Exhibit_A-Specification_Package_No.BOST_514-16.pdf
PDF 1 MB Posted
- Attached to
- LCAC 48 FY-16 Fleet Modernization Program Federal contract opportunity
- Solicitation number
- N55236-16-R-0015
About this file
Exhibit A-Specification Package No.BOST 514-16.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N55236-16-R-0015-0001.pdf | ||
| Attachment_2_-_Request_for_Specification_Clarification_Form.docx | DOCX document | |
| Attachment_1_-_Reference_Information_Sheet.doc | DOC document | |
| N55236-16-R-0015_LCAC_48_FMP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVSEA BOSTON
LCAC 48 (LCAC 48)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: BOST-514-16
SHIP CHARACTERISTICS
LENGTH OVERALL
MAX. BEAM AT DESIGN WATERLINE
91 FEET
47 FEET
10 INCHES
10 INCHES
EXTREME BEAM INCLUDING APPENDAGES 49 FEET 2 INCHES
DRAFT (MAX. NAVIGABLE) (FWD.)
DRAFT (MAX. NAVIGABLE) (AFT.)
3 FEET
3 FEET
2 INCHES
2 INCHES
LIGHT DISPLACEMENT 89 LONG TON
FULL LOAD DISPLACEMENT 166 LONG TON
HEIGHT OF MAST ABOVE DESIGN WATERLINE 18 FEET 6 INCHES
SHIP: LCAC 48 (ACU 45411) BOST-514-16
INDEX
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE DATE
009-01 General Criteria; accomplish 07/18/2014
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/18/2014
009-03 Toxic and Hazardous Substances; control 07/18/2014
009-04 Quality Management System; provide 07/18/2014
009-05 Temporary Accesses; provide 07/18/2014
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; 07/18/2014 accomplish
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 07/18/2014
009-08 Fire Protection at Contractor's Facility; accomplish 07/18/2014
009-10 Shipboard Asbestos-Containing Material (ACM); control 07/18/2014
009-18 Magnetic Material; control 07/18/2014
009-19 Provisioning Technical Documentation (PTD); provide 07/18/2014
009-20 Government Property; control 07/18/2014
009-21 Logistics and Technical Data; provide 07/18/2014
009-23 Interferences; remove and install 07/18/2014
009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 07/18/2014
009-28 Fire Prevention Requirements; accomplish 06/10/2014
009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, 01/17/2013 and Housekeeping; accomplish
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for 07/19/2007 Commercial Equipment/ Component; provide
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material 07/18/2014 Handling Equipment at Naval Facilities; accomplish
009-59 Organotin Antifouling Material; control 07/29/2011
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
07/18/2014
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014
009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/18/2014
009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011
009-67 Integrated Total Ship Testing; manage 07/18/2014
009-69 Heavy Weather/Mooring Plan; provide 07/18/2014
ITEM_NO. TITLE DATE
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for 07/18/2014 Unmanned Vessels; accomplish
009-72 Physical Security at Private Contractor's Facility; accomplish 01/02/2015
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and 07/18/2014 install
009-74 Occupational, Safety and Health Requirements; accomplish 07/18/2014
009-77 Cofferdam Requirements; accomplish 07/18/2014
009-79 Government Owned Material (GOM); status reporting 07/18/2014
009-80 Ship's Facilities; provide 07/18/2014
009-81 Compartment Closeout; accomplish 07/18/2014
009-82 Data Requirements When Installing an Equal Component Vice Specified 07/29/2011 Component; provide
009-83 Wire Rope Fitting Verfication; provide 01/17/2013
009-84 Accountability of Temporary Fasteners; provide 07/18/2014
009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) 08/01/2008 Materials; accomplish
009-87 Chemical disinfection Procedures; accomplish 07/18/2014
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, 07/18/2014 including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes; 07/29/2011 accomplish
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution 07/18/2014 Prevention Act (PPA) Information; provide
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 07/18/2014
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for 01/17/2013 Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide
009-99 Ship Departure Report; provide 07/18/2014
009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/18/2014
009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 07/18/2014
009-102 Alteration Verification; provide 07/29/2011
009-103 Weight and Moment Change Data; provide 07/18/2014
009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014
009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from 07/18/2014 Contractor's Facility; accomplish
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; 07/18/2014
ITEM_NO. TITLE DATE
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/18/2014
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; 07/18/2014 provide and manage
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/18/2014
009-118 CG Deck Loading; accomplish 07/18/2014
009-120 Fact Finding and Critique of Unplanned Events; manage 07/18/2014
009-121 Ship Assessment/Inspection Requirements; provide 07/18/2014
CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
ITEM NO. TITLE DATE
009-11 Insulation and Lagging Requirements; accomplish 07/18/2014
009-12 Welding, Fabrication, and Inspection Requirements; accomplish 09/01/2015
009-25 Structural Boundary Test; accomplish 07/18/2014
009-32 Cleaning and Painting Requirements; accomplish 11/07/2013
009-63 Lubricating Oils and Hydraulic Fluids; analyze 07/18/2014
