Attachment J-1: Specification Package No. BOST-510-19

View the file

Other files for this federal contract opportunity

Other files attached to LCAC 52 Fleet Modernization Program, newest first.
File Type Posted
Exhibit_A_Pricing_Workbook.xlsm XLSM spreadsheet
S-2.docx DOCX document
S-1.doc DOC document
Exhibit_C.xlsx XLSX spreadsheet
LCAC_52_CDRL.pdf PDF
Exhibit_C(1).xlsx XLSX spreadsheet
RFP_N5523619R0004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVSEA BOSTON

LCAC 52 (LCAC 52)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: BOST-510-19

SHIP CHARACTERISTICS

LENGTH OVERALL

MAX. BEAM AT DESIGN WATERLINE

91 FEET

47 FEET

10 INCHES

10 INCHES

EXTREME BEAM INCLUDING APPENDAGES 49 FEET 2 INCHES

DRAFT (MAX. NAVIGABLE) (FWD.)

DRAFT (MAX. NAVIGABLE) (AFT.)

3 FEET

3 FEET

2 INCHES

2 INCHES

LIGHT DISPLACEMENT 91 LONG TON

FULL LOAD DISPLACEMENT 163 LONG TON

HEIGHT OF MAST ABOVE DESIGN WATERLINE 18 FEET 6 INCHES

BOST-510-19 SHIP: LCAC 52 (ACU 5)

INDEX

009-01 General Criteria; accomplish 04/30/2018

009-02 Environmental Compliance Report for Material Usage at Naval Facility; accomplish 04/30/2018

009-03 Toxic and Hazardous Substances; control 10/01/2017

009-04 Quality Management System; provide 10/01/2017

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; 08/31/2018

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-19 CH-4 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER W ITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

accomplish

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 10/01/2017

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 08/31/2018

009-10 Asbestos-Containing Material (ACM); control 04/30/2018

009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018

009-19 Provisioning Technical Documentation (PTD); provide 03/26/2018

009-20 Government Property; control 10/01/2017

009-21 Alteration Verification, Logistics and Technical Data; provide 03/26/2018

009-23 Interference; remove and install 04/30/2018

009-24 Authorization, Control, Isolation, Blanking, Tagging and Cleanliness; accomplish 04/30/2018

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; accomplish 11/18/2016

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manual for 03/06/2018 Commercial Equipment/Component; accomplish

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at Naval Facility; provide

03/26/2018

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

04/30/2018

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014

009-67 Integrated Total Ship Testing; manage 04/30/2018

009-69 Heavy W eather/Mooring Plan; provide 04/30/2018

009-70

Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for

03/26/2018

Unmanned Vessels; accomplish

009-72 Physical Security at a Private Contractor Facility; accomplish 08/31/2018

009-73 Shipboard Electrical/Electronic Cable Procedure; accomplish 03/26/2018

009-74 Occupational, Safety and Health Plan; accomplish 04/30/2018

ITEM_NO.

TITLE DATE

009-80 Ship Facilities; maintain 11/18/2016

009-81 Compartment Closeout; accomplish 08/31/2018

009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018

009-84 Threaded Fastener Requirements; accomplish 10/01/2017

009-93

Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

03/06/2018

009-99

Ship Departure Report; provide

07/18/2014

009-100 Ship's Stability; maintain 03/06/2018

009-101 Ship Transit and Berthing; accomplish 11/26/2018

009-106 Work Authorization Form Coordinator (W AFCOR); provide 10/01/2017

009-109 Non-SUBSAFE W ork on SUBSAFE-Certified Vessel; accomplish 10/01/2017

009-110 Non-Nuclear Work on Nuclear Vessels; accomplish 11/18/2016

009-111 Schedule and Associated Reports for Availabilities 9 W eeks or Less in Duration; 04/30/2018 provide and manage

009-117 Combat Systems Light-Off; support 08/31/2018

009-118 CG Deck Loading; accomplish 07/18/2014

009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018

009-122 Temporary Padeye; install and remove 10/01/2017

CATEGORY II. FY-19 CH-4 STANDARD ITEMS W HICH MAY BE INVOKED IN THE W ORK ITEMS OF THIS JOB ORDER

009-11 Insulation and Lagging; accomplish 10/01/2017

009-12 W eld, Fabricate, and Inspect; accomplish 04/30/2018 009-25 Structural Boundary Test; accomplish 03/06/2018

009-32 Cleaning and Painting Requirements; accomplish 03/26/2018

009-57 Reduction Gear Security; accomplish 11/18/2016

009-63 Lubricating Oil and Hydraulic Fluid; analyze 04/30/2018

009-71 Piping System; test 08/31/2018

009-86 Recovery and Turn-In of Ozone Depleting Substance (ODS); accomplish 11/18/2016

SHIP: LCAC 52 (ACU 5) BOST-510-19

ITEM NO. TITLE

077-01-001 Hazardous Waste Produced on Naval Vessels; control

171-85-002 LCAC AER-263 Rev 02, Light Mast Support Bracket; accomplish

234-90-004 Torque Meter Installation for ETF40B Main Propulsion Engine; accomplish

