N6449819Q5224.docx
DOCX document 118 KB Posted
- Attached to
- Propeller Repair Federal contract opportunity
- Solicitation number
- N6449819Q5224
About this file
RFQ closing 9/13/19 4:00PM EST
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6449819Q52240001.docx | DOCX document | |
| DD254_Propeller_Repair_August_2019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6449819Q5224
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lite |
Propellar Repair
FFP
On-site repair for propeller SN 28572 at TRF Bangor.
FOB: Destination
VENDOR PART NR: 100001414324-0040
PURCHASE REQUEST NUMBER: 1300797104
PSC CD: J030
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
Statement of Work (SOW)) for In-Service Submarine Propellers SN 28572 Trident On-Site Repair
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 426, which is responsible for in-service submarine propellers.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied
1.0.3 Government / Contractor Relationship
(a) The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
(b) The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence
(c) Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
(d) Employee Relationship:
| 1) | The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor. |
| 2) | Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract. |
(e) Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.
(f) Notice. It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1) The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.
2) The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
| (i) | Confirm the conduct is in violation and when necessary direct the mode of further performance, |
| (ii) | Countermand any communication regarded as a violation, |
| (iii) | Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or |
| (iv) | In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor. |
1.1 BACKGROUND
The MRG and Propulsors Branch (Code 426) and the Propulsion Systems Division (Code 42) of the Naval Surface Warfare Center, Philadelphia Division (NSWCPD), provide services to support in-service submarine propellers and propulsors. Services include supporting repairs to submarine propellers and propulsors damaged in-service or in storage.
SSBN 726 Class propeller SN 28572 suffered stress corrosion cracking damage while in storage at Trident Refit Facility (TRF) Bangor and requires repairs.
1.2 SCOPE OF WORK
The contractor shall perform an engineered repair of SSBN 726 Class propeller SN 28572 at Trident Refit Facility (TRF) Bangor in accordance with Section 2.0 Applicable Documents. The contractor shall provide all necessary tooling, equipment, and personnel for the inspection and repair of the propeller.
2.0 APPLICABLE DOCUMENTS
2.1 Technical Data Package
2.2 NAVSEA S9245-AQ-TSM-010/PROP Submarine Propeller and Propulsor Repair Manual
2.3 NSWC letter Ser 932/104 dtd 9 Sep 08, Submarine Propeller Piece X Repair Patch and Mechanical Fastener Installation Requirements
2.4 NSWC letter Set 932/088 dtd 22 Jul 08, Void Repair Requirements
2.5 NAVSEA Drawing 203-4355176 Rev E
For copies of these documents, contact NSWCPD Code 426, POC: Jamie Kostic, 215-897-7791, james.kostic@navy.mil
The Contractor shall reference and utilize the latest version available when performing tasks within this SOW.
3.0. REQUIREMENTS
3.1 Perform a dye penetrant aided Visual Technical Inspection (VTI) of the propeller blade special attributes to find and document cracks only. Areas of the preservative coating may need to be removed to perform inspections.
3.1.1 The contractor shall provide the VTI report to a TRF Bangor Engineering Representative for government review. The VTI shall then be submitted to NSWCPD Code 426.
3.2 Repairs shall be in accordance with 2.1 and as noted herein. Repairs shall not begin prior to authorization from NAVSEA 05P3 or NSWCPD 426. Only repairs included in this SOW shall be completed.
3.3 Ultrasonic testing shall be performed prior to weld repair of special attributes. MIL-CuAl-A2 weld filler material is authorized and shall be used for welds associated with the repair of special attributes. UT shall be performed with a transducer size of 0.250 inch at a frequency of 5 MHz
3.3.1 Repair cracks visible to the surface by welding.
CAUTION: The special temperature limitation of 2.2 may be exceeded to a maximum temperature of 400 degrees F adjacent to replaced post welds and 300 degrees F for peripheral welds. These temperature limits shall be strictly adhered to for Piece 15 and the base casting in the area adjacent to Piece 15 for all welding operations.
