This document is a Solicitation/Contract/Order for Commercial Items related to a federal contract opportunity to procure Situational Awareness Bridge Display System (SABDS) upgrade equipment for Navy aircraft carriers CVN 69, CVN 70, CVN 74, and CVN 76.
The solicitation is set aside 100% for small businesses, with a request for quotes due by August 12, 2024 at 5:00 PM local time. The contract will be awarded using the Tradeoff source selection process, allowing the government to accept other than the lowest priced or highest technically rated proposal to achieve a best value contract. The solicitation includes brand name or equal purchase descriptions and salient characteristics for the SABDS equipment required across the four ship upgrade kits. The government will provide the contractor with site installation drawings, factory acceptance test procedures, and environmental qualification testing requirements for certification of any proposed equal items. The contractor must support telecons as requested and include provision to ship all material in one shipment per hull.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
1.
REQUISITION NUMBER
2. CONTRACT NO.
7. FOR SOLICITATION INFORMATION CALL:
3.
AWARD/EFFECTIVE DATE 4. ORDER NUMBER
a. NAME
FRANK VENNELL
5. SOLICITATION NUMBER
N6449824Q4045
b. TELEPHONE NUMBER 215-897-1337
(No Collect Calls)
6. SOLICITATION ISSUE DATE
09-Jul-2024
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 12 Aug 2024
9. ISSUED BY
CODE
N64498 10.
THIS ACQUISITION IS
UNRESTRICTED OR X SET ASIDE:
100 % FOR:
NAVAL SURFACE WARFARE CENTER PHILA CODE 0231, FRANK VENNELL
215-897-1337, FRANK.VENNELL@NAVY.MIL
SMALL BUSINESS HUBZONE SMALL
WOMEN-OWNED SMALL BUSINESS (WOSB) ELIGIBLE UNDER THE WOMEN-OWNED SMALL BUSINESS PROGRAM
NAICS:
5001 SOUTH BROAD STREETX
PHILADELPHIA PA 19112
TEL: 215-897-1337 FAX:
11. DELIVERY FOR FOB DESTINA-
12. DISCOUNT TERMS
BUSINESS
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS
EDWOSB
8(A)
13b. RATING
334111
SIZE STANDARD:
1,250
TION UNLESS BLOCK IS MARKED
SEE SCHEDULE
15. DELIVER TO CODE N64498 NAVAL SURFACE WARFARE CENTER PHILA
DONATO DIBARTOLOMEO NSWC PHILADELPHIA DIVISION NSLC DETACHMENT
1601 LANGLEY AVE BLDG 542
PHILADELPHIA PA 19112
13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700)
16. ADMINISTERED BY
14. METHOD OF SOLICITATION
X RFQ IFB RFP CODE
TEL: 215-806-9990 FAX:
17a.CONTRACTOR/ CODE
FACILITY
18a. PAYMENT WILL BE MADE BY CODE
OFFEROR CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
SUCH ADDRESS IN OFFER
BELOW IS CHECKED
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY
22. UNIT
23.
UNIT PRICE
24.
AMOUNT
SEE SCHEDULE
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.1 X
ADDENDA
ARE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHEDX
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 2 29. AWARD OF CONTRACT: REF.X
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER DATED
. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a.UNITED STATES OF AMERICA
(SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER
(TYPE OR PRINT)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER
TEL: EMAIL:
(TYPE OR PRINT)
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
SEE SCHEDULE
| 32a. QUANTITY IN COLUMN 21 HAS BEEN | |
| RECEIVED | INSPECTED |
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
| 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
| 32c. DATE |
| 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
| 32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
| 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
| 33. SHIP NUMBER |
| 34. VOUCHER NUMBER |
| 35. AMOUNT VERIFIED CORRECT FOR |
| 36. PAYMENT |
| COMPLETE | PARTIAL | FINAL |
| 37. CHECK NUMBER |
PARTIAL
FINAL
| 38. S/R ACCOUNT NUMBER |
| 39. S/R VOUCHER NUMBER |
| 40. PAID BY |
| 41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT |
| 42a. RECEIVED BY (Print) |
| 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER |
| 41c. DATE |
42b. RECEIVED AT (Location)
| 42c. DATE REC'D (YY/MM/DD) |
| 42d. TOTAL CONTAINERS |
AUTHORIZED FOR LOCAL REPRODUCTION PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
Section A - Solicitation/Contract Form
CONTINUATION SHEET
Standard Form (SF) 1449 – Solicitation / Contract / Order for Commercial Items (CONTINUATION SHEET)
1. Block 8 Offer Due Date / Local Time: 12 August 2024 by 5:00 P.M. Local Time
EMAIL OFFERS ARE AUTHORIZED
Emailed Offers shall be sent to: frank.vennell.civ@us.navy.mil
FACSIMILE OFFERS ARE NOT AUTHORIZED
2. Block 17a: Offeror’s assigned DUNS Number: .
Offeror’s CAGE CODE: .
3. Are you registered in System for Award Management (SAM)? ( ) YES ( ) NO You will not be eligible for award if you are not registered in the System for Award Management (SAM). If you have previously registered, make sure that your registration has not expired.