243-11-001 Shafting; remove, turnover and install

245-11-001 Propeller Control Module; remove, turnover and install

248-11-002 Cushion Vane Assembly; repair

248-85-007 LCAC Craft Change Document CCD-580 Rev 00, Cushion Vane Bearing Replacement; accomplish

251-11-001 Blow-In Door and Filter Access Door Assembly; repair

251-11-002 Heater, Door Seal - Anti-Icing; test and repair

304-11-002 Propeller Control Module Cabling; replace

555-11-002 Halon System Repair; accomplish

561-11-001 Steering Control Assembly; replace

568-11-001 Port and Starboard Bow Thruster Bearing; replace

568-12-001 Bow Thruster Motor; remove, turnover and install

568-12-002 Bow Thruster Manifold Thruster Ring Crack Repair; accomplish

575-85-001 LCAC AER-313 Rev 01, Equipment Bay Vent and Ramp Plug Replacement; accomplish

(IN PART)

584-31-002 Bow and Stern Ramp Bulb Seal Replacement; accomplish

584-31-005 Stern Ramp Repair; accomplish

631-11-002 Line Locker; clean and preserve

631-90-003 LCAC Craft Change Document CCD-445 Rev 01, INCR 01, Limited Compartment Painting;

Accomplish

992-31-001 Cleaning and Pumping; accomplish

../workitem52/07701001.pdf ../workitem52/17185002.pdf ../workitem52/23490004.pdf ../workitem52/24311001.pdf ../workitem52/24511001.pdf ../workitem52/24811002.pdf ../workitem52/24885007.pdf ../workitem52/25111001.pdf ../workitem52/25111002.pdf ../workitem52/30411002.pdf ../workitem52/55511002.pdf ../workitem52/56111001.pdf ../workitem52/56811001.pdf ../workitem52/56812001.pdf ../workitem52/56812002.pdf ../workitem52/57585001.pdf ../workitem52/58431002.pdf ../workitem52/58431005.pdf ../workitem52/63111002.pdf ../workitem52/63190003.pdf ../workitem52/99231001.pdf

SHIP: ASSAULT CRAFT UNIT 5 (ACU

45411)

ITEM NO: 077-01-001

COAR: 16 PCN: LC52-L077

CMP: NONE

PLANNER: ROGERS, WALTER

SSP: BOST-510-19 1 of 5 ITEM NO: 077-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Craft

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

Report: HAZARDOUS WASTE MANIFEST KTR START DATE + 2 days

3.1.3 Submit one legible copy, in hard copy or approved

transferrable media, of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented

SHIP: ASSAULT CRAFT UNIT 5 (ACU 45411)

SSP: BOST-510-19 2 of 5 ITEM NO: 077-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

SSP: BOST-510-19 3 of 5 ITEM NO: 077-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________ __________

Sodium Hydroxide _____ ____________ __________

Cleaning Solvents _____ 30 Gallons __________

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Carbohydrazide _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ 2 Tons __________

(contaminated with a known hazardous waste)

Trichloroethane _____ 20 Gallons __________

Miscellaneous Chemicals _____ 10 Pounds 20 Pounds

(Ignitable)

Miscellaneous Chemicals _____ 10 Gallons __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ 10 Gallons __________

(Reactive)

Oil (Synthetic) _____ 30 Gallons __________

Paints (Enamel, Latex, _____ 20 Gallons __________

Epoxy, thinners, oil based, rubber paint, nonskid, lacquer, remover, varnishes)

Paints (May include lead, _____ 10 Pounds __________

SSP: BOST-510-19 4 of 5 ITEM NO: 077-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ __________ lead, chromium)

Sludge (Contaminated with _____ 25 Gallons __________ a known hazardous waste)

Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)

Ventilation Debris/Residue

(heavy metals, e.g., cadmium, chromium) _____ ____________ __________

Insulation (May contain Lead) _____ 40 Square Feet __________

Oily Rags _____ 50 Pounds __________

3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.

Report: HAZARDOUS WASTE LISTING SITUATIONAL + 3 days

3.7 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.7.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, SSP: BOST-510-19 5 of 5 ITEM NO: 077-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

or otherwise removed from the requirements of Subtitle C of 2.1.

Inclusion of these substances in the waste listed in 3.5 does not preclude the contractor from taking action consistent with 2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS).

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

ITEM NO: 171-85-002

COAR: 16 PCN: LC52-L263

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-510-19 1 of 2 ITEM NO: 171-85-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: LCAC AER-263 Rev 02, Light Mast Support Bracket; accomplish

1.2 Location of Work:

1.2.1 02 Level, Top of Personnel and Equipment Module, Frame 3, Port

1.3 Identification:

1.3.1 Quantity (One EA), 3-1/2 Inch Navigation Light Mast

2. REFERENCES:

2.1 Standard Items

2.2 LCAC AER-263 Rev 02, Light Mast Support Bracket

2.3 635-5749105 Rev G, LCAC Insulation Instl, Hull

2.4 7614-947911 Rev A, Landing Craft Air Cushion Process Specification For Cleaning, Chemical & Mechanical

2.5 7614-947915 Rev A, Landing Craft Air Cushion Process Specification For Adhesive Bonding Materials

3. REQUIREMENTS:

3.1 Accomplish removals, modifications and installations for LCAC AER- 263 Rev 02, Light Mast Support Bracket, for the equipment listed in 1.3 and located in 1.2, in accordance with 2.2.