009-71 Testing Requirements for Piping Systems; accomplish 07/18/2014
ITEM NO. TITLE
077-01-001 Hazardous Waste Produced on Naval Vessels; control
110-21-001 Hull Structure, Plating and Framing; clean, inspect and repair
110-21-002 Lift Fan Void Access Cover Repair; accomplish
114-11-001 Fendering System; repair
123-11-003 Fuel Tank No. One Plating Repair; accomplish
234-11-002 Waterwash Simplification Modification; repair and test
243-11-001 Shafting; remove, turnover and install
245-11-001 Propeller Control Module; remove, turnover and install
245-11-002 Port and Starboard Propeller Centerbody; repair
245-85-001 LCAC1 Class AER-489, Composite Transfer Sleeve; accomplish
246-11-001 Starboard Propeller Duct Assembly; remove, turnover and install
246-12-001 Port Propeller Duct Assembly; remove, turnover and install
248-11-001 Starboard Lift Fan Blade Impeller Assembly; remove, turnover and install
248-11-002 Cushion Vane Assembly; repair
248-11-004 Lift Fan Bearing; replace
248-12-001 Port Lift Fan Blade Impeller Assembly; remove, turnover and install
248-85-005 LCAC1 Class AER-533, Cushion Vane Bearing Housing Replacement; accomplish
248-90-001 LCAC Craft Change Document CCD-553 Rev 00, Cushion Vane Fitting Modification;
accomplish
259-11-002 Main Engine Exhaust Collector; replace
304-11-002 Propeller Control Module Cabling; replace
331-85-001 LCAC Craft Change Document-569 Rev 00, Removal of Portable Emergency Light;
accomplish
422-85-002 LCAC Craft Change Document CCD-574 Rev 00, LCAC Searchlight Replacement;
accomplish
441-85-001 LCAC Craft Change Document-559 Rev 00, VHF Whip Antenna Relocation; accomplish
555-11-002 Halon System Piping; replace
561-11-001 Steering Control Assembly; replace
562-11-002 Port and Starboard Rudder Assembly; remove, turnover and install
612-85-001 LCAC1 Class AER-0529, Handrail Socket and Bolt Design; accomplish
631-11-001 Line Locker; clean and preserve
../workitem48/07701001.pdf ../workitem48/11021001.pdf ../workitem48/11021002.pdf ../workitem48/11411001.pdf ../workitem48/12311003.pdf ../workitem48/23411002.pdf ../workitem48/24311001.pdf ../workitem48/24511001.pdf ../workitem48/24511002.pdf ../workitem48/24585001.pdf ../workitem48/24611001.pdf ../workitem48/24612001.pdf ../workitem48/24811001.pdf ../workitem48/24811002.pdf ../workitem48/24811004.pdf ../workitem48/24812001.pdf ../workitem48/24885005.pdf ../workitem48/24890001.pdf ../workitem48/25911002.pdf ../workitem48/30411002.pdf ../workitem48/33185001.pdf ../workitem48/42285002.pdf ../workitem48/44185001.pdf ../workitem48/55511002.pdf ../workitem48/53111001.pdf ../workitem48/56211002.pdf ../workitem48/61285001.pdf ../workitem48/63111001.pdf
ITEM NO. TITLE
631-11-003 Fuel, Overflow and Oily Waste Tank; clean, inspect, test and preserve
631-11-004 Water Wash Tank; clean, inspect and preserve
631-90-002 LCAC Craft Change Document 445 Rev 01, Incr 01, Limited Compartment Painting;
accomplish
662-85-001 LCAC Craft Change Document CCD-572 Rev 00, LCAC Operator Seat Replacement;
accomplish
713-85-001 LCAC Craft Change Document CCD-571 Rev 00, LCAC Weapon Stowage Modification;
992-31-001 Cleaning and Pumping; accomplish
../workitem48/63111003.pdf ../workitem48/63111004.pdf ../workitem48/63190002.pdf ../workitem48/66285001.pdf ../workitem48/71385001.pdf ../workitem48/99231001.pdf
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 077-01-001
COAR: 16 PCN: LC48-B078
CMP: NONE
PLANNER: ROGERS, WALTER
SSP: BOST-514-16 1 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Resource Conservation and Recovery Act (RCRA)
2.2 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act
2.3 Applicable Hazardous Waste Manifest Form
2.4 10 U.S.C. 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
Report: Hazardous Waste Manifest Date: + 2
3.1.3 Submit one legible copy, in hard copy or approved
transferrable media, of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411)
SSP: BOST-514-16 2 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include _____ ____________ __________
SSP: BOST-514-16 3 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) _____ ____________ __________
Sodium Hydroxide _____ ____________ __________
Cleaning Solvents _____ 10 Gallons __________
Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
Carbohydrazide _____ ____________ __________
Methyl Ethyl Ketone _____ ____________ __________
Spent Abrasive Blast Material _____ 2 Ton __________
(contaminated with a known hazardous waste)
Trichloroethane _____ 5 Gallons __________
Miscellaneous Chemicals _____ 5 Gallons 5 Gallons
(Ignitable)
Miscellaneous Chemicals _____ 5 Gallons __________
(Corrosive)
Miscellaneous Chemicals _____ ____________ __________
(TCLP Toxic)
Miscellaneous Chemicals _____ 5 Gallons __________
(Reactive)
Oil (Synthetic) _____ 10 Gallons __________
Paints (Enamel, Latex, _____ 10 Gallons __________
Epoxy, thinners, oil based, rubber paint, nonskid, lacquer, remover, varnishes)
Paints (May include lead, _____ 5 Pounds __________ cadmium, or chrome)
Paint Strippers (phenols, _____ ____________ __________ lead, chromium)
SSP: BOST-514-16 4 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Sludge (Contaminated with _____ 25 Gallons __________ a known hazardous waste)
Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)
Ventilation Debris/Residue
(heavy metals, e.g., cadmium, chromium) _____ ____________ __________
Insulation (May contain Lead) _____ 40 Square Feet __________
Oily Rags _____ 30 Pounds __________
3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
Report: Hazardous waste listing Date: + 3
3.7 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.
