TWR6Docking-WorkPackage.pdf

PDF 422 KB Posted

Attached to
DEVIL RAY (TWR-6) Docking Availability Federal contract opportunity
Solicitation number
N55236-15-R-0036
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Attachment 1 Specification Package SSSD 011-15

View the file

Other files for this federal contract opportunity

Other files attached to DEVIL RAY (TWR-6) Docking Availability, newest first.
File Type Posted
N55236-15-R-0036-0006.pdf PDF
N55236-15-R-0036-0005.pdf PDF
N55236-15-R-0036-0004.pdf PDF
N55236-15-R-0036_0003.pdf PDF
077-00-001TWR6Docking_(3).pdf PDF
N55236-15-R-0036_0002.pdf PDF
N55236-15-R-0036_0001.pdf PDF
Attachment_2_-_Request_for_Specification_Clarification_Form.docx DOCX document
N55236-15-R-0036.pdf PDF
TWR6dockingAvailErrata01.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER:

SHIP CHARACTERISTICS

FEET INCHESLENGTH OVERALL

FEET INCHESMAX. BEAM AT DESIGN WATERLINE

FEET INCHESEXTREME BEAM INCLUDING APPENDAGES

FEET INCHESDRAFT (MAX. NAVIGABLE) (FWD.)

FEET INCHESDRAFT (MAX. NAVIGABLE) (AFT.)

LONG TONLIGHT DISPLACEMENT

LONG TONFULL LOAD DISPLACEMENT

INCHESFEETHEIGHT OF MAST ABOVE DESIGN WATERLINE

INCLUDES ALL CHANGES THROUGH 6/4/2015

INDEX

SHIP: ARCO (CNRMC 5) SSSD-011-15

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-01 General Criteria; accomplish 01/02/2015

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 01/02/2015

009-03 Toxic and Hazardous Substances; control 01/02/2015

009-04 Quality Management System; provide 01/02/2015

009-05 Temporary Accesses; provide 01/02/2015

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

01/02/2015

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 01/02/2015

009-08 Fire Protection at Contractor's Facility; accomplish 01/02/2015

009-10 Shipboard Asbestos-Containing Material (ACM); control 01/02/2015

009-18 Magnetic Material; control 01/02/2015

009-19 Provisioning Technical Documentation (PTD); provide 01/02/2015

009-20 Government Property; control 01/02/2015

009-21 Logistics and Technical Data; provide 01/02/2015

009-23 Interferences; remove and install 01/02/2015

009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 01/02/2015

009-28 Fire Prevention Requirements; accomplish 01/02/2015

009-29 Asbestos-Free Pipe Hanger Liner Material; install 01/02/2015

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/02/2015

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

01/02/2015

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide

01/02/2015

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

01/02/2015

009-59 Organotin Antifouling Material; control 01/02/2015

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

01/02/2015

009-61 Shipboard Use of Fluorocarbons; control 01/02/2015

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 01/02/2015

009-65 Polychlorinated Biphenyls (PCBs); control 01/02/2015

009-67 Integrated Total Ship Testing; manage 01/02/2015

009-69 Heavy Weather/Mooring Plan; provide 01/02/2015

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

01/02/2015

009-72 Physical Security at Private Contractor's Facility; accomplish 01/02/2015

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 01/02/2015

Page 1 of 4 PLANNED WORK

ITEM_NO. TITLE DATE

009-74 Occupational, Safety and Health Requirements; accomplish 01/02/2015

009-77 Cofferdam Requirements; accomplish 01/02/2015

009-79 Government Owned Material (GOM); status reporting 01/02/2015

009-80 Ship's Facilities; provide 01/02/2015

009-81 Compartment Closeout; accomplish 01/02/2015

009-82 Data Requirements When Installing an Equal Component Vice Specified Component;

