EXHIBIT A - Specification Package No. BOST-513-16.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N55236-16-R-0007_-_AMENDMENT_0001.pdf | ||
| Attachment_1_-_Reference_Information_Sheet.doc | DOC document | |
| Attachment_2_-_Request_for_Specification_Clarification_Form.docx | DOCX document | |
| N55236-16-R-0007.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVSEA BOSTON
LCAC 31 (LCAC 31)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: BOST-513-16
SHIP CHARACTERISTICS
LENGTH OVERALL
MAX. BEAM AT DESIGN WATERLINE
91 FEET
47 FEET
10 INCHES
10 INCHES
EXTREME BEAM INCLUDING APPENDAGES 49 FEET 2 INCHES
DRAFT (MAX. NAVIGABLE) (FWD.)
DRAFT (MAX. NAVIGABLE) (AFT.)
3 FEET
3 FEET
2 INCHES
2 INCHES
LIGHT DISPLACEMENT 89 LONG TON
FULL LOAD DISPLACEMENT 166 LONG TON
HEIGHT OF MAST ABOVE DESIGN WATERLINE 18 FEET 6 INCHES
bbessette Cross-Out
SHIP: LCAC 031 (ACU 45411) BOST-513-16
INDEX
CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
ITEM NO. TITLE DATE
009-11 Insulation and Lagging Requirements; accomplish 17-Jan-13
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
07-Nov-13
009-25 Structural Boundary Test; accomplish 17-Jan-13
009-32 Cleaning and Painting Requirements; accomplish 07-Nov-13
009-63 Lubricating Oils and Hydraulic Fluids; analyze 18-Jul-14
SHIP: LCAC 031 (ACU 45411) BOST-513-16
INDEX
ITEM NO. TITLE
077-01-001 Hazardous Waste Produced on Naval Vessels; control
123-11-003 Fuel Tank No. One Plating Repair; accomplish
243-11-001 Shafting; remove, turnover and install
245-11-001 Propeller Control Module; remove, turnover and install
245-11-002 Port and Starboard Propeller Centerbody; repair
246-11-001 Starboard Propeller Duct Assembly; remove, turnover and install
246-12-001 Port Propeller Duct Assembly; remove, turnover and install
248-11-001 Starboard Lift Fan Blade Impeller Assembly; remove, turnover and install
248-11-004 Lift Fan Bearing; replace
248-12-001 Port Lift Fan Blade Impeller Assembly; remove, turnover and install
259-11-002 Main Engine Exhaust Collector; replace
259-85-001
304-11-002
LCAC Craft Change Document CCD-505 Rev 02, Main Engine Exhaust Collector Installation Modification; accomplish Propeller Control Module Cabling; replace
422-85-001
523-80-001
LCAC Craft Change Document CCD-574 Rev 00, LCAC Searchlight Replacement; accomplish LCAC CraftAlt-380D Rev 00, Water Wash Tank Sight Glass; accomplish
555-11-002 Main Engine and APU Compartment Halon System Piping; replace
561-11-001 Steering Control Assembly; replace
562-11-002 Port and Starboard Rudder Assembly; remove, turnover and install
612-85-001 LCAC1 Class AER-529, Handrail Socket and Bolt Design; accomplish
631-11-003 Fuel, Overflow and Oily Waste Tank; clean, inspect, test and preserve
631-11-004 Water Wash Tank; clean, inspect and preserve
631-90-002
662-85-001
713-85-001
992-31-001
LCAC Craft Change Document 445 Rev 01, Incr 01, Limited Compartment Painting; accomplish
LCAC Craft Change Document CCD-572 Rev 00, LCAC Operator Seat Replacement; accomplish LCAC Craft Change Document CCD-571 Rev 00, LCAC Weapon Stowage Modification; accomplish
Cleaning and Pumping; accomplish
../workitem31/07701001.pdf ../workitem31/12311003.pdf ../workitem31/24311001.pdf ../workitem31/24511001.pdf ../workitem31/24511002.pdf ../workitem31/24611001.pdf ../workitem31/24612001.pdf ../workitem31/24811001.pdf ../workitem31/24811004.pdf ../workitem31/24812001.pdf ../workitem31/25911002.pdf ../workitem31/25985001.pdf ../workitem31/30411002.pdf ../workitem31/42285001.pdf ../workitem31/52380001.pdf ../workitem31/55511002.pdf ../workitem31/56111001.pdf ../workitem31/56211002.pdf ../workitem31/61285001.pdf ../workitem31/63111003.pdf ../workitem31/63111004.pdf ../workitem31/63190002.pdf ../workitem31/66285001.pdf ../workitem31/71385001.pdf ../workitem31/99231001.pdf
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 077-01-001
COAR: 16 PCN: LC31-B078
CMP: NONE
PLANNER: ROBERTS, JEARLD
SSP: BOST-513-16 1 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Resource Conservation and Recovery Act (RCRA)
2.2 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act
2.3 Applicable Hazardous Waste Manifest Form
2.4 10 U.S.C. 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
Report: Hazardous Waste Manifest Date: + 2
3.1.3 Submit one legible copy, in hard copy or approved
transferrable media, of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411)
SSP: BOST-513-16 2 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include _____ ____________ __________
SSP: BOST-513-16 3 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) _____ ____________ __________
Sodium Hydroxide _____ ____________ __________
Cleaning Solvents _____ 10 Gallons __________
Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
Carbohydrazide _____ ____________ __________