3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.7.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in
3.5 does not preclude the contractor from taking action consistent with
2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.
Processes that add hazardous constituents to the bilges may require that
SSP: BOST-514-16 5 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
4.2.2 Reference to a Material Safety Data Sheet (MSDS).
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 110-21-001
COAR: 16 PCN: LC48-B110
CMP: NONE
PLANNER: ROBERTS, JEARLD
DEMERS, RAY
SSP: BOST-514-16 1 of 4 ITEM NO: 110-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hull Structure, Plating and Framing; clean, inspect and repair
1.2 Location of Work:
1.2.1 Underwater Hull Plating, Frames One through 19
1.2.2 Bow Plating
1.2.3 Stern Plating
1.2.4 Wet Deck Compartments, Frame 2 through Frame 19, Port and Starboard
1.2.5 Sideshell Plating, Port and Starboard
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 802-7616004 Rev G, SLEP Plan View of Each Level, Deck & Platform
2.3 S6360-AE-MMA-010 Rev 10, Technical Manual For Landing Craft, Air Cushion (LCAC) Corrosion Control
2.4 S9100-AC-TMM-048 Rev 01, Technical Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Structural Maintenance and Repair (LCAC 48)
2.5 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods
2.6 MIL-STD-2035, Nondestructive Testing Acceptance Criteria
2.7 101-5749137 Rev AK, LCAC Flotation Compartment Assembly
2.8 101-5749968 Rev M, LCAC Details-Flotation Compt
2.9 111-5749144 Rev M, LCAC Plating Installation, Wet Deck
2.10 111-5749145 Rev P, LCAC Plating Details, Wet Deck
2.11 111-5749140 Rev L, LCAC Bow Plating Assembly
2.12 111-5749141 Rev G, LCAC Bow Plating Details
2.13 111-5749142 Rev K, LCAC Stern Plating Assembly
2.14 111-5749143 Rev G, LCAC Stern Plating Details
2.15 111-5749138 Rev F, LCAC Sidewall Plating Assy Fr 3 to Fr 18
2.16 111-5749139 Rev F, LCAC Sidewall Plating Details
2.17 111-5749147 Rev B, LCAC Extrusion, Hat
../dwgidx/8027616004.htm ../techmanuals/s6360-ae-mma-010.pdf ../techmanuals/s9100-ac-tmm-048.pdf ../dwgidx/1015749137.htm ../dwgidx/1015749968.htm ../dwgidx/1115749144.htm ../dwgidx/1115749145.htm ../dwgidx/1115749140.htm ../dwgidx/1115749141.htm ../dwgidx/1115749142.htm ../dwgidx/1115749143.htm ../dwgidx/1115749138.htm ../dwgidx/1115749139.htm ../dwgidx/1115749147.htm
SSP: BOST-514-16 2 of 4 ITEM NO: 110-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.18 161-6386242 Rev A, LCAC Landing Rail-Welded
2.19 121-5749154 Rev T, LCAC Longitudinal Bulkhead Assy at 0'-0"
2.20 121-5749155 Rev G, LCAC Longitudinal Bulkhead at BL 0'-0" Details
2.21 121-5749156 Rev AB, LCAC Longitudinal Bulkhead Assy 12'-9" Butt
2.22 121-5749157 Rev J, LCAC Longitudinal Bulkhead Details 12'-9" Butt
2.23 121-5749158 Rev P, LCAC Long Bhd Assy-BL 13'-6"
2.24 121-5749159 Rev N, LCAC Long Bhd Details-BL 13'-6"
2.25 121-5749160 Rev N, LCAC Long Bhd Assy-BL 7'-6"
2.26 121-5749161 Rev J, LCAC Long Bhd Details-BL 7'-6"
2.27 121-5749162 Rev G, LCAC Long Bhd Assy-BL 10'-6"
2.28 121-5749163 Rev E, LCAC Long Bhd Details-BL 10'-6"
2.29 121-5749164 Rev F, LCAC Long Bhd Assy-BL 19'-6"
2.30 121-5749165 Rev D, LCAC Long Bhd Details-BL 19'-6"
2.31 121-5749166 Rev E, LCAC Longitudinal Bulkhead Assy 8'-3" Butt
