N68335-17-R-0191_STATEMENT_OF_WORK_RevB.pdf
PDF 309 KB Posted
- Attached to
- OPTION - Additive Manufacturing (AM) Powder Blown System Federal contract opportunity
- Solicitation number
- N68335-17-R-0191
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| APPLICABLE_CONTRACT_PROVISIONS_AND_CLAUSES_Rev_B.pdf | ||
| N68335-17-R-0191_STATEMENT_OF_WORK_RevC.pdf | ||
| N68335-17-R-0191_CDRL.pdf | ||
| APPLICABLE_CONTRACT_PROVISIONS_AND_CLAUSES.pdf | ||
| N68335-17-R-0191_SPECIFICATION_RevC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Additive Manufacturing (AM) Powder Blown System
Statement of Work
1. Scope
1.1. Purpose
The primary purpose of this Statement of Work (SOW) is to identify the requirements for the AM Powder Blown System to be installed at NAWCAD Lakehurst, NJ. The AM Powder Blown System will to allow the Navy to move beyond the two primary technologies that have been focused on up until this time (Powder Bed/DMLS based technology & Wire Fed based technology). In addition, this technology will allow the Navy to development of repair capabilities that can be expanded across multiple projects and fold into the Enterprise Qualification / Certification Solutions needed to operationalize additive manufacturing solutions. This requirement also includes logistics support for the system including training and maintenance.
2. References
3. Requirements
3.1. AM Powder Blown System
The AM Powder Blown System shall be in accordance with the equipment specification. This equipment shall be required to rapidly produce parts of at least 0.216 cubic meters in size in various materials including: Aluminum, Steel, Stainless Steel, Titanium, Cobalt-Chromium & Nickel Alloys. Products such as a prototype unit, pre-production model, or experimental units do not qualify as meeting the requirements specified herein.
3.2. Installation and Equipment Requirements
Within one (1) week after contract award, the contractor shall submit a document identifying any installation requirements for the equipment. The contractor shall identify all major components of the AM Powder Blown System and provide detailed facility requirements for each component.
All utility requirements, ventilation requirements, structural and any other requirements shall be identified. The Contractor shall also identify the electric loading (power, voltage, amperage, phase, etc.) requirements for their equipment. The submitted document shall be in accordance with Contract Data Requirements List (CDRL) A001 - Installation and Equipment Requirements.
3.2.1. Post-Award Kickoff Meeting
Within four (4) weeks of contract award, there shall be an in-person meeting at NAWCAD Lakehurst between the Contractor and appropriate representatives from the Government to discuss the Contractor's proposal in further detail, review the Installation and Equipment Requirements, and discuss the terms and conditions of the awarded contract.
3.2.1.1. Observation
During this visit, the Government will provide access to the location the AM Powder
[1] NAVAIR, An Additive Manufacturing (AM) Powder Blown System Specification, 2018.
Blown System will be located. The Contractor shall, at their own expense,- be responsible for conducting a site survey, taking measurements, and ensuring that the proposed machine will be able to be delivered and installed in the proposed location.
This includes moving to the final placement location, as well as maintaining clearance around the machine in its final location. If any issues or concerns arise the Contractor shall immediately bring it to the Government’s attention.
3.2.1.2. Installation Schedule
The installation schedule shall be discussed at the post-award kickoff meeting·. The Contractor shall construct the installation schedule based on the discussion at the post-award kickoff meeting. This schedule shall include, but is not limited to, the identification of the AM Powder Blown System facility requirements, the delivery and installation of the system, any calibration required and contractor provided training.
The Contractor shall adhere to this schedule unless otherwise noted.
3.2.1.3. Deliverables
The contractor shall be responsible for the schedule and meeting minutes which shall be submitted within 30 days after the kickoff meeting is held in accordance with CDRL A002 - Kickoff Meeting Minutes and Installation Schedule. Official changes to this schedule shall only be applied upon agreement between all parties.
3.2.2. Machine/Installation Documentation
Within 30 days of contract award, the Contractor shall supply three (3) sets of hard copy manuals and one (1) set of digital manuals detailing procedures for: machine installation and removal, machine maintenance, configuration, operation (all actions that would be performed during operation), accident prevention, and emergency management in accordance with CDRL A003 - Machine Documentation.