Methyl Ethyl Ketone _____ ____________ __________
Spent Abrasive Blast Material _____ 2 Ton __________
(contaminated with a known hazardous waste)
Trichloroethane _____ 5 Gallons __________
Miscellaneous Chemicals _____ 5 Gallons 5 Gallons
(Ignitable)
Miscellaneous Chemicals _____ 5 Gallons __________
(Corrosive)
Miscellaneous Chemicals _____ ____________ __________
(TCLP Toxic)
Miscellaneous Chemicals _____ 5 Gallons __________
(Reactive)
Oil (Synthetic) _____ 10 Gallons __________
Paints (Enamel, Latex, _____ 10 Gallons __________
Epoxy, thinners, oil based, rubber paint, nonskid, lacquer, remover, varnishes)
Paints (May include lead, _____ 5 Pounds __________ cadmium, or chrome)
Paint Strippers (phenols, _____ ____________ __________ lead, chromium)
SSP: BOST-513-16 4 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Sludge (Contaminated with _____ 25 Gallons __________ a known hazardous waste)
Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)
Ventilation Debris/Residue
(heavy metals, e.g., cadmium, chromium) _____ ____________ __________
Insulation (May contain Lead) _____ 40 Square Feet __________
Oily Rags _____ 30 Pounds __________
3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
Report: Hazardous waste listing Date: + 3
3.7 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.
3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.7.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in
3.5 does not preclude the contractor from taking action consistent with
2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.
Processes that add hazardous constituents to the bilges may require that
SSP: BOST-513-16 5 of 5 ITEM NO: 077-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
4.2.2 Reference to a Material Safety Data Sheet (MSDS).
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 123-11-003
COAR: 16 PCN: LC31-B630
CMP: NONE
PLANNER: ROBERTS, JEARLD
DEMERS, RAY
SSP: BOST-513-16 1 of 3 ITEM NO: 123-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Fuel Tank No. One Plating Repair; accomplish
1.2 Location of Work:
1.2.1 Storage and Electronic Equipment (1-2-1-Q)
1.2.2 Troop/Passenger Seating (1-4-1-C)
1.3 Identification:
1.3.1 Fuel Tank No. One (2-3-3-F)
2. REFERENCES:
2.1 Standard Items
2.2 802-7616004 Rev G, SLEP Plan View of Each Level, Deck & Platform
2.3 S6360-AE-MMA-010 Rev 10, Technical Manual for Landing Craft, Air Cushion (LCAC) Corrosion Control
2.4 S9100-AC-TMM-031 Rev 02, Technical Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Structural Maintenance and Repair (LCAC 31)
2.5 131-8430254 Rev A, LCAC Stbd Fuel Tank Lap Plate Instl
2.6 131-5749211 Rev AE, LCAC Machinery Deck Assy
2.7 131-5749212 Rev A, LCAC Extrusion - Tee, 3 In
2.8 131-5749213 Rev T, LCAC Machinery Deck Details
2.9 101-5749137 Rev AK, LCAC Flotation Compartment Assembly
2.10 101-5749968 Rev M, LCAC Details - Flotation Compartment
2.11 111-5749144 Rev M, LCAC Plating Installation Wet Deck
2.12 111-5749145 Rev P, LCAC Plating Details, Wet Deck
2.13 111-5749147 Rev B, LCAC Extrusion, Hat
2.14 121-5749084 Rev E, LCAC Bulkhead Instl, Long, BL 12'-9" - Flotation Compartment
2.15 111-5749138 Rev F, LCAC Sidewall Plating Assy Fr 3 To Fr 18
2.16 111-5749139 Rev F, LCAC Sidewall Plating Details
2.17 121-5749075 Rev H, LCAC Bulkhead Instl, Long, BL 7'-6" - Flotation Compartment
2.18 121-5749085 Rev F, LCAC Bulkhead Instl, Longitudinal 13'-6" - Flotation Compartment
2.19 122-5749100 Rev F, LCAC Frame 3, Installation-Sta 10'-2" Flotation Compartment
2.20 122-5749112 Rev E, LCAC Frame 4 Installation-Sta 14'-8" Flotation
../dwgidx/8027616004.htm ../dwgidx/1318430254.htm ../dwgidx/1315749211.htm ../dwgidx/1315749212.htm ../dwgidx/1315749213.htm ../dwgidx/1015749137.htm ../dwgidx/1015749968.htm ../dwgidx/1115749144.htm ../dwgidx/1115749145.htm ../dwgidx/1115749147.htm ../dwgidx/1215749084.htm ../dwgidx/1115749138.htm ../dwgidx/1115749139.htm ../dwgidx/1215749075.htm ../dwgidx/1215749085.htm ../dwgidx/1225749100.htm ../dwgidx/1225749112.htm ../techmanuals31/s6360-ae-mma-010.pdf ../techmanuals31/s9100-ac-tmm-031.pdf
SSP: BOST-513-16 2 of 3 ITEM NO: 123-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Compartment
2.21 122-5749114 Rev E, LCAC Frame 5 Installation-Sta 18'-10" Flotation Compartment
2.22 131-5749211 Rev PD, SLEP Machinery Deck Assy
2.23 2C541C407 Rev C, LCAC SLEP Acceptance Test Procedure, Fuel Storage, Overflow, and Stripping Tank Tightness Test
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-25 of 2.1 for preliminary air test of the tank listed in 1.3 and located in 1.2. Test pressure shall be
2 PSIG.
(V)(G) "JOINT VISUAL INSPECTION"
3.2 Accomplish a joint visual inspection with the SUPERVISOR of the tank listed in 1.3 and located in 1.2 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, using 2.2 through 2.4 for guidance.