2.32 121-5749167 Rev C, LCAC Longitudinal Bulkhead Details 8'-3" Butt
2.33 121-5749604 Rev C, LCAC Bhd Assy, Long-Port BL 18'-9"
2.34 121-5749605 Rev B, LCAC Bhd Details, Long-Port BL 18'-9"
2.35 122-5749171 Rev C, LCAC Frame 1, Installation
2.36 122-5749172 Rev J, LCAC Frame 2, Assembly
2.37 122-5749173 Rev L, LCAC Frame 3, Assembly
2.38 122-5749174 Rev L, LCAC Frame 4, Assembly
2.39 122-5749175 Rev J, LCAC Frame 5, Assembly
2.40 122-5749176 Rev J, LCAC Frame 6, Assembly
2.41 122-5749177 Rev K, LCAC Frame 6A, Assembly
2.42 122-5749178 Rev K, LCAC Frame 7, Assembly
2.43 122-5749179 Rev H, LCAC Frame 7A/8A Assembly
2.44 122-5749180 Rev M, LCAC Frame 8, Assembly
2.45 122-5749182 Rev J, LCAC Frame 9, Assy
2.46 122-5749183 Rev L, LCAC Frame 10, Assembly
2.47 122-5749184 Rev U, LCAC Frame 11, Assembly
2.48 122-5749185 Rev K, LCAC Frame 12, Assembly
2.49 122-5749186 Rev M, LCAC Frame 13, Assembly
2.50 122-5749187 Rev K, LCAC Frame 14, Assembly
2.51 122-5749188 Rev V, LCAC Frame 15, Assembly
2.52 122-5749189 Rev V, LCAC Frame 16, Assembly
../dwgidx/1616386242.htm ../dwgidx/1215749154.htm ../dwgidx/1215749155.htm ../dwgidx/1215749156.htm ../dwgidx/1215749157.htm ../dwgidx/1215749158.htm ../dwgidx/1215749159.htm ../dwgidx/1215749160.htm ../dwgidx/1215749161.htm ../dwgidx/1215749162.htm ../dwgidx/1215749163.htm ../dwgidx/1215749164.htm ../dwgidx/1215749165.htm ../dwgidx/1215749166.htm ../dwgidx/1215749167.htm ../dwgidx/1215749604.htm ../dwgidx/1215749605.htm ../dwgidx/1225749171.htm ../dwgidx/1225749172.htm ../dwgidx/1225749173.htm ../dwgidx/1225749174.htm ../dwgidx/1225749175.htm ../dwgidx/1225749176.htm ../dwgidx/1225749177.htm ../dwgidx/1225749178.htm ../dwgidx/1225749179.htm ../dwgidx/1225749180.htm ../dwgidx/1225749182.htm ../dwgidx/1225749183.htm ../dwgidx/1225749184.htm ../dwgidx/1225749185.htm ../dwgidx/1225749186.htm ../dwgidx/1225749187.htm ../dwgidx/1225749188.htm ../dwgidx/1225749189.htm
SSP: BOST-514-16 3 of 4 ITEM NO: 110-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.53 122-5749190 Rev U, LCAC Frame 17, Assembly
2.54 122-5749191 Rev N, LCAC Frame 18, Assembly
2.55 122-5749192 Rev F, LCAC Frame 19, Assembly
2.56 122-5749194 Rev T, LCAC Bulkhead Web Details
2.57 122-5749195 Rev S, LCAC Bulkhead Stiffener Details
3. REQUIREMENTS:
3.1 Clean the exterior surfaces of the underwater hull, bow, stern and sideshell plating located in 1.2, using the hydroblast method with a maximum pressure of 1500 PSI, prior to inspection in 3.2.
(V)(G) "JOINT VISUAL INSPECTION"
3.2 Accomplish a joint visual inspection with the SUPERVISOR of the hull plating and framing including decks, bulkheads, overheads, structural stiffeners, landing rails and craft restraint fittings located in 1.2, for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, using 2.2 through 2.4 for guidance.
(I) "NONDESTRUCTIVE TESTING"
3.2.1 Accomplish a liquid penetrant inspection on indications of suspect areas of craft restraint fittings resulting from visual inspection of 3.2 in accordance with 2.5. The accept or reject criteria shall be in accordance with Paragraph 7 of 2.6.
Report: Inspection Results Date: + 2
3.2.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.2 and 3.2.1, to the SUPERVISOR, showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.