~NOTE: Offeror’s should ensure that all clauses, certifications, and representations within this solicitation have been accurately completed.
VERY IMPORTANT: The vendor must certify their agreement to these terms and conditions of the solicitation by signing and dating page one (1) of form SF1449.
NOTE: THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PARTS AND QUANTITIES FOR EACH SPECIFIC CLIN.
NOTE: SOLICITATION FOR COMMERCIAL ITEMS PREPARED IN ACCORDANCE WITH FAR PART 13.5 SIMPLIFIED PROCEDURES FOR COMMERCIAL ITEMS.
Note: The Government will utilize the subjective Tradeoff source selection process. This process allows for a tradeoff between non-price factors and price, and allows the Government to accept other than the lowest priced proposal or other than the highest technically rated proposal to achieve a best value contract award. The basis for award of a contract as a result of this solicitation will be an integrated assessment by the Contracting Officer of the results of the evaluation based on the evaluation factors and their importance as indicated below. The integrated assessment will include consideration of the strengths and weaknesses of the proposals. Accordingly, the Government may award to other than the lowest priced Quoter, or other than the Quoter with the highest evaluation rating.
The Government reserves the right to make an award, i.e. issue an order without discussions. Therefore, each initial quote should contain the quoter’s best terms from a price standpoint. However, the government reserves the right to conduct discussions if determined necessary by the Contracting Officer.
SOW-PWS Template 12 January 2024 version Page 3
The contract resulting from this solicitation will be awarded to the responsible Quoter whose offer, conforming to the solicitation, in the Government’s estimation, provides the best value in response to the requirement.
SOW-PWS Template 12 January 2024 version Page 4
Section B - Supplies or Services and Prices
AMOUNTITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
Each
CVN 69 Upgrade Kit FFP Situational Awareness Bridge Display System (SABDS) CVN 69. See Section C Statement of Work for specific items requested for this CLIN NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination PSC CD: 7H20
NET AMT
QUANTITY
UNIT
UNIT PRICE
CVN 70 Upgrade Kit FFP Situational Awareness Bridge Display System (SABDS) CVN 70. See Section C Statement of Work for specific items requested for this CLIN NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
SOW-PWS Template 12 January 2024 version Page 5
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
CVN 74 Upgrade Kit FFP Situational Awareness Bridge Display System (SABDS) CVN 74. See Section C Statement of Work for specific items requested for this CLIN NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
QUANTITY
UNIT
UNIT PRICE
CVN 76 Upgrade Kit FFP Situational Awareness Bridge Display System (SABDS) CVN 76. See Section C Statement of Work for specific items requested for this CLIN NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
SOW-PWS Template 12 January 2024 version Page 6
Section C - Descriptions and Specifications
STATEMENT OF WORK
Statement of Work (SOW) Navigation Critical Data System (NCDS)
Situational Awareness Bridge Display System (SABDS) Upgrade For CVN69, CVN70, CVN74, and CVN76
1.2 SCOPE OF WORK
The contractor shall procure piece parts that meet the requirements on the following pages. The contractor shall provide the quantities required for each of the four (4) hulls listed.Brand name or equal purchase descriptions, along with the salient characteristics of the brand item that an “equal” item must meet to be acceptable for award are provided below:
SOW-PWS Template 12 January 2024 version Page 7
| Requirement- Salient Characteristics |
| Quantity |
| P/N Example |
| Associated OEM |
CLIN 0001 - CVN69
19 inch Flat Panel Display Display connections shall include DVI-I in, VGA out, VGA in, IEC inlet, IEC outlet and USB I/O with expansion capability to support composite video input, touch screen and serial communication. Minimum resolution 1280 x 1024.
Input power includes AC & DC with auto switching capability.
| 11 |
| JH 19T14 MMD-MR1-SABA |
| Hatteland Technology |
Mounting Bracket Adjustable for 17” – 20” displays. All mounting hardware shall be included.
| 11 |
| JH MMDBR STD A-1 |
| Hatteland Technology |
Rotary Bracket Bracket shall integrate with mounting bracket above for rotary view capability. All mounting hardware shall be included.
| 11 |
| JH MMDRO STD A-1 |
| Hatteland Technology |
20 inch Flat Panel Display The display shall be military grade with a touch screen display and integral, internal processor. Display shall be shock approved per MIL-S-901D for Grade- A, Class I, Hull and Deck Mounted Type A, either Back or Face Mounted.
| 2 |
| AB219-32102 |
| Leidos |
KVM Switch Ultra Matrix The KVM switch design shall be able to configure, name, and select computers and show connections. Features shall include local monitor connection, security, flash memory, and system status.
| 2 |
| EP2-2X4U |
| Tripp Lite |
USB KVM Extender Set The extender set shall integrate with the KVM Switch Matrix and be able to control a USB computer or server 1,000 feet using standard CAT5 cable. The extender set shall support all analog VGA video and include video equalization and gain to compensate for image quality loss over long cable lengths.