3.2 Accomplish the requirements of 009-12 of 2.1, including Table 4, Column C, Lines One through 7.

3.2.1 Accomplish nondestructive testing in accordance with Line 10.

3.3 Accomplish the requirements of 009-25 of 2.1 for the water hose test in way of new installations for the equipment listed in 1.3 and located in 1.2. Allowable leakage: None.

3.4 Remove existing and install new hull insulation in way of repairs in accordance with 2.3.

3.4.1 Accomplish the requirements of 009-11 of 2.1.

3.4.2 Clean structure prior to bonding insulation in accordance with 2.4.

3.4.3 Bond insulation to structure in accordance with 2.5.

3.5 Accomplish the requirements of 009-32 of 2.1, for new and disturbed surfaces.

4. NOTES:

4.1 Insulation handling is covered on Work Item 077-01-001, Hazardous

../dwgidx/LCAC_AER0263_0_2.htm ../dwgidx/6355749105.htm ../dwgidx/7614947911.htm ../dwgidx/7614947915.htm

SSP: BOST-510-19 2 of 2 ITEM NO: 171-85-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Waste Produced on Naval Vessels; control.

4.2 Insulation removed in the P&E Module may be contaminated with lead.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 234-90-004

COAR: 16 PCN: LC52-L234

CMP: NONE

PLANNER: ROGERS, WALTER

DEMERS, RAY

SSP: BOST-510-19 1 of 5 ITEM NO: 234-90-004

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Torque Meter Installation for ETF40B Main Propulsion Engine;

accomplish

1.2 Location of Work:

1.2.1 Starboard Engine Compartment, Frames 12-15

1.2.2 Port Engine Compartment, Frames 12-15

1.3 Identification:

1.3.1 Quantity (2 EA), No. One and No. 3 ETF40B Engine Assembly (E1 and E3)(Part No. 0-001-010-74) Find No. 3 of 2.2

1.3.2 Quantity (2 EA), No. 2 and No. 4 ETF40B Engine Assembly (E2 and E4)(Part No. 0-001-010-74) Find No. 3 of 2.2

1.3.3 Quantity (3 EA), Starboard Drive Shaft Nos. 5, 7 and 9

1.3.4 Quantity (3 EA), Port Drive Shaft Nos. 6, 8 and 10

1.3.5 Quantity (2 EA), No. 3 and No. 5 Gearbox, Assembly 5750403-1 of 2.3

1.3.6 Quantity (2 EA), No. 4 and No. 6 Gearbox, Assembly 5750403-2 of 2.3

2. REFERENCES:

2.1 Standard Items

2.2 234-7325552 Rev D, SLEP Modification, Engine Installation, Main

2.3 241-5750403 Rev W, LCAC Assembly, Engine Gearbox 3 thru 6

2.4 S9240-AA-TMM-052 Rev 03, Operational and Maintenance Manual for Landing Craft, Air Cushion (LCAC) Transmission System (LCAC 52)

2.5 252-8677619 Rev B, ECP 935-13-07 LCAC SLEP Engine Control System Installation Torque Meter

2.6 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.7 MIL-STD-1310, Shipboard Bonding, Grounding and Other Techniques for Electromagnetic Compatibility and Safety

2.8 S9200-A6-TMM-052 Rev 03, Operational and Maintenance Manual for Landing Craft, Air Cushion (LCAC) Propulsion System (LCAC-52)

2.9 4A436C453 Rev C, SLEP Acceptance Test Procedure, Control Alarm and Monitoring System Sensor Functional Test

2.10 4B234C451 Rev L, LCAC SLEP Acceptance Test Procedure,Propulsion/Lift Engine Control System Functional Test

../dwgidx/2347325552.htm ../dwgidx/2415750403.htm ../techmanuals/S9240-AA-TMM-052.pdf ../dwgidx/2528677619.htm ../techmanuals/S9200-A6-TMM-052.pdf ../test/4A436C453C.pdf ../test/4B234C451L.pdf

SSP: BOST-510-19 2 of 5 ITEM NO: 234-90-004

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

2.11 5A436C468 Rev G, LCAC SLEP Acceptance Test Procedure, CAMS B Verification and Function Test

2.12 5B234C461 Rev E, SLEP Acceptance Test Procedure, Propulsion Gas Turbine Operational Test

2.13 5B241C462 Rev F, LCAC SLEP Acceptance Test Procedure, Engine and Transmission Functional Test

3. REQUIREMENTS:

(V)(G) "VERIFY SYSTEMS DE-ENERGIZED"

3.1 Prior to the start of work, assure that all electrical power to the equipment has been turned off, and that personnel are aware of the safety precautions that must be observed while working with any high voltage systems. Verify that all electrical, lubrication, and fuel systems have been tagged out.

