180267_SSJ_Final_Redacted.pdf
PDF 173 KB Posted
- Attached to
- COMSOL Multiphysics License Renewal Federal contract opportunity
- Solicitation number
- N66604-18-Q-0267
About this file
Sole Source Justification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 180267_SSJ_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
v1.0_APRIL2016
Nonlinear Structural Materials Module, Floating Network License (FNL) for one (1) concurrent user, License No.
1027553, 12 months subscription: 05/01/2018 through 04/30/2019
61376 2
5 Structural Mechanics Module, Floating Network License (FNL) for one (1) concurrent user, License No. 1027553, 12 months subscription: 05/01/2018 through 04/30/2019.
61376 3
AC/DC Module, Floating Network License (FNL) for one (1) concurrent license. This is an addition to License No. 1027553 and includes 12 month subscription, 05/01/2018 through 04/30/2019.
61376 1
COMSOL Multiphysics, Floating Network License (FNL) for one (1) concurrent user, an addition to License No. 1027553, 12 months subscription: 05/01/2018 through 04/30/2019.
61376 1
Sole Source Justification:
COMSOL Multiphysics software has been in use at NUWCDIVNPT for over 10 years.
COMSOL, Inc. is the sole owner and developer of this proprietary software and is the only source capable of providing the required maintenance and support. Not renewing this maintenance agreement will result in the loss of updates, security patches, technical support and training. The ability to link to other software will also be lost if the COMSOL licenses are not renewed. Additionally, this software may be removed from NUWCDIVNPT operations for Information Assurance (IA) reasons without the proper security patching made available through the maintenance agreement. This would significantly limit the RDT&E S&T community’s ability to perform their tasking, resulting in missed project deadlines.
If maintenance is dropped, reactivation costs will consist of all outstanding back maintenance costs and a penalty fee for all renewals more than three months past the original renewal date.
The penalty fee ranges from 25% to 50% of the maintenance costs of uncovered months.
Alternatively, the costs of meeting NUWCDIVNPT requirements with any other source are estimated at approximately $200,000, not including the costs for finding and replacing an alternative product to the equation solver that is unique to COMSOL, Inc.
RESELLERS:
COMSOL, Inc. is the sole owner, developer and seller of its proprietary software including maintenance and support; there are no authorized resellers of the required COMSOL products.
Requiring Department:
v1.0_APRIL2016
Based on the above, I recommend this acquisition be conducted on a Sole Source basis. I certify the technical data which form the basis of this justification are complete and accurate.
Date
APPROVAL:
Branch Head:
Based on the above, I have determined that the circumstances of the contract action deem only one source reasonably available. I certify that this justification is accurate and complete to the best of my knowledge and belief.
Date
04/10/2018
04/10/2018
File details come from the government source that posted it.