| 2 |
| CRK-1USB |
| Rose Electronics |
KVM Switch, Cable Assembly The cable assembly shall provide a VGA console interface capability.
| 5 |
| CAB-CXVUSBM005 |
| Rose Electronics |
KVM Switch, Cable Assembly The cable assembly shall provide the ability connect a USB keyboard and mouse to the KVM switch.
| 3 |
| CAB-CX0606M005 |
| Rose Electronics |
5 inch Touch Panel The touch panel display shall include programmable icons, include web browsing capability, include H.265, H.264, support H.265, H.264, or MJPEG streaming video, and have a 1280 x 720 display resolution.
| 11 |
| TSW-570-B-S |
| Crestron |
10.1 inch Touch Panel The touch panel display shall include programmable icons, include web browsing capability, include H.265, H.264, support H.265, H.264, or MJPEG streaming video, and have a 1920 x 1200 display resolution
| 1 |
| TSW-1070-GV-B-S |
| Crestron |
CLIN 0002 - CVN70
19 inch Flat Panel Display Display connections shall include DVI-I in, VGA out, VGA in, IEC inlet, IEC outlet and USB I/O with expansion capability to support composite video input, touch screen and serial communication. Minimum resolution 1280 x 1024.
Input power includes AC & DC with auto switching capability.
| JH 19T14 MMD-MR1-SABA |
| Hatteland Technology |
Mounting Bracket Adjustable for 17” – 20” displays. All mounting hardware shall be included.
| 11 |
| JH MMDBR STD A-1 |
| Hatteland Technology |
Rotary Bracket Bracket shall integrate with mounting bracket above for rotary view capability. All mounting hardware shall be included.
| 11 |
| JH MMDRO STD A-1 |
| Hatteland Technology |
20 inch Flat Panel Display The display shall be military grade with a touch screen display and integral, internal processor. Display shall be shock approved per MIL-S-901D for Grade- A, Class I, Hull and Deck Mounted Type A, either Back or Face Mounted.
| 2 |
| AB219-32102 |
| Leidos |
5 inch Touch Panel The touch panel display shall include programmable icons, include web browsing capability, include H.265, H.264, support H.265, H.264, or MJPEG streaming video, and have a 1280 x 720 display resolution.
| 11 |
| TSW-570-B-S |
| Crestron |
10.1 inch Touch Panel The touch panel display shall include programmable icons, include web browsing capability, include H.265, H.264, support H.265, H.264, or MJPEG streaming video, and have a 1920 x 1200 display resolution
| 1 |
| TSW-1070-GV-B-S |
| Crestron |
SOW-PWS Template 12 January 2024 version Page 8
| Requirement- Salient Characteristics |
| Quantity |
| P/N Example |
| Associated OEM |
Rugged 1U Computer The Rugged 1U computer shall be used as the video processor for the SABDS. Minimum Capabilities shall include:
INTEL CORE i5-4590S CPU, UPTO 3.7GHz 2GB DDR3 1600MHz
SLIM DVD-RW DRIVE – SATA
240GB INTERNAL SOLID STATE DRIVE, 2.5", SATA
| 20659-1UMIL-LB-03 |
| Core Systems |
Control Processor Minimum Capabilities shall include:
100/1000 MBPS Ethernet USB 2.0 Interface RS-232 Interface SDRAM 2 GB Flash 8 GB Memory Card support of SD and SDHC cards up to 32 GB
| CP4N |
| Crestron |
Com Port Module The control module shall provide compact wired I/O module providing two RS- 232 COM ports for easy device expansion within a system. Minimum Capabilities shall include:
100 MBPS Ethernet PoE (Power over Ethernet) Capability RS-232 Interface
| CEN-IO-COM-102 |
| Crestron |
Mounting Bracket for Com Port The mounting bracket shall serve as a 1U space rack mount shelf for the Com Port Module
| 1 |
| RMK-IFE-1U |
| Crestron |
Network Switch The network switch shall provide a minimum 30 port capability that includes:
(2) 10/100/1000Base-T auto-sensing Gigabit Ethernet
(24) 10/100/1000Base-T auto-sensing Gigabit Ethernet w/PoE+
(4) 10 Gigabit Base-X SFP+ Up to 16k MAC Addresses
| CEN-SWOPE-30 |
| Crestron |
Video Scaler The video scalar shall integrate SABDS HDMI and analog video sources, include a minimum three (3) HDMI inputs, simultaneous outputs for HDMI and analog RGB or component video, a PIP - picture-in-picture capability, and auto-switching between inputs.
| DVS-605-D |
| Extron |
UPS
The UPS shall be a 2U size that provides continuous 1625VA/1300W to the SABDS and meet the following criteria:
Blown Precipitation – MIL-STD-810G EMI/RFI – MIL-STD-461F Shipboard – MIL-STD-1399 Shock – MIL-STD-810F Vehicle Power – MIL-STD-1275 Vibration – MIL-STD-167-1 36 minutes minimum backup time on a 1000W load
| ACG1625XRLISHC1 |
| Acumentrics |
CLIN 0003 - CVN74
19 inch Flat Panel Display Display connections shall include DVI-I in, VGA out, VGA in, IEC inlet, IEC outlet and USB I/O with expansion capability to support composite video input, touch screen and serial communication. Minimum resolution 1280 x 1024.