provide

01/02/2015

009-83 Wire Rope Fitting Verfication; provide 02/19/2015

009-84 Accountability of Temporary Fasteners; provide 02/13/2015

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish

02/13/2015

009-87 Chemical disinfection Procedures; accomplish 02/13/2015

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

01/02/2015

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish

01/02/2015

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

01/02/2015

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/02/2015

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 01/02/2015

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/02/2015

009-99 Ship Departure Report; provide 01/02/2015

009-100 Ship's Stability Process Control Procedure (PCP); maintain 01/02/2015

009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 01/02/2015

009-102 Alteration Verification; provide 01/02/2015

009-103 Weight and Moment Change Data; provide 01/02/2015

009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/02/2015

009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish

01/02/2015

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;

accomplish

01/02/2015

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 01/02/2015

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;

provide and manage

01/02/2015

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 01/02/2015

009-118 CG Deck Loading; accomplish 01/02/2015

009-120 Fact Finding and Critique of Unplanned Events; manage 01/02/2015

009-121 Ship Assessment/Inspection Requirements; provide 01/02/2015

Page 2 of 4 PLANNED WORK

DATETITLEITEM NO.

CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

009-09 Process Control Procedure (PCP); provide and accomplish 02-Jan-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

02-Jan-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

07-Nov-13

009-32 Cleaning and Painting Requirements; accomplish 02-Jan-15

009-32 Cleaning and Painting Requirements; accomplish 07-Nov-13

Page 3 of 4 PLANNED WORK

ITEM NO. TITLE

Hull; preserve110-10-001

Saltwater Piping; flush520-00-001

Bow Thruster; replace568-11-001

Extruded Rubber Fender; remove and install620-11-001

Rubber Panel and Bumper Rubber; remove and install new690-00-001

Page 4 of 4 PLANNED WORK

SHIP: ARCO (CNRMC 5) ITEM NO: 110-10-001

COAR: 28 PCN: TE01-0031

BWST FILE NO: 000-001 CMP: NONE

REVISED: 11 Dec 2014 PLANNER: STOUT, MICHAEL

GREEN, DONALD

SSP: SSSD-011-15 1 of 1 ITEM NO: 110-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Hull; preserve

1.2 Location of Work:

1.2.1 Under Water Hull

1.3 Identification:

1.3.1 Under Water Hull

2. REFERENCES:

2.1 Standard Items

2.2 N00253-05-C-0004, Craft Information Book for TWR/SC:87 FOOT TORPEDO

WEAPONS RETRIEVER/SECURITY CRAFT

2.3 C-1, Rev 0, Lines Plan

3. REQUIREMENTS:

3.1 Provide encapsulation of ship to accomplish the requirements of this work item.

3.1.1 Provide and install covers for all ship's components and related surfaces exposed to paint over spray.

3.2 Accomplish the requirements of 009-32 of 2.1, including Table One, Line 10, Column A throughA through G, for ships entire hull surface, using 2.2 and 2.3 as guidance.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

3.4 Submit one legible copy, in hard copy or approved transferrable media, of a report listing the completion of 3.2 and 3.3 to the

SUPERVISOR.

4. NOTES:

4.1 Primary point of contact is Ship Building Specialist's Michael Stout, Cell# 619-726-5753 or/and Don green, Cell#619-571-2668.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: ARCO (CNRMC 5) ITEM NO: 520-00-001

COAR: 28 PCN: TE01-0047

BWST FILE NO: 000-001 CMP: NONE

REVISED: 11 Dec 2014 PLANNER: GREEN, DONALD

SSP: SSSD-011-15 1 of 1 ITEM NO: 520-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Saltwater Piping; flush

1.2 Location of Work:

1.2.1 Throughout Ship

1.3 Identification:

1.3.1 Quantity (One) Salt water Piping System

2. REFERENCES:

2.1 Standard Items

2.2 P-5, Seawater Cooling System Diagram

2.3 Mil-STD-777, Mil-STD-777; Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-09 of 2.1 for flushing saltwater system piping listed in 1.3.1 using 2.2 for guidance.