3.3 Accomplish the following repairs to hull plating and framing and associated structures located in 1.2, in accordance with 2.7 through 2.57, using 2.4 for guidance.
3.3.1 Remove existing and install new a total of 150 square feet of plating as designated by the SUPERVISOR.
3.3.1.1 The minimum size for each insert plate shall be one
square foot.
3.3.1.2 Approval from the SUPERVISOR shall be obtained prior to cutting frames or main structural members.
3.3.2 Clad weld a total of 400 square inches of pitted plating as designated by the SUPERVISOR.
3.3.3 Vee-out and weld repair a total of 35 linear feet of
deteriorated and damaged welds as designated by the SUPERVISOR.
../dwgidx/1225749190.htm ../dwgidx/1225749191.htm ../dwgidx/1225749192.htm ../dwgidx/1225749194.htm ../dwgidx/1225749195.htm
SSP: BOST-514-16 4 of 4 ITEM NO: 110-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.3.4 Remove existing and install new a total of 20 linear feet of structural stiffeners and 20 linear feet of hatting as designated by the SUPERVISOR.
3.3.5 Template exact size, configuration, and location from existing landing craft conditions.
3.3.6 Chip and grind surfaces flush and smooth in way of removals.
3.3.7 Acomplish the requirements of 009-12 of 2.1, including Table 4, Column C, Lines One through 7.
3.3.7.1 Accomplish nondestructive testing in accordance with
Line 10.
3.3.8 Accomplish the requirements of 009-25 of 2.1 for the air hose test in way of new installations. Allowable leakage: None.
3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Removal and installation of the skirt shall be accomplished by the Assault Craft Unit (ACU).
4.2 Ensure repairs are completed prior to preservation operations of Work Item 631-90-002, LCAC Craft Change Document 445 Rev 01, Incr 01, Limited Compartment Painting; accomplish.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 110-21-002
COAR: 16 PCN: LC48-B111
CMP: NONE
PLANNER: ROBERTS, JEARLD
SSP: BOST-514-16 1 of 2 ITEM NO: 110-21-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Lift Fan Void Access Cover Repair; accomplish
1.2 Location of Work:
1.2.1 Floodable Void (2-6.5-1-V)
1.2.2 Floodable Void (2-6.5-2-V)
1.2.3 Floodable Void (2-6.5-5-V)
1.2.4 Floodable Void (2-6.5-6-V)
1.2.5 Floodable Void (2-8.5-1-V)
1.2.6 Floodable Void (2-8.5-2-V)
1.2.7 Floodable Void (2-8.5-5-V)
1.2.8 Floodable Void (2-8.5-6-V)
1.3 Identification:
1.3.1 Quantity (8 EA), Access and Cover, Fan Void (Find No. 105 of 2.2)
2. REFERENCES:
2.1 Standard Items
2.2 123-5749200 Rev G, LCAC Duct Details-Lift Fan Exhaust
2.3 LCAC1 Class AER-281 Rev 02, Lift Fan Void Access Cover Mods
2.4 123-5749199 Rev L, LCAC Duct Assy & Instl-Lift Fan Exhaust
2.5 802-7616004 Rev G, SLEP Plan View of Each Level, Deck & Platform
2.6 7614-947915 Rev A, Process Specification for Adhesive Bonding of Materials LCAC
3. REQUIREMENTS:
3.1 Accomplish removals, modifications and installations for the equipment listed in 1.3 and located in 1.2, in accordance with 2.3, using 2.2, 2.4 and 2.5 for guidance and the following:
3.1.1 Remove existing and install new a total of 32 square feet of plating as designated by the SUPERVISOR.
3.1.2 Remove existing and install new a total of 80 linear feet of periphery access cover framing as designated by the SUPERVISOR.
3.1.3 Remove existing and install new a total of 4 each access cover plate as designated by the SUPERVISOR.
3.1.4 Chip and grind surfaces flush and smooth in way of removals.
3.1.5 Template exact size, configuration, and location from existing
../dwgidx/1235749200.htm ../dwgidx/lcac_aer0281_0_2.htm ../dwgidx/1235749199.htm ../dwgidx/8027616004.htm ../dwgidx/7614947915.htm
SSP: BOST-514-16 2 of 2 ITEM NO: 110-21-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
landing craft conditions.
3.1.6 Install new gasket Piece No. 2 of 2.3 for each area listed in 1.2.
3.1.6.1 Bond gasket in accordance with 2.6.
3.1.7 Install new mounting hardware in accordance with 2.3 and 2.4 for each area listed in 1.2.
3.1.7.1 Install fasteners using thread locking compound similar or equal to Loctite 080, conforming to ASTM-D5363.
3.2 Accomplish the requirements of 009-12 of 2.1, including Table 4, Columns C and D, Lines One through 7.
3.2.1 Accomplish nondestructive testing in accordance with Line 10.
3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Additional plating repairs are accomplished in Work Item 110-21-001, Hull Structure, Plating and Framing; clean, inspect and repair.