Input power includes AC & DC with auto switching capability.
| 11 |
| JH 19T14 MMD-MR1-SABA |
| Hatteland Technology |
Mounting Bracket Adjustable for 17” – 20” displays. All mounting hardware shall be included.
| 11 |
| JH MMDBR STD A-1 |
| Hatteland Technology |
Rotary Bracket Bracket shall integrate with mounting bracket above for rotary view capability. All mounting hardware shall be included.
| 11 |
| JH MMDRO STD A-1 |
| Hatteland Technology |
20 inch Flat Panel Display The display shall be military grade with a touch screen display and integral, internal processor. Display shall be shock approved per MIL-S-901D for Grade- A, Class I, Hull and Deck Mounted Type A, either Back or Face Mounted.
| 2 |
| AB219-32102 |
| Leidos |
KVM Switch Ultra Matrix The KVM switch design shall be able to configure, name, and select computers and show connections. Features shall include local monitor connection, security, flash memory, and system status.
| 2 |
| EP2-2X4U |
| Tripp Lite |
SOW-PWS Template 12 January 2024 version Page 9
| Requirement- Salient Characteristics |
| Quantity |
| P/N Example |
| Associated OEM |
USB KVM Extender Set The extender set shall integrate with the KVM Switch Matrix and be able to control a USB computer or server 1,000 feet using standard CAT5 cable. The extender set shall support all analog VGA video and include video equalization and gain to compensate for image quality loss over long cable lengths.
| 2 |
| CRK-1USB |
| Rose Electronics |
KVM Switch, Cable Assembly The cable assembly shall provide a VGA console interface capability.
| 5 |
| CAB-CXVUSBM005 |
| Rose Electronics |
KVM Switch, Cable Assembly The cable assembly shall provide the ability connect a USB keyboard and mouse to the KVM switch.
| 3 |
| CAB-CX0606M005 |
| Rose Electronics |
5 inch Touch Panel The touch panel display shall include programmable icons, include web browsing capability, include H.265, H.264, support H.265, H.264, or MJPEG streaming video, and have a 1280 x 720 display resolution.
| 11 |
| TSW-570-B-S |
| Crestron |
10.1 inch Touch Panel The touch panel display shall include programmable icons, include web browsing capability, include H.265, H.264, support H.265, H.264, or MJPEG streaming video, and have a 1920 x 1200 display resolution
| 1 |
| TSW-1070-GV-B-S |
| Crestron |
Rugged 1U Computer The Rugged 1U computer shall be used as the video processor for the SABDS. Minimum Capabilities shall include:
INTEL CORE i5-4590S CPU, UPTO 3.7GHz 2GB DDR3 1600MHz
SLIM DVD-RW DRIVE – SATA
240GB INTERNAL SOLID STATE DRIVE, 2.5", SATA
| 6 |
| 20659-1UMIL-LB-03 |
| Core Systems |
Control Processor Minimum Capabilities shall include:
100/1000 MBPS Ethernet USB 2.0 Interface RS-232 Interface SDRAM 2 GB Flash 8 GB Memory Card support of SD and SDHC cards up to 32 GB
| 1 |
| CP4N |
| Crestron |
Com Port Module The control module shall provide compact wired I/O module providing two RS- 232 COM ports for easy device expansion within a system. Minimum Capabilities shall include:
100 MBPS Ethernet PoE (Power over Ethernet) Capability RS-232 Interface
| 1 |
| CEN-IO-COM-102 |
| Crestron |
Mounting Bracket for Com Port The mounting bracket shall serve as a 1U space rack mount shelf for the Com Port Module
| 1 |
| RMK-IFE-1U |
| Crestron |
Network Switch The network switch shall provide a minimum 30 port capability that includes:
(2) 10/100/1000Base-T auto-sensing Gigabit Ethernet
(24) 10/100/1000Base-T auto-sensing Gigabit Ethernet w/PoE+
(4) 10 Gigabit Base-X SFP+ Up to 16k MAC Addresses
| 1 |
| CEN-SWOPE-30 |
| Crestron |
Video Scaler The video scalar shall integrate SABDS HDMI and analog video sources, include a minimum three (3) HDMI inputs, simultaneous outputs for HDMI and analog RGB or component video, a PIP - picture-in-picture capability, and auto- switching between inputs.
| 1 |
| DVS-605-D |
| Extron |
UPS
The UPS shall be a 2U size that provides continuous 1625VA/1300W to the SABDS and meet the following criteria:
Blown Precipitation – MIL-STD-810G EMI/RFI – MIL-STD-461F Shipboard – MIL-STD-1399 Shock – MIL-STD-810F Vehicle Power – MIL-STD-1275 Vibration – MIL-STD-167-1 36 minutes minimum backup time on a 1000W load
| 2 |
| ACG1625XRLISHC1 |
| Acumentrics |
CLIN 0004 - CVN76
SOW-PWS Template 12 January 2024 version Page 10
| Requirement- Salient Characteristics |
| Quantity |
| P/N Example |
| Associated OEM |
5 inch Touch Panel The touch panel display shall include programmable icons, include web browsing capability, include H.265, H.264, support H.265, H.264, or MJPEG streaming video, and have a 1280 x 720 display resolution.