3.3.2. Repair cracks visible to the surface if located in a peripheral weld. Peripheral weld repairs shall have a vent hold provided during all welding.
CAUTION: The special temperature limitation of 2.2 may be exceeded to a maximum temperature of 400 degrees F adjacent to replaced post welds and 300 degrees F for peripheral welds. These temperature limits shall be strictly adhered to for Piece 15 and the base casting in the area adjacent to Piece 15 for all welding operations.
3.3.3. Repair failed or cracked post welds. Failed or cracked post welds shall be repaired and replaced with mechanical fasteners in accordance with 2.3.
3.3.4 Repair all voids in accordance with 2.4 to meet the repair tolerance as specified in 2.2.
3.4 Perform a dye penetrant aided Visual Technical Inspection of blade special attributes after repairs are completed.
3.4.1 All weld repairs shall be documented in accordance with 2.1. Weld repairs made with MIL-CuAl-A2 shall be specifically identified.
3.5 Upon completion of repairs, add the following stamped markings: “ENG REPAIR, ‘CONTRACTOR NAME’, DATE.”
3.6 Restore packaging and preservation to the requirements of 2.1.
3.7 Inspection and acceptance shall be in accordance with 2.1. A TRF Bangor Engineering Representative will provide on-site government review.
3.8 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components
The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
4. DATA REQUIREMENTS
4.1 Contract Status Report (CDRL A001)
4.1.1 This report shall reflect both prime and Subcontractor data if applicable at the same level of detail.
4.1.2 The CDRL shall be delivered electronically. Format is specified in CDRL A001.
4.2 Travel Report (CDRL A002)
4.2.1 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.2.2 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
4.3 Contractor’s Personnel Roster (CDRL A003)
4.3.1 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.4 Other Direct Costs Report (CDRL A004)
4.4.1 The CDRL shall be delivered electronically, unless otherwise stated or data is being submitted in eCRAFT, and while Contractor’s format is acceptable, Government’s approval is required from the COR. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.5 Waivers and Deviations (CDRL A005)
4.5.1 Contractor shall utilize DD Form 1694 for submission of all waivers and deviations.
4.5.2 Waivers and deviations shall be submitted to NSWCPD in accordance with CDRL A001.
4.6 Data – Inspection and Acceptance for On-Site Repairs (CDRL A006)
4.6.2. Data for the pre-repair shall consist of the report for the VTI Inspection, including NDT results.
4.6.2.1 Inspection and acceptance of pre-repair data shall be completed by the contractor’s DCMA QAR. Copies of all data shall be forwarded to NSWCPD 426 following acceptance.
4.6.3 Data for post-repair shall consist of the report for the VTI inspection, including NDT results, and a weld report for any weld repairs necessary. Weld repairs performed with MIL-CuAl-A2 shall be specifically identified.
4.6.3.1 Inspection and acceptance for data for the post-repair shall be completed by the contractor’s DCMA QAR. Copies of all data shall be forwarded to NAVSUP WSS and NSWCPD 426 following acceptance.
5. SECURITY REQUIREMENTS
The Contractor is responsible for completing all required Government mandated training to maintain security and network access to government sites and IT systems to include but not limited to: Antiterrorism Level 1 Awareness; DoD Cyber Awareness Challenge; Combatting Human Trafficking; Records Management in the DON: Everyone's Responsibility; Training and Readiness: The Active Shooter; Constitution Day; NAVSEA Introduction to Controlled Unclassified Information; Operations Security (OPSEC); NAVSEA Counterintelligence Training; Privacy and Personally Identifiable Information (PII) Awareness Training; and NAVSEA Physical Security training. Certificates of successful completion shall be sent to the COR and as otherwise specified in the contract.
