3 CDRL A002.pdf
PDF 172 KB Posted
- Attached to
- LSD-46 HYDRA SYSTEM-ENGINEER AND LOGISTIC SUPPORT- INTENDED SOLE SOURCE Federal contract opportunity
- Solicitation number
- N65236-18-Q-7303
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3 CDRL A003.pdf | ||
| 3 CDRL T001.pdf | ||
| 3 CDRL A007.pdf | ||
| 3 CDRL T002.pdf | ||
| 3 CDRL A006.pdf | ||
| 3 CDRL A001.pdf | ||
| 3 PWS.doc | DOC document | |
| 3 CDRL A005.pdf | ||
| 3 CDRL A004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| A_CONTRACT_LINE_ITEM_NO: |
| B_EXHIBIT: A |
| TDP: |
| TM: |
| OTHER: |
| DSYSTEMITEM: AN/SRC-55 HYDRA |
| E_CONTRACTPR_NO: N6523618V7308/1300726314 |
| FCONTRACTOR: TBD |
| 1_DATA_ITEM_NO: A002 |
| 2_TITLE_OF_DATA_ITEM: Contract Closeout Report |
| 3_SUBTITLE: |
| 4_AUTHORITY_Data_Acquisit: |
| 5_CONTRACT_REFERENCE: PWS Para 5.2.1.2 |
| 6_REQUIRING_OFFICE: SPAWARSYSCEN Atlantic |
| 7_DID_250_REQ: LT |
| 8_APP_CODE: N/A |
| DIST_STATEMENT: |
| 10_FREQUENCY: 1TIME |
| 11_AS_OF_DATE: See BLK 16 |
| 12_DATE_OF_FIRST_SUBMISSI: See BLK 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: N/A |
| addressee1: COR |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: |
| draft2: |
| reg2: |
| repro2: |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_repro: 0 |
| 16_REMARKS: BLK 11: Reporting period ends at PO completion date. |
BLK 12: NLT 30 days after PO completion date BLK 14: COR will perform inspection of report for any discrepancies prior to acceptance.
Unless otherwise directed by the COR, the contractor shall e-mail addressee(s) an editable, electronic document. The report shall include, as a minimum, the following data items:
(a) Financial data – Breakdown of all costs (labor, travel, material, fee) per invoice, all key personnel that were utilized/charged on the job, specify all work yet to be charged, all remaining funds, and balances available, if any, for return (de-obligation), etc.
(b) Deliverable status -- Percentage job complete, any outstanding issues, CDRL status, list of any items/services under workmanship/manufacturer warranty, etc.
(c) (c) Government Property – All Contractor-acquired Property (CAP) and Government-furnished Property (GFP) provided on TO shall be accountable at the completion of each TO. Property shall be consumed, transferred to an active TO, disposed, or returned to the government. A final TO Inventory list shall be submitted accounting for all TO government property. Contractor shall incorporate information and receipts obtained from the initial disposition inventory list. For property being returned, the contractor shall include on the inventory list the following minimum information: part numbers, National Stock Number (NSN) (if applicable), quantity, and condition of each item (i.e., Condition A, F, etc.). Paperwork validating official receipt by government is required for returned items. Note: this update list shall additionally be distributed to the contract designated SSC Atlantic Property Administrator
(d) (d) Cost Analysis Report –A Cost Analysis shall be required for all CPIF TOs (optional for others) when the final cost deviated (overrun or under run) from the budgeted [target] cost over five percent (5%). At a minimum, the report shall include the following issues:
(e) 1. When the final cost underruns the budgeted [target] cost, the report shall explains the innovations used to allow for the cost savings. If analysis reveals task order target cost overestimated and/or unsubstantiated, Contractor has option to request reduction in budgeted [target] cost/fee.
(f) 2. When the final cost overruns the budgeted [target] cost, the report shall explain failures leading to cost growth and recommended corrective actions for future similar situations. This report does not alleviate the responsibility of the contractor to notify the PCO and COR upon discovery of any potential situation where the cost will exceed the budgeted [target].
| 17_PRICE_GROUP: | |
| ESTIMATED_TOTAL_PRICE: | |
| G_PREPARED_BY: | |
| H_DATE: | |
| 1_APPROVED_BY: | |
| J_DATE: 6/27/2018 | |
| Page: 1 | |
| of_pages: 1 | |
| Reset: | |
| reg38t: 1 | |
| 2018-06-27T12:31:36-0400 | |
| BIRKHOLZ.JEREMIAH.NOEL.1152053254 |
| 2018-06-27T14:26:10-0400 | |
| FREEMAN.RANDY.W.1229475700 |
File details come from the government source that posted it.