on, or determination of, any adjustment and its effective date.
(c) Any price adjustment under this clause is subject to the following limitations:
(1) Any adjustment shall be limited to the effect on the price of 6AL-4V Titanium Alloy for the forward and aft housing and the lugwell parts in the Warhead Housings shown in the Schedule.
There shall be no adjustment for --
(i) Supplies for which the production cost is not affected by such changes;
(ii) Changes in prices other than those shown in the Schedule; or
(iii) Changes in the quantities of material used from those shown in the Schedule for each item.
(2) No upward adjustment shall apply to supplies or services that are required to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Default clause.
(3) There shall be no adjustment for any change in unit prices that would not result in a net change of at least 3 percent of the then-current total contract price. This limitation shall not apply, however, if, after final delivery of all line items, either party requests an adjustment under paragraph (b) of this clause.
(d) The Contracting Officer may examine the Contractor’s books, records, and other supporting data relevant to the cost of 6AL-4V Titanium Alloy during all reasonable times until the end of 3 years after the date of final payment under this contract or the time periods specified in Subpart 4.7 of the Federal Acquisition Regulation (FAR), whichever is earlier.
| 5252.211- 9510 | CONTRACTOR EMPLOYEES (NAVAIR)(MAY 2011) | |
| (a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall: | |
| | (1) Not by word or deed give the impression or appearance of being a Government employee; |
| | (2) Wear appropriate badges visible above the waist that identify them as contractor employees when in Government spaces, at a Government-sponsored event, or an event outside normal work spaces in support of the contract/order; |
| | (3) Clearly identify themselves as contractor employees in telephone conversations and in all formal and informal written and electronic correspondence. Identification shall include the name of the company for whom they work; |
| | (4) Identify themselves by name, their company name, if they are a subcontractor the name of the prime contractor their company is supporting, as well as the Government office they are supporting when participating in meetings, conferences, and other interactions in which all parties are not in daily contact with the individual contractor employee; and |
| | (5) Be able to provide, when asked, the full number of the contract/order under which they are performing, and the name of the Contracting Officer’s Representative. |
| (b) If wearing a badge is a risk to safety and/or security, then an alternative means of identification maybe utilized if endorsed by the Contracting Officer’s Representative and approved by the Contracting Officer. | |
| (c) The Contracting Officer will make final determination of compliance with regulations with regard to proper identification of contractor employees. | |
H-TXT-GFP RENT-FREE USE OF GOVERNMENT PROPERTY ACCOUNTABLE UNDER AN ALTERNATE GOVERNMENT CONTRACT (NAVAIR)(MAY 2016)
| (a) Pursuant to FAR 45.301, authorization is granted to use the Government property identified below on a non-interference basis without rental charge in the performance of this contract and subcontracts of any tier issued hereunder . Government property currently accountable and managed under the following contracts: |
| [List Government property and applicable contract number(s) in the table below, or if all property accountable under another contract is being authorized, state: “All the property accountable under the [contract number] Contract” in lieu of filling in the table. (Remove red font instructions when incorporating into solicitation/contract/BOAs)] |
Contract Number
| Nomenclature/ Description |
| Part/ Model/ Number |
| Mfg |
| Serial Number (Unique Item Identifier) |
| Quantity/ |
Unit of Issue Property provided “As Is” Yes/No
| (b) The said property shall be governed by the terms and conditions of the contract(s) under which it is accountable. |
| (c) The contractor is responsible for scheduling the use of the said property. The Government shall not be responsible for conflicts, delay or disruptions to any work performed by the contractor due to use of the property under this contract or any other contracts under which use of such property is authorized. |
Section I - Contract Clauses
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct |
| OCT 2015 |
| 52.204-2 |
| Security Requirements |
| AUG 1996 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| OCT 2016 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| OCT 2015 |
| 52.209-9 |
| Updates of Publicly Available Information Regarding Responsibility Matters |
| JUL 2013 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.210-1 |
| Market Research |
| APR 2011 |
| 52.211-5 |
| Material Requirements |
| AUG 2000 |
| 52.211-15 |
| Defense Priority And Allocation Requirements |
| APR 2008 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-10 |
| Price Reduction for Defective Certified Cost or Pricing Data |
| AUG 2011 |
| 52.215-11 |
| Price Reduction for Defective Certified Cost or Pricing Data--Modifications |
| AUG 2011 |
| 52.215-13 (Dev) |
| Subcontractor Certified Cost or Pricing Data - Modifications (Deviation 2018-O0015) |
| JUL 2018 |
| 52.215-14 Alt I |
| Integrity of Unit Prices (Oct 2010) - Alternate I |
| OCT 1997 |
| 52.215-15 |
| Pension Adjustments and Asset Reversions |
| OCT 2010 |
| 52.215-17 |
| Waiver of Facilities Capital Cost of Money |
| OCT 1997 |
| 52.215-21 |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications |
| OCT 2010 |
| 52.215-23 |
| Limitations on Pass-Through Charges |
| OCT 2009 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| NOV 2016 |
| 52.219-16 |
| Liquidated Damages-Subcontracting Plan |
| JAN 1999 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-19 |
| Child Labor -- Cooperation with Authorities and Remedies |
| JAN 2018 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| APR 2015 |
| 52.222-26 |
| Equal Opportunity |
| SEP 2016 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| OCT 2015 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUL 2014 |
| 52.222-37 |
| Employment Reports on Veterans |
| FEB 2016 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| MAR 2015 |
| 52.222-54 |
| Employment Eligibility Verification |
| OCT 2015 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.229-4 |