| 11 |
| TSW-570-B-S |
| Crestron |
10.1 inch Touch Panel The touch panel display shall include programmable icons, include web browsing capability, include H.265, H.264, support H.265, H.264, or MJPEG streaming video, and have a 1920 x 1200 display resolution
| 1 |
| TSW-1070-GV-B-S |
| Crestron |
Rugged 1U Computer The Rugged 1U computer shall be used as the video processor for the SABDS. Minimum Capabilities shall include:
INTEL CORE i5-4590S CPU, UPTO 3.7GHz 2GB DDR3 1600MHz
SLIM DVD-RW DRIVE – SATA
240GB INTERNAL SOLID STATE DRIVE, 2.5", SATA
| 20659-1UMIL-LB-03 |
| Core Systems |
Control Processor Minimum Capabilities shall include:
100/1000 MBPS Ethernet USB 2.0 Interface RS-232 Interface SDRAM 2 GB Flash 8 GB Memory Card support of SD and SDHC cards up to 32 GB
| CP4N |
| Crestron |
Com Port Module The control module shall provide compact wired I/O module providing two RS- 232 COM ports for easy device expansion within a system. Minimum Capabilities shall include:
100 MBPS Ethernet PoE (Power over Ethernet) Capability RS-232 Interface
| CEN-IO-COM-102 |
| Crestron |
Mounting Bracket for Com Port The mounting bracket shall serve as a 1U space rack mount shelf for the Com Port Module
| 1 |
| RMK-IFE-1U |
| Crestron |
Network Switch The network switch shall provide a minimum 30 port capability that includes:
(2) 10/100/1000Base-T auto-sensing Gigabit Ethernet
(24) 10/100/1000Base-T auto-sensing Gigabit Ethernet w/PoE+
(4) 10 Gigabit Base-X SFP+ Up to 16k MAC Addresses
| CEN-SWOPE-30 |
| Crestron |
Video Scaler The video scalar shall integrate SABDS HDMI and analog video sources, include a minimum three (3) HDMI inputs, simultaneous outputs for HDMI and analog RGB or component video, a PIP - picture-in-picture capability, and auto- switching between inputs.
| DVS-605-D |
| Extron |
UPS
The UPS shall be a 2U size that provides continuous 1625VA/1300W to the SABDS and meet the following criteria:
Blown Precipitation – MIL-STD-810G EMI/RFI – MIL-STD-461F Shipboard – MIL-STD-1399 Shock – MIL-STD-810F Vehicle Power – MIL-STD-1275 Vibration – MIL-STD-167-1 36 minutes minimum backup time on a 1000W load
| ACG1625XRLISHC1 |
| Acumentrics |
SOW-PWS Template 12 January 2024 version Page 11
The brand name part numbers above are already certified and qualified for the SABDS. If alternative items are proposed, certification of those parts for use in the SABDS will need to be included in the proposal, and shall require the assembly of a complete SABDS system per CVN 69 SCD 8813 Site Installation Drawings (SIDS), SABDS Factory Acceptance Test Procedure Rev 1, and environmental qualification testing (EQT) per the SABDS SyRS Rev 1.0.2015.07.15.
Note that all SIDS are being provided with some specific to equipment removal and install on ships.
The factory acceptance test and EQT results shall be submitted to the NSWCPD C541 as CDRL 0001.
