N6660423Q0537 Amendment 0001.pdf

PDF 781 KB Posted

Attached to
Construction - B147 Roof Replacement Project Federal contract opportunity
Solicitation number
N6660423Q0537
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Construction - B147 Roof Replacement Project, newest first.
File Type Posted
RI WD 06_30_2023.pdf PDF
b147 roof site visit log.pdf PDF
Attachment_4_ Contractor Fall protection sample letter.docx DOCX document
Attachment_3_ RI Wage Determination RI20230001 6_16_2023.pdf PDF
N6660423Q0537.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301085047

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Section A.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jul-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6660423Q0537

X 9B. DATED (SEE ITEM 11)

20-Jun-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jul-2023

CODE

NAVAL UNDERSEA WARFARE CENTER

MICHAEL NORMAN OUELLETTE , CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660423Q0537

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

GENERAL INFORMATION

Distribution: TBD NUWCDIVNPT PID number: N66604-22-SIMACQ-NPT-10-0317 NUWCDIVNPT Requisition number: 1301085047 NUWCDIVNPT POC: Jay Parker; jay.a.parker2.civ@us.navy.mil Distribution: TBD NUWCDIVNPT PID number: N66604-23-SIMACQ-NPT-10-0072 NUWCDIVNPT Requisition number: 1301085515 NUWCDIVNPT POC: Jay Parker; jay.a.parker2.civ@us.navy.mil

Amendment 0001:

The purpose of amendment 0001 is to:

1. Answer RFI 001 and RFI 002.

2. Provide revised Drawing package

3. Provide revised Wage Determination.

RFI 001

1. The plans and specs for this project dated 5/2023 call for a three-tab roof shingle. We can provide a heavier duty/superior architectural shingle (such as Landmark Pro) which would be better for this application. Would pricing be acceptable to the Govt. for architectural shingle use? Please advise. Please see revised Drawings.

RFI 002

1. Does all the roof decking plywood on sloped roof need to be replaced? Yes, all existing decking material on sloped roof is to be removed, properly disposed of and replaced with new plywood as part of this project.

2. Specs are calling for double layer 30 pound felt. Can it be changed to synthetic felt? No synthetic felt to be used on this project.

3. Calling for 3tab shingles. Can it be changed to dimensional shingles? See revised Drawings. Architectural type asphalt shingles to be installed as part of the project. Shingle type shall be GAF Timberline HDZ shingles in pewter gray or equivalent.

4. Where is the dumpster to be located as well as the staging area for material? Dumpster and material staging location to be coordinated post contract award with construction manager. Proposed location to be outlined in Construction Site Plan preconstruction submittal to be approved by construction manager.

Parking spaces and other adjacent locations may be blocked to facilitate construction with adequate coordination with constriction manager.

5. Can we install box gutter with a flange on the flat roof area? No, government would like newly installed gutter to be 5” K Style Gutter in white to be installed.

6. Was the flat roof cored to see insulation size? The scope of work is calling for 2 layers of 2.5 insulation but no cover board. No destructive investigation was performed on the roofs. No cover board is required for this roof installation.

7. Are there any permanent tie-off points being installed on the flat roof? No permanent tie off points to be installed as part of this project.

N6660423Q0537

8. When painting/staining pressure treated wood best practice is to allow one full year of weathering. Is the NSWC willing to accept responsibility that exterior paint may not adhere correctly given the current scope of work? All work to be completed within the 150 allotted contract period. Contractor is only responsible to warranty work for a 1-year period after project completion. Government will take responsibility for any repair work after 1-year contractor warranty expires.

9. Are window frames included in items that will be required to paint? No, the window frames are no included within the scope of this project.

10. What color EPDM, black or white? Black.

11. What are the minimum thicknesses of metal for gutters, fascia, and downspouts? Minimum thickness for drainage related metal to be a minimum of 0.027 inches.

SECTION J:

1. Attachment 0001 Drawing package dated 09 May 2023 is removed and replaced with revised drawing package dated 11 July 2023.

2. Attachment 0003 RI Wage Determination dated 16 June 2023 is removed and replaced with RI Wage Determination dated 30 June 2023.

All other solicitation terms and conditions remain unchanged.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Drawing 22-042A 8 09-MAY-2023 Attachment 2 Specification 156 09-MAY-2023 Attachment 3 RI Wage Determination 19 16-JUN-2023 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Revised Drawings 8 11-JUL-2023 Attachment 2 Specification 156 09-MAY-2023 Attachment 3 RI Wage Determination 19 30-JUN-2023

(End of Summary of Changes)