Statement_of_Work_-_TXC35.pdf

PDF 435 KB Posted

Attached to
SPECTROTEST TXC35 Spectrometer Federal contract opportunity
Solicitation number
N68335-19-R-0309
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

View the file

Other files for this federal contract opportunity

Other files attached to SPECTROTEST TXC35 Spectrometer, newest first.
File Type Posted
NAVAIR_Calibration_Sets.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for

PORTABLE METAL SPECTROMETER

6 MAY 2019

1.0 SCOPE

This statement of work (SOW) is for the Firm Fixed Price procurement of a Portable Metal Spectrometer, for the

Quality Assurance Department, Prototype, Manufacturing Division, in accordance with the Requirements listed below.

2.0 REQUIREMENTS

2.1 General

The contractor shall provide all Requirements for the Procurement of the Portable Metal Spectrometer listed below:

1. Must: Universal Metal Analyzer for use in metal producing parts and metal processing.

2. Must: Plasma Generator, with a high speed optic read out system and logic system that records with a memory and has an output mechanism. Need to be able to map entire relevant wave lengths, The optic components must heated and be completely integrated and protected from dust and shock.

3. Must: Long Sample UV probe to reach samples behind other pieces, bundled materials or in seams.

Effective wavelength range 185-670 nm, with UV probe 174-670nm.

4. Automatic profiling

5. Must: Needs to be able to identify: phosphorous, sulfur, boron or tin, with focus on detection limits that are required for carbon.

6. Must be able to detect nitrogen for the identification of duplex steels

7. Must: Carbon must be able to be measured at 500 ppm to enable the spectrometer to rapidly identify materials using the carbon content for low alloy steel.

8. Must be one sample calibration, using the material verification table seen below:

Calibration Module Fe3 spark UV

Fe-01-MO Fe-10-MO Fe-15-MO Fe-20-MO Fe-30-MO Fe-40-MO Fe-50-MO Fe-60-Mo Fe-65-MO

Orientation Fe-Base

Low alloy steel

Free cutting steel

Cast iron Cr-, Cr/Ni -steel

Tool steel Mn - steel Cr hard cast

Ni - resist

C 0.006-5.4 0.005-1.8 0.005-1.8 0.5-5.4 0.006-3 0.006-3 0.006-1.92 0.006-4.56 4/1/1968

Si 0.005-24 0.005-24 0.005-24 0.005-4.32 0.005-5.04 0.005-2.52 0.005-1.92 0.005-2.04 0.005-6.6

Mn 0.004-24 0.004-2.76 0.004-2.76 0.004-4.92 0.004-18.12 0.004-2.52 1,0-24,0 0.004-2.52 0.004-8.16

P 0.003-2.88 0.003-0.16 0.003-0.16 0.003-2.88 0.003-0.18 0.003-0.06 0.003-0.12 0.003-0.49 0.003-0.67

S 0.002-0.51 0.002-0.3 0.002-0.52 0.002-0.21 0.002-0.09 0.002-0.1 0.002-0.08 0.002-0.12 0.002-0.3

Cr 0.005-39.6 0.005-10.1 0.005-10.1 0.005-3 0.005-36

0.005-

13.92 0.005-5.04 10-38.16

0.005- 10.92

Mo 0.003-11.4 0.003-10.2 0.003-10.2 0.003-2.64 0.003-10.2 0.003-11.4 0.003-3.6 0.003-4.56 0.003-1.8

Ni 0.005-55.2 0.005-6.48 0.005-6.48 0.005-6.36 0.005-55.2 0.005-1.8 0.005-18.6

0.005- 19.56

0.005- 43.92

Al 0.002-6.24 0.002-2.4 0.002-2.4 0.002-0.13 0.002-6.24 0.002-0.11 0.002-0.48

Co 0.005-21.6 0.002-2.52 0.002-2.52 0.005-0.25 0.005-21.6 0.005-13 0.005-0.48

Cu 0.002-9.72 0.002-1.44 0.002-1.44 0.002-3 0.002-7.44 0.002-0.43 0.002-0.64 0.002-3 0.002-9.72

Nb 0.005-3.6 0.003-0.39 0.003-0.38 0.005-0.36 0.005-3.6 0.005-0.25 0.005-0.46

Ti 0.001-3.6 0.001-1.2 0.001-1.2 0.001-0.6 0.001-3.6 0.001-0.04 0.001-0.99

V 0.002-12 0.002-1.32 0.002-1.32 0.002-0.75 0.002-12 0.002-12 0.002-0.42

W 0.04-24.6 0.03-3.72 0.03-3.72 0.04-0.15 0.04-7.32 0.04-24.6

Pb 0.01-0.31 0.01-0.31 0.01-0.31 0.01-0.07 0.01-0.13

Sn 0.002-0.3 0.002-0.18 0.002-0.18 0.002-0.3 0.002-0.27 0.002-0.03 0.002-0.3

Mg 0.002-0.28 0.002-0.15 0.002-0.28

As 0.005-0.28 0.005-0.17 0.005-0.17 0.005-0.28 0.005-0.13 0.005-0.03

Zr 0.003-0.3 0.003-0.28 0.003-0.28 0.003-0.1 0.003-0.19

Bi 0.015-0.05 0.03-0.06

Ca 0.0005-0.02 0.0005-0.02 0.0005-

0.01 0.0005-0.02

Ce 0.006-0.66 0.006-0.66 0.006-0.12 0.006-0.02

B 0.0005-0.13 0.0005-0.018 0.0005- 0.018

0.0005-

0.13 0.0005-0.025

Zn 0.003-0.05 0.003-0.04 0.003-0.05

La 0.003-0.28 0.002-0.27 0.003-0.04

9. Must: Able to operated independently from the mains supply with a rechargeable battery pack and able to transport on a trolley or on its own wheeled cart.

Contract must include installer, and on-site (PMD Bldg. 148) training for 5 Quality Assurance Specialists

(for a total of 24 hours, in three days or more).

10. Must be warranted for Preventative Maintenance, parts and service visits for 3 years

11. Must have a 3 year service maintenance contract including parts to begin at the end of the Warrantee package.

2.2 Attachment: Must requirement

NAVAIR Calibration Sets

2.3 Specifications

2.3 Government Inspection and Acceptance

Government Inspection and Acceptance of unit shall be accomplished at the destination.

3.0 PACKAGING, PRESERVATION AND SHIPPING

Shipments shall be packaged and transported (FOB Destination) via safe, secure, reliable, and traceable means of transportation and provide protection from normal climatic/weather conditions and incidental mishandling during shipping to prevent any damage or loss during shipment. All shipments under this contract shall be addressed to the

NAVAIR Lakehurst Staging Facility as indicated below. Shipping costs need to be incurred by the contractor who is doing the shipping.

Naval Air Warfare Center, Aircraft Division

Highway Route 547

Building 148

Joint Base MDL, New Jersey 08733

All exterior shipping containers/packaging shall at a minimum be marked with the following Contract Number.

Deliveries shall be made by 9/01/2019, and billed by 9/15/2019.

File details come from the government source that posted it.