DRAFT_N66604-19-Q-2403_CDRLs.pdf
PDF 60 KB Posted
- Attached to
- Torpedo Tube Control Panel Improvements Federal contract opportunity
- Solicitation number
- N66604-19-R-2403
About this file
Draft CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6660419Q2403.pdf | ||
| DRAFT_N66604-19-Q-2403_DD254.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-2, AUG 96 (EG) PREVIOUS EDITION MAY BE USED Page ___ of ___ Pages
CONTRACT DATA REQUIREMENTS LIST
(2 Data Items)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0001 TDP TM OTHER X Blk 16
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Legacy Class WLHS 1300789445 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Technical Report – Study/Services See Block 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para 4.1.1, 4.1.5, 4.2.1, 4.2.5 NUWCDIVNPT Code 40 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED See Block 16 See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A (See Block 16) N/A See Block 16 Reg Repro
16. REMARKS Code 40 1 1 0
Block C Category: (Other) MISC Block 3: See Block 16 Addendum Block 9: See Block 16 Distribution Statement Addendum.
Block 10 & 12: Preliminary Design Recommendations shall be delivered 90 days from task award; The Government will review and comment within 14 days of receipt; The contractor shall deliver the final report 14 days after receipt of Government comments.
Critical Design Reports shall be submitted within 30 days of test completion. The Government will review and comment within 14 days of receipt; The contractor shall deliver the final report 14 days after receipt of Government comments.
Block 14: See Block 16 Addendum
Code 40 COR 1 1 0
15. TOTAL 2 2 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Developmental Design Drawings/Models and Associated Lists
See Block 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81002F SOW Para 4.1.2, 4.1.5, 4.2.2, 4.2.5 NUWCDIVNPT Code 40 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
See Blk 16 REQUIRED See Block 16 See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A (See Block 16) N/A See Block 16 Reg Repro
16. REMARKS Code 40 1 1 0 Block C Category: TDP Block 3: See Block 16 Addendum Block 7: Draft on LT, final on DD.
Block 9: See Block 16 Distribution Statement Addendum.
Block 10, 12 & 13: The Government estimates 4 drawings will be required for 4.1, and 4 drawings will be required for 4.2. The Contractor shall submit Preliminary Design Drawings 30 days after Government approval of Preliminary Design Recommendation. The Government will review and comment within 14 days of receipt.
Final deliverables are due 14 days after receipt of Government comments. Critical Design Drawings shall be submitted within 30 days of test completion. The Government will review and comment within 14 days of receipt; The contractor shall deliver the final drawings 14 days after receipt of Government comments.
Code 40 COR 1 1 0
15. TOTAL 2 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Nicholas Bitsakis
20 Mar 2019
DD Form 1423-2, AUG 96 (EG) PREVIOUS EDITION MAY BE USED Page ___ of ___ Pages
(2 Data Items)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0001 TDP TM OTHER X Blk 16
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Legacy Class WLHS 1300789445 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 Certificate of Compliance See Block 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-81356A SOW Paragraphs 4.1, 4.2 NUWCDIVNPT Code 40 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED See Block 16 See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
N/A (See Block 16) N/A N/A Reg Repro
16. REMARKS Code 40 0 1 0
Block C Category: (Other) MISC Block 3: See Block 16 Addendum Block 9: See Block 16 Distribution Statement Addendum.
Block 10 & 12: The Government estimates that 2 CoCs will be required. CoCs shall be provided with each hardware deliverable.
Code 40 COR 0
1 0
15. TOTAL 0 2 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A004 Status Reports Contractor Monthly Progress Performance Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80368A SOW Paragraph 5.0 NUWCDIVNPT Code 40 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED See Block 16 See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
N/A (See Block 16) N/A See Block 16 Reg Repro
16. REMARKS Code 40 0 1 0 Block 9: See Block 16 Distribution Statement Addendum Block 10, 12 & 13: The contractor shall submit a Monthly Contractor Status Report 30 days after contract award and monthly thereafter until completion.
Code 40 COR 0 1 0
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Nicholas Bitsakis 20 Mar 2019
DD FORM 1423
BLOCK 16 ADDENDUM
Applies to CDRL item No. A001
Block 3:
SOW 4.1.1: TTCP Backplane Preliminary Design Recommendation SOW 4.1.5: TTCP Backplane Critical Design Report SOW 4.2.1: TTCP Simulator Preliminary Design Recommendation SOW 4.2.5: TTCP Simulator Critical Design Report
Block 14 Media Requirements: The Contractor shall submit all reports in Microsoft Office compatible electronic media.
Applies to CDRL item No. A002
Block 3:
SOW 4.1.2: TTCP Backplane Preliminary Design Drawings SOW 4.1.5: TTCP Backplane Critical Design Drawings SOW 4.2.2: TTCP Simulator Preliminary Design Drawings SOW 4.2.5: TTCP Simulator Critical Design Drawings
Block 14 Media Requirements: The Contractor shall submit all Preliminary Design Drawings in PDF. The Contractor shall submit all Critical Design Drawings in PDF and Solidworks or other native drawing format as approved by the Government.
Applies to CDRL item No. A003
Block 3:
SOW 4.1.3: TTCP Backplane Certificate of Compliance SOW 4.2.3: TTCP Simulator Certificate of Compliance
Block 14 Media Requirements: The Contractor shall submit all reports in Microsoft Office compatible electronic media.
Applies to CDRL item Nos. A001-A004
Block 14: See contract section G-242-H001 Contractual Authority and Communications for distribution. Reg copy to be submitted via electronic submission.
BLOCK 16 DISTRIBUTION STATEMENT ADDENDUM
Applies to CDRL item Nos. A001-A004.
Block 9: The following information is amplification of the Block 9 Distribution Statement Selected:
Distribution Statement paragraph is in addition to CLASSIFICATION markings of the data.
Distribution Statement D: Distribution authorized to the DoD and U.S. DoD contractors only; CRITICAL TECHNOLOGY (date data generated). Other requests for this document shall be referred to NUWC Division, Newport (Code 40).
The following “EXPORT CONTROL WARNING NOTICE” must be used in conjunction with DISTRIBUTION STATEMENT identified in the above CDRL items.
Warning – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 27521 et seq.) or the Export Administration Act of 1979, as amended, title 50, U.S.C., App 2401 et seq. Violation of these exports laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Refer to the security classification guide applicable to the order.
File details come from the government source that posted it.