Attachment_1__Specification_Package_SSSD-_012-15.pdf

PDF 582 KB Posted

Attached to
LCU 1665; Continuous Maintenance Availability Federal contract opportunity
Solicitation number
N55236-15-R-0038
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Attachment 1 Specification Package SSSD- 012-15

View the file

Other files for this federal contract opportunity

Other files attached to LCU 1665; Continuous Maintenance Availability, newest first.
File Type Posted
Amendment_No._0002.pdf PDF
Amendment_No._0001.pdf PDF
N55236-15-R-0038_LCU_1665.pdf PDF
Attachment_2_-_Request_for_Specification_Clarification_Form.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

SWRMC (NMD)

ACU ONE (ACU 53257)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: SSSD-012-15

INCLUDES ALL CHANGES THROUGH 6/15/2015

INDEX

SHIP: ACU ONE (ACU 53257) SSSD-012-15

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-01 General Criteria; accomplish 01/02/2015

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 01/02/2015

009-03 Toxic and Hazardous Substances; control 01/02/2015

009-04 Quality Management System; provide 01/02/2015

009-05 Temporary Accesses; provide 01/02/2015

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

01/02/2015

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 01/02/2015

009-08 Fire Protection at Contractor's Facility; accomplish 01/02/2015

009-10 Shipboard Asbestos-Containing Material (ACM); control 01/02/2015

009-18 Magnetic Material; control 01/02/2015

009-19 Provisioning Technical Documentation (PTD); provide 01/02/2015

009-20 Government Property; control 01/02/2015

009-21 Logistics and Technical Data; provide 01/02/2015

009-23 Interferences; remove and install 01/02/2015

009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 01/02/2015

009-28 Fire Prevention Requirements; accomplish 01/02/2015

009-29 Asbestos-Free Pipe Hanger Liner Material; install 01/02/2015

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/02/2015

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

01/02/2015

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide

01/02/2015

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

01/02/2015

009-59 Organotin Antifouling Material; control 01/02/2015

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

01/02/2015

009-61 Shipboard Use of Fluorocarbons; control 01/02/2015

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 01/02/2015

009-65 Polychlorinated Biphenyls (PCBs); control 01/02/2015

009-67 Integrated Total Ship Testing; manage 01/02/2015

009-69 Heavy Weather/Mooring Plan; provide 01/02/2015

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

01/02/2015

009-72 Physical Security at Private Contractor's Facility; accomplish 01/02/2015

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 01/02/2015

ITEM_NO. TITLE DATE

009-74 Occupational, Safety and Health Requirements; accomplish 01/02/2015

009-77 Cofferdam Requirements; accomplish 01/02/2015

009-79 Government Owned Material (GOM); status reporting 01/02/2015

009-80 Ship's Facilities; provide 01/02/2015

009-81 Compartment Closeout; accomplish 01/02/2015

009-82 Data Requirements When Installing an Equal Component Vice Specified Component;

provide

01/02/2015

009-83 Wire Rope Fitting Verfication; provide 02/19/2015

009-84 Accountability of Temporary Fasteners; provide 02/13/2015

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish

02/13/2015

009-87 Chemical disinfection Procedures; accomplish 02/13/2015

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

01/02/2015

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish

01/02/2015

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

01/02/2015

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/02/2015

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 01/02/2015

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/02/2015

009-99 Ship Departure Report; provide 01/02/2015

009-100 Ship's Stability Process Control Procedure (PCP); maintain 01/02/2015

009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 01/02/2015

009-102 Alteration Verification; provide 01/02/2015

009-103 Weight and Moment Change Data; provide 01/02/2015

009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/02/2015

009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish

01/02/2015

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;

accomplish

01/02/2015

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 01/02/2015

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;

provide and manage

01/02/2015

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 01/02/2015

009-118 CG Deck Loading; accomplish 01/02/2015

009-120 Fact Finding and Critique of Unplanned Events; manage 01/02/2015

009-121 Ship Assessment/Inspection Requirements; provide 01/02/2015

DATETITLEITEM NO.

CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

009-11 Insulation and Lagging Requirements; accomplish 02-Jan-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

02-Jan-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

07-Nov-13

009-25 Structural Boundary Test; accomplish 02-Jan-15

009-32 Cleaning and Painting Requirements; accomplish 02-Jan-15

009-32 Cleaning and Painting Requirements; accomplish 07-Nov-13

009-90 Technical Representative; provide 02-Jan-15

ITEM NO. TITLE

LCU 1665 Hazardous Waste Produced on Naval Vessels; control077-01-002

LCU 1665 Hull Zincs; replace (DRYDOCK)110-11-001

LCU 1665 Pilot House; repair110-11-002

LCU 1665 Starboard Side Shell Plating; repair120-11-001

LCU 1665 Ventilation Louver; repair512-80-001

LCU 1665-Reverse Osmosis Desalination System; groom512-80-002

LCU 1665 Anchor Cable; repair575-16-001

LCU 1665-Stern Gate Dogs; repair584-21-001

LCU 1665 Bow Ramp; repair584-34-001

LCU 1665-Stanchion Assembly; replace612-11-002

LCU 1665 Bilge Cleaning and Preservation; accomplish631-11-001

LCU 1665-Dock Trial and Sea Trial; accomplish982-31-001

LCU-1665 - Dryberthing, accomplish997-00-001

SHIP: ACU ONE (ACU 53257) ITEM NO: 077-01-002

COAR: 26 PCN: DA65-L004

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 5 ITEM NO: 077-01-002

1. SCOPE:

1.1 Title: LCU 1665 Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Landing Craft Utility No. 1665

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

3.1.2.1 Consider existing interior coatings to be removed by the invoking work items of this contract to contain lead, cadmium and chromium.

3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

SHIP: ACU ONE (ACU 53257)

SSP: SSSD-012-15 2 of 5 ITEM NO: 077-01-002

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Asbestos Insulation material

Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

SSP: SSSD-012-15 3 of 5 ITEM NO: 077-01-002

Ethylene Glycol (Antifreeze) _____ ____________

Sodium Hydroxide _____ ____________ __________

Cleaning Solvents _____ ____________ 35 gallons

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ ____________

(contaminated with a known hazardous waste)

Trichloroethane _____ ____________ __________

Miscellaneous Chemicals _____ ____________ __________

(Ignitable)

Miscellaneous Chemicals _____ ____________ __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ ____________ __________

(Reactive)

Oil (Synthetic), _____ ____________ 10 gallons including hydraulic fluid

Paints (Enamel, Latex, _____ ____________ 5 gallons

Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)

Paints (May include lead, _____ ____________ 1 pounds cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ ______ lead, chromium)

Paint Chips _____ ____________ 1 pounds

Sludge (Contaminated with _____ ____________ 5 gallons a known hazardous waste)

Diesel Fuel _____ ____________

Contaminated oil, water, steam

SSP: SSSD-012-15 4 of 5 ITEM NO: 077-01-002 skeg & kort nozzle presevative (cosmoline) ____________ 120 gallons

3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.

3.7 Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the

SUPERVISOR.

3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.7.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or

4.2.3 Applying knowledge of the hazardous characteristics of the

SSP: SSSD-012-15 5 of 5 ITEM NO: 077-01-002 waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 110-11-001

COAR: 26 PCN: DA65-L002

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 1 ITEM NO: 110-11-001

1. SCOPE:

1.1 Title: LCU 1665 Hull Zincs; replace (DRYDOCK)

1.2 Location of Work:

1.2.1 Underwater Hull

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 100-5104276, Rev A, Zinc Protectors Arrangement

2.3 S9AA0-AB-GOS-010, General Specifications for Overhaul of Surface Ships, Section 633 Cathodic Protection

3. REQUIREMENTS:

3.1 Remove each hull zinc, including the fasteners, from the underwater hull.

3.1.1 Chip and grind surfaces flush in way of repairs.

3.2 Install new (41 EA), ZHC type (MIL-A-18001) hull zincs using new star washers and fasteners in accordance with 2.2 and 2.3, in place of those removed in the location listed in 1.2.1.

3.2.1 Clean the surfaces in way of each new zinc and apply coatings the same as that specified for the surrounding areas.