In accordance with SECNAV M-5510.30 Chapters 5 and 6, all Contractor personnel that require access to Department of Navy (DON) information systems and/or work on-site are designated Non-Critical Sensitive/IT-II positions, which require an open investigation or favorable adjudicated National Agency Check (NACLC) by the Industrial Security Clearance Office (DISCO). Investigations should be completed using the SF-86 Form and the SF-87 finger print card. An interim clearance can be granted by the company Security Officer and recorded in the Joint Personnel Adjudication System (JPAS). An open or closed investigation with a favorable adjudication is required prior to issuance of a badge providing access to NSWCPD sites and buildings. If an unfavorable adjudication is determined by DISCO all access will terminated. For Common Access Card (CAC) card you must have a completed investigation that has been favorably adjudicated or a final security clearance. A CAC Card will not be issued to contractors who have an interim security clearance.
Contractor personnel that require a badge to work on-site at one of the NSWCPD sites must provide an I-9 form to verify proof of citizenship. The I-9 form should be signed by the company Facility Security Officer or the company Human Resource Department. In addition to the I-9 form, Contractors shall also bring their birth certificate, current United States Passport or naturalization certificate and state issued ID to the NSWCPD Security Officer at the time of badge request to verify citizenship. Finally, contractors shall supply a copy of their OPSEC Training Certificate or other proof that the training has been completed.
Construction badges for contractor personnel that work on-site at one of the NSWCPD sites will be good for 60 days.
A Facility Access Determination (FAD) will be completed on any contractor that does not have a favorable adjudicated investigation in JPAS and is requesting swipe/non-swipe access to our buildings in excess of 120 days. Any contractor that has unfavorable information that has not been favorably adjudicated by Department of Defense Central Adjudication Facility (DOD CAF) will not be issued a badge.
This effort requires access to classified information up to the Confidential level. No classified data will be generated by the Contractor. The Contractor is required to have and maintain a Confidential clearance. The requirements of the attached DD Form 254 apply.
The Contractor shall appoint a Facility Security Officer (FSO), who shall (1) be responsible for all security aspects of the work performed under this contract, (2) assure compliance with the National Industrial Security Program Operating Manual (NISPOM) (DOD 5220.22-M), and (3) assure compliance with any written instructions from the NSWCPD, Security Office.
The Prime Contractor shall:
| (1) | Forward signed copies of DD254s provided to subcontractors to the Naval Surface Warfare Center Philadelphia Division (NSWCPD), ATTN: Security. |
| (2) | Direct the subcontractor to obtain approval, through the prime Contractor, for the public release of information received or generated by the sub through the prime Contractor. |
| (3) | Submit the subcontractor request for public release through the technical point of contact identified on the DD 254. |
Access to TRF Bangor will be required. POC’s for JPAS and access are Larry Schofield ((360) 315-1187, larry.schofield@navy.mil) and Julie Wasson (360-315-2420, Julie.wasson@navy.mil)
Additional information related to the facility clearance process can be obtained by visiting www.dss.mil or http://www.dss.mil/isec/pcl_index.htm.
The planned utilization of non-U.S. Citizens in the performance of this contract effort must be identified by name and country of citizenship in the proposal. Foreign Nationals shall not be allowed access to classified or critical program information unless approved on a case by case basis by DSS.
6. PLACE OF PERFORMANCE
6.1 Performance will occur at the following government sites: Trident Refit Facility Bangor.
6.1.1 Government will provide under this Contract:
6.1.1.1. An enclosure or building with a minimum of four (4) feet of clearance between any point on the propeller and the structure. The enclosure or building must meet the security requirements specified in SCG ID# 05-056.4. The enclosure or building shall provide adequate heat and or air circulation.
6.1.1.2. Electrical power at 110 & 220VAC, compressed air at 160 CFM correlating to 90 to 120 psi at the pneumatic tool fitting, and lighting as necessary.
6.1.1.3. Staging, as necessary, surrounding the propeller to provide a stable working surface which allows access to all points on the propeller and provides fall protection.