Report: Inspection Results Date: + 3
3.2.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.
3.3 Accomplish the requirements of 2.5 for modifications and
installations to the tank listed in 1.3 and located in 1.2 using 2.2 through 2.21, as modified by 2.22 for guidance.
3.3.1 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line 27, Column A for surface preparation of overhead interior surfaces, and 6" below the overhead of periphery bulkhead surfaces of the tank listed in 1.3, including manhole cover.
3.3.2 Template exact size, configuration, and location from existing landing craft conditions.
3.3.3 Clad weld a total of 400 square inches of pitted and defective main deck plating located in 1.2 as designated by the SUPERVISOR.
Chip and grind surfaces flush and smooth in way of repairs.
3.4 Acomplish the requirements of 009-12 of 2.1, including Table 4, Column C, Lines One through 7.
3.4.1 Accomplish nondestructive testing in accordance with Line 10.
(V)(G) "HYDROSTATIC TEST"
3.5 Accomplish the requirements of 2.23 for a twenty-four hour continuous hydrostatic test of the tank listed in 1.3 and located in 1.2.
Allowable drop in pressure: None.
Report: Test Results Date: + 3
../dwgidx/1225749112.htm ../dwgidx/1225749114.htm ../dwgidx/1315749211pd.htm ../test/2C541C407c.pdf
SSP: BOST-513-16 3 of 3 ITEM NO: 123-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.5.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.
3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Preliminary air test required in 3.1 and hydrostatic air test required in 3.5 is accomplished in Work Item 631-11-003, Fuel, Overflow and Oily Waste Tank; clean, inspect, test and preserve.
4.2 Preservation of tank listed in 1.3 is accomplished in Work Item 631- 11-003, Fuel, Overflow and Oily Waste Tank; clean, inspect, test and preserve.
4.3 Preservation of deck surfaces located in 1.2 is accomplished in Work Item 631-90-002, LCAC Craft Change Document 445 Rev 01, Incr 01, Limited Compartment Painting; accomplish.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 243-11-001
COAR: 16 PCN: LC31-B243
CMP: NONE
PLANNER: DEMERS, RAY
SSP: BOST-513-16 1 of 3 ITEM NO: 243-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Shafting; remove, turnover and install
1.2 Location of Work:
1.2.1 Main Deck, Port
1.2.2 Main Deck, Starboard
1.3 Identification:
1.3.1 Quantity (12 EA), Power Transmission Shafting Assembly
1.3.1.1 Quantity (6 EA), Sections S2 through S12, Port
1.3.1.2 Quantity (6 EA), Sections S1 through S11, Starboard
2. REFERENCES:
2.1 S9240-AA-TMM-031, Operation and Maintenance Manual
for (SLEP) Landing Craft, Air Cushion (LCAC) Transmission System (LCAC 31)
2.2 241-5750320 Rev F, LCAC Power Transmission Installation
2.3 245-5750288 Rev F, LCAC Shaft, Drive-Propeller System
2.4 240-5750400 Rev G, LCAC Transmission System
2.5 S9243-A2-TMM-031, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Ancillary Propeller Equipment (LCAC 31)
3. REQUIREMENTS:
3.1 Accomplish alignment checks for Total Indicated Runout (TIR) and coupling deflections for the shafting listed in 1.3 and located in 1.2, in accordance with Paragraphs 6-6.5.8, 7-4.5.3 and 7-5 of 2.1.
Report: TIR and Coupling Deflection Readings Date: + 2
3.1.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.
3.2 Remove the shafting listed in 1.3 and located in 1.2 from the power transmission system and the propeller system, using 2.2 through 2.4 for guidance. Turnover removed equipment to the SUPERVISOR for disposition.
3.2.1 Matchmark laminated shim spacers and fasteners and retain for reuse.
3.2.2 Remove high spots, burrs, abrasions, nicks, corrosion, gasket material, and foreign matter from exposed flanges and mating surfaces.
(V)(G) "SHAFT INSPECTION"
../techmanuals31/s9240-aa-tmm-031.pdf ../dwgidx/2415750320.htm ../dwgidx/2455750288.htm ../dwgidx/2405750400.htm ../techmanuals31/s9243-a2-tmm-031.pdf
SSP: BOST-513-16 2 of 3 ITEM NO: 243-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.3 Accomplish a visual external inspection of the shafting removed in
3.2 for general condition including deterioration, pitting, cracks, and areas of damage or distortion.
Report: Inspection Results Date: + 3
3.3.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.