3.1.1 Verify halon systems for the equipment listed in 1.3.1 and

1.3.2 have been de-energized, properly secured and tagged "Safe for Work" to safely accomplish work required by this Work Item. Ensure each squib actuator has been removed by the Unit.

3.1.1.1 Accomplish the requirements of 009-86 of 2.1.

3.2 Accomplish removals, modifications and installations of torque meters for the main engines listed in 1.3.1 and 1.3.2 and located in 1.2, in accordance with 2.2 through 2.6.

3.2.1 Remove the shafting listed in 1.3.3 and 1.3.4 using 2.4 as guidance.

3.2.2 Provide the services for gearbox oversight and inspection by the NSWC-PD Gearbox Inspection Team during the disassembly, installation of the torque meters, assembly and test of the equipment listed in 1.3, using 2.2 through 2.5 as guidance. Protect and retain removed equipment for installation.

3.2.2.1 Accomplish the requirements of 009-57 of 2.1.

3.2.2.2 Remove and dispose of system fluids in accordance with federal, state, and local laws, codes, ordinances, and regulations.

3.2.2.3 Protect, blank, wrap, cover, or mask equipment and

openings to preclude damage and prevent entry of contaminants into gas turbine engines to include foreign object debris (FOD).

3.2.3 Remove each gearbox listed in 1.3.5 and 1.3.6 in accordance with 2.2 through 2.4.

3.3 Remove existing, fit, and install new the following parts in accordance with 2.5:

QUANTITY NAME ITEM REF. FIGURE PART

REQUIRED OF PART NO. NO. DRAWING NO. NO.

8 EA Boot One 2.5 N/A 207W656-100/184

../test/5A436C468G.pdf ../test/5B234C461E.pdf ../test/5B241C462F.pdf

SSP: BOST-510-19 3 of 5 ITEM NO: 234-90-004

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

8 EA Pin Contact 3 2.5 N/A M39029/29-212

8 EA Socket Cont 4 2.5 N/A M39029/30-218

3 EA Heat Shrink 5 2.5 N/A HRHF-250-10A

8 EA Shield,Pigtail 7 2.5 N/A CWT-3805-W2

8 EA Shield 8 2.5 N/A CWT-3805

3.4 Identify cabling, and the equipment by installing new label plates, cable bands and wire markers as follows:

3.4.1 Install new label plates conforming to MIL-DTL-15024.

3.4.2 Mark applicable lead designations on the lead markers by hot stamping (Branding). Lead markers are to be made of white insulating sleeving conforming to MIL-I-631, Type F, Grade A, Form U. Install lead markers hot stamped (Branded) with the word "Spare" and the cable designation of the cable containing the spare conductors on spare conductors. When cables have more than one spare conductor, bind the spare conductors together and identify them with a single lead marker.

3.4.3 Cable Tags (Bands) shall be of soft aluminum and conform to MIL-A-2877 and shall be embossed with the applicable cable designation using numbers and capital letters having minimum height of 3/16 inch and embossed to at least 1/64 inch above the surface.

Cable tags and securing strips shall have a thickness of 0.014 to

0.016 inch. Cable tags shall have a minimum width of one-half inch.

3.5 Bond and ground equipment in accordance with 2.7. Grounding straps shall be CRES 316L for topside equipment.

3.5.1 Acceptable criteria for equipment to hull ground via bond or ground strap is one-tenth ohm maximum.

3.6 Install Government Furnished Material (GFM) provided in 5.1 for the equipment listed in 1.3 and located in 1.2 in accordance with 2.4 and 2.8.

3.7 Install the equipment removed in 3.2.3 in accordance with 2.2 through 2.4, and 2.6.

3.7.1 Accomplish the requirements of 009-57 of 2.1.

3.8 Install the equipment removed in 3.2.1 in accordance with 2.4.

3.9 Review the Acceptance and Functional Test Procedures of 2.9 through

2.13 for accomplishment with the assistance of NSWC-PD Gearbox Inspection Team.

3.9.1 Review and edit each Acceptance and Functional Test Procedure to correspond to actual scope of work required to verify satisfactory completion of work required by this Work Item, including testing prior to removal of the equipment listed in 1.3 and located in 1.2, and final testing necessary to accomplish craft light-off.

Report: ACCEPTANCE AND FUNCTIONAL TEST PROCEDURE SITUATIONAL - 14 days

3.9.1.1 Submit one legible copy, in hard copy or approved

SSP: BOST-510-19 4 of 5 ITEM NO: 234-90-004

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

transferrable media, of a report listing results of the requirements of 3.9.1 to the SUPERVISOR at least 14 days prior to accomplishment for review and approval.

(Q)(G) "SYSTEM VERIFICATION AND OPERATIONAL TESTING"

3.10 Accomplish the prerequisites and acceptance and system functional tests in accordance with each approved test procedure submitted in 3.9.