6.1.1.4. A fire extinguisher upon request of the contractor.
6.1.1.5. Trash, industrial waste, mechanical/grinding particles, etc. removal, as collected by the contractor.
6.1.1.6. A 24 hr engineering POC.
6.1.1.7. Vehicle access to the CIA and parking in the vicinity of where the propeller is staged.
6.1.2 The specific location(s) will be provided at time of award of the Contract. The Contractor shall provide a list of employees who require access to these areas, including standard security clearance information for each person, to the Contracting Officer Representative (COR) no later than three business days after the date of award. The work space provided to the Contractor personnel shall be identified by the Awardee, with appropriate signage listing the company name and individual Contractor employee name.
6.1.3 Access to Government buildings at Naval Surface Warfare Center Philadelphia Division is from 0600 to 1800 Monday through Friday, except Federal holidays. Normal work hours are from 0600 to 1800, Monday through Friday. Contractor employees shall be under Government oversight at all times. Government oversight requires that a Government employee be present in the same building/facility whenever Contractor employee(s) are performing work under this Contract. Contractor personnel are not allowed to access any Government buildings at NSWCPD outside the hours of 0600 to 1800 without the express approval of the Procuring Contracting Officer (PCO).
6.1.4 Early Dismissal and Closure of Government Facilities
When a Government facility is closed and/or early dismissal of Federal employees is directed due to severe weather, security threat, or a facility related problem that prevents personnel from working, onsite Contractor personnel regularly assigned to work at that facility should follow the same reporting and/or departure directions given to Government personnel. The Contractor shall not direct charge to the contract for time off, but shall follow its own company policies regarding leave. Non-essential Contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal and during periods of inclement weather, onsite Contractors should monitor radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site Contractors will continue working established work hours or take leave in accordance with parent company policy. Those Contractors who take leave shall not direct charge the non-working hours to the Contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, and closings in accordance with the FAR, applicable cost accounting standards, and company policy. Contractors shall follow their disclosed charging practices during the Contract period of performance, and shall not follow any verbal directions to the contrary. The PCO will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy.
6.1.5 The contractor shall ensure that each contractor employee who will be resident at NSWCPD completes the Environmental Management System (EMS) Awareness training within 30 days of commencing performance at NSWCPD. This document is available at: https://navsea.navy.deps.mil/wc/pnbc-code10/Safety/default.aspx
In accordance with C-223-W002, ON-SITE SAFETY REQUIREMENTS (NAVSEA), the contractor shall certify by e-mail to Paul Breeden (paul.breeden@navy.mil) that on-site employees have read the “Philadelphia Division Environmental Policy and Commitment” and taken the EMS Awareness training within 30 days of commencing performance at NSWCPD. The e-mail shall include the employee name, work site, and contract number.
7. TRAVEL
The Contractor may be required to travel from the primary performance location when supporting this requirement. The estimated number of trips is one.
Travel in support of this requirement is anticipated to include, but may not be limited to, the following alternate performance locations:
Trident Refit Facility Bangor Bangor, WA
The number of times the Contractor may be required to travel to each location cited above may vary as program requirements dictate, provided that the total estimated travel cost is not exceeded. The numbers of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements. All travel shall be approved by the COR and Contracting Officer before travel occurs. Approval may be via the Technical Instruction (TI). In accordance with the TI instructions, before initiating any travel the Contractor(s) shall submit a detailed and fully-burdened estimate that includes the number of employees traveling, their expected travel costs for airfare, lodging, per diem, rental car, taxi/mileage and any other costs or actions requiring approval. The travel estimate shall be submitted to the Contracting Officer's Representative (COR) and Contract Specialist. Actuals cost, resulting from the performance of travel requirements, shall be reported as part of the Contractor's monthly status report. The reportable cost shall also be traceable to the Contractor's invoice
All travel shall be conducted in accordance with FAR 31.205-46, Travel Costs, and B-231-H001 Travel Cost (NAVSEA) and shall be pre-approved by the COR. The Contractor shall submit travel reports in accordance with DI-MGMT-81943 (CDRL A002).
Travel Costs
The current “maximum per diem” rates are set forth in the (i) Federal Travel Regulations for travel in the Continental United States; (ii) Joint Travel Regulations for Overseas Non-Foreign areas (e.g., Alaska, Hawaii, Guam, Puerto Rico, etc.); and (ii) Department of State (DOS) prescribed rates for foreign overseas locations.