3.4 Prior to turning equipment over to the SUPERVISOR, install protective plugs in existing bolt holes to ensure proper fit of fitted bolts at installation.
3.5 Upon receipt of each returned shaft assembly listed in 1.3, install the Government Furnished Material (GFM) provided in 5.1 and located in 1.2, in accordance with 2.3 and 2.4, using 2.1, 2.2 and 2.5 for guidance.
(V)(G) "VISUAL INSPECTION"
3.5.1 Accomplish a visual inspection of each returned shaft assembly for general condition, completeness of powder coating, and shipping damages prior to installation.
Report: Inspection Results Date: + 2
3.5.1.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.5.1 to the SUPERVISOR.
3.5.2 Remove protective plugs installed in 3.4.
3.5.3 Install using laminated shim spacers and fasteners matchmarked and retained in 3.2.1, in accordance with 2.4.
3.5.4 Align shafting in accordance with Paragraphs 6-6.5.8, 7-4.5 and 7-5 of 2.1.
(V)(G) "FINAL ALIGNMENT CHECK"
3.6 Accomplish shaft alignment verification in accordance with Paragraph 7-4.5.3 of 2.1.
Report: Alignment Verification Report Date: + 3
3.6.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.6 to the SUPERVISOR.
4. NOTES:
4.1 Additional shroud repairs and testing of the transmission assembly are accomplished on Work Items 246-11-001, Starboard Propeller Duct Assembly; remove, turnover and install; and 246-12-001, Port Propeller
SSP: BOST-513-16 3 of 3 ITEM NO: 243-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Duct Assembly; remove, turnover and install.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART PIECE NO. REF NO.
NATIONAL
STOCK NO.
REQ
PARA NO.
1. 2 EA
Shaft, Assembly S1 & S2 5750625-1 2.4
01-191- 3770 3.5
2. 2 EA
Shaft, Assembly S3 & S4 5750625-2 2.4
01-189- 8956 3.5
3. 2 EA
Shaft, Assembly S5 & S6 5750625-3 2.4
01-184- 3977 3.5
4. 2 EA
Shaft, Assembly S7 & S8 5750625-4 2.4
01-185- 4232 3.5
5. 2 EA
Shaft, Assembly S9 & S10 5750625-5 2.4
01-190- 0943 3.5
6. 2 EA
Shaft, Assembly S11 & S12
5750288- 001 2.4 3.5
5.2 PUSH MATERIAL:
1. None.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 245-11-001
COAR: 16 PCN: LC31-B248
CMP: NONE
SSP: BOST-513-16 1 of 3 ITEM NO: 245-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Propeller Control Module; remove, turnover and install
1.2 Location of Work:
1.2.1 Main Deck, Frame 19, Starboard Propeller Assembly, Centerbody Fairing
1.2.2 Main Deck, Frame 19, Port Propeller Assembly, Centerbody Fairing
1.3 Identification:
1.3.1 Quantity (2 EA), Propeller Control Module, Mfr: Smiths
Aerospace Inc., P/N 694004002 (Figure 8-14 of 2.2)
2. REFERENCES:
2.1 Standard Items
2.2 S9245-BA-TMM-031 Rev 01, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Controllable Pitch Propeller (LCAC 31)
2.3 S9243-A2-TMM-031, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Ancillary Propeller Equipment (LCAC 31)
2.4 S9260-AF-TMM-031, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Propulsion Lubricating Oil Assembly
(LCAC 31)
2.5 426-6386260 Rev PH, SLEP Wiring/Schematic Craft Control Sys
2.6 426-6386259 Rev PA, SLEP Deck Plan Craft Control System
2.7 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines
2.8 MIL-STD-1310, Shipboard Bonding, Grounding and other Techniques for Electromagnetic Compatibility and Safety
2.9 SE000-01-IMB-010, Navy Installation and Maintenance Book (NIMB), Section VII, Industrial Electromagnetic Compatibility (IEMC) Work Process Instructions (Source CD: N0002400003)
2.10 2C556C411 Rev C, LCAC SLEP Acceptance Test Procedure, Aft Hydraulic Systems Piping Test
2.11 3C556C443 Rev B, LCAC SLEP Acceptance Test Procedure, Aft Hydraulic Systems Servicing and Functional Test
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-63 of 2.1.
3.1.1 Test and analyze hydraulic oil samples from each system listed in 1.3.
3.2 Remove and dispose of fluids to accomplish the requirements of this
../techmanuals31/s9245-ba-tmm-031.pdf ../techmanuals31/s9243-a2-tmm-031.pdf ../techmanuals31/s9260-af-tmm-031.pdf ../dwgidx/4266386260.htm ../dwgidx/4266386259.htm ../test/2C556C411C.pdf ../test/3C556C443b.pdf
SSP: BOST-513-16 2 of 3 ITEM NO: 245-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Work Item.
3.3 Disconnect electrically and mechanically and remove the equipment listed in 1.3 and located in 1.2, using 2.2 through 2.4 for guidance.
Record electrical hook-up data using 2.5 for guidance. Retain all hardware and fasteners for installation.
3.3.1 Turnover removed equipment to the SUPERVISOR for disposition.
3.4 Install, connect and service the equipment removed in 3.3, in accordance with 2.2 through 2.7, using hardware and fasteners retained in 3.3.