Record test results on Test Data Sheets. Verify operation using data contained in each test procedure for acceptance criteria. Install new system filters after completion of each individual flushing operation.

3.10.1 Adjust and correct equipment and systems to ensure successful completion of each test.

Report: COMPLETED ACCEPTANCE AND FUNCTIONAL TEST DATA

SHEETS

SITUATIONAL + 3

days

3.10.2 Submit one legible copy, in hard copy or approved

transferrable media, of completed Acceptance and Functional Test Data Sheets applicable to each test procedure accomplished in 3.10 to the

SUPERVISOR.

3.11 Accomplish the requirements of 009-32 of 2.1 for new and disturbed equipment.

4. NOTES:

4.1 Work in this item interfaces with Work Items 243-11-001 Shafting;

remove, turnover and install and 555-11-002 Halon System Repair;

accomplish.

4.2 Removals in 3.2.1 and installation of shafting in 3.8 including alignment of shafting to gearboxes is accomplished in Work Item 243-11- 001 Shafting; remove, turnover and install.

4.3 Disposal of system fluids and hazardous materials is accomplished in Work Item 077-01-001, Hazardous Waste Produced on Naval Vessels; control.

4.4 Point of Contact for required services in 3.2.2:

Darin Campbell, SWRMC C261 MGTI/ACU-5 31T OSR

Darin.Campbell@navy.mil

Phone: (760) 212-2629

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 4 EA

O-ring, M83248/1-386

Figure 8-7, Index 14 2.8

01-005- 0533 3.6

2. 4 EA

O-ring, M83248/1-327

Figure 8-2, 2.4

01-005- 3213 3.6

SSP: BOST-510-19 5 of 5 ITEM NO: 234-90-004

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Index 1

3. 4 EA

O-ring, M83248/1-331

Figure 8-2, Index 6 2.4

00-167- 5157 3.6

4. 6 EA Seal, MS27196-24

Figure 8-3, Index 12 2.4

00-944- 5941 3.6

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 243-11-001

COAR: 16 PCN: LC52-L243

CMP: NONE

PLANNER: PARIS, MICHAEL

DEMERS, RAY

SSP: BOST-510-19 1 of 3 ITEM NO: 243-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Shafting; remove, turnover and install

1.2 Location of Work:

1.2.1 Main Deck, Starboard

1.2.2 Main Deck, Port

1.3 Identification:

1.3.1 Quantity (12 EA), Power Transmission Shafting Assembly

1.3.1.1 Quantity (6 EA), Sections S1 through S11, Starboard, Figure 8-1 of 2.2

1.3.1.2 Quantity (6 EA), Sections S2 through S12, Port, Figure 8-1 of 2.2

2. REFERENCES:

2.1 Standard Items

2.2 S9240-AA-TMM-052 Rev 03, Operation and Maintenance Manual for Landing

Craft, Air Cushion (LCAC) Transmission System (LCAC 52)

2.3 S9243-A2-TMM-052 Rev 01, Operation and Maintenance Manual for (SLEP)

Landing Craft, Air Cushion (LCAC) Ancillary Propeller Equipment (LCAC 52)

2.4 240-5750400 Rev G, LCAC Transmission System

2.5 241-5750320 Rev F, LCAC Power Transmission Installation

2.6 245-5750288 Rev F, LCAC Shaft, Drive-Propeller System

2.7 245-5750289 Rev K, LCAC Shroud-Drive Shaft

2.8 245-5750286 Rev R, LCAC Propeller Instl

3. REQUIREMENTS:

3.1 Accomplish alignment checks for Total Indicated Runout (TIR) and coupling deflections for the shafting listed in 1.3 and located in 1.2, in accordance with Paragraphs 6-6.5.8, 7-4.5.3 and 7-5 of 2.2.

Report: RESULTS OF TIR SITUATIONAL + 3 days

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.

3.2 Remove the shafting listed in 1.3 and located in 1.2 from the power transmission system and the propeller system, using 2.4 through 2.6 as

../techmanuals/S9240-AA-TMM-052.pdf ../techmanuals/S9243-A2-TMM-052.pdf ../dwgidx/2405750400.htm ../dwgidx/2415750320.htm ../dwgidx/2455750288.htm ../dwgidx/2455750289.htm ../dwgidx/2455750286.htm

SSP: BOST-510-19 2 of 3 ITEM NO: 243-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

guidance.

3.2.1 Match-mark laminated shim spacers and fasteners and retain for reuse.

3.2.2 Remove high spots, burrs, abrasions, nicks, corrosion, gasket material, and foreign matter from exposed flanges and mating surfaces.

3.2.3 Retain Glass Reinforced Plastic (GRP) shroud assembly, Find No. One of 2.7 for installation.

(V)(G) "SHAFT INSPECTION"

3.3 Accomplish a visual external inspection of the shafting removed in

3.2 for deterioration, pitting, cracks, and areas of damage or distortion. Turn over each removed shaft to the SUPERVISOR for disposition.

