This document is an Amendment to Solicitation N6660424Q0741 for the Construction - B1176 Emergency Generator Project. The amendment provides answers to several Requests for Information (RFI) related to the project:

  1. The electrical outage for panel DP will be available from 18:00 Friday to 06:00 Monday, and the contractor must conduct operations to minimize interference with normal activity operations.
  2. Submittals for the government-furnished generator and automatic transfer switch are attached.
  3. The government will move the generator and transfer switch to the work area prior to the contractor's installation.
  4. The contractor is responsible for coordinating with the generator manufacturer for startup, personnel instructions, and field-testing.
  5. The contractor can run MC cable for generator accessory circuits during normal working hours with government approval.

The amendment also updates the Table of Contents to include a new Attachment 3 containing the Generator and Transfer Switch specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Construction - B1176 Emergency Generator Project, newest first.
File Type Posted
Attachment_2_RI Davis Bacon Wage Determination 12 July 2024.pdf PDF
N6660424Q0741.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301182510

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Section A.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6660424Q0741

X 9B. DATED (SEE ITEM 11)

02-Aug-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2024

CODE

NAVAL UNDERSEA WARFARE CENTER

MICHAEL NORMAN OUELLETTE , CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660424Q0741

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

GENERAL INFORMATION

Distribution: TBD NUWCDIVNPT Requisition Number: TBD NUWCDIVNPT PID Number: N66604-24-SIMACQ-NPT-10-0363 NUWCDIVNPT POC: Michael Ouellette; Email: Michael.n.ouellette.civ@us.navy.mil

IMPORTANT NOTES:

1. The Generator will be provided as Government Furnished Equipment (GFE) and is expected to be delivered on or around 15 December 2024.

2. The Government is requiring the Concrete pad to be in place no later than 1 December 2024.

3. The new Generator pad will include anchor points that will need to be verified prior to installation.

4. Transfer switch will also be provided as GFE.

AMENDMENT 0001:

The purpose of Amendment 0001 is to provide answers to RFIs as seen below.

1. Is outage time for panel DP 18:00 Friday – 0600 Monday available?

A: Per NUWCDIVNPT B1176 NATSC NEW EMERGENCY GENERATOR specification SECTION 01 14 00, PART 1, Paragraph 1.2 SPECIAL SCHEDULING REQUIREMENTS:

a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

b. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity. Weekend or week day after working hours shutdown of electrical panels in building 1176 is required.

Power must be restored to the electrical panels by 0600 on the following work day.

c. Permission to interrupt any utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

2. Please provide cut sheets on unit with WT., Tank size, Dia., etc.

A: The GFE (generator and ATS) submittals are attached. (see Attachment # 3)

3. Is Navy delivering unit to site for contractor offloading?

A: Per NUWCDIVNPT B1176 NATSC NEW EMERGENCY GENERATOR drawing #24-022A, sheet 2 of 2, within work notes #5 (generator) and #6 (ATS):

“The Government will move GFE to the work area prior to installation by the Contractor.” To clarify, the Contractor is responsible for installation of GFE, to include placement of the generator onto the generator pad and floor/wall mounting the ATS in room 163.

4. Does the Navy own start up and load bank testing?

N6660424Q0741

A: The Contractor is responsible for coordination with the generator manufacturer for job site startup, personnel instructions, and field-testing. These services were not included with the generator purchase contract.

5. Can MC cable for generator circuits be run during normal working hours?

A: MC cable for generator accessory circuits can be run during normal working hours with approval from the Government. Additionally, as stated in RFI answer 1. b., The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

All other solicitation terms and conditions remain unchanged.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Drawings and

Specification

147 25-JUL-2024

Attachment 2 Davis Bacon Wage Determination

15 12-JUL-2024

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Drawings and

Specification

147 25-JUL-2024

Attachment 2 Davis Bacon Wage Determination

15 12-JUL-2024

Attachment 3 Generator_Transfer Spec 64 09-AUG-2024

(End of Summary of Changes)