N55236-15-R-0011_Amendment_0002.pdf
PDF 69 KB Posted
- Attached to
- Amphibious Construction Batallion ONE (ACB 1) Crafts; Continuous Maintenance Availability Federal contract opportunity
- Solicitation number
- N55236-15-R-0011
About this file
Description Amendment 0002. For a copy of references listed in Amendment 0002 please contact the contract specialist at sharon.m.young navy.mil and angi.encarnacion navy.mil.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N55236-15-R-0011_Amendment_0004.pdf | ||
| N55236-15-R-0011_Amendment_0003.pdf | ||
| N55236-15-R-0011_Amendment_0001.pdf | ||
| N55236-15-R-0011.pdf | ||
| Attachment_2_-_Reference_Information_Sheet_(1).doc | DOC document | |
| Attachment_3_-_SB_Subcontracting_Data_Sheet.doc | DOC document | |
| Attachment_4_-_Request_for_Specification_Clarification_Form.docx | DOCX document | |
| Attachment_1_-Specification_Package_SSSD-004-15.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: ACB-1 CRAFTS, CONTIUOUS MAINTENANCE AVAILABILITY
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Mar-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N55236-15-R-0011
X 9B. DATED (SEE ITEM 11)
19-Feb-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Mar-2015
CODE
SOUTHWEST REGIONAL MAINTENANCE CENTER
CODE 410 3755 BRINSER STREET, STE 1
SAN DIEGO CA 92136
N55236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N55236-15-R-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
RMC L-2-0007 INSPECTION OF VESSELS is amended as follows: FROM: Date/Time: 0800 - 1500/24 Feb
2015 - 2 March 2015 TO: 0800 - 1500/24 Feb 2015 - 13 March 2015
Requests for specification clarifiation:
a. Work Item: 247-00-001 for PM02 - Question: Will this also include changing out the shaft liners? Response:
Shaft liners to be inspected per 3.2 and report provide to the SUPERVISOR. At that time the decision will be made to replace the shaft liners or not.
b. Work Item: 247-00-002 for WT02 - Question: Will this also include changing out the shaft? Response: WI 247-
00-002 removed from solicitation per previous amendment 0001. There are no shafts being changed out at this time.
c. Work Item: 114-11-001 – Question: IAW Para 3.2, Contractor is tasked to procure material and fabricate 2 each side connector fenders using references 2.2 through 2.6 for guidance and material requirements. References 2.2 through 2.6 were not included on the reference CD for this solicitation. Response: The drawings referenced are on the disk under "CM pocket covers".
d. Work Item: 110-00-001 – Question: IAW Para 3.2.3 contractor is tasked to cut out damaged area on craft listed in 1.2.3 and identified in 1.3.3. Procure material, fabricate and install new port and starboard female sheer connector end pieces. Para 1.2.3 and 1.3.3 call for the starboard shear connector only. Is contractor to replace both port and starboard sheer connectors as listed in Para 3.2.3 or just the starboard shear connector as listed in Para’s 1.2.3 and
1.3.3? Please clarify. Answer: The work item is to only replace the starboard female shear connector end pieces.
e. Work Item: 110-00-004 - Question: IAW Para 3.2.3 contractor is tasked to cut out damaged area on craft listed in 1.2.3 and identified in 1.3.3. Procure material, fabricate and install new port and starboard female sheer connector end pieces. Para 1.2.3 and 1.3.3 call for the starboard shear connector only. Is contractor to replace both port and starboard sheer connectors as listed in Para 3.2.3 or just the starboard shear connector as listed in Para’s 1.2.3 and
1.3.3? Please Clarify. Response: The work item is to only replace the starboard female shear connector end pieces.
f. Work Item: 612-11-001 - Question: IAW Para 3.1, Contractor is tasked to procure material, Manufacture and
Install 10 each hatch brace brackets and stanchions using references 2.2 and 2.3 for guidance and material requirements. References 2.2 and 2.3 were not included on the reference CD for this solicitation. Please provide the following drawings: Ref 2.2 DWG 167-01 “INLS ECN #5” and Ref 2.3 DWG 1600411 Rev-C “Structural
Closures”. Response: Reference 2.2 is available on CD provided by the Government. See attached for reference
2.3.
File details come from the government source that posted it. Updated .