9. PURCHASES
Only items directly used and incidental to the services for this Contract and for work within the scope of the Statement of Work shall be purchased under the Other Direct Cost (ODC) line items. Individual purchases above $10,000 shall be approved by the Contracting Officer prior to purchase by the Contractor. The purchase request and supporting documentation shall be submitted via email to the Contracting Officer and the Contracting Officer's Representative (COR) it shall be itemized and contain the cost or price analysis performed by the Contractor to determine the reasonableness of the pricing.
Information Technology (IT) equipment, or services must be approved by the proper approval authority. All IT requirements, regardless of dollar amount, submitted under this Contract shall be submitted to the PCO for review and approval prior to purchase. The definition of information technology is identical to that of the Clinger-Cohen Act, that is, any equipment or interconnected system or subsystem of equipment that is used in the automatic acquisition, storage, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information. Information technology includes computers, ancillary equipment, software, firmware and similar procedures, services (including support services), and related resources.
11. COUNTERFEIT MATERIAL PREVENTION
11.1 Non-Electronic Materiels
Department of the Navy contractors (and their subcontractors at all tiers) who obtain critical or high risk materiel shall implement a risk mitigation process as follows:
• If the materiel is currently in production or currently available, solicitations shall require the materiel to be obtained only from authorized suppliers
• If the materiel is not in production or currently available from authorized suppliers, solicitations shall require the materiel to be obtained from suppliers that meet appropriate counterfeit avoidance criteria
• Require the contractor to notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized supplier
• Require the contractor to take mitigating actions to authenticate the materiel if purchased from an unauthorized supplier
• Require the contractor to report instances of counterfeit and suspect counterfeit materiel to the contracting officer and the GIDEP as soon as the contractor becomes aware of the issue
12. PERSONNEL
12.1 Personnel Requirements. All persons proposed in key and non-key labor categories shall be U.S. citizens holding at least a current CONFIDENTIAL clearance, or ability to obtain one.
Clause 52.222-2 "Payment for Overtime Premiums" will provide for the total approved dollar amount of overtime premium or will state “zero” if not approved. If overtime premium has not been approved under this contract in accordance with Clause 52.222-2, overtime effort to be performed shall be requested from the Contracting Officer prior to performance of premium overtime. For overtime premium costs to be allowable costs; the Contracting Officer is required to approve the performance of overtime prior to the actual performance of overtime. The dollar amount in FAR 52.222-2 shall equal overtime premium negotiated between the Government and the prime contractor. This overtime premium amount shall equal the prime contractor's unburdened premium OT labor costs plus the subcontractors' fully-burdened premium OT labor costs.
Appendix A NSWCPD Cybersecurity Rev -02/02/2018 Code 104
Cybersecurity Workforce (CSWF) Tasks Outline Ref: SECNAV M-5239.2, DON Cyberspace IT and Cybersecurity Workforce Management and Qualification of June 2016 Personnel performing the following duties and tasks should be considered in the CSWF:
· Those who require Privileged Access Accounts, including Zone A (network connected) and Zone D (standalone) enclaves, for both ashore and afloat platforms.
· Secure, defend, preserve data, and monitor any/all systems control on Navy networks.
· Design, build, configure, operate and maintain Navy’s information technology, networks, and capabilities.
· Those who occupy similar billets to: 0332, 0335, 0390, 0391, 0392, 0394, 1550, 2210, 2299, 2502, and 2504 per Memo: Identifying and Coding Department of Defense Civilian Cyber Workforce Positions.
· Those who:
· Resolve network security issues by installing, configuring, and troubleshooting: software, hardware, and network security systems (Specialty Code 41).
· Install and administer user identification or authentication mechanism to includes creating user accounts, modify user’s permissions, roles for users, and delete user accounts.
· Permissions and capability to install software/hardware/peripherals, and modify configuration setting of Government-owned IT application, server, workstations or network devices to includes system upgrades or modification on Government computer systems.