Report: INSPECTION RESULTS SITUATIONAL + 3 days

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.

3.4 Install the equipment listed in 1.3.1 and located in 1.2 and provided as Government Furnished Material (GFM) in 5.1, in accordance with 2.4, using 2.2, 2.3, 2.5 and 2.6 as guidance.

3.4.1 Install laminated shim spacers and fasteners match-marked and retained in 3.2.1, in accordance with 2.4.

3.4.2 Align shafting in accordance with Paragraphs 6-6.5.8, 7-4.5 and 7-5 of 2.2, and 2.3.

3.4.3 Install GRP shroud assembly, Find No. One of 2.7 retained in

3.2.3 in accordance with Figure 8-2 of 2.3.

3.4.3.1 Fit, and install new the following parts:

TOTAL

QUANTITY NAME INDEX REF. FIGURE PART

REQUIRED OF PART NO. NO. NO. NO.

160 Bolt 3 2.3 8-2 NAS501-4-7A

344 Washer 4 2.3 8-2 AN960C416L

160 Nut 5 2.3 8-2 MS21044C4

38 Bolt 6 2.3 8-2 NAS501-4-10A

38 Washer 7 2.3 8-2 AN960C416

24 Bolt 8 2.3 8-2 NAS501-4-10A

24 Washer 9 2.3 8-2 AN960C416L

24 Washer 10 2.3 8-2 AN960C416L

SSP: BOST-510-19 3 of 3 ITEM NO: 243-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

24 Nut 11 2.3 8-2 MS21044C4

A/R Lockwire 11A 2.3 8-2 MS20995C47

(V)(G) "SHAFT ALIGNMENT VERIFICATION"

3.5 Accomplish shaft alignment verification in accordance with Paragraphs 6-6.5.8, 7-4.5 and 7-5 of 2.2.

Report: ALIGNMENT VERIFICATION REPORT SITUATIONAL + 3 days

3.5.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Work in this item interfaces with Work Item 234-90-004, Torque Meter Installation for ETF40B Main Propulsion Engine; accomplish.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 2 EA

Shaft, Assembly S1 & S2

5750625- 1 2.4

01-191- 3770 3.4

2. 2 EA

Shaft, Assembly S3 & S4

5750625- 2 2.4

01-189- 8956 3.4

3. 2 EA

Shaft, Assembly S5 & S6

5750625- 3 2.4

01-184- 3977 3.4

4. 2 EA

Shaft, Assembly S7 & S8

5750625- 4 2.4

01-185- 4232 3.4

5. 2 EA

Shaft, Assembly S9 & S10

5750625- 5 2.4

01-190- 0943 3.4

6. 2 EA

Shaft, Assembly S11 & S12

5750288- 001 2.6 N/A 3.4

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 245-11-001

COAR: 16 PCN: LC52-L245

CMP: NONE

PLANNER: PARIS, MICHAEL

SSP: BOST-510-19 1 of 3 ITEM NO: 245-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Propeller Control Module; remove, turnover and install

1.2 Location of Work:

1.2.1 Main Deck, Frame 19, Starboard Propeller Assembly, Centerbody Fairing

1.2.2 Main Deck, Frame 19, Port Propeller Assembly, Centerbody Fairing

1.3 Identification:

1.3.1 Quantity (2 EA), Propeller Control Module, Mfr: Smiths

Aerospace Inc., P/N 694004002 (Figure 8-14 of 2.2)

2. REFERENCES:

2.1 Standard Items

2.2 S9245-BA-TMM-052 Rev 02, Operation and Maintenance Manual for Landing Craft, Air Cushion (LCAC) Controllable Pitch Propeller (LCAC 52)

2.3 S9243-A2-TMM-052 Rev 01, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Ancillary Propeller Equipment (LCAC 52)

2.4 S9260-AF-TMM-052 Rev 01, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Propulsion Lubricating Oil Assembly

(LCAC 52)

2.5 426-6386260 Rev PI, SLEP Wiring/Schematic Craft Control Sys

2.6 426-6386259 Rev PB, SLEP Deck Plan Craft Control System

2.7 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.8 MIL-STD-1310, Shipboard Bonding, Grounding and other Techniques for Electromagnetic Compatibility and Safety

2.9 SE000-01-IMB-010, Navy Installation and Maintenance Book (NIMB), Section VII, Industrial Electromagnetic Compatibility (IEMC) Work Process Instructions (Source CD: N0002400003)

2.10 2C556C411 Rev C, LCAC SLEP Acceptance Test Procedure, Aft Hydraulic Systems Piping Test

2.11 3C556C443 Rev B, LCAC SLEP Acceptance Test Procedure, Aft Hydraulic Systems Servicing and Functional Test

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-63 of 2.1.

3.1.1 Test and analyze hydraulic oil sample from the equipment listed in 1.3 and located in 1.2.

../techmanuals/S9245-BA-TMM-052.pdf ../techmanuals/S9243-A2-TMM-052.pdf ../techmanuals/S9260-AF-TMM-052.pdf ../dwgidx/4266386260PI.htm ../dwgidx/4266386259PB.htm ../test/2C556C411C.pdf ../test/3C556C443B.pdf

SSP: BOST-510-19 2 of 3 ITEM NO: 245-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2 Remove and dispose of fluids to accomplish the requirements of this Work Item.