2.0 APPLICABLE DOCUMENTS
(as required for certification and EQT test results) CVN 69 SCD 8813 Site Installation Drawings
| DWG# |
| TITLE |
| 8859008 |
| ASTAB MOD INCID SCD 8813 |
| 8859284 |
| SABDS - CIRCUITS 3IN, 4IN & BTV REMOVAL BLOCK WIRING |
DIAGRAM
| 8859285 |
| SABDS - CKT 3IN & 4IN INSTALLATION BLOCK WIRING DIAGRAM |
| 8859286 |
| SABDS ‐ CKT 3IN & 4IN INSTALLATION WIRING TABLE |
| 8859287 |
| SABDS – FLAG BRIDGE ( 08-159-1-C) ARRANGEMENT |
| 8859288 |
| SABDS - NSSMS DIRECTOR 1 & 2 EQUIPMENT ROOM ( 010-160-3-C) |
ARRANGEMENT
| 8859289 |
| SITUATIONAL AWARENESS BRIDGE DISPLAY SYS PILOT HOUSE ( |
09-159-1-C) ARR
| 8859290 |
| SABDS - TACTICAL OPERATIONS PLOT ( 09-162-1-C) |
ARRANGEMENT
| 8859291 |
| SABDS - CHART R □ DM ( 09-165-5-C) ARRANGEMENT |
| 8859292 |
| SABDS - PRIMARY FLIGHT CONTROL ( 010-160-1-C) |
ARRANGEMENT
| 8859304 |
| SITUATIONAL AWARENESS BRIDGE DISPLAY SYSTEM-AUX CONN |
C 09-163-1-C) ARR
| 8859721 |
| SABDS - DRY AIR MOD |
| 8860551 |
| SITUATIONAL AWARENESS BRIDGE DISPLAY - OUTFITTING |
REMOVAL
| 8860552 |
| SITUATIONAL AWARENESS BRIDGE DISPLAY - OUTFITTING INSTALLATION |
| 8860553 |
| SITUATIONAL AWARENESS BRIDGE DISPLAY - MANUFACTURING |
DETAILS
| 8860554 |
| SITUATIONAL AWARENESS DISPLAY – ENGINEERING |
CALCULATIONS
| 8860555 |
| SITUATIONAL AWARENESS DISPLAY – SHEATING MODS |
| 8871373 |
| SABDS LIGHTING REMOVAL |
| 8871374 |
| SABDS LIGHTING INSTALL |
| 8871375 |
| SABDS NODAL POWER INSTALL |
| 8887939 |
| SABDS - FDN RMV NSSMS DIR 1 & 2 EQPT RM (010-160-3-C) |
| 8887940 |
| SABDS - FDN PREFAB & INSTL 09 & 010 LEVEL |
| 8887941 |
| SABDS – ENGINEERING CALCULATION |
| 8937360 |
| SABDS RCPT POWER MOD |
N6449824Q4045
| DWG# |
| TITLE |
| 8937539 |
| S96-SABDS STANDARDIZATION - IC CKT SIN MODIFICATION |
BLOCK WIRING DIAGRAM
| 8938261 |
| SABDS IC CKT JA MOD BWD |
SABDS Factory Acceptance Test Procedure Rev 1 SABDS SyRS Rev 1.0.2015.07.15
3.0. REQUIREMENTS
3.1 The contractor shall support telecons as requested by the government.
3.2 The contractor shall include the provision to ship in place (i.e., store at local facility) for future shipment of all material in one shipment per hull.
4.0 DATA REQUIREMENTS
CDRL A001 Technical Reports: As required for certification and EQT test results.
5.0 SECURITY REQUIREMENTS
Not applicable.
6.0 PLACE OF PERFORMANCE
Not applicable.
7.0 TRAVEL
Not applicable.
8.0 GOVERNMENT FURNISHED PROPERTY
Not applicable.
9.0 GOVERNMENT FURNISHED INFORMATION
Not applicable.
10.0 PURCHASES
Not applicable.
11.0 COUNTERFEIT MATERIAL PREVENTION
11.1 Electronic End-Items
The contractor planning shall document procedures and processes to minimize the risk of procuring and/or using counterfeit parts and materials, and their process for detecting counterfeit materiel in the event it is procured. This requirement applies to both new/modified and existing mission and safety critical hardware. SAE AS5553 contains information regarding the detection, avoidance, and mitigation of counterfeit electronic components, and may be used as a reference document for the development of the plan.
11.2 Non-Electronic Materiels
11.2.1 Department of the Navy contractors (and their subcontractors at all tiers) who obtain critical or high risk materiel shall implement a risk mitigation process as follows:
11.2.1.1 If the materiel is currently in production or currently available, materiel shall be obtained only from authorized suppliers.
11.2.1.2 If the materiel is not in production or currently available from authorized suppliers, materiel shall be obtained from suppliers that meet appropriate counterfeit avoidance criteria.
11.2.1.3 Contractor shall notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized supplier.
11.2.1.4 Contractor shall take mitigating actions to authenticate the materiel if purchased from an unauthorized supplier.
11.2.1.5 Contractor shall report instances of counterfeit and suspect counterfeit materiel to the contracting officer and the GIDEP as soon as the contractor becomes aware of the issue.
CLAUSES INCORPORATED BY FULL TEXT
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
(End of text)
C-211-H020 PROTECTION OF THE VESSEL (NAVSEA) (MAR 2019)
(a) The Contractor shall exercise reasonable care, as agreed upon with the Supervisor, to protect the vessel from fire, and shall maintain a system of inspection over the activities of its welders, burners, riveters, painters, pipe fitters, and similar workers, and of its subcontractors, particularly where such activities are undertaken in the vicinity of the vessel's magazines, fuel oil tanks, or store rooms containing inflammable materials. All ammunition, fuel oil, motor fuels, and cleaning fluids shall have been off-loaded and the tanks cleaned, except as may be mutually agreed upon between the Contractor and the Supervisor prior to work on the vessel by the Contractor. Fire hose lines shall be maintained by the Contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the Contractor's pier or in dry dock. All tanks under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe to the extent necessary, and the Contractor shall furnish the vessel's Gas Free Officer and the Supervisor with a "Gas Chemists' Certificate" before any hot work is done. The Contractor shall maintain a fire watch aboard the vessel in areas where the Contractor is working. All other fire watches aboard the vessel shall be the responsibility of the Government.
(b) Except as otherwise provided in contractually invoked technical specifications or NAVSEA furnished directives, while the vessel is at the Contractor's plant and when the temperature becomes as low as thirty-five degrees Fahrenheit, the Contractor shall assist the Government when requested in keeping all pipe-lines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected by the Contractor from frost damage by applied heat through the use of a salamander or other proper means.
