Defensive_Fighting_Position_SoW.pdf

PDF 123 KB Posted

Attached to
Defensive Fighting Positions Federal contract opportunity
Solicitation number
N6889814RCBG851
Issued by
Department of the Air Force Air Mobility Command

About this file

Defensive Fighting Position SoW

View the file

Other files for this federal contract opportunity

Other files attached to Defensive Fighting Positions, newest first.
File Type Posted
N6889814RCBG851_RFQ_Amendment_One.doc DOC document
RFQ.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work: Defensive Fighting Position

GENERAL: The work to be performed by this contract consists of furnishing all labor, materials, equipment, supplies, and tools necessary to provide a Defensive Fighting Position (DFP) for Joint Base Charleston, South Carolina.

SCOPE OF WORK: The anticipated scope of work for the project include the following:

The Contractor shall furnish satisfactory ballistic certifications from a reputable third party, showing that the material to be used in the actual fabrication of the DFP (same lot of material, not a generic test) must be provided in advance. This applies to the material used in the all walls, doors, shooting ports, windows, and the ceiling. Note: If the lot of material changes in the manufacturing process additional certifications will be required.

The Contractor shall furnish a DFP identical to the DFP on site (drawings attached)

MUST INCLUDE THE FOLLOWING SALIENT CHARACTERISTICS:

Ballistic Resistant Enclosure, ProTech Model #P-506 or equal

8' x 8' x 8' Tall Unit

Ballistic Resistance - .50 APM2 per NPTU Charleston ballistic standard.

To include 360-degree seamless protection, all windows, doors, gun ports, roof, and floor.

Gun ports:

1. Swing Door Gun ports: One (1), Entrance Door

2. Sliding Gun ports (3), on all other gun ports

HVAC - 24,000 BTU Mitsubishi Split System (or Equal)

Electrical, 125AMP panel, 4 duplex receptacles, fluorescent lighting

Anti-skid coated 3/16" steel floor

14 ga. Mild steel interior

Lifted Lugs for installation

High Performance PPG Coating System, Navy-grey Exterior color