3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 110-11-002

COAR: 26 PCN: DA65-2311

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 2 ITEM NO: 110-11-002

1. SCOPE:

1.1 Title: LCU 1665 Pilot House; repair

1.2 Location of Work:

1.2.1 Pilothouse (1-28-1-C)

1.3 Identification:

1.3.1 Quantity (One EA) Fixed Window

1.3.2 Quantity (One EA) Inboard Porthole

2. REFERENCES:

2.1 Standard Items

2.2 111-2889602, Deckhouse Structure

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Remove existing inboard fixed window, inboard port side porthole conduct an inspection of plating and associated equipment located in

1.2.1 and listed 1.3, using 2.2 for guidance.

3.1.1 Remove existing deteriorated plating and install new 4 square feet pilothouse plating, T beam, stiffeners and support structures in its entirety located in 1.2.1.

3.1.2 Chip and grind surfaces flush in way of repairs.

3.1.3 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.1 to the

SUPERVISOR.

3.2 Reinstall inboard front fixed window and inboard portside porthole assemble, using new gaskets and fasteners located in 1.2 and identified in 1.3.

3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.

(V)(G) "AIR TEST"

3.4 Accomplish the requirements of 009-25 of 2.1, for air hose test of the new disturbed plating, weld seams, and deck cable penetrations.

Allowable leakage: None.

(V)(G) "AIR TEST"

3.5 Accomplish the requirements of 009-25 of 2.1, for air test of each window, and porthole. Allowable leakage. None

3.6 Accomplish the requirements of 009-11 of 2.1, for 10 square feet of insulation below the port lights and fixed windows located in 1.2.1.

SSP: SSSD-012-15 2 of 2 ITEM NO: 110-11-002

3.6.1 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line One, Column A through D for bulkheads, and F and G for thermal insulations and markings.

3.6.1.1 Final color for each bulkhead shall be white.

3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 120-11-001

COAR: 26 PCN: DA65-L001

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 2 ITEM NO: 120-11-001

1. SCOPE:

1.1 Title: LCU 1665 Starboard Side Shell Plating; repair

1.2 Location of Work:

1.2.1 Main Deck, Starboard plating, Frames 33-38

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 100-2889594, Rev F, Shell Expansion

2.3 100-5107660, Synthetic Fendering System Installation Arrangements and Details

2.4 107-2889600, Vehicle Decking Framing Plating

3. REQUIREMENTS:

3.1 Accomplish the following structural repairs in each area listed in 1.2, using 2.2, through 2.4, for guidance and material requirements.

3.1.1 Remove existing and install new 16 square feet of starboard shell plating in frames 33 through 38.

3.1.1.1 Install New 12 square feet of synthetic fendering

including fasteners and associating equipment.

3.1.2 Remove existing damaged and deteriorated stiffeners and beams and install new using 2.2 through 2.4 for guidance.

3.1.3 Remove existing, eight square feet of deck plating using 2.4 for guidance.

3.1.4 Remove existing 20 fendering studs and install new in

accordance with 2.3.

3.1.5 Accomplish the requirements of 009-11 of 2.1, for new side plating.

3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.

3.2.1 Accomplish nondestructive testing in accordance with Line 9 for shell plating inserted 3.1.1.

(V)(G) "AIR TEST"

3.3 Accomplish the requirements of 009-25 of 2.1, for air hose test of new and disturbed plating, weld seams and deck cable penetration.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

SSP: SSSD-012-15 2 of 2 ITEM NO: 120-11-001

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 512-80-001

COAR: 26 PCN: DA65-L005

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 2 ITEM NO: 512-80-001

1. SCOPE:

1.1 Title: LCU 1665 Ventilation Louver; repair

1.2 Location of Work:

1.2.1 Port Fwd and Aft Engine Room lovers (2 ea),covers ( 2 ea), frame 2 (ea), and screen ( 2 ea) located in frame 56 , frame 50

1.2.2 Starboard Fwd and Aft Engine room Exhaust vent louver (2 ea), cover (2 ea), frame (2 ea), and screen (2 ea) located in frame 53, and frame 58

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 513-5106287, Ventilation System Upgrade engine room

3. REQUIREMENTS:

3.1 Remove louvers, access covers, frames, and screens for each equipment located in 1.2.1, and 1.2.2, using 2.2 for guidance.