· Conducts data integration, modeling, mining and analytics modeling (Specialty Code 42).
· Manages, administers, and enables the organization to identify, capture catalog, classify, retrieve and share intellectual capital and informational content between IT systems (Specialty Code 43).
· Installs, configures, tests, operates, maintains and manages network devices including hardware, software, and operating systems to allow information sharing across the full spectrum of transmissions (Specialty Code 44).
· Create, initiate, or otherwise enact system, database, or application backup or restoration activities on Government-owned application, workstations, servers and networks.
· Ensure server and systems configurations (hardware and software) confidentiality, integrity, and availability. Administers server-based systems, security devices, distributed applications, network storage, messaging, and performs systems monitoring (Specialty Code 45).
· Maintain system audit functions and periodically review audit information for detection of system abuse.
· Permissions to access and/or modify a database for a Government-owned IT systems.
· Responsible for maintenance, repair, or related upkeep of Government-owned computer or IT-related hardware.
· Conducts and documents the systems integration, testing, operations, maintenance, and security of an information environment. Coordinates threat and mitigation strategies across the enterprise (Specialty Code 46).
· Assess and implement identified corrections (e.g., system patches and fixes) associated with technical vulnerabilities as part of the information Assurance Vulnerability Management (IAVM) Program and other DOD configuration security requirements (i.e., Security Technical Implementation Guides (STIG) and Security Requirements Guides (SRG)), to include performing network scans on Government computer systems.
· Oversees, evaluates, and supports the documentation, validation, and accreditation processes necessary to ensure new and existing IT systems meet information assurance (IA) and security requirements. Ensures appropriate treatment of risk, compliance, and monitoring assurance from internal and external perspectives (Specialty Code 61).
· Develops, modifies, enhances, and sustains new or existing computer applications, software, or utility throughout the software lifecycle (Specialty Code 62).
· Conducts technology and/or feasibility assessments. Provides, builds, and supports a prototype capability and/or evaluates its security and utility. Facilitates innovation (Specialty Code 66).
· Develops and conducts processes and procedures (e.g., testing) to evaluate compliance with security requirements (Specialty Code 67).
· Manages strategy, personnel, infrastructure, policy enforcement, emergency planning, and security awareness to support information technology (IT) security goals, and reduce overall organizational risk (Specialty Code 72).
· Ensure rigorous application of cybersecurity policies, principles and practices in the delivery of all information technology (IT services).
· Control and monitor privilege access to DoD systems. Allow only minimum Privilege Access (Principle of Least Privilege) required to perform specific tasks/duties on specific DOD systems.
· Applies technical and organizational knowledge to define an entity’s strategic direction, determine resource allocations, establishes priorities and policies. Develops plans that will support new initiatives, new programs, or advocates for policy change required for IT infrastructure enhancements (Specialty Code 75).
· Identify cybersecurity requirement and actively participate as subject matter expert in the IT acquisition development process.
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department means the Department of the Navy.
(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA) (OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-211-H001 ACCESS TO THE VESSEL(S) (NAVSEA) (OCT 2018)
Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.
C-211-H002 DRY-DOCK CERTIFICATION (NAVSEA) (OCT 2018)
The dry-docking of all vessels shall be accomplished in dry docks certified in accordance with MIL-STD-1625D(SH) dated 27 August 2009 as invoked by NAVSEA Standard Item 009-01 dated 18 November 2016. A copy of Standard Item (SI) 009-01 can be obtained from the internet by going to http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC/NSI/ and selecting the NAVSEA Standard Items (NSI) tab then select the applicable FY standard item link and then select SI 009-01.