4.2 Ensure repairs are completed prior to preservation operations of Work Item 631-90-002, LCAC Craft Change Document 445 Rev 01, Incr 01, Limited Compartment Painting; accomplish.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 114-11-001
COAR: 16 PCN: LC48-B114
CMP: NONE
PLANNER: ROBERTS, JEARLD
SSP: BOST-514-16 1 of 3 ITEM NO: 114-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Fendering System; repair
1.2 Location of Work:
1.2.1 Fendering System, Main Deck, Starboard
1.2.1.1 Fendering System, Main Deck, Frame 15 Starboard
1.2.2 Fendering System, Main Deck, Port
1.2.2.1 Fendering System, Main Deck, Frame 12 Port
1.2.2.2 Fendering System, Main Deck, Frame 15 Port
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 S9100-AC-TMM-048 Rev 01, Technical Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Structural Maintenance and Repair (LCAC 48)
2.3 114-5749148 Rev G, LCAC Fendering Support Struct Assembly
2.4 114-5749149 Rev E, LCAC Fendering Details
2.5 114-5749150 Rev F, LCAC Fender
2.6 114-5749563 Rev -, LCAC Extrusion-Tee
2.7 114-5749564 Rev B, LCAC Extrusion Clamping Bar
2.8 114-5749565 Rev -, LCAC Extrusion Backplate
2.9 114-5749601 Rev D, LCAC Clamping Bar Details
2.10 114-5749602 Rev D, LCAC Backplate Assy
2.11 114-6386239 Rev F, LCAC Fendering Installation
2.12 114-6517400 Rev C, C/A 0149K LCAC Fendering System Fender Replacement Improvement
2.13 835-6517544 Rev E, LCAC AER-0255 Rev 01, Fender Repair/Improv.
Fender Repair Instruction
2.14 835-6268569 Rev A, LCAC Tech Item #3 LCAC Eng Data Pkg Fender Rep/Imprv
2.15 114-6386381 Rev A, Extrusion-Channel
2.16 631-6266706 Rev Q, LCAC Paint and Marking
3. REQUIREMENTS:
(V)(G) "JOINT VISUAL INSPECTION"
../techmanuals/s9100-ac-tmm-048.pdf ../dwgidx/1145749148.htm ../dwgidx/1145749149.htm ../dwgidx/1145749150.htm ../dwgidx/1145749563.htm ../dwgidx/1145749564.htm ../dwgidx/1145749565.htm ../dwgidx/1145749601.htm ../dwgidx/1145749602.htm ../dwgidx/1146386239.htm ../dwgidx/1146517400.htm ../dwgidx/8356517544.htm ../dwgidx/8356268569.htm ../dwgidx/1146386381.htm ../dwgidx/6316266706.htm
SSP: BOST-514-16 2 of 3 ITEM NO: 114-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.1 Accomplish a joint visual inspection with the SUPERVISOR within 10 days of start of availability of the fendering system and associated structure in each location listed in 1.2, for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, using
2.2 for guidance.
Report: Visual Inspection Date: + 3
3.1.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR, showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.
3.2 Accomplish repairs to the fendering system located in 1.2 as designated by the SUPERVISOR as a result of 3.1.1, in accordance with 2.3 through 2.15, using 2.2 for guidance and the following:
3.2.1 Remove existing and install new a total of 20 linear feet of crushbox plating and support structure.
3.2.1.1 Remove existing and install new the rubber fender
sections (Part Number 001 of 2.5, 54 inches each) in way of repairs.
3.2.2 Remove existing and install new an additional total of 2 linear feet of crushbox plating and securing bars, for each area listed in 1.2.1.1, 1.2.2.1 and 1.2.2.2.
3.2.2.1 Remove existing and install new the rubber fender
sections (Part Number 001 of 2.5, 54 inches each) in way of repairs.
3.2.3 Install new hardware in way of new installations.
3.2.4 Clad weld repair a total of 150 square inches of pitted areas of crushbox plating.
3.2.5 Vee-out and weld repair a total of 10 linear feet of defective welds as designated by the SUPERVISOR.
3.2.6 Exact locations and quantities shall be designated by the
SUPERVISOR.
3.2.7 Template exact size, configuration, and location from existing landing craft conditions.
3.3 Accomplish the requirements of 009-12 of 2.1, including Table 4, Column C, Lines One through 7.
3.3.1 Accomplish nondestructive testing in accordance with Line 10.
3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 26, Colums A, B and D for new and disturbed surfaces, using 2.16 for guidance.
3.4.1 Method of surface preparation shall not include Stainless Steel Shot, listed in Column A, as an option.
3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed
SSP: BOST-514-16 3 of 3 ITEM NO: 114-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
surfaces.