3.2 Upon PCP approval accomplish system flush.

3.3 Upon system flush completion install piping with new gaskets and fasteners in accordance with 2.3.

4. NOTES:

4.1 Primary point of contact is Ship Building Specialist's Don Green, Cell# 619-571-2668 or Michael Stout Cell# 619-726-5753

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ARCO (CNRMC 5) ITEM NO: 568-11-001

COAR: 00 PCN: TE01-0011

CSWT FILE NO: 529-001 CMP: NONE

REVISED: 11 Oct 2014 PLANNER: STOUT, MICHAEL

SSP: SSSD-011-15 1 of 2 ITEM NO: 568-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Bow Thruster; replace

1.2 Location of Work:

1.2.1 Bow, Outer Hull

1.3 Identification:

1.3.1 Quantity (One) EA, Bow Thruster, Mfg: Thrustmaster, Model

16TT20L-AL (HYD)

2. REFERENCES:

2.1 Standard Items

2.2 N00253-05-C-0004, Craft Information Book For TWR/SC, 87 FOOT

TORPEDO WEAPONS RETRIEVER/SECURITY CRAFT

3. REQUIREMENTS:

3.1 Remove existing, template, and install new, the equipment listed in

1.3.1 located at 1.2.1.

3.1.1 Clean each thruster tunnel to remove debris and foreign matter.

(V)(G) "VERIFY ROTATION

3.1.2 Verify conformance and operational capabilities in accordance with manufacturer's specifications. Allowable leakage: None.

3.1.3 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1.3 to the SUPERVISOR.

3.2 Accomplish the requirements of 009-12, including Table 4, Column C, Lines One through 7.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 30 Day delivery from Thrustmaster from time of order. POC: James Kelley, 1-713-937-6295

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

SHIP: ARCO (CNRMC 5)

SSP: SSSD-011-15 2 of 2 ITEM NO: 568-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SHIP: ARCO (CNRMC 5) ITEM NO: 620-11-001

COAR: 28 PCN: TE01-0016

BWST FILE NO: 000-001 CMP: NONE

REVISED: 11 Dec 2014 PLANNER: STOUT, MICHAEL

SSP: SSSD-011-15 1 of 1 ITEM NO: 620-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Extruded Rubber Fender; remove and install

1.2 Location of Work:

1.2.1 Top, Middle and Water Line

1.3 Identification:

1.3.1 Quantity (425) Ft., Ship Bumper Top, Middle and Lower Section from Bow to Stern

1.3.2 Quantity (50) Linear Foot of Ship Bumper Aluminum Guide Channel

2. REFERENCES:

2.1 Standard Items

2.2 SK-15-00877, Rubber Bumper Protector Stern Roller; Install

3. REQUIREMENTS:

3.1 Remove existing, fit and install new each rubber bumper listed in

1.3.1 in accordance with 2.2.

3.2 Remove existing, template from existing and install new channel for the rubber bumper found missing or damaged listed in 1.3.2, using existing as guidance.

3.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column C, Lines One through 7.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

3.4 Submit one legible copy, in hard copy or approved transferrable media, of a report listing the completion of 3.1 and 3.2 to the

SUPERVISOR.

4. NOTES:

4.1 POC onboard is BMC Maguire for location purposes.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ARCO (CNRMC 5) ITEM NO: 690-00-001

COAR: 28 PCN: TE01-0039

TE01-0045

CMP: NONE

PLANNER: GREEN, DONALD

SSP: SSSD-011-15 1 of 1 ITEM NO: 690-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Rubber Panel and Bumper Rubber; remove and install new

1.2 Location of Work:

1.2.1 Aft, In Shute Starboard Side

1.2.2 Circumference of Boat Hull, Top, Center and Lower Hull

1.3 Identification:

1.3.1 Quantity (One) Rubber Panel One inch thick by approximately 2' X 3'X 2" Thick

1.3.2 Quantity (Approximately (425) Linear Foot of Bumper Material

2. REFERENCES:

2.1 Standard Items

3. REQUIREMENTS:

3.1 Grind smooth outer hull and install new one solid section of rubber panel in the location listed in 1.2 using port side rubber as guidance.

3.1.1 Rubber is to be a solid piece, not layered.

3.1.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column(s) A, Lines One through 6.

(V)(G) "ADHERENCE "

3.2 With a 0.005 inch feeler gauge attempt to insert under rubber on all sides and corners.

3.2.1 Allowable Entry: None.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.