C-211-H004 HEAVY WEATHER PLAN (NAVSEA) (OCT 2018)
(a) In order to ensure that Naval vessel(s), material and Government property are protected during destructive weather such as gales, storms, hurricanes, high winds, heavy snow, ice and high water, the Contractor is required to have a written Heavy Weather Plan (HWP) which assigns responsibilities and prescribes actions to be taken on the approach of and during heavy weather conditions as delineated in NAVSEA Standard Item (SI) 009-69 dated 18 November 2016. A copy of Standard Item (SI) 009-69 can be obtained from via the internet by going to: http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC/NSI/ and selecting the NAVSEA Standard Items (NSI) tab then select the applicable FY standard item link and then select SI 009-69. In accordance with SI 009-69, the Contractor shall furnish to the cognizant Regional Maintenance Center (RMC), a copy of such HWP, and shall make such changes in the plan as the RMC considers necessary and reasonable to protect and care for vessel(s), material and Government property.
(b) In the event the RMC directs the Contractor to implement the HWP pursuant to SI 009-69 the Contractor may submit to the Contracting Officer a request for reimbursement for costs resulting from such actions together with any documentation that the Contracting Officer may reasonably require. The Government shall reimburse the Contractor for all reasonable, allowable and allocable costs resulting from the Contractor's implementation of the HWP based on such Government direction.
C-211-H005 PLANT PROTECTION (NAVSEA) (OCT 2018)
(a) In accordance with NAVSEA STANDARD ITEM (SI) 009-72, ( ) the Contractor shall develop, maintain, and implement, as necessary, a Plant Protection Plan ( ) which prescribes the actions and procedures and assigns responsibilities for actions to be taken to provide adequate protection of the ship(s) and the materials and equipment to be installed therein. A copy of SI 009-72 can be obtained from the purchasing office representative listed in Section G of the contract or via the internet by going to http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC/NSI/ and selecting the NAVSEA Standard Items (NSI) tab then select the applicable FY standard item link and then select SI 009-72.
(b) The Contractor shall establish and maintain, for its plant and the work in process under this contract, physical security boundaries and other security measures to provide safeguards against hazards, including unauthorized entry, malicious mischief, theft, espionage, sabotage, and terrorism to U.S. Naval Vessels and their crews, in accordance with SI 009-72 and Attachment A thereto. The Contractor shall also provide reasonable safeguards against vandalism and fire.
(c) The Contractor shall meet the requirements of Force Protection Condition NORMAL (as defined in SI 009-72) at all times. In addition, and in accordance with SI 009-72, the Contractor shall meet the requirements of increased levels of Force Protection as may be required or approved by the Contracting Officer, or when notified by the Supervisor, for the protection of its plant and the work in process under this contract against any threats including terrorism, espionage, sabotage, and enemy action.
(d) At the Supervisor’s discretion, the Contractor and the Supervisor shall negotiate a cost rate agreement applicable to each level of increased Force Protection above the NORMAL level. In addition to material costs, the labor cost rates shall be negotiated using the contractor’s and the Supervisor’s accepted common business practices. The labor and material costs to the Contractor for all safeguards so required or approved shall, to the extent allowable and allocable to this contract, be reimbursed to the Contractor in the same manner as if the Contractor has furnished such safeguards pursuant to a change order issued under the clause of this contract entitled "Changes-Fixed Price" (FAR 52.2431) or "Changes-CostReimbursement" (FAR 52.2432), as applicable. Such costs shall not include any allowance on account of overhead expense, except shop overhead charges incident to the construction or installation of such devices or equipment.
(e) Upon payment, in accordance with the Payments provision of this contract, by the Government of the cost to the Contractor for any device or equipment required or approved under paragraph (c) above, title thereto shall vest in the Government, and the Contractor shall comply with the instructions of the Contracting Officer respecting the identification and disposition thereof. No part or item of any such devices or equipment shall be or become a fixture by reason of affixation to any realty not owned by the Government.
(f) The plant protection plan and rate agreements required by this requirement shall be completed and implemented, within sixty (60) days of contract award for new construction and prior to ship arrival for conversion, repair or overhaul.
C-211-H010 TUG AND PILOT SERVICES (NAVSEA) (OCT 2018)
The Contractor shall provide necessary tug and pilot services to move the vessel(s) from the fairway of the plant to the pier or dock, and upon completion of all work from the pier or dock, to the fairway of the plant.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-211-H019 COMMONALITY AND STANDARDIZATION (NAVSEA) (FEB 2019)
The Contractor shall develop and implement a Commonality and Standardization Plan, reducing range and increasing depth of like equipment, to enhance supportability, minimize life cycle costs, and increase system readiness and interoperability across ships/ship classes through the selection of equipment and components which are, to the maximum extent possible, (1) common for application within the Class and (2) common with equipment/components currently installed in U.S. Navy ships. The Contractor shall utilize both Industry (e.g., the Common Parts Catalog) and Government (e.g., NAVSEA Enterprise Commonality Virtual Shelf and the Hull, Mechanical and Electrical Equipment Data Research System (HEDRS)) tools to implement its Commonality and Standardization Plan. For selecting Hull Mechanical and Electrical (HM&E) equipment/components, the Contractor shall utilize NAVSEA Enterprise Commonality Virtual Shelf before other tools, if the items meet the contract requirements. The Virtual Shelf is a web-based repository of HM&E equipment/components that meet cross-platform requirements and specifications and provide superior Total Ownership Cost (TOC). Information to gain access to the Virtual Shelf is located on the following web site: https://www.dau.mil/team/virtualshelf/SitePages/Home.aspx.
C-211-H020 PROTECTION OF THE VESSEL (NAVSEA) (MAR 2019)
(a) The Contractor shall exercise reasonable care, as agreed upon with the Supervisor, to protect the vessel from fire, and shall maintain a system of inspection over the activities of its welders, burners, riveters, painters, pipe fitters, and similar workers, and of its subcontractors, particularly where such activities are undertaken in the vicinity of the vessel's magazines, fuel oil tanks, or store rooms containing inflammable materials. All ammunition, fuel oil, motor fuels, and cleaning fluids shall have been offloaded and the tanks cleaned, except as may be mutually agreed upon between the Contractor and the Supervisor prior to work on the vessel by the Contractor. Fire hose lines shall be maintained by the Contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the Contractor's pier or in dry dock. All tanks under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe to the extent necessary, and the Contractor shall furnish the vessel's Gas Free Officer and the Supervisor with a "Gas Chemists' Certificate" before any hot work is done. The Contractor shall maintain a fire watch aboard the vessel in areas where the Contractor is working. All other fire watches aboard the vessel shall be the responsibility of the Government.
(b) Except as otherwise provided in contractually invoked technical specifications or NAVSEA furnished directives, while the vessel is at the Contractor's plant and when the temperature becomes as low as thirtyfive degrees Fahrenheit, the Contractor shall assist the Government when requested in keeping all pipelines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected by the Contractor from frost damage by applied heat through the use of a salamander or other proper means.
(c) The work shall, whenever practicable, be performed in such manner as not to interfere with the work performed by military personnel attached to the vessel, and provisions shall be made so that personnel assigned shall have access to the vessel at all times, it being understood that such personnel will not unduly interfere with the work of the Contractor's workmen.
(d) The Contractor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by its employees, or the work performed by the Contractor in accordance with this contract, and at the completion of such work shall remove all rubbish from and about the site of the work, and shall leave the work in its immediate vicinity "broom clean", unless more exactly specified by the Supervisor.
(End of Text)
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated in response to Solicitation No. .
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-222-H001 ACCESS TO THE VESSELS BY NON-U.S. CITIZENS (NAVSEA) (APR 2019)
(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by COMNAVSEA or his designated representative that such access should be permitted in the best interest of the United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST 5510.2D.
(b) If the Contractor desires to employ non-U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non-U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control Plan (ACP) which shall contain as a minimum, the following information:
(1) Badge or Pass oriented identification, access, and movement control system for non-U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.
(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.
(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.
(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.
(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.
(2) Contractor's plan for ascertaining citizenship and for screening employees for security risk.
(3) Data reflecting the number, nationality, and positions held by non-U.S. citizen employees, including procedures to update data as non-U.S. citizen employee data changes, and pass to cognizant CAO.
(4) Contractor's plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.
(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of…
This is the start of the file's text. The full file is on GovTribe.