3.4.1 Install Government Furnished Material (GFM) provided in 5.1.
3.4.2 Connect electrically and mechanically using electrical hook-up data retained in 3.3.
3.4.3 Ensure hydraulic fluid levels are to recommended system operational requirements.
3.4.3.1 Install new fluid conforming to MIL-PRF-23699.
3.4.3.2 Accomplish the requirements of 009-63 of 2.1.
3.4.3.3 Test and analyze hydraulic oil sample.
3.5 Bond and ground equipment in accordance with 2.8. Grounding straps shall be CRES 316L for topside equipment.
3.5.1 Acceptable criteria for equipment to hull ground via bond or ground strap is one-tenth ohm maximum.
3.6 Weatherproof and seal connectors exposed to the weather in accordance with 2.9.
(V)(G) "OPERATIONAL TEST"
3.7 Accomplish an operational test of the equipment listed in 1.3 and located in 1.2 in accordance with 2.10 and 2.11.
3.8 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Disposal of fluids in 3.2 is covered on Work Item 077-01-001, Hazardous Waste Produced on Naval Vessels; control.
4.2 Additional shroud repairs accomplished on Work Items 245-11-002, Port and Starboard Propeller Centerbody; repair, and 304-11-002, Propeller Control Module Cabling; replace.
4.3 Testing required in 3.7 is accomplished in Work Items 246-11-001, Starboard Propeller Duct Assembly; remove, turnover and install, and 246- 12-001, Port Propeller Duct Assembly; remove, turnover and install.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
TOTAL
QUANTITY NAME Of PART PIECE NO. REF NO.
NATIONAL
STOCK NO.
REQ
PARA NO.
SSP: BOST-513-16 3 of 3 ITEM NO: 245-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
PROVIDED
1. 2 EA
Propeller Control Module 694004002 2.2
01-230- 8051 3.4.1
5.2 PUSH MATERIAL:
1. None.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 245-11-002
COAR: 16 PCN: LC31-B575
CMP: NONE
SSP: BOST-513-16 1 of 5 ITEM NO: 245-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Port and Starboard Propeller Centerbody; repair
1.2 Location of Work:
1.2.1 Main Deck, Frame 19, Port
1.2.2 Main Deck, Frame 19, Starboard
1.3 Identification:
1.3.1 Quantity (2 EA), Propeller Support Shaft Assembly, Part No.
694001002 of 2.2
1.3.2 Quantity (2 EA), Cone, Armor Centerbody Fairing, Part No.
5749334-5 of 2.3
2. REFERENCES:
2.1 Standard Items
2.2 245-5750290 Rev K, LCAC Shaft Instl - Prop Sprt
2.3 164-5749334 Rev F, LCAC Cone, Armor - Centerbody Fairing
2.4 S9245-BA-TMM-031 Rev 01, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Controllable Pitch Propeller (LCAC 31)
2.5 S9260-AF-TMM-031, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Propulsion Lubricating Oil Assembly
(LCAC 31)
2.6 246-5749957 Rev AC, LCAC Fairing Instl-Center Body
2.7 S9243-A2-TMM-031, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Ancillary Propeller Equipment (LCAC 31)
2.8 7614-947915 Rev A, Process Specification for Adhesive Bonding of Materials
3. REQUIREMENTS:
3.1 Remove the equipment listed in 1.3.1 and located in 1.2 using 2.2, 2.3, Figure 8-21 of 2.4 and 2.5 for guidance. Retain serviceable hardware and fasteners for installation.
3.2 Remove existing, fit, and install new the following parts for the equipment listed in 1.3.1 and located in 1.2 in accordance with 2.2, using Figures 8-3, 8-13, 8-21 and 8-22 of 2.4, 2.6, and Figures 8-3 and 8-7 of 2.7 for guidance. Install Government Furnished Material (GFM) listed in 5.1, using hardware and fasteners retained in 3.1:
TOTAL
QUANTITY NAME INDEX REF. FIGURE PART
REQUIRED OF PART NO. NO. NO. NO.
2 EA Cap, Protection 6 2.4 8-3 660504618
../dwgidx/2455750290.htm ../dwgidx/1645749334.htm ../dwgidx/2465749957.htm ../dwgidx/7614947915.htm ../techmanuals31/s9245-ba-tmm-031.pdf ../techmanuals31/s9260-af-tmm-031.pdf
SSP: BOST-513-16 2 of 5 ITEM NO: 245-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2 EA Ring, Sealing 15 2.4 8-3 601026614
2 EA Ring, Sealing 18 2.4 8-3 750420313 (Alt. P998235)
2 EA O-Ring 5 2.4 8-13 750420334 (Alt. P998256)
2 EA Cover One 2.4 8-21 694001604
2 EA Ring, Sealing 2 2.4 8-21 750420320 (Alt. P998242)
2 EA Locknut 3 2.4 8-21 694001605
2 EA Ring, Rub 5 2.4 8-21 694001602
2 EA O-Ring 3 2.4 8-22 750420326 (Alt. P998248)
2 EA O-Ring 4 2.4 8-22 750420841
2 EA Seating Ring 141 2.6 N/A 5749957-185
4 EA Wedge 153 2.6 N/A 5749957-189
2 EA Bearing One 2.7 8-3 55RIN241 (5750297-001)
2 EA Locknut 2 2.7 8-3 5750299-001
2 EA Locknut 2 2.7 8-3 5750299-003
2 EA Spacer 3 2.7 8-3 5750282-001
4 EA Bearing 4 2.7 8-3 D4-66123 (5750303-001)
2 EA Gasket 2 2.7 8-7 5750306-003
2 EA Seal, Carbon 9 2.7 8-7 5750319-007
2 EA Ring 15 2.7 8-7 5750315-003
2 EA Gasket 19 2.7 8-7 5750306-023
2 EA Gasket 26 2.7 8-7 5750306-005
3.2.1 Remove existing, fit, and install new the following parts using Figure 8-20 of 2.4, and Figures 8-3, 8-6 and 8-7 of 2.7 for guidance:
TOTAL
QUANTITY NAME INDEX REF. FIGURE PART
REQUIRED OF PART NO. NO. NO. NO.