3.1.1 Template from existing and fabricate 4 each screen, access cover, and frame removed in 3.1.

3.1.2 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, Column A, for the near-white blast clean NACE 2 SSPC-SP- 10 to each equipment removed in 3.1 prior application of powder coat.

3.1.2.1 Powder coat shall be black in color for each louver, screen haze gray for each access cover and frame, and shall conform to MIL-PRF-24712.

3.2 Remove existing three broken fasteners, chase, tap plenum cover, and louver exposed threaded areas.

3.3 Remove high spots, burrs, abrasion, nicks, corrosion, gasket material, and foreign matter from exposed plenum cover and louver matting surfaces.

3.4 Reinstall each louver, access cover, frame, and screen, using new gaskets and new CRES fasteners, using 2.2 for guidance.

(V)(G) "(V)(G) "OPERATIONAL TEST""

3.5 Conduct an operational test verifying each access cover can be dogged in open and closed positions with no sticking, binding or misalignment allowed.

3.5.1 Install and adjust each dogging mechanism for open and close position, for proper operation and to obtain 100 percent centered contact of knife edge to gasket.

3.5.2 Remove existing and install new, 4 each plenum cover open position securing pins with lanyard, using 2.2 for guidance.

SSP: SSSD-012-15 2 of 2 ITEM NO: 512-80-001

3.5.2.1 Verify that cover can be secure in open position and

proper fit of securing devices.

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 512-80-002

COAR: 26 PCN: DA65-2154

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 2 ITEM NO: 512-80-002

1. SCOPE:

1.1 Title: LCU 1665-Reverse Osmosis Desalination System; groom

1.2 Location of Work:

1.2.1 Aft Supply Room (2-40-0-A)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 OWNER'S MANUAL, Sea Recovery Aqua Whisper II 450-1800

2.3 NAVSEA, S6430-AE-TED-010, Piping Devices, Flexible, Hose Assemblies

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1.

3.1.1 Provide the services of a qualified on-site technical

representative to provide assistance in the inspection, grooming and testing equipment located in 1.2.1, using manufacturer's technical manual as 2.2 for guidance.

3.1.2 Submit one legible copy, in hard copy or electronic media, of a report listing the results of the requirements of 3.1.1, to the

SUPERVISOR.

3.2 Remove existing and install new in its entirety, including each hose, fitting, o ring, flange, clamp, and BB filter in the system.

3.2.1 Verify all safety and shutdown components operate as designed using the OEM technical manual, 2.2 for guidance.

3.2.2 Remove existing and install new brass flare and connectors.

3.2.3 Verify proper operation of control monitoring system.

3.2.4 Check visually for saltwater, and freshwater leaks.

3.2.5 Verify feed pressure is 45PSI, adjust accordingly to operation system manual.

3.2.6 Remove existing and install new packing in high regulator stem.

3.2.7 Fabrication, flushing, testing, and tagging of each hose in according with 2.3.

(V)(G) "OPERATIONAL TEST"

3.3 Restore system to operational status and test operate. Allowable leakage. None

3.3.1 Submit one legible copy, in hard copy or electronic media of a report listing results of the requirements of 3.3 to the SUPERVISOR.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed

SSP: SSSD-012-15 2 of 2 ITEM NO: 512-80-002 surfaces to match surrounding areas.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 575-16-001

COAR: 26 PCN: DA65-L00A

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 2 ITEM NO: 575-16-001

1. SCOPE:

1.1 Title: LCU 1665 Anchor Cable; repair

1.2 Location of Work:

1.2.1 Anchor Winch Room

1.3 Identification:

1.3.1 Quantity (One EA) Anchor Cable

2. REFERENCES:

2.1 Standard Items

2.2 520-2889665, Anchor Handling Arrangements and Details

2.3 S9086-UU-STM-010/CH-613R3, Wire and Fiber Rope and Rigging

3. REQUIREMENTS:

3.1 Remove existing anchor cable listed in 1.3, and located in 1.2, using 2.2 and 2.3 for guidance.

3.1.1 Remove existing grease, inspect anchor cable for strain, crimped, broken wire strands and markings.

3.1.2 Submit one legible copy, in hard copy and electronic media report listing the results 3.1.1, results to the SUPERVISIOR, within 24 hours after the inspection have been completed.