3.2.3. Installation Drawings
Within 30 calendar days after of the Post-Award Kickoff Meeting, the Contractor shall supply drawings of the proposed machine layout within the area identified in the machine specification, appendix A. The drawings shall be of sufficient detail to allow maintenance personnel to move, install, and perform regular maintenance and repairs on the machine in accordance with CDRL A004 - Installation Drawings. All dimensions shall be provided in English units. The Government shall review all drawings and documents and identify within 15 days whether or not they are acceptable. If disapproved, the Contractor shall correct the documents and resubmit within 2 weeks.
3.2.4. Machine Installation/Logistics
The Contractor shall be responsible for all shipping, delivery, installation, initial configuration and calibration of the AM Powder Blown System. The Contractor shall notify the Government point of contact (POC) of the dates in which they need to have their personnel in the Government facility. The Contractor shall provide all equipment and personnel to move the system to the required location. The Government shall supply utilities for the machine as required. However, these utility requirements shall not exceed those specified in the equipment specification. The Contractor shall be responsible for all utility hookups.
3.2.4.1. Validation and Verification
3.2.4.1.1. Post-Installation Inspection
Within 24 hours after the installation of the AM Powder Blown System is complete, the Contractor shall, inspect the machine for overall alignment, fit-ups, and proper operation of safety features. If any deficiencies are found through these inspections and tests, the Contractor shall be responsible for correcting them before the Government accepts the machine.
3.2.4.1.2. Pre-Operational Test
Prior to operating the machine, the Contractor shall contact the on-site Government representative so that the Joint Base Fire and Safety personnel can monitor initial power-up and testing of the equipment.
3.2.4.1.3. Operational Test
The Contractor shall perform alignment, accuracy, and operational testing to demonstrate that the machine meets all of the requirements described in paragraph 3.2 of the System Specification for both Stainless Steel and Titanium.
All tests results shall be documented by the Contractor and witnessed by the Government, the test results shall be submitted within 30 days after the execution of these tests in accordance with CDRL A005 - Operational Test Results. All material and labor for these tests shall be supplied by the contractor.
3.2.4.1.4. Material Disposal
The Contractor shall be responsible for the proper disposal of all installation waste material. This includes but is not limited to: shipping materials, packing materials, tarps, pallets, etc.
3.3. Safety Data Sheets
Safety Data Sheets (SDS) shall be provided for all materials specified within the Machine Specification by the Contractor within 30 days after contract award in accordance with CDRL A006 - Safety Data Sheets (SDS).
3.4. Software
The Contractor shall install all required software for machine operation on any computer that is part of the AM Powder Blown System. The contractor shall also provide a second (separately licensed if applicable) copy of the software that may be installed on a government provided IT asset. All software shall be compatible with the two latest major releases of Microsoft Windows.
The Contractor shall provide a minimum of two backup copies of all software used in the AM Powder Blown System on Compact Discs (CDs) no less than one week prior to installation in accordance with CDRL A007- Software. Portable hard-drives or thumb drives are not acceptable mediums. Additionally, the AM Powder Blown System will not have access to network resources (i.e. the internet).
All software supplied by the Contractor/manufacturer that requires license keys with expiration dates for the AM Powder Blown System shall co-terminate and be supported for at least two years.
3.5. Training
The Contractor shall provide training at the Government's facility. Training shall occur on a schedule that is consistent with the minimum requirements listed below and has been agreed upon by both the Contractor and the Government at the Post Award Conference. The following shall be provided:
3.5.1. Training Materials
At least seven (7) days prior to the scheduled training, the contractor shall provide all relevant training materials to the applicable training in accordance with CDRL A008 - Training Materials. The training materials shall be comprehensive, detailing all required and best practice procedures that are necessary for machine operation. The Government shall have the right to use, modify, reproduce, and release these documents within the Government.
3.5.2. Safety Training
The Contractor shall provide a briefing and mock demonstration to up to five (5) Fire Safety Personnel with emergency management instruction in the event of an emergency situation (e.g. recommended action when responding to a fire in or around the equipment). This training shall occur prior to any on-site operation of the machine. The briefing shall be submitted in accordance with CDRL A008 - Training Materials.
3.5.3. Basic Training
The Vendor shall provide training to operate all equipment and perform all tasks under paragraph 4.0 of the specification. This training session shall be 4-5 days and shall be for four (4) participants immediately after the machine has been installed and safety training has been performed.
3.5.4. Basic Training Follow-up
Between 60 and 120 days after the Government accepts receipt of the equipment, the Vendor shall provide follow up training to the basic training to refresh the operator personnel with the concepts learned in the basic training. Follow up shall be for two (2) days with four (4) participants.