| Federal, State, And Local Taxes (State and Local Adjustments) |
| FEB 2013 |
| 52.232-1 |
| Payments |
| APR 1984 |
| 52.232-8 |
| Discounts For Prompt Payment |
| FEB 2002 |
| 52.232-9 |
| Limitation On Withholding Of Payments |
| APR 1984 |
| 52.232-11 |
| Extras |
| APR 1984 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-23 Alt I |
| Assignment of Claims (May 2014) - Alternate I |
| APR 1984 |
| 52.232-25 |
| Prompt Payment |
| JAN 2017 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| JUL 2013 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.234-1 |
| Industrial Resources Developed Under Title III, Defense Production Act |
| SEP 2016 |
| 52.242-5 |
| Payments to Small Business Subcontractors |
| JAN 2017 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.243-1 |
| Changes--Fixed Price |
| AUG 1987 |
| 52.244-5 |
| Competition In Subcontracting |
| DEC 1996 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| AUG 2018 |
| 52.245-1 |
| Government Property |
| JAN 2017 |
| 52.245-9 |
| Use And Charges |
| APR 2012 |
| 52.246-23 |
| Limitation Of Liability |
| FEB 1997 |
| 52.248-1 |
| Value Engineering |
| OCT 2010 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| APR 2012 |
| 52.249-8 |
| Default (Fixed-Price Supply & Service) |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7003 |
| Agency Office of the Inspector General |
| DEC 2012 |
| 252.203-7004 |
| Display of Hotline Posters |
| OCT 2016 |
| 252.204-7000 |
| Disclosure Of Information |
| OCT 2016 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| OCT 2016 |
| 252.204-7015 |
| Notice of Authorized Disclosure of Information for Litigation Support |
| MAY 2016 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| DEC 1991 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| OCT 2015 |
| 252.211-7005 |
| Substitutions for Military or Federal Specifications and Standards |
| NOV 2005 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 252.211-7008 |
| Use of Government-Assigned Serial Numbers |
| SEP 2010 |
| 252.215-7002 |
| Cost Estimating System Requirements |
| DEC 2012 |
| 252.225-7001 |
| Buy American And Balance Of Payments Program-- Basic |
| DEC 2017 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| DEC 2017 |
| 252.225-7004 |
| Report of Intended Performance Outside the United States and Canada--Submission after Award |
| OCT 2015 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| DEC 2017 |
| 252.225-7013 |
| Duty-Free Entry--Basic |
| MAY 2016 |
| 252.225-7025 |
| Restriction on Acquisition of Forgings |
| DEC 2009 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.227-7013 |
| Rights in Technical Data--Noncommercial Items |
| FEB 2014 |
| 252.227-7016 |
| Rights in Bid or Proposal Information |
| JAN 2011 |
| 252.227-7030 |
| Technical Data--Withholding Of Payment |
| MAR 2000 |
| 252.231-7000 |
| Supplemental Cost Principles |
| DEC 1991 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.239-7001 |
| Information Assurance Contractor Training and Certification |
| JAN 2008 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.244-7000 |
| Subcontracts for Commercial Items |
| JUN 2013 |
| 252.245-7001 |
| Tagging, Labeling, and Marking of Government-Furnished Property |
| APR 2012 |
| 252.245-7002 |
| Reporting Loss of Government Property |
| DEC 2017 |
| 252.245-7003 |
| Contractor Property Management System Administration |
| APR 2012 |
| 252.245-7004 |
| Reporting, Reutilization, and Disposal |
| DEC 2017 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
| 52.209-3 | FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989) |
| (a) The Contractor shall destructively test 1 forging set of the initial 21 forging sets as specified in this contract. At least 10 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests. The Contractor shall non-destructively test 20 forging sets as specified in this contract. At least 10 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests. |
| (b) The Contractor shall submit the first article forging test report within 15 calendar days from the completion of the tests to the Government as specified in CDRL A002. Within 15 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval. |
| (c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests. |
| (d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract. |
| (e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance. |
| (f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. |
| (g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government. |
| (h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver. |
| 52.209-4 | FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989) |
| (a) The Contractor shall deliver 10 units of the Preproduction Lot within 54 calendar weeks from the date of this contract to the Government at |
NAVAL AIR WARFARE CENTER WEAPONS DIVISION (NAWCWD)
Receiving Officer, Code 822223D Bldg. 1024, Blandy Ave.
Contract #TBD William (Bill) McCarter, Code: 47340MD Tel: 760-939-6369 Alt: Zane Goedert, Code 477200D China Lake, CA 93555-6100 for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
| (b) Within 47 calendar weeks after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval. | |
| (c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval . The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. | |
| (d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract. | |
| (e) Unless otherwise provided in the contract, the Contractor-- | |
| (1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and |
| (2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense. |
| (f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price , and any other contractual term effected by the delay. | |
| (g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test. | |
| (h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government. | |
| (i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver. | |
52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (DEVIATION 2018-O0015) (MAY 2018)
(a) Unless an exception under FAR 15.403-1 applies, the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), in accordance with FAR 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractor’s estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the nature and amount of any contingencies included in the price) –
(1) Before awarding any subcontract expected to exceed $750,000 prior to July 1, 2018, or modifying any subcontract that was awarded prior to July 1, 2018, involving a pricing adjustment expected to exceed $750,000, or
(2) Before awarding any subcontract expected to…