(c) The work shall, whenever practicable, be performed in such manner as not to interfere with the work performed by military personnel attached to the vessel, and provisions shall be made so that personnel assigned shall have access to the vessel at all times, it being understood that such personnel will not unduly interfere with the work of the Contractor's workmen.
(d) The Contractor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by its employees, or the work performed by the Contractor in accordance with this contract, and at the completion of such work shall remove all rubbish from and about the site of the work, and shall leave the work in its immediate vicinity "broom clean", unless more exactly specified by the Supervisor.
(End of Text)
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated in response to Solicitation No. N6449824Q4045.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-222-H001 ACCESS TO THE VESSELS BY NON-U.S. CITIZENS (NAVSEA) (APR 2019)
(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by COMNAVSEA or his designated representative that such access should be permitted in the best interest of the United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST 5510.2D.
(b) If the Contractor desires to employ non-U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non-U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control Plan (ACP) which shall contain as a minimum, the following information:
(1) Badge or Pass oriented identification, access, and movement control system for non-U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.
(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.
(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.
(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.
(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.
(2) Contractor's plan for ascertaining citizenship and for screening employees for security risk.
( ) Data reflecting the number, nationality, and positions held by non-U.S. citizen employees, including procedures to update data as non-U.S. citizen employee data changes, and pass to cognizant CAO.
( ) Contractor's plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.
(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.
(c) To request approval for non-U.S. citizens of hostile and or communist-controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22-M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for the above group. Approval of ACP's for access of non-U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non-U.S. citizens of hostile and or communist-controlled countries.
(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S. citizens on this contract or agreement until such time as the compliance with an approved ACP is demonstrated and upon a determination by the CAO that the overnment's interests are protected. urther, the overnment reserves the right to cancel previously granted authority when such cancellation is determined to be in the overnment's best interest. Use of non-U.S. citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated or default in accordance with the clause entitled "Default ( ixed-Price Supply and Service)" ( AR 52.2 9- ), "Default ( ixed-Price Research and Development)" ( AR 52.2 9-9) or "Termination (Cost Reimbursement)" ( AR 52.2 9- ), as applicable.
(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.
(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.
(g) The same restriction as in paragraph (f) above applies to other non-U.S. citizens who have access to the Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.) except that, with respect to access to the vessel and worksite, the restrictions shall not apply to uniformed U.S. Navy personnel who are non-U.S. citizens and who are either assigned to the ship or require access to the ship to perform their duties.
C-223-H004 MANAGEMENT AND DISPOSAL OF HAZARDOUS WASTE (NAVSEA) (MAY 2023)
(a) General
(1) The Contractor shall comply with the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), 10 U.S.C. 8681 and all other applicable Federal, State and local laws, codes, ordinances and regulations for the management and disposal of hazardous waste.
(2) Nothing contained in this special contract requirement shall relieve the Contractor from complying with applicable Federal, State, and local Laws, codes, ordinances, and regulations, including obtaining licenses and permits, giving notices and submitting reports, in connection with hazardous waste management and disposal in the performance of this contract. Nothing contained herein shall serve to alter either party's liability or responsibility under CERCLA.
(3) Materials contained in ship systems are not waste until after removal from the system.
(b) Identification of Hazardous Wastes - of this contract identifies the types and amounts of hazardous wastes that are required to be removed by the Contractor, or that are expected to be generated, during the performance of work under this contract.
(c) Generator Identification Numbers
(1) Documentation related to hazardous waste generated solely by the physical actions of ship's force or Navy employees on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law.
(2) Documentation related to hazardous waste generated solely by the physical actions of Contractor personnel shall only bear a generator identification number issued to the Contractor pursuant to applicable law. Regardless of the presence of other materials in or on the shipboard systems or structures which may have qualified a waste stream as hazardous, where the Contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator identification number issued to the Contractor.
(3) Documentation related to hazardous waste generated by the combined physical actions of Navy and Contractor personnel shall bear a generator identification number issued to the Contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law.
(4) Notwithstanding paragraphs (c)(1) - (c)(3) above, hazardous wastes are considered to be co-generated in cases where: (a) the Contractor merely drains a system and such drainage creates hazardous waste or (b) the Contractor performs work on a system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste. Documentation related to such co-generated waste shall bear a generator identification number in accordance with the provisions of paragraph (c)(3) above.