3.6. Maintenance
The contractor shall provide maintenance and periodic calibration as required in accordance with the original equipment manufacturer's preventative and reactive maintenance plan. This Maintenance Plan shall include all parts and labor to repair the AM Powder Blown System in the event a failure occurs. The contractor shall be responsible for the acquisition and installation of version upgrades to any installed software on the AM Powder Blown System’s computer. In the event of a version upgrade, all required installation files shall be provided to the Government no less than one week prior to installation in accordance with CDRL A007 - Software. The AM Powder Blown System may not have access to network resources (i.e. internet connection).
3.6.1. Maintenance Agreement
12 Month Hardware Warranty The contractor/manufacturer shall replace or repair any system hardware components that fail within 12 months of the government acceptance of the fully installed and operational system at no cost to the government. The contractor/manufacturer shall identify any consumable items that are not covered under this warranty.
5-Year Preventative Maintenance Services The contractor/manufacturer shall provide at least five preventative maintenance visits to NAWCADLKE to verify and optimize system performance and to perform any system maintenance required. The contractor/manufacturer shall include the scope for this maintenance in the proposal. The maintenance schedule shall include at least one visit per year for the first five (5) years after government acceptance of the fully installed and operational system at no additional cost to the government.
5-Year Software Maintenance/Updates The contractor/manufacturer shall provide all software updates released within five (5) years of the date when the government acceptance of the fully installed and operational system at no additional cost to the government.
3.7. Spare Parts and Service Kit
The contractor/manufacturer shall provide a list of all common consumables, replacement parts and items necessary to perform preventative maintenance in accordance with CDRL A011 - Replacement Parts List. The list shall include a commercial part number, specification (if applicable), quantity concurrently used, and typical frequency of replacement (e.g. 1 every 100 machine hours, 1 every 6 months). The contractor/manufacturer shall also provide a spare parts and service kit. The quantity of spares shall include common consumables and all items necessary to perform preventative maintenance. All spare parts must conform to the machine specifications. A digital copy of the certification shall be provided at the time of shipment or a hard copy shall be included with the shipment. Material certifications shall be provided in accordance with CDRL A009- Material Certification.
4. General Requirements
4.1. Communication
A primary POC who can obtain and provide any required information for his or her party shall be established at this time for each party to streamline the communication process. All parties shall provide the appropriate contact information for each of their POCs, which shall include but is not limited to: Office Telephone Number, Business Mailing Address, Email Address, Cellular Phone Number, and the same information for an alternate POC. It shall be the Contractor's responsibility to keep in contact with the appropriate Government representatives in order to maintain consistency and transparency of every process in the planning, fabrication, delivery, and installation of this machine. All communication subsequent to the Post-Award Meeting should be in the form of e-mail or telephone, unless other forms are necessitated by the nature of the information being transferred (e.g. mailing drawings). Any requests for official changes or deviations from the Contract shall only be implemented after being submitted through the Procurement Contracting Officer (PCO) for approval. Communication shall exist only between the established POCs.
4.2. Contractor Workforce Qualification and Licensing
The Contractor shall ensure that all personnel involved with on-site activities are fully qualified and licensed to perform their particular functions in the state of New Jersey.
4.3. Safety Requirements
During the performance of all work under this contract, the Contractor shall strictly adhere to industry safety standards at all times including the use of proper safety equipment and attire. All contractor personnel shall comply with the Safety/Health requirements in the standards and directives listed below:
a. National Electric Code (NEC 2011)
b. International Electrical Testing Agency (NETA)
c. The Institute of Electrical and Electronics Engineers standards (IEEE)
d. Current Occupational Safety and Health Regulations (OSHA)
e. National Safety Council, Accident Prevention Manual for Industrial Operations
f. Applicable federal, state, and local safety operating procedures
g. National Safety Code (ANSI C2)
h. National Fire Protection Association (NFPA 101) Life Safety Code
i. Joint Base MDL Standards and Safety Regulations
4.4. Safety Plan
This contract shall be governed by the requirements set forth in the Department of the Army, Corps of Engineers Manual entitled "Safety and Health Requirements Manual." EM385-1-1. The Contractor shall use a qualified person to prepare the written site specific Accident Prevention Plan (APP). This plan shall be provided within 30 days after contract award in accordance with CDRL A010 - Accident Prevention Plan. Prepare the APP in accordance with the format and requirements of USACE EM385-1-1 Appendix A, "Minimum Basic Outline for Preparation of Accident Prevention Plan." The APP shall be job specific and shall address any unusual or unique aspects of the project or activity for which it is written. Included in the
APP shall be an Activity Hazard Analysis, identifying job specific hazards and how the Contractor intends to deal with these hazards. If a crane is to be used, certification of the crane and operator's license shall be submitted with the safety plan. If required for installation, the contractor shall obtain a hot permit by contacting either 732-323-7578 or 732-323-7580.