4. NOTES:
4.1 Work in this item interfaces with Work Item 631-11-003, Water Wash Tank; clean, inspect and preserve.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 123-11-003
COAR: 16 PCN: LC48-B150
CMP: NONE
PLANNER: DEMERS, RAY
SSP: BOST-514-16 1 of 3 ITEM NO: 123-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Fuel Tank No. One Plating Repair; accomplish
1.2 Location of Work:
1.2.1 Storage and Electronic Equipment (1-2-1-Q)
1.2.2 Troop/Passenger Seating (1-4-1-C)
1.3 Identification:
1.3.1 Fuel Tank No. One (2-3-3-F)
2. REFERENCES:
2.1 Standard Items
2.2 802-7616004 Rev G, SLEP Plan View of Each Level, Deck & Platform
2.3 S6360-AE-MMA-010 Rev 10, Technical Manual for Landing Craft, Air Cushion (LCAC) Corrosion Control
2.4 S9100-AC-TMM-048 Rev 01, Technical Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Structural Maintenance and Repair (LCAC 48)
2.5 131-8430254 Rev B, LCAC Stbd Fuel Tank Lap Plate Instl
2.6 131-5749211 Rev AE, LCAC Machinery Deck Assy
2.7 131-5749212 Rev A, LCAC Extrusion - Tee, 3 In
2.8 131-5749213 Rev T, LCAC Machinery Deck Details
2.9 101-5749137 Rev AK, LCAC Flotation Compartment Assembly
2.10 101-5749968 Rev M, LCAC Details - Flotation Compartment
2.11 111-5749144 Rev M, LCAC Plating Installation Wet Deck
2.12 111-5749145 Rev P, LCAC Plating Details, Wet Deck
2.13 111-5749147 Rev B, LCAC Extrusion, Hat
2.14 121-5749084 Rev E, LCAC Bulkhead Instl, Long, BL 12'-9" - Flotation Compartment
2.15 111-5749138 Rev F, LCAC Sidewall Plating Assy Fr 3 To Fr 18
2.16 111-5749139 Rev F, LCAC Sidewall Plating Details
2.17 121-5749075 Rev H, LCAC Bulkhead Instl, Long, BL 7'-6" - Flotation Compartment
2.18 121-5749085 Rev F, LCAC Bulkhead Instl, Longitudinal 13'-6" - Flotation Compartment
2.19 122-5749100 Rev F, LCAC Frame 3, Installation-Sta 10'-2" Flotation Compartment
2.20 122-5749112 Rev E, LCAC Frame 4 Installation-Sta 14'-8" Flotation Compartment
../dwgidx/8027616004.htm ../techmanuals/s6360-ae-mma-010.pdf ../techmanuals/s9100-ac-tmm-048.pdf ../dwgidx/1318430254.htm ../dwgidx/1315749211.htm ../dwgidx/1315749212.htm ../dwgidx/1315749213.htm ../dwgidx/1015749137.htm ../dwgidx/1015749968.htm ../dwgidx/1115749144.htm ../dwgidx/1115749145.htm ../dwgidx/1115749147.htm ../dwgidx/1215749084.htm ../dwgidx/1115749138.htm ../dwgidx/1115749139.htm ../dwgidx/1215749075.htm ../dwgidx/1215749085.htm ../dwgidx/1225749100.htm ../dwgidx/1225749112.htm
SSP: BOST-514-16 2 of 3 ITEM NO: 123-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.21 122-5749114 Rev E, LCAC Frame 5 Installation-Sta 18'-10" Flotation Compartment
2.22 131-5749211 Rev PD, SLEP Machinery Deck Assy
2.23 2C541C407 Rev C, LCAC SLEP Acceptance Test Procedure, Fuel Storage, Overflow, and Stripping Tank Tightness Test
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-25 of 2.1 for preliminary air test of the tank listed in 1.3 and located in 1.2. Test pressure shall be
2 PSIG.
(V)(G) "JOINT VISUAL INSPECTION"
3.2 Accomplish a joint visual inspection with the SUPERVISOR of the tank listed in 1.3 and located in 1.2 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, using 2.2 through 2.4 for guidance.
Report: Inspection Results Date: + 3
3.2.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.
3.3 Accomplish the requirements of 2.5 for modifications and
installations to the tank listed in 1.3 and located in 1.2 using 2.2 through 2.21, as modified by 2.22 for guidance.
3.3.1 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line 23, Column A for surface preparation of overhead interior surfaces, and 6" below the overhead of periphery bulkhead surfaces of the tank listed in 1.3, including manhole cover.
3.3.2 Template exact size, configuration, and location from existing landing craft conditions.
3.3.3 Clad weld a total of 400 square inches of pitted and defective main deck plating located in 1.2 as designated by the SUPERVISOR.
Chip and grind surfaces flush and smooth in way of repairs.
3.4 Acomplish the requirements of 009-12 of 2.1, including Table 4, Column C, Lines One through 7.
3.4.1 Accomplish nondestructive testing in accordance with Line 10.
(V)(G) "HYDROSTATIC TEST"
3.5 Accomplish the requirements of 2.23 for a twenty-four hour continuous hydrostatic test of the tank listed in 1.3 and located in 1.2.
Allowable drop in pressure: None.
Report: Test Results Date: + 3
../dwgidx/1225749114.htm ../dwgidx/1315749211pd.htm ../test/2C541C407C.pdf
SSP: BOST-514-16 3 of 3 ITEM NO: 123-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.5.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.
3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Preliminary air test required in 3.1 and hydrostatic air test required in 3.5 is accomplished in Work Item 631-11-003, Fuel, Overflow and Oily Waste Tank; clean, inspect, test and preserve.
4.2 Preservation of tank listed in 1.3 is accomplished in Work Item 631- 11-003, Fuel, Overflow and Oily Waste Tank; clean, inspect, test and preserve.
4.3 Preservation of deck surfaces located in 1.2 is accomplished in Work Item 631-90-002, LCAC Craft Change Document 445 Rev 01, Incr 01, Limited Compartment Painting; accomplish.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 234-11-002
COAR: 16 PCN: LC48-B519
CMP: NONE
SSP: BOST-514-16 1 of 4 ITEM NO: 234-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Waterwash Simplification Modification; repair and test
1.2 Location of Work:
1.2.1 Throughout the Craft
1.2.1.1 Electronic Equipment Space (2-12-4-Q)
1.2.1.2 Water Wash Tank (2-12-6-W)
1.3 Identification:
1.3.1 Quantity (One EA), Windshield Wash, Waterwash and Detergent Wash System
1.3.2 Quantity (One EA), Waterwash Detergent Tank, 35 Gallon
Capacity (Item No. One of 2.2)
1.3.3 Quantity (One EA), Sight Gauge, (Part No: YB4898-3000BW), (incl CRES 304 Bolts, Bodies and O-rings, Item No. One of 2.3)
2. REFERENCES:
2.1 Standard Items
2.2 234-7291406 Rev C, CraftAlt 189K/410K LCAC Water Wash Detergent Tank Assembly and Detail
2.3 234-6733730 Rev I, CCD 380 LCAC Water Wash Tank Sight Gauge Installation
2.4 234-8677593 Rev -, CraftAlt 519K LCAC Waterwash Simplification Modifications LCAC 48
2.5 321-8677592 Rev A, CraftAlt 519K LCAC 48 Electrical Mods Water Wash Simpl LCAC 48
2.6 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines
2.7 234-7646460 Rev D, CraftAlt 519K LCAC 1-90 Water Wash Relay Panel Rework for WW Simplification (Craft with On-Line Wash)
2.8 321-7646461 Rev E, CCD 519K LCAC 1-90 Water Wash Elec Mods for WW Simplification (Applicable SLEP Craft)
2.9 234-8336740 Rev -, CraftAlt 519K Windshield & Waterwash System Diagram
2.10 234-5750061 Rev F, LCAC Valve-Shutoff Water/Wash
2.11 234-5750025 Rev AK, LCAC Water Wash Installation Engine Systems
2.12 234-6734278 Rev F, LCAC CraftAlt 189K Piping Modification Incidental To Engine On-Line Detergent Water Wash Installation
2.13 625-5749102 Rev X, LCAC Windshield Wash Installation
2.14 505-6800352 Rev B, LCAC Non-Conductive Insert for Cres Fittings
../dwgidx/2347291406.htm ../dwgidx/2346733730.htm ../dwgidx/2348677593.htm ../dwgidx/3218677592.htm ../dwgidx/2347646460.htm ../dwgidx/3217646461.htm ../dwgidx/2348336740.htm ../dwgidx/2345750061.htm ../dwgidx/2345750025.htm ../dwgidx/2346734278.htm ../dwgidx/6255749102.htm ../dwgidx/5056800352.htm
SSP: BOST-514-16 2 of 4 ITEM NO: 234-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Thru Alum. Decks, Bulkheads & Brackets
2.15 LCAC1 CLASS CRAFTALT-0519K Rev 00, Waterwash Simplification Mods
2.16 S9200-A6-TMM-048, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Propulsion System (LCAC 48)
2.17 234-5750025 Rev PC, SLEP Water Wash Installation Engine Systems
2.18 625-5749102 Rev PE, SLEP Windshield Wash Installation
2.19 LCAC 48, Government Furnished Material (GFM) List
2.20 MIL-STD-1310, Shipboard Bonding, Grounding and other Techniques for Electromagnetic Compatibility and Safety
2.21 LCAC SLEP Craft Specification Dated 26 April 2001
2.22 2C532C405 Rev B, LCAC SLEP Acceptance Test Procedure, Freshwater Tank Completion Test
2.23 5C532C439 Rev E, LCAC SLEP Acceptance Test Procedure, APU and Engine Wash Equipment Test
2.24 S9523-AF-TMM-048, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) ETF40B Engine Waterwash System (LCAC 48)
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.4 and 2.5 for removals, modifications, and new installations to the equipment listed in 1.3 and located in 1.2, in accordance with 2.6,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .