Attachment__1_CLIN-SLIN-_Combined_synopsis-solicitation.docx
DOCX document 28 KB Posted
- Attached to
- Nutanix Vitualization/Nutanix Block Systems Federal contract opportunity
- Solicitation number
- N66604-15-Q-1321
About this file
Attachment 1 - Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C25_Access_Gvt_Site.docx | DOCX document | |
| Attachment__2-_JA_signed_Brandname_-Final_20150428.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #1 – CLINs/SLINs
Specific items for each system are identified below.
CLIN 0001: System 1: Virtual SONAR (vSONAR) Project
| SLINs |
| Description |
| Part # |
| Quantity / Unit |
| 0001AA |
| Material Components |
| Nutanix Scale-Out ConvergedCompute/Storage Platform (NX-3461) Nutanix -NX-3461, License, Pro entitlement for NX-3061 Nutanix -LIC-PRO-3061 |
| 422-NX-3461 |
| 2 EA |
| Config: Includes 256GB (16x16GB) on each NX-3061 node Nutanix - C-MEM-256GB-3061 |
| 422-C-MEM-256GB-3061 |
| 8 EA |
| 3YR GOLD System support for Nutanix NX-3461 Nutanix - S-GOLD-3461-3YR |
| 422-S-Gold-3461-3yr |
| 2 EA |
| Cable 3m SFP+ to SFP+ Nutanix - C-CBL-3MSFP+-SFP+ |
| 422-C-CBL-3m-SFP+-SFP+ |
| 16 EA |
| Arista 7150S, 24x10GbE (SFP+) switch, front to rear air, 2xAC, 2xC13-C14 cords |
| DCS-7150S-24-F |
| 2 EA |
1 Month A-Care Software & NBD Hardware Replacement/Same Day Ship for 2 Arista Switches-7150S-24 as shown below:
1 Arista Switch – 12 Mo 1 Arista Switch – 12 Mo
| SVC-7150S-24-1MNB |
| 24 MO |
| 0001AB |
| Vendor Installation / Setup |
• Install, and configure Nutanix Infrastructure
• Install, and configure hypervisor (KVM, vSphere, or Hyper-V)
• Install, and configure Acropolis
• Install, and configure Arista Networks Switches
• Configure switches into existing infrastructure
• Configure 10GbE switches with uplinks
1 JO
CLIN 0002 - System 2: SONAR Development and Evaluation Center (SSDEC)
| SLINs |
| Description |
| Part # |
| Quantity/ Unit |
| 0002AA |
| Material Components |
| Nutanix Scale-Out ConvergedCompute/Storage Platform (NX-6260) Nutanix -NX-6260 |
| 422-NX-6260 |
| 1 EA |
| Config: Includes 256GB (16x16GB) on each NX-6060 node Nutanix - C-MEM-256GB-6060 |
| 422-C-MEM-256GB-6060 |
| 3 EA |
| 1YR GOLD System support for Nutanix NX-1YR GOLD System support for Nutanix NX-6260 Nutanix - S-GOLD-6260-1YR |
| 422-S-GOLD-6260- |
| 1 EA |
| Nutanix Scale-Out ConvergedCompute/Storage Platform (NX-6160) Nutanix -NX-6160 |
| 422-NX-6160 |
| 1 EA |
| 1YR GOLD System support for Nutanix NX-6160 Nutanix - S-GOLD-6160-1YR |
| 422-S-GOLD-6160-1YR |
| 1 EA |
| Cable 3m SFP+ to SFP+ Nutanix - C-CBL-3MSFP+-SFP+ |
| 422-C-CBL-3MSFP+-SFP+ |
| 6 EA |
| License, 1YR Pro entitlement for NX-6060Nutanix - LIC-PRO-6060-1YR |
| 422-LIC-PRO-6060-1yr |
| 3 EA |
| Arista 7150S, 52x10GbE (SFP+) switch with clock, front-to-rear air, 2xAC, 2xC13-C14 cords |
| DCS-7150S-52-CL-F |
| 1 EA |
| Arista 7150S, 24x10GbE (SFP+) switch, fronttorearair, 2xAC, 2xC13-C14 cords |
| DCS-7150S-24-F |
| 1 EA |
| 10GBASE-SR SFP+ (Short Reach) |
| SFP-10G-SR |
| 6 EA |
| 1000BASE-T SFP (RJ-45 Copper) |
| SFP-1G-T |
| 2 EA |
| 10GBASE-CR twinax copper cable with SFP+ connectors on both ends (1.5m) |
| CAB-SFP-SFP-1.5M |
| 4 EA |
| 1 Month A-Care Software & NBD Hardware Replacement/Same Day Ship for Arista Switch 7150S-52-CL |
| SVC-7150S-52-CL-1M-NB |
| 12 MO |
| 1 Month A-Care Software & NBD Hardware Replacement/Same Day Ship for Arista Switch 7150S-24 |
| SVC-7150S-24-1MNB |
| 12 MO |
| Rack PDU 2G, Metered, ZeroU, 8.6kW, 208V, (36) C13 &(6) C19 & (2) 5-20 |
| AP8865 |
| 1 EA |