4 EA Shim One 2.4 8-20 857004059
2 EA Washer 5 2.7 8-3 W24
2 EA Nut 6 2.7 8-3 AN24
2 EA Washer 7 2.7 8-3 W28
2 EA O-ring 3 2.7 8-6 M83248/1-267
4 EA O-ring 4 2.7 8-6 M83248/1-264
16 EA Bolt 6 2.7 8-6 NAS501-5-15A
16 EA Washer 7 2.7 8-6 AN960C516
16 EA Nut 8 2.7 8-6 MS21044C5
SSP: BOST-513-16 3 of 5 ITEM NO: 245-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2 EA O-ring 9A 2.7 8-6 M83248/2-265
2 EA O-ring 11 2.7 8-6 M83248/1-170
12 EA Bolt 13 2.7 8-6 NAS501-3H4A
12 EA Washer 14 2.7 8-6 AN960C10L
16 EA Bolt 20 2.7 8-6 NAS501-4-10A
16 EA Washer 21 2.7 8-6 AN960416
2 EA Seal 17 2.7 8-6 R2007-437G
2 EA O-ring 19 2.7 8-6 M83248/2-169
16 EA Shim 23 2.7 8-6 5750290-005
A/R Shim 24 2.7 8-6 5750290-003
4 EA Bolt 3 2.7 8-7 NAS501-5H12A
12 EA Bolt 4 2.7 8-7 NAS501-5H10A
2 EA Ring 7 2.7 8-7 KR612S
2 EA Shim 8 2.7 8-7 5750306-007
2 EA Shim 10 2.7 8-7 5750306-011
4 EA O-ring 16 2.7 8-7 M83248/2-245
16 EA Screw 20 2.7 8-7 MS27039C1-11
16 EA Washer 21 2.7 8-7 AN960C10L
2 EA Seal 22 2.7 8-7 9549LUP-H5/L16
2 EA Ring 24 2.7 8-7 KR550S
12 EA Bolt 27 2.7 8-7 NAS501-5H11A
2 EA Key 35 2.7 8-7 5750298-001
3.3 Ensure lubricating oil fluid levels are to recommended system operational requirements.
3.3.1 Accomplish the requirements of 009-63 of 2.1.
3.3.1.1 Test and analyze lubricating oil samples from each lube oil system.
3.4 Remove existing, fit, and install new the following parts for the equipment listed in 1.3.2 and located in 1.2 in accordance with 2.6, using 2.3 and Figure 8-8 of 2.7 for guidance:
TOTAL
QUANTITY NAME FIND REF. FIGURE PART
REQUIRED OF PART NO. NO. NO. NO.
28 EA Washer 92 2.6 N/A AN960C10
28 EA Screw, Pan HD 145 2.6 N/A MS51958-65
32 EA Screw, Flat HD 146 2.6 N/A MS51960-69
28 EA Insert 147 2.6 N/A MS21209F1-30
SSP: BOST-513-16 4 of 5 ITEM NO: 245-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
4 EA Latch 151 2.6 N/A 2-56-1796-52
4 EA Keeper Plate 154 2.6 N/A 5749957-193
3.4.1 Remove existing and install new a total of 28 inserts, Find No. 147 of 2.6 in way of damaged or no longer serviceable for continued use as designated by the SUPERVISOR.
3.4.2 Bond new seating ring Find No. 141 of 2.6 in accordance with 2.8.
3.5 Accomplish the requirements of 009-12 of 2.1, including Table 4, Column C, Lines One through 7.
3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Additional shroud repairs and operational testing of the equipment listed in 1.3 is accomplished on Work Items 246-11-001, Starboard Propeller Duct Assembly; remove, turnover and install, and 246-12-001, Port Propeller Duct Assembly; remove, turnover and install.
4.2 Work in this item interfaces with Work Items 245-11-001, Propeller Control Module; remove, turnover and install, and 304-11-002, Propeller Control Module Cabling; replace.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART PIECE NO. REF NO.
NATIONAL
STOCK NO.
REQ
PARA NO.