(5) In the event of a failure by the parties to agree to the assignment of a generator identification number to any hazardous waste as set forth in paragraphs (c)(1) through (c)(4) above, the Government may direct which party or parties shall provide generator identification numbers for the waste and such number(s) shall be used on all required documentation. Any disagreement with this direction shall be a dispute within the meaning of clause of this contract entitled "Disputes" (FAR 52.233-1). However, the Contractor shall not stop any work but shall continue with performance of all work under this contract as specified in the "DISPUTES" clause.
| (6) Hazardous Waste Manifests - For wastes described in (c)(2), (c)(3), and (c)(4) above (and (c)(5) as applicable), the Contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the Manifest is required for disposal. The Contractor shall obtain | concurrence with the categorization of wastes under paragraphs (c)(3) and (c)(4) above before completion of the manifest. Manifests prepared pursuant to paragraph (c)(1) above shall be presented to the | for completion after the hazardous waste has been identified. |
| (7) For purposes of paragraphs (c)(2) and (3) herein, if the Contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the State in which the availability will be performed, the Contractor shall notify | within 3 business days of receipt of written notification by the | |
| State. After obtaining | approval, the Contractor shall use the Navy site generator identification number and |
insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located. For purposes of paragraph (c)(1) herein, if the work is being performed at a contractor facility and the Government cannot obtain a separate generator identification number for the State, the Government shall use the Contractor site generator identification number and shall cite in the remarks block a Navy generator identification number. In both instances described above, the Contractor shall prepare the Uniform Hazardous Waste Manifest described in paragraph (c)(6) above and present it to for completion.
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A0001, attached hereto.
C-227-H014 PROTECTION OF DEPARTMENT OF NAVY TRADEMARKS - BASIC (NAVSEA) (JUL 2021)
(a) The contractor shall not assert any claim, in any jurisdiction, based on trademark or other name or design-based causes of action that are based on rights the contractor believes it has in the term(s) [contracting officers shall list terms(s) (Government assigned or approved nomenclature)] (the “Designation(s)”), against the Government or others authorized by the Government to use the Designation(s) (including the word(s), name, symbol, or design) acting within the scope of such authorization (i.e. claims for trademark infringement, dilution, trade dress infringement, unfair competition, false advertising, palming off, passing off, or counterfeiting). Such authorization shall be implied by the award of a Government contract to any party for the manufacture, production, distribution, use, modification, maintenance, sustainment, or packaging of the products and services identified under this contract, and the scope of such implied authorization is defined as the use of the Designation(s) in performance under such contract by the prime contractor and its subcontractors and suppliers at any tier. In all other cases, the scope of the authorization will be defined by the Government in writing.
(b) The contractor shall notify the contracting officer at least 30 days before asserting rights in, or filing an application to register, any one of the Designation(s) in any jurisdiction within the United States. Any such notification shall be in writing and shall identify the Designation(s) (including the word(s), name, symbol, or design), provide a statement as to its intended use(s) in commerce, and list the particular classes of goods or services in which registration will be sought.
C-228-H001 INDEMNIFICATION FOR ACCESS TO VESSEL (NAVSEA) (DEC 2018)
Notwithstanding any provision in the "Access to Vessel" clause (DFARS 252.217- 7011), or any other clause of the contract, the Contractor agrees to allow officers, employees, and associates of the Government, or other prime contractors with the Government and their subcontractors, and officers, employees, and associates of offerors on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price.
C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)
(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.
(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:
(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;
(2) Description of work necessary to undo work already completed which has been deleted by the change;
(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;
(4) Description of interference and inefficiencies in performing the change;
(5) Description of each element of disruption and exactly how work has been, or will be disrupted:
(i) The calendar period of time during which disruption occurred, or will occur;
(ii) Area(s) aboard the vessel where disruption occurred, or will occur;
(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;
(iv) Scheduling of trades before, during, and after period of disruption;
(v) Description of measures taken to lessen the disruptive effect of the change;
(6) Delay in delivery attributable solely to the change;
(7) Other work attributable to the change;
(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, cross-referenced to the detailed information provided as required above; and
(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.
(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.
(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph
(b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.
C-244-H002 SUBCONTRACTORS/CONSULTANTS (NAVSEA) (FEB 2023)
In addition to the information required by FAR 52.244-2(e) of the contract, when consent to subcontract is required per FAR 52.244-2, the contractor shall also include the following information in requests to add subcontractors or consultants during performance:
(1) Impact on subcontracting goals,
(2) Impact on providing support at the contracted value,
(3) IF SEAPORT TASK ORDER - The results of negotiations to incorporate fee rate caps no higher than the lower of
(i) SeaPort NXG fee rate caps for the prime contractor, or in the case where the proposed subcontractor is also a SeaPort NXG prime, (ii) fee rate caps that are no higher than the subcontractor's prime SeaPort NXG contract.
C-245-H006 ADDITIONAL REQUIREMENTS RELATING TO GOVERNMENT PROPERTY (NAVSEA) (OCT 2018)
(a) For purposes of paragraph (h) of the clause entitled "Government Property" (FAR 52.245-1) in addition to those items of property defined in that clause as Government Property, the following shall also be included within the definition of Government Property:
(1) the vessel;
(2) the equipment on the vessel;
(3) movable stores;
(4) cargo; and
(5) other material on the vessel
(b) For purposes of paragraph (b) of the clause entitled "Government Property", notwithstanding any other requirement of this contract, the following shall not be considered Government Property:
(1) the vessel;
(2) the equipment on the vessel;
(3) movable stores; and
(4) other material on the vessel
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
Section D - Packaging and Marking
D-211-H004 IDENTIFICATION MARKING OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .