Amendment_0001.docx
DOCX document 44 KB Posted
- Attached to
- Silica Sand Federal contract opportunity
- Solicitation number
- N6449819R4030
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A.docx | DOCX document | |
| N6449819R4055_RELEASED.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6449819R4055
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
Specifications for NFPC Sand Procurement For The Naval Foundry and Propeller Center
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for Naval Foundry and Propeller Center (NFPC) who is responsible for the design, manufacture, and repair propellers for the US Navy.
0. BACKGROUND
NFPC utilizes sand during its manufacturing process. The Government analyzed its current inventory and determined a requirement of 1,300 tons of sand by August 2019 with an additional option to deliver 2,000 tons of sand by September 2020.
1.2 SCOPE OF WORK
The scope of work requires the contractor to deliver 1,300 tons of sand to the Naval Foundry and Propeller Center in Philadelphia, PA by August 2019. There is an additional option CLIN to deliver 2,000 tons of sand by September 2020. The sand shall meet the requirements stated in section 3.0. The CLIN structure is the following:
| CLIN |
| Description |
| Quantity |
| Delivery By: |
| 0001 |
| Sand |
| 1,300 Tons |
| August 2019 |
| 0002 (Option) |
| Sand |
| 2,000 Tons |
| September 2020 |
2.0 APPLICABLE DOCUMENTS
American Foundry Society (AFS) Sieve Analysis and Grain Fineness Number (GFN). This documentation can be found at the following:
https://hub.afsinc.org/NC__Product?id=a2Z1a000000Qi7REAS
3.0. REQUIREMENTS
3.1. The contractor shall ensure that the sand that meets the following characteristics:
3.1.1. American Foundry Society (AFS) Grain Fineness Number (GFN) of 45 +/- 5
3.1.2. The grain shape shall be sub-angular in accordance with American Foundry Society (AFS) Sieve Analysis and Grain Fineness Number (GFN).
3.1.3. The silica content shall be 99% minimum in accordance with American Foundry Society (AFS) Sieve Analysis and Grain Fineness Number (GFN).
3.1.4. The clay content shall be 0.30% maximum in accordance with American Foundry Society (AFS) Sieve Analysis and Grain Fineness Number (GFN).
3.1.5. The iron oxide shall be 1.00% maximum in accordance with American Foundry Society (AFS) Sieve Analysis and Grain Fineness Number (GFN).
3.1.6. The sand shall be dry.
3.2. The nominal sand distribution shall meet the following requirements:
3.2.1. At least 4 sieves shall retain at least 10% (4 screen distribution on 40, 50, 70 and 100) in accordance with American Foundry Society (AFS) Sieve Analysis and Grain Fineness Number (GFN).
3.2.2. The 50 and 70 Sieves shall retain a combined 50% minimum in accordance with American Foundry Society (AFS) Sieve Analysis and Grain Fineness Number (GFN).
3.2.3. The 270 Sieve and Pan shall retain a combined 0.3% maximum in accordance with American Foundry Society (AFS) Sieve Analysis and Grain Fineness Number (GFN).
3.2.4. The sand’s product data sheet showing the nominal distribution must be approved by Government personnel.
3.3. The driver must present certified analysis that the sand meets the requirements of section 3.1 and section 3.2 to Government personnel for acceptance prior to unloading. If the driver does not have proper the paperwork, an email copy certification from the contractor would be acceptable for review by Government personnel. After acceptance of certification paperwork by Government personnel, the sand can be off loaded. If certification papers cannot be secured for acceptance, the SAND WILL NOT BE offloaded into the silos.
3.3.1. The contractor delivery truck must have the ability to pump the sand directly into the Government Silo.
3.4. The contractor shall send a Certificate of Analysis (COA) for each batch of sand which shows the Sieve Analysis of that batch. The COA should be e-mailed (preferred) or sent with the truck driver. If the contractor emails the COA, the contractor shall send to the Government personnel indicated in section 14 of the Statement of Work. Sending the COA before the sand arrives at NFPC is highly preferred.
4.0 DATA REQUIREMENTS
Not applicable.
5.0 SECURITY REQUIREMENTS
5.1 Escorted visit. Escorted visits are required for any person who is not assigned to NNSY/NFPC and/or does not have a valid clearance. Visitors will be escorted at all time by an NFPC employee and no exposure to any classified open storage areas or material. Requests for escorted access must be submitted 5 working days prior to arrival. If it is service or maintenance that needs to be done or an emergency the request needs to be submitted immediately in order to allow for ample time for proper vetting of individual/individuals requesting access.
The requesting NFPC code/shop will coordinate the visit and verify proof of US citizenship. The responsible code shall provide escort during the contractor’s visit.
Acceptable documents for proof of Citizenship are;
1. US Birth Certificate (original)
1. US Voters registration
1. US Passport
1. (Home Land security), Transportation Workers Identification Credential (TWIC)
1. Naturalization paperwork
NFPC code requiring visit must request for the contractor to submit SECNAV 5512 to kenya.l.jones.ctr@navy.mil
Code 1122 will review request and when acceptable notify requesting NFPC code/shop to arrange visit.
5.2 Contractor Vehicle Parking: (OPNAV 5530.14E) All contractor commercial vehicles must be visually inspected prior to entry into any NFPC buildings and are subject to random inspections anywhere on the compound. While on the compound, vehicles must visibly display vehicle parking pass (contact C1122). Vehicles must clearly display an authorized company sign or logo including a company phone number. Vehicles must only be allowed in the compound for transportation of contractors' tools, parts, and materials to and from the work site with the exception of MILCON scope projects. Vehicles must be registered to the company and not to an individual. Parking of POV's is available at “S” lot which is approximately one mile for work site. Contractor shall ensure that their vehicles, including delivery trucks, have valid and current vehicle registration and insurance upon arrival to NFPC. Non-valid and outdated or missing vehicle registration and insurance shall result in denied facility access requiring the Contractor to reschedule delivery immediately at the contractor’s expense.
5.3 Camera cell phones are not allowed in areas where NAVSEA work is being performed.
Camera cell phones are PROHIBITED:
In the CAA (Controlled Access Area), In Restricted Areas (Open Storage Confidential Areas, Secure Rooms, Vaults, etc.) and any location (office, trailer, shop, work area, etc.) where NAVSEA business is conducted.
Cell phones with the camera features disabled are no longer considered to be “camera” cell phones, and none of the restrictions for camera cell phones apply.
· “Disabled” means physical removal/destruction of the lens (drilling out, for instance) and filling the void with a permanent epoxy.
· The “acceptance criteria” is that it must be visually obvious to untrained personnel that the camera feature has been disabled. Accordingly, claiming that the camera feature or function has been “deprogrammed”, “inactivated” (or similar) would NOT be acceptable, since this cannot be readily verified by untrained personnel. Also, the camera feature or function could be reprogrammed or re-activated after inspection.
Cell phone owners should consider locations into which they intend/desire to carry cellphones before permanently modifying them. Modifications to cell phones are solely the decision and the responsibility of the owner.
Personnel camera cell phones are permitted in Personally Owned Vehicles parked outside of the Controlled Access Area. (General parking lots across the street)
Personal camera cell phones are permitted in areas outside of the CAA and where Naval Sea Systems Command (NAVSEA) business of a sensitive nature is NOT conducted.
This means that camera cell phones are PROHIBITED in Secure Rooms (regardless of where any of these areas are located), and in any meeting, discussion or forum where NAVSEA business of a sensitive nature is carried on.
Cellphone lockers/boxes will be placed at the entrance to facilities, or as close to the entrance as possible in order to facilitate this policy.
***********CAA-Controlled Access Area is anywhere within the fenceline***********
5.4. The contractor shall adhere to the facility/base access guidance per the following website:
https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system/faqs.html
5.5. The contractor shall ensure that only contractor employees who meet the security requirements stated below perform under this contract at the Government site (e.g. delivery drivers and passengers, etc.). The contractor shall propose and maintain a list of employees whom meet these requirements and be willing to submit this list to the Government, along with the necessary documentation to prove they meet them (e.g. the results of a contractor conducted background check, etc.), for the Government’s security vetting, to include any Government background check, and approval. Once vetted and approved, a list of approved contractor employees must be maintained for the entire period of performance of the contract (i.e. propose new employees, replace existing employees or provide updates to existing employees’ records, as necessary). A minimum of two employees, primary and backup, should be cleared by the Government to perform the necessary functions under this contract (e.g. proposed drivers of a delivery vehicle) throughout the entire period of performance of the contract. Contractors must have the ability to be granted access by ensuring current documentation is available at the submission of their proposal to allow background checks for any proposed driver and passenger under the following criteria:
· Felony conviction of any type within 10 years, or felony arrest that has not been adjudicated yet (includes "deferred findings").
· Misdemeanor conviction or on-base arrest within 5 years, for any of the following types of crimes (includes "deferred findings"): Crimes of violence, sexual assault, larceny, drugs, or a habitual offender.
· On the Sex Offender Registry.
· Is barred from any Navy installation.
If a contractor’s employee is denied entry at delivery due to inaccurate or outdated personal and/or vehicle documentation, the Government is absolved of any costs accrued as a result of the denial and the contractor is still pledged to fulfill the contract requirements. Failure to fulfill the contract requirement may result in a termination for default pursuant to FAR 49.4.
6.0 PLACE OF PERFORMANCE
6.1 Performance will occur at the following government site:
Philadelphia Navy Yard Philadelphia, PA
For CLIN 0001, the contractor shall deliver 1,300 tons of sand by 30 August 2019. The contractor shall be provided 2 weeks’ notice prior to the delivery of the sand.
For CLIN 0002, the contractor shall deliver 2,000 tons of sand by 30 September 2020, if exercised. The contractor shall be provided 2 weeks’ notice prior to the delivery of the sand.
6.2 The specific location will be provided at time of award.
6.3 Access to Government buildings at Naval Foundry & Propeller Center is from 0730 to 1800 Monday through Friday, except Federal holidays. Normal work hours are from 0730 to 1800, Monday through Friday. Contractor employees shall be under Government oversight at all times. Government oversight requires that a Government employee be present in the same building/facility whenever Contractor employee(s) are performing work under this contract. Contractor personnel are not allowed to access any Government buildings at NFPC outside the hours of 0730 to 1800 without the express approval of the Procuring Contracting Officer (PCO).
7.0 TRAVEL
Not applicable.
8.0 GOVERNMENT FURNISHED PROPERTY
Not applicable.
9.0 GOVERNMENT FURNISHED INFORMATION
Not applicable.
10.0 PURCHASES
Not applicable.
11.0 COUNTERFEIT MATERIAL PREVENTION
Not applicable.
12.0 PERSONNEL
Not applicable.
13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING (ECRAFT) SYSTEM
Not applicable.
14.0 ADDITIONAL INFORMATION
Not applicable.
(End of Summary of Changes) image1.wmf