| NetShelter SV 42U 800mm Wide x 1060mm DeepEnclosure with Sides Black |
| AR2480 |
| 1 EA |
10GBASE-SRL SFP+ (Short Reach Lite) Arista Networks - SFP-10G-SRL
| SFP-10G-SRL |
| 2 EA |
LC/LC Multimode Duplex 50/125micron 50 Meter 10Gb Fiber
| F1241214214-050 |
| 2 EA |
| MICROSOFT : Office Pro English Lic/SA Pack OLV NL 1YR Acq Y1 Addtl Prod |
| 479966 |
| 15 EA |
Network Attached Storage – 4U Rackmount Server
System Configuration:
| NCS-4USS |
| 2 EA |
•Dual socket R (LGA 2011) supports Intel® Xeon® processor E5-2600 and E5-2600 v2 family
•Up to 1.5TB ECC DDR3, up to 1866MHz; 24x DIMM sockets
•3x PCI-E 3.0 x16 and 1x PCI-E 3.0 x8 slots (Low-profile)
•Intel® i350 GbE Controller; 4x ports
•36x Hot-swap 3.5" SAS2 (with LSI expander) / SATA3 HDD Bays; 24 front + 12 rear HDD Bays
•Hardware RAID controller and JBOD Expansion; RAID 0, 1, 5, 6, 10, 50, 60
•Server remote management: IPMI 2.0 / KVM over LAN / Media over LAN
•7x Heavy duty PWM fans
•1280W Redundant Power Supplies Platinum Level (95%)
•Two (2) Intel Xeon E5-2650V3 Processor 2.6 GHz, 8 Cores, 20M cache
•Two (2) Passive heat sinks
•Two (2) 8GB DDR3-1600 ECC Registered DIMM (Total 16GB)
•Two (2) 120GB SSD, 6Gb/s SATA, 2.5in
•Two (2) Adaptor HDD carrier to install 2.5" HDD in 3.5" HDD tray
•Thirty Four (34) 6TB 6Gb/s 7200RPM Enterprise hard drives
•Intel X520-SR2 10 GbE Network Adapter with SR Optics
•IPMI support with dedicated network port
•LSI CachebVault Module Not included
•Microsoft WinServer 2012 Installed - Configured for Raid 6
4U JBOD
•Extra High-Density 4U Storage Chassis - Rack mount server
•High-Availability Features: Redundant, Hot pluggable cooling system, Power Supplies, Hot-swap drives
•Redundant (1+1) 1400W Gold Level power supply with PMBus function
•Maximum 3.5" hot-swap drives density 45x (24 front + 21 rear) HDD bays Single Expander supports SAS2 (6Gb/s)
•7x 8cm (middle) Hot-swap cooling fans, redundant cooling
•(45) 6TB 6Gb/s 7200RPM Enterprise hard drives Total 79x 6TB hard-drives configured RAID6 without hot-spare
•External IPASS SAS cable (87 cm)
•Standard Server Packaging Materials
| 0002AB |
| Vendor On-Site Installation / Setup |
Vendor shall provide on-site support for installation and setup for the following:
• Install, and configure Arista Networks Switches
• Configure switches into existing infrastructure
• Install, and configure Nutanix Infrastructure
• Install, and configure KVM hypervisor Infrastructure
• Install, and configure Acropolis
• Install, and configure virtual desktop infrastructure
• Optimize and configure Base Image
• Setup desktop pools to support 15 users
• Install, and configure Liquidware Labs ProfileUnity
• Configure user persona (capture user settings)
• STIG all Windows member servers, and lock down Nutanix CVMs (provide SCAP or retina scans)
1 JO
| 0002AC |
| Vendor On-Site Training |
Vendor shall provide on-site training to the government system administrators on how to build virtual machines for the operating systems (Microsoft Windows or Red Hat Enterprise Linux) for the user desktop environments and demonstrate how to install additional application services. Additionally, the vendor shall train the system administrators how to patch the system and the desktop virtual machines (VDI clients). Success is a fully functional system capable of running VMWare and supporting 15 thin-clients capable of running virtual desktops for Microsoft Windows or Red Hat Enterprise Linux.
1 JO
| 0003 |
| Shipping Costs |
1 LO
File details come from the government source that posted it. Updated .