3.1.3 Lubricate anchor cable with new grease after completion of the requirements, install anchor cable using 2.2 and 2.3 for guidance.

3.1.4 Mark the wire rope using new paint conforming to MIL-PRF-24763 in the following manner;

3.1.4.1 From the anchor socket extending 20 linear feet, soild white

3.1.4.2 At the end of 100 linear feet from the anchor socket, one yellow stripe 6 inches wide.

3.1.4.3 At the end of 200 linear feet from the anchor socket, 2 yellow stripes 6 inches long separated by a 6 inch space.

3.1.4.4 At the end of 300 linear feet from the anchor socket, 3 yellow stripes 6 inches long by two 6 inch spaces.

3.1.4.5 At the end of 400 linear feet from the anchor socket, 4 yellow stripes 6 inches long separated by three 6 inch spaces.

3.1.4.6 At the end of 500 linear feet from the anchor socket, One white stripe 6 inches long.

3.1.4.7 At the end of 600 linear feet from the anchor socket, 2 white stripes 6 inches long separated by one 6 inch space.

3.1.4.8 At the end of 700 linear feet from the anchor socket, 3 white stripes 6 inches long separated b two 6 inch spaces.

3.1.4.9 At the end of 800 linear feet from the anchor socket

extending to 900 feet solid white.

SSP: SSSD-012-15 2 of 2 ITEM NO: 575-16-001

(V)(G) "(V) (G) "OPERATIONAL TEST""

3.2 Raise and lower the anchor through three cycles, ensuring there is the correct tension on cable, no binding, erratic operation or improper completion of anchor cable.

(V)(G) "VISUAL INSPECTION"

3.3 Clean Mud Box Drain piping, to allow for free flowing ability of drain piping.

3.4 Accomplish the requirements of 009-32 of 2.1, for new and disturbed surfaces.

4. NOTES:

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 584-21-001

COAR: 26 PCN: DA65-L006

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 2 ITEM NO: 584-21-001

1. SCOPE:

1.1 Title: LCU 1665-Stern Gate Dogs; repair

1.2 Location of Work:

1.2.1 Stern

1.3 Identification:

1.3.1 Quantity (1 EA), Directional Control Valve Mfr. : Parker, P/N:

VDP11-D-10, 3/4"-16 UNC SAE port

1.3.2 Quantity (1 EA), Flow Control Valve Item #5 of 2.2 Mfr:

Parker, P/N F-820-S-S, 8 GPM MAX. 3/4' -16 UNF SAE port

1.3.3 Quantity (1 EA), Stern Dog

2. REFERENCES:

2.1 Standard Items

2.2 556-5106611, Rev B, Modification of stern gate and hydraulic ram

2.3 LAR 135- LCU -0925A, LCU Stern gate hydraulic system upgrade

2.4 S6530-AE-TED-010, Technical Directive for piping devices, flexible hose assemblies

2.5 S9086-S4-STM-010/CH-556, Rev 4, Hydraulic equipment

2.6 LAR 135LCU, LCU Hydraulics Modification Hydrostatic test

2.7 BOATALT 135/254-C, Stern Gate

2.8 122-2889613, Rev E, Stern Gate and Mechanical

2.9 S9086-RK-STM-010, NAVSEA Piping System

3. REQUIREMENTS:

3.1 Remove and dispose of hydraulic fluids to accomplish the

requirements of this work item.

3.2 Remove existing and install New control valve, distribution block, each bracket, fastener and fitting, all equipment identified in 1.3, using 2.2 through 2.9 for guidance.

3.2.1 Fasteners shall be New CRES materials

3.2.1.1 New system tubing connections shall be Parker O-ring

seal fittings

3.3 Template from existing and fabricate starboard stern dog locking device and attachment bracket.

3.4 Accomplish visual inspection of foundation ensuring structural integrity and install stern gate dog and associate equipment in its entirety. .

