Purchase Description Draft N6426723Q0012.pdf
PDF 146 KB Posted
- Attached to
- Post and Hoist Platform Fabrication Federal contract opportunity
- Solicitation number
- N6426723Q0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Solicitation Purchase Description Draft.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE DESCRIPTION
PRE-SOLICITATION NUMBER: N6426723Q0012
Post and Hoist Platform Fabrication
1. INTRODUCTION
2. BACKGROUND
3. REQUIREMENTS
Naval Surface Warfare Center (NSWC), Corona Division is seeking Fiberglass Reinforced Polymer (FRP) material for POST and Hoist platforms fabrication.
NSWC, Corona Division has a requirement to procure Fiberglass Reinforced Polymer material for Helicopter Hoist Trainer (Device 9H1) and a Parachute Overwater Survival Trainer (POST) (Device 9F9A). The efforts involves replacing new platforms made of Fiberglass Reinforced Polymer.
The contractor is required to adhere to all standards and guidelines when applicable. In the absence of named standards, Department of the Navy (DON) standards, applicable Federal Information Processing Standards (FIPS), and broadly accepted professional standards shall prevail as related to the associated industries within the task identified below.
1. Contractor shall provide parts completed according to specification of the drawing.
2. Contractor shall provide parts completed according to specification using Fiberglass
Reinforced Polymer (RFP) material.
3. Contractor shall deliver completed part by March 31, 2023.
Drawing Number Description Brand Name QTY
X-101 – X-163 Fiberglass Reinforced Polymer material for Post Hoist Platform
Fabrication
Bedford Reinforced Plastics 1 Each
X-101 – X-175 Fiberglass Reinforced Polymer material for Hoist Beam Fabrication
Bedford Reinforced Plastics 1 Each
ADDITIONAL INFORMATION
A. PERIOD OF PERFORMANCE / REQUIRED DELIVERY DATES
B. PLACE OF PERFORMANCE
C. SHIPPING ADDRESS
D. INSPECTION AND ACCEPTANCE
E. TECHNICAL POINT OF CONTACT
March 31, 2023
TBD
TBD
File details come from the government source that posted it. Updated .