3.3 Disconnect electrically and mechanically and remove the equipment listed in 1.3 and located in 1.2, using 2.2 through 2.4 as guidance.

Record electrical hook-up data using 2.5 as guidance. Retain all hardware and fasteners for installation.

3.3.1 Turnover removed equipment to the SUPERVISOR for disposition.

3.4 Install, connect and service the equipment removed in 3.3, in accordance with 2.2 through 2.7, using hardware and fasteners retained in 3.3.

3.4.1 Install Government Furnished Material (GFM) provided in 5.1.

3.4.2 Connect electrically and mechanically using electrical hook-up data retained in 3.3.

3.4.3 Ensure hydraulic fluid levels are to recommended system operational requirements.

3.4.3.1 Install new fluid conforming to MIL-PRF-23699.

3.4.3.2 Accomplish the requirements of 009-63 of 2.1.

3.4.3.3 Test and analyze hydraulic oil sample.

3.5 Bond and ground equipment in accordance with 2.8. Grounding straps shall be CRES 316L for topside equipment.

3.5.1 Acceptable criteria for equipment to hull ground via bond or ground strap is one-tenth ohm maximum.

3.6 Weatherproof and seal connectors exposed to the weather in accordance with 2.9.

(V)(G) "OPERATIONAL TEST"

3.7 Accomplish an operational test of the equipment listed in 1.3 and located in 1.2 in accordance with 2.10 and 2.11.

3.8 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Disposal of fluids in 3.2 is covered on Work Item 077-01-001, Hazardous Waste Produced on Naval Vessels; control.

4.2 Additional shroud repairs accomplished on Work Item 304-11-002, Propeller Control Module Cabling; replace.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 2 EA

Propeller Control Module

69400400 2 2.2

01-230- 8051 3.4.1

SSP: BOST-510-19 3 of 3 ITEM NO: 245-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 248-11-002

COAR: 16 PCN: LC52-L248

CMP: NONE

PLANNER: DEMERS, RAY

SSP: BOST-510-19 1 of 6 ITEM NO: 248-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Cushion Vane Assembly; repair

1.2 Location of Work:

1.2.1 Frames 6-10, Underwater Hull, Port

1.2.1.1 Bag Feed Port (2-6-1/2-4-P)

1.2.1.2 Bag Feed Port (2-8-1/2-4-P)

1.2.2 Frames 6-10, Underwater Hull, Starboard

1.2.2.1 Bag Feed Starboard (2-6-1/2-3-P)

1.2.2.2 Bag Feed Starboard (2-8-1/2-3-P)

1.3 Identification:

1.3.1 Quantity (8 EA), Cushion Vane Assembly, 56 inch X 13 inch, 6061 Aluminum, Port (4 Each Forward and 4 Each Aft) Part No. 5749597- 001, Index No. 102, Figure 8-19 of 2.3

1.3.2 Quantity (8 EA), Cushion Vane Assembly, 56 inch X 13 inch, 6061 Aluminum, Starboard (4 Each Forward and 4 Each Aft) Part No.

5749597-001, Index No. 102, Figure 8-19 of 2.3

2. REFERENCES:

2.1 Standard Items

2.2 568-5749819 Rev K, LCAC Mechanical Installation Vane Control

2.3 S9248-AA-TMM-052 Rev 03, Operation and Maintenance Manual for

Landing Craft, Air Cushion (LCAC) Lift System Fans and Ducting (LCAC 52)

2.4 248-5749558 Rev I, LCAC Vane Assy and Installation

2.5 248-5749597 Rev X, LCAC Vane Details

2.6 101-5749137 Rev AK, LCAC Flotation Compt Assembly

2.7 101-5749968 Rev M, LCAC Details-Flotation Compt

2.8 111-5749144 Rev M, LCAC Plating Installation, Wet Deck

2.9 111-5749145 Rev P, LCAC Plating Details, Wet Deck

2.10 122-5749177 Rev K, LCAC Frame 6A, Assembly

2.11 122-5749179 Rev H, LCAC Frame 7A/8A Assembly

2.12 122-5749611 Rev E, LCAC Frame 10 Installation-STA 40'-0" Flotation

Compartment

2.13 122-5749183 Rev L, LCAC Frame 10, Assembly

2.14 101-5749137 Rev PF, SLEP Flotation Compartment Assembly

../dwgidx/5685749819.htm ../dwgidx/2485749558.htm ../dwgidx/2485749597.htm ../dwgidx/1015749137.htm ../dwgidx/1115749144.htm ../dwgidx/1115749145.htm ../dwgidx/1225749177.htm ../dwgidx/1225749179.htm ../dwgidx/1225749611.htm ../dwgidx/1225749183.htm ../dwgidx/1015749137PF.htm ../techmanuals/S9248-AA-TMM-052.pdf ../dwgidx/1015749968.htm