3.5 Accomplish the requirements of 009-12, of 2.1, including Table 2 Column A One through 7.

3.6 Fill hydraulic system with new hydraulic fluid (2135 TH).

3.7 Accomplish hydraulic line hydrostatic test with system hydraulic

SSP: SSSD-012-15 2 of 2 ITEM NO: 584-21-001 fluid (2135 TH), using 2.5 and 2.7 for guidance. Allowable leakage: None

3.7.1 Duration of test shall be 30 minutes in accordance with 2.6.

3.7.2 Hydrostatic pressure shall be 1,350 PSI, in accordance with 2.3.

(V)(G) "OPERATIONAL TEST"

3.8 Accomplish operational test of newly install stern dog, ensuring the dog secure the stern gate. Open and close dog three times.

3.9 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 584-34-001

COAR: 26 PCN: DA65-2174

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 1 ITEM NO: 584-34-001

1. SCOPE:

1.1 Title: LCU 1665 Bow Ramp; repair

1.2 Location of Work:

1.2.1 Bow Ramp

1.3 Identification:

1.3.1 Quantity (One EA), Port Bow Ramp Pin

2. REFERENCES:

2.1 Standard Items

2.2 122-2889612, Rev F, Bow Ramp and Mechanical

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish the inspection of bow ramp hinges and install new bow ramp pin and associated equipment, using 2.2 for guidance.

3.2 Submit one legible copy, in hard copy and electronic media, of a report listing results of the requirements of 3.1 to the SUPERVISOR within 24 hours.

3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 10.

(V)(G) "VISUAL INSPECTION"

3.4 Accomplish an operational test of the raising and lowering bow ramp 3 times checking for proper operation.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 612-11-002

COAR: 26 PCN: DA65-2214

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 2 ITEM NO: 612-11-002

1. SCOPE:

1.1 Title: LCU 1665-Stanchion Assembly; replace

1.2 Location of Work:

1.2.1 01 Level superstructure deck

1.2.2 port and stbd wing wall

1.3 Identification:

1.3.1 Quantity (35 EA), 01 Level Stanchion and Socket

1.3.2 Quantity (10 EA), Port and Stbd Wing Wall Lifeline Stanchion and Socket

1.3.3 Quantity (10 EA) Stanchion brace

2. REFERENCES:

2.1 Standard Items

2.2 600-2889670, Rev D, Railings

2.3 612-H05013, Standard Lifeline/Liferail Stanchion Static Test

3. REQUIREMENTS:

3.1 Remove existing and new install each lifeline stanchion, lifeline assembly, bracket and socket in each area listed in 1.2 and identified in 1.3, in accordance with 2.2.

3.1.1 Lifeline stanchions shall be templated from existing quantity and location.

3.1.1.1 Wing Wall stanchion height from aft to forward, shall be from tallest to shortest to maintain flat level or horizontal plane.

3.1.2 Fabricate 10 new deck sockets if necessary for each stanchions the lenght three inch off deck.

3.1.3 Chip and grind surfaces flush in way of repairs.

3.1.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.

3.1.5 Accomplish the requirements of 009-12 of 2.1, including Table One, Column B, Lines One through 10.

3.1.6 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 13 Column A, each stanchion prior to powder coat.

3.1.6.1 Powder coat shall be haze gray in color and conforming to MIL-PRF-24712.

3.1.7 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 10, Columns A through E, of each new stanchion socket and boss plate installed in 3.1.

3.1.7.1 Reinstall each new stanchion removed in 3.1, using new fasteners and toggle pins with lanyard in accordance with 2.2.