1. 2 EA Cap, Protection 660504618 2.4 01-203- 4968 3.2
2. 2 EA Ring, Sealing 601026614 2.4 01-019- 7503 3.2
3. 2 EA Ring, Sealing 750420313 2.4 01-204- 3189 3.2
4. 2 EA O-Ring 750420334 2.4 01-208- 9798 3.2
5. 2 EA Cover 694001604 2.4 01-198- 1046 3.2
6. 2 EA Ring, Sealing 750420320 2.4 01-190- 5654 3.2
7. 2 EA Locknut 694001605 2.4 01-189- 1961 3.2
8. 2 EA Ring, Rub 694001602 2.4 01-190- 5648 3.2
9. 2 EA O-Ring 750420326 2.4 01-195- 8881 3.2
10. 2 EA O-Ring 750420841 2.4 01-195- 6539 3.2
11. 2 EA
Ring, Seating 5749957-185 141 2.6
01-462- 1540 3.2
12. 4 EA
Wedge, 5749957- 189 153 2.6
01-462- 9357 3.2
SSP: BOST-513-16 5 of 5 ITEM NO: 245-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
13. 2 EA Locknut 5750299- 001 2.7
01-383- 8866 3.2
14. 2 EA Locknut 5750299- 003 2.7
01-411- 3844 3.2
15. 2 EA Spacer 5750282- 001 2.7 N/A 3.2
16. 2 EA
Bearing, 55RIN241
5750297- 001 2.7
01-325- 2832 3.2
17. 2 PR
Bearing, 5750303-001 4 2.7
01-320- 3584 3.2
18. 2 EA
Gasket, 5750306- 003 2 2.7
01-333- 4474 3.2
19. 2 EA
Seal, 5750319- 007 9 2.7
01-317- 9140 3.2
20. 2 EA
Ring, Retainer 5750315-003 15 2.7
01-320- 7201 3.2
21. 2 EA Gasket 5750306- 023 2.7
01-333- 5233 3.2
22. 2 EA Gasket 5750306- 005 2.7
01-343- 2678 3.2
5.2 PUSH MATERIAL:
1. None.
SHIP: ASSAULT CRAFT UNIT ACU 5 (ACU 45411) ITEM NO: 246-11-001
COAR: 16 PCN: LC31-B247
CMP: NONE
SSP: BOST-513-16 1 of 5 ITEM NO: 246-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Starboard Propeller Duct Assembly; remove, turnover and install
1.2 Location of Work:
1.2.1 Main Deck, Frame 18, Starboard
1.3 Identification:
1.3.1 Quantity (One EA), Propeller Duct Assembly No. One (including Propeller Shroud and Stator), Assy 5749946-003 of 2.2
1.3.1.1 Quantity (One EA), Propeller Drive Shaft S11
1.3.2 Quantity (2 EA), Rudder Assembly, No. One and No. 3, Starboard
1.3.2.1 Quantity (2 EA), Rudder Bearing, Upper
1.3.2.2 Quantity (2 EA), Rudder Bearing, Lower
2. REFERENCES:
2.1 Standard Items
2.2 246-5749946 Rev R, Propeller Duct Instl
2.3 246-5749525 Rev V, LCAC Propeller Shroud Assembly
2.4 246-5749955 Rev O, LCAC Stator Assy & Instl
2.5 S9246-AA-TMM-031, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Propeller Duct Shrouds and Support Structures (LCAC 31)
2.6 245-5750289 Rev K, LCAC Shroud-Drive Shaft
2.7 562-5749958 Rev N, LCAC Rudder Assembly and Installation
2.8 562-5749959 Rev L, LCAC Rudder Details
2.9 246-5749947 Rev M, LCAC Rudder Fitting, Top
2.10 246-5749948 Rev M, LCAC Rudder Fitting, Assy Bottom
2.11 S9562-AB-TMM-031, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Rudder Assembly (LCAC 31)
2.12 S6360-AE-MMA-010 Rev 10, Technical Manual For Landing Craft, Air Cushion (LCAC) Corrosion Control
2.13 S9100-AC-TMM-031 Rev 02, Technical Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Structural Maintenance and Repair (LCAC 31)
2.14 562-6735035 Rev G, Craft/Alt 067K LCAC Rudder Bearing Fitting Mod & Bearing Instl
2.15 246-8429395 Rev B, LCAC CCD 471 Modification Rudder Fitting Assembly, Top
2.16 246-8429396 Rev C, LCAC CCD 471 Modification Rudder Fitting
../dwgidx/2465749946.htm ../dwgidx/2465749525.htm ../dwgidx/2465749955.htm ../dwgidx/2455750289.htm ../dwgidx/5625749958.htm ../dwgidx/5625749959.htm ../dwgidx/2465749947.htm ../dwgidx/2465749948.htm ../dwgidx/5626735035.htm ../dwgidx/2468429395.htm ../dwgidx/2468429396.htm ../techmanuals31/s9246-aa-tmm-031.pdf ../techmanuals31/s9562-ab-tmm-031.pdf
SSP: BOST-513-16 2 of 5 ITEM NO: 246-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Assembly, Bottom
2.17 S9240-AA-TMM-031, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Transmission System (LCAC 31)
2.18 S9245-BA-TMM-031 Rev 01, Preliminary Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Controllable Pitch Propeller (LCAC 31)
2.19 S9260-AF-TMM-031, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Propulsion Lubricating Oil Assembly
(LCAC 31)
2.20 S9243-A2-TMM-031, Operation and Maintenance Manual for (SLEP) Landing Craft, Air Cushion (LCAC) Ancillary Propeller Equipment (LCAC 31)
2.21 3C556C443 Rev B, LCAC SLEP Acceptance Test Procedure, Aft Hydraulic Systems Servicing and Functional Test
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of the exterior surfaces of the propeller duct, shroud and stator assembly, and each rudder assembly listed in 1.3 and located in 1.2 for pitting, cracks, erosion, corrosion, pinholes, structural integrity, and areas of damage or distortion using
2.2 through 2.11 for guidance.