4.4.1. Toxic and Hazardous Substances
The Contractor shall submit a Safety Data Sheet (SDS) in accordance with CDRL A006 for each toxic or hazardous substance to be utilized on board Joint Base MDL Lakehurst. Toxic and hazardous substances are defined in CFR 29 Part 1910 Subpart Z. The SDSs shall be submitted 30 days after contract award. All approved toxic and hazardous substances must be labeled in accordance with CFR 29 Part 1910.1200.
4.4.2. Interruption of Utilities
The Contractor shall perform the work under their contract with a minimum of outage time for all utilities. The Contractor shall give written notification to designated government personnel at least 14 working days in advance of his need for a proposed major utility outage (i.e. turning off the main supply to a building). The Contractor shall give 5 business day notice of his need for a minor outage (i.e. turning off power to an area internal to a building). The Contractor shall provide temporary heat and/or domestic hot water if outage is expected to be longer than 8 hours continuous duration. This time period shall include start-up and cool-down periods. The utilities may be interrupted only when approved in writing by the designated government personnel. Because of mission requirements, utility interruptions may have to be scheduled at a time other than that requested by the Contractor.
4.5. Security
4.5.1. Facilities Access Restrictions
The Contractor shall note that only United States citizens will be permitted access to the facility.
All personnel entering the facility will be required to provide date of birth, valid photo ID, and social security number. Current vehicle registration and proof of insurance will be required of each vehicle entering the facility. No weapons of any kind will be allowed on base. No animals are allowed on base with exception of documented service animals. Vehicles and personnel entering the base will be subject to search. The Contractor shall perform installation and training during normal hours of operation. Joint Base MDL Lakehurst operates on a compressed work schedule. Normal hours of operation are Monday through Thursday from 7:00AM to 4:30PM.
Friday hours are 7:00AM to 3:30PM every other week. The Base is closed on alternating Fridays. The Contractor shall be notified of the base operational schedule along with holidays and shop-closings in advance prior to the start of the job.
In case there is any snow or ice accumulation, it is the Contractor's responsibility to contact the Snow Line (732-323-7669) to check for base closures.
4.5.2. Pictures
The Contractor shall not take any pictures in or around the facility. If pictures are required, the Contractor shall notify the Government and a Government representative will take the necessary pictures. These pictures shall be turned over to the Contractor only if they have been cleared for public release by Government security personnel.
4.5.3. Contractor’s Parking
The Contractor's personnel shall park in the designated parking lots. No personally owned vehicles shall be parked in any restricted areas.
4.5.4. Contractor’s Employee Restrictions
The Contractor's employees shall be restricted to areas within this scope of work plus direct routes to and from the site.
4.5.5. Subcontracting
The Contractor shall be responsible for ensuring that all subcontractors comply with the contract requirements.
4.6. Security Force and Fire Protection
The Base Security Police telephone number is 732-323-4000 and the Base Fire Department telephone number is 911 for reporting a fire.
4.7. Emergencies
In case of an emergency, the Commanding Officer (CO) of the Joint Base, Security Forces personnel, Base Fire Chief, and Base Operations Officer, or their representatives, shall have the authority to order the Contractor to stop work and clear the area of personnel and equipment.
The Contractor shall comply with such an order with all possible speed. After clearing the work site as instructed, the Contractor shall immediately inform the contracting officer of all verbal or written stop work orders. In the case of being halted by Security Forces personnel, the Fire Chief, or Base Operations Officer, the Contractor shall notify the contracting officer in writing and provide explanation for the stoppage.
4.8. Failure to Comply
If the Contractor fails to comply with the specifications herein, it may result in the cancellation of this contract and/or the work herein.
4.9. Unforeseen Conditions
Should unforeseen conditions arise during the course of work, the Contractor shall immediately notify the Contracting Officer and await their direction. If the Contractor resolves the unforeseen condition without proper notification and direction by the Contracting Officer, they do so at their own risk and relieve the Government of any liability for payment if additional costs are incurred.