(I)(G) "(I)(G) "STANCHION PULL TEST""

SSP: SSSD-012-15 2 of 2 ITEM NO: 612-11-002

3.2 Accomplish a pull test on each new lifeline stanchion and socket in accordance with 2.3.

Report: Test Results Date: + 0

3.2.1 Submit one legible copy, in hard copy and electronic media, of a report listing results of the requirements of 3.3 to the SUPERVISOR with in 24 hours of test completion.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 631-11-001

COAR: 26 PCN: DA65-L000

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 2 ITEM NO: 631-11-001

1. SCOPE:

1.1 Title: LCU 1665 Bilge Cleaning and Preservation; accomplish

1.2 Location of Work:

1.2.1 Forward Engine room (2-50-0-E)

1.2.2 Aft Engine room (2-56-0-E)

1.2.3 Steering Gear Room (2-71-0-Q)

1.2.4 Anchor Winch Compartment, (2-62-0-Q)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

3. REQUIREMENTS:

3.1 Remove, clean, and pressure wash using detergent, each deck plate and grating from each space listed in 1.2. Tag each deck plate and grating with location and hold for reinstallation.

(V)(G) "VISUAL INSPECTION"

3.2 Accomplish a visual inspection on each space listed in 1.2 after removal of each deck plate and grating, check for damage, deterioration, and structural integrity of each bilge, deck plate and grating framing and support structures. .

3.2.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.2 with the recommended repairs and parts needed to accomplish repairs, to the

SUPERVISOR.

3.3 Accomplish cleaning and pressure washing using detergent on each space listed in 1.2, clean each bilge to the red and white dividing lines and disposed of any contaminated oil and water prior the start of pressure wash.

3.3.1 Bilges shall be dry and free of any oil and contaminants.

3.4 Reinstall each deck plate and grating removed in 3.1 using new CRES fasteners and bracketsand, retap holes as needed.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

SSP: SSSD-012-15 2 of 2 ITEM NO: 631-11-001

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 982-31-001

COAR: 26 PCN: DA65-L009

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 2 ITEM NO: 982-31-001

1. SCOPE:

1.1 Title: LCU 1665-Dock Trial and Sea Trial; accomplish

1.2 Location of Work:

1.2.1 Landing Craft Utility No. 1665

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 S9086-C4-STM-000/CH-094, NSTM, Trials

3. REQUIREMENTS:

3.1 Complete all contractor related work required by the contract to ensure the ship is ready for trials.

3.2 Accomplish the following to support dock trial and sea trial in accordance with Sections One and 6 of 2.1.

3.2.1 Provide qualified personnel to repair, test, set and adjust equipment during dock trial and sea trial in accordance with the requirements in each work item.

3.2.2 Remove debris, tools, equipment, and rigging material not required prior to sea trial.

3.2.3 Submit one (1) legible copy of dock and sea trials agenda to the SUPERVISOR, listing the name of Test Coordinator/Director, each work item and test memorandum number for each equipment and system installed or repaired, the scheduled time and date tests are to be accomplished, 10 days prior to the scheduled dock and sea trial.

3.3 Submit one (1) legible copy of completed test report, listing each deficiency and recommendation to the SUPERVISOR. Submit test memorandum within 24 hours of completion.

3.4 Provide the services of four (4) personnel to support one (1) day dock trial and four (4) personnel to support one (1) day sea trial.

3.4.1 For scheduling purposes, a day is defined as a period of eight

(8) hours for dock trial and a period of 8 continuous hours for sea trial.

3.4.2 Submit one (1) legible copy of a list to the SUPERVISOR with the full name, title, security clearance, home address, home telephone number and name of next of kin of each person scheduled to ride the ship during sea trial, ten (10) days prior to established sea trial date.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

SSP: SSSD-012-15 2 of 2 ITEM NO: 982-31-001

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 997-00-001

COAR: 26 PCN: DA65-L003

CMP: NONE

PLANNER: ROSE, VERNON

SSP: SSSD-012-15 1 of 3 ITEM NO: 997-00-001

1. SCOPE:

1.1 Title: LCU-1665 - Dryberthing, accomplish

1.2 Location of Work:

1.2.1 Contractor's Facility

1.3 Identification:

1.3.1 Underwater Hull

2. REFERENCES:

2.1 Standard Items

2.2 845-2889758, Rev E, Docking Plan

2.3 S9086-7G-STM-000/CH-997, NSTM, Docking Instructions and Routine Work in Dry Dock

2.4 6109997 Rev-, Cradles for Dryberthing U.S. Navy Boats

2.5 S9086-CH-STM-010/CH-074, NSTM, Welding and Allied Processes

2.6 S9086-RK-STM-010/CH-505, NSTM, Piping Systems

3. REQUIREMENTS:

3.1 Furnish a sound dryberth facility, necessary qualified personnel and equipment, to safely dryberth the craft in position number One using 2.2 for guidance.