SSP: BOST-510-19 2 of 6 ITEM NO: 248-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

2.15 111-5749144 Rev PB, SLEP Plating Installation Wet Deck

2.16 122-5749611 Rev P-, SLEP Frame 10 Installation-STA 40'-0" Flotation Compartment

2.17 122-5749183 Rev P-, SLEP Frame 10 Assembly

2.18 S6240-A9-MAN-010 Rev 07, Welding and Inspection Manual for Landing Craft, Air Cushion (LCAC)

2.19 7614-947918 Rev -, Process Specification for Polyurethane (Erosion) Protection LCAC

3. REQUIREMENTS:

(V)(G) "JOINT VISUAL INSPECTION"

3.1 Accomplish a joint visual inspection with the SUPERVISOR of the equipment listed in 1.3 and located in 1.2 for proper operation and alignment in both fully opened and fully closed positions using 2.2 and

2.3 as guidance.

Report: INSPECTION RESULTS SITUATIONAL + 3 days

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.

3.2 Disassemble each cushion vane assembly listed in 1.3 and located in 1.2, including bearings, flanges and linkage using Paragraphs 3-4.2, 6-

5.29 and 6-5.30 of 2.3, 2.4 and 2.5 as guidance.

3.2.1 Retain serviceable parts for installation.

3.3 Clean the exterior surfaces of the equipment listed in 1.3 and located in 1.2, by low pressure clean fresh water wash method. Surfaces shall be cleaned free of salt, sand and foreign matter.

3.3.1 Accomplish a visual inspection of each cushion vane assembly for structural integrity, deterioration, pitting, cracks, weld repairs and areas of damage or distortion.

3.3.1.1 Turnover a total of six removed cushion vane assemblies found defective or beyond repair resulting from inspection to the SUPERVISOR for disposition.

Report: INSPECTION RESULTS SITUATIONAL + 3 days

3.3.1.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.3.1 and 3.3.1.1 to the SUPERVISOR.

3.4 Weld repair a total of 24 linear inches of defective welds and clad weld repair a total of 288 square inches of pitted areas for the equipment listed in 1.3 and located in 1.2 as designated by the SUPERVISOR, resulting from 3.3.1.2.

../dwgidx/1115749144PB.htm ../dwgidx/1225749611P-.htm ../dwgidx/1225749183P-.htm ../techmanuals/S6240-A9-MAN-010.pdf ../dwgidx/7614947918.htm

SSP: BOST-510-19 3 of 6 ITEM NO: 248-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.4.1 Weld build-up a total of 40 square inches of cracked, worn, and eroded areas of cushion vane assemblies as designated by the SUPERVISOR resulting from 3.3.1.2.

3.4.2 Accomplish the requirements of 009-12 of 2.1, including Table 4, Column C, Lines One through 7.

3.4.2.1 Accomplish nondestructive testing in accordance with

Line 10.

3.4.2.2 Accomplish the requirements of Table 13-2 of 2.18 for approved Weld Procedure Number GT-A14 for aluminum.

3.5 Machine areas of each cushion vane assembly listed in 1.3 and located in 1.2 as designated by the SUPERVISOR resulting from 3.3.1.1, to original dimensions and contours in accordance with 2.5.

3.5.1 Install new polyurethane tape to the leading edge of each cushion vane in accordance with Note 14 of 2.5, and 2.19.

3.6 Accomplish the following repairs to the plating, framing and associated structures located in 1.2, as designated by the SUPERVISOR resulting from 3.3.1.2, in accordance with 2.6 through 2.13, as modified by 2.14 through 2.17.

3.6.1 Remove existing and install new a total of 20 square feet of plating and 20 linear feet of structural stiffeners as designated by the SUPERVISOR.

3.6.2 clad weld repair a total of 50 square inches of pitted surfaces.

3.6.3 The minimum size for each insert plate shall be one square foot.

3.6.4 Approval from the SUPERVISOR shall be obtained prior to cutting frames or main structural members.

3.6.5 Template exact size, configuration, and location from existing landing craft conditions.

3.6.6 Chip and grind surfaces flush and smooth in way of removals.

3.6.7 Accomplish the requirements of 009-12 of 2.1, including Table 4, Column C, Lines One through 7.

3.6.7.1 Accomplish nondestructive testing in accordance with

Line 10.

3.6.8 Accomplish the requirements of 009-25 of 2.1 for the air hose test in way of new installations. Allowable leakage: None.

3.7 Assemble and install each cushion vane assembly listed in 1.3 and located in 1.2 using parts retained in 3.2.1, in accordance with Paragraphs 6-5.29 and 6-5.30 of 2.3, 2.4 and 2.5, using Fig.8-19 of 2.3 as guidance. Remove existing, fit, and install new the following parts:

TOTAL

QUANTITY NAME INDEX REF. FIGURE PART

REQUIRED OF PART NO. NO. NO. NO.

SSP: BOST-510-19 4 of 6 ITEM NO: 248-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in…