Report: Inspection Results Date: + 3
3.1.1 Submit one legible copy, in hard copy or approved
transferrable media of a report listing results of the requirements of 3.1 to the SUPERVISOR.
3.2 Remove the equipment listed in 1.3.1 and located in 1.2 using 2.2 through 2.11 for guidance.
3.2.1 Turnover the removed equipment, along with the securing hardware, bearings and fittings to the SUPERVISOR for disposition.
Retain the equipment listed in 1.3.1.1 and 1.3.2 for installation.
(V)(G) "INSPECTION OF MAIN DECK"
3.3 Accomplish a joint visual inspection with the SUPERVISOR of main deck surfaces in way of equipment removals in 3.2 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, using 2.12 and 2.13 for guidance.
Report: Inspection Results Date: + 3
3.3.1 Submit one legible copy, in hard copy or approved
transferrable media of a report listing results of the requirements of 3.3 to the SUPERVISOR
3.4 Install new the equipment listed in 1.3.1 and provided as Government
../dwgidx/2468429396.htm ../test/3C556C443b.pdf ../techmanuals31/s9240-aa-tmm-031.pdf ../techmanuals31/s9245-ba-tmm-031.pdf
SSP: BOST-513-16 3 of 5 ITEM NO: 246-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Furnished Material (GFM) in 5.1, in accordance with 2.2 through 2.20.
(V)(G) "SHROUD INSPECTION"
3.4.1 Prior to installation accomplish a visual inspection of the propeller duct, shroud and stator assembly for general condition and completeness, and shipping damages. Verify modifications complete in accordance with 4.1 and 4.2.
Report: Shroud Inspection Date: - 3
3.4.1.1 Submit one legible copy, in hard copy or approved
transferrable media of a report listing results of the requirements of 3.4.1 to the SUPERVISOR.
3.4.2 Remove existing, fit, and install new the following parts:
TOTAL
QUANTITY NAME INDEX REF. FIGURE PART
REQUIRED OF PART NO. NO. NO. NO.
4 EA Bolt 2 2.5 8-1 NAS1012-48A (See 4.4)
4 EA Washer 3 2.5 8-1 75775CY-12 (Alt. NAS1587-12C)
4 EA Washer 4 2.5 8-1 AN960C1216
4 EA Washer 5 2.5 8-1 75775PY-12 (Alt. NAS1587-12)
4 EA Nut 6 2.5 8-1 MS21044C12
8 EA Bolt 7 2.5 8-1 NAS1014-46A (See 4.5)
8 EA Washer 8 2.5 8-1 75775CY-14 (Alt. NAS1587-14C)
8 EA Washer 9 2.5 8-1 AN960C1416
8 EA Washer 10 2.5 8-1 75775PY-14 (Alt. NAS1587-14)
8 EA Nut 11 2.5 8-1 MS21044C14
4 EA Bolt 13 2.5 8-1 NAS572C109
A/R Shim 14 2.5 8-1 5749216-011
3.4.3 Accomplish the requirements of 009-12 of 2.1, including Table 4, Column C lines One through 7 for plug weld repair of existing shroud foundation bolt holes. Chip and grind surfaces flush in way of repairs.
3.4.4 Template from equipment, layout and drill new anchoring holes during the installation of the duct assembly, after all final alignments are accomplished. Drill out, and ream equipment support feet and foundations in accordance with 2.2, using Figures 8-1 and 8- 2 of 2.5 for guidance.
(I)(G) "ALIGNMENT"
3.5 Accomplish alignment checks for Total Indicated Runout (TIR) for the
SSP: BOST-513-16 4 of 5 ITEM NO: 246-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
equipment listed in 1.3.1 and located in 1.2 upon completion of installation, in accordance with Table 6-7 Recommended Alignment Readings, and Paragraphs 7-4.8m and 7-5 of 2.17.
Report: Alignment Date: + 3
3.5.1 Submit one legible copy, in hard copy or approved
transferrable media of a report listing results of the requirements of 3.5 to the SUPERVISOR.
(V)(G) "OPERATIONAL TEST"
3.6 Accomplish an operational test of the equipment listed in 1.3 and located in 1.2 in accordance with 2.21.
Report: Test Results Date: + 3
3.6.1 Submit one legible copy, in hard copy or approved
transferrable media of a report listing results of the requirements of 3.6 to the SUPERVISOR.
3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Prior to installation, ensure modification of split rudder bearing fitting in accordance with LCAC Craft Change Document-471 Rev 01, Modification to Split Rudder Bearing Fitting has been accomplished on refurbished propeller duct assembly provided in 5.1.
4.2 Prior to…