3.1.1 Provide a tug to move the craft to and from the dryberth facility. The tug shall have a minimum of 800 shaft horsepower.

3.1.2 Craft shall be dryberth during the contract period between 24 August 2015 to 5 October 2015.

(I)(G) "(I) (G) "ALIGN BLOCKS""

3.2 Provide, set and align blocks in accordance with 2.2. Position each block to ensure equipment on each surface, or protruding from the hull will not be damaged and will be accessible for removal or repairs.

Provide clearance between the craft's hull to perform work required by this contract. Minimum clearance shall comply with the requirements of

2.2. Ensure each hull opening will not be obstructed. Submit four legible copies of any proposed deviations from 2.2, to the SUPERVISOR a minimum of 10 days prior to the scheduled docking date.

3.2.1 Include supporting data on proposed deviations substantiating the block loading pressures are limited to a maximum of 20 long tons per square foot and a minimum of 90 percent of the blocks land on longitudinal strength members or main transverse bulkheads.

3.2.2 Crib and brace each block in excess of 6 feet in height in accordance with 997-2.5.3 of 2.3 using the drawing applicable to the contractor's type of dryberthing facility.

3.2.3 Construct each block of hardwood or composite concrete and hardwood, and soft caps as specified in 2.3 with a minimum of 2

SSP: SSSD-012-15 2 of 3 ITEM NO: 997-00-001 inches of soft cap thickness.

(I)(G) "(I) (G) "DRYBERTH CRAFT""

3.3 Dryberth the craft identified in 1.3.1.

3.3.1 Accomplish the requirements of 997-2.3 of 2.3 or 2.4 as applicable to this dryberthing.

3.3.2 Submit one legible marked-up copy of 2.2 in accordance with Paragraph 997-2.3 of 2.3 to the SUPERVISOR within 72 hours after the craft has landed on the docking blocks.

3.4 Provide a minimum of 50 amps of shore power to the vessel while dryberthed.

3.5 Electrically connect craft's hull while dryberthed, to the established connection point at the bow and stern of the craft and ground connection in dryberth area in accordance with Paragraphs 074-5.8 through 074- 5.24 of 2.5.

3.5.1 Connect each static ground lead to the craft being dryberthed before water is within one foot above keel level.

3.6 Maintain the entire dryberth area free from accumulation of sand, debris and salvageable materail on a daily basic.

3.6.1 Wash down the entire dryberth area to remove silt, mud and debris immediately after the craft is dryberthed.

3.7 Provide 4 each parking spaces, 2 for the crew and 2 for (Govt) to be located at the nearest authorize area near the vicinity of the craft, for government personnel use.

3.8 Inspect the underwater hull and each underwater appendage for conformance with 2.2.

3.8.1 Correct 2.2 to conform to the craft's hull form, each

appendage and shell opening.

3.8.2 Provide 2 legible marked-up copies of 2.2 showing corrections to the SUPERVISOR. This report may be provided in conjunction with report submitted in 3.3.2.

3.9 Remove each temporary drain line and restore each system to working condition, upon completion of dryberthing.

3.10 Conduct a refloating conference a minimum of one day prior to refloating.

3.11 Submit one legible copy, in hard copy or electronic format, of a report to the SUPERVISOR prior to returning craft to water, certifying that contractor work in the specification requiring the craft to be dryberthed including welding on interior surfaces of underwater hull, is complete.

3.12 Refloat the craft at a date and time mutually agreed upon by the SUPERVISOR and the contractor. Before floating craft ensure each sea valve and hull penetration below full load draft are watertight.

3.12.1 At a pre-determined water level, (prior to re-floating the craft) stop floating craft and perform a watertight integrity check of work affecting watertightness of the hull and each hull

SSP: SSSD-012-15 3 of 3 ITEM NO: 997-00-001 penetration below the water level in company with the craft's force.

Continue floating craft when directed by the Contractor's Representative.

3.13 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.