J-12 Request for Clarification RFC Answer Needed - Combined_Redacted.pdf

PDF 799 KB Posted

Attached to
USS SAMPSON (DDG 102) 3A1 Continuous Maintenance Availability (CMAV) Federal contract opportunity
Solicitation number
N4523A22R0555
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document contains a solicitation for a Continuous Maintenance Availability for the USS SAMPSON. The solicitation is seeking offers for ship repair and maintenance through the completion of work items in Attachment J-1. The period of performance is from November 7, 2022 to December 2, 2022. The acquisition is set aside 100% for small businesses with a 1,250 size standard under NAICS code 336611 for ship building and repair. Offerors must have previously executed a Master Ship Repair Agreement or Agreement for Boat Repair and be registered in the System for Award Management. Requests for clarification are due by August 31, 2022 and proposals are due by September 23, 2022. The solicitation references plans, drawings and technical manuals available upon request. The agency is the Department of the Navy Naval Supply Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to USS SAMPSON (DDG 102) 3A1 Continuous Maintenance Availability (CMAV), newest first.
File Type Posted
C 04.0 RFP N4523A22R0555.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST: 08/30/2022

REQUIREMENT:

ITEM NO: 523-11-001

TITLE: Countenneasure Washdov.'Il (CMWD)

Nozzle Zone One, 2 and 4 Piping; clean angela.charpia@navy.mil

QUESTION NO: 1

REQUISITION NO.:N4523A22R0555

ISSUING OFFICE POC (CODE 423):

Contract Specialist Name: Angela Charpia

Cheri Richard cheri.richards@navy.mil

PARA. NO: 3.7.1 PAGE NO: 2 CONTRACTOR: ---

PLANNER'S NAME: ATTACH. NO:

CONTRACTOR QUESTION:

Specified CMWD Zones require a 009-71 pressure test at 180 PSIG. Please verify test pressure is required at 180 PSIG as we have been advised that there is a gate valve upstream that may not be able to handle 180 PSIG.

DO NOT WRITE BELOW THIS LINE

SPEC CHG: YIN DWG/REF CHG. YIN

TECHNICAL REVIEW:

RQMTS CHG: YIN MAT'L CHG: YIN

SERIAL NO:

ERATTA will be issued to change the test procedure to an operational test to be performed by SF at the first available opportunity while unde1way.

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING

OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST

FOR PROPOSAL.

KTR is using an outdated Standard Item. Standard Item FY 23 Change 3 has removed the requirement of note 4.4 due to 009-88 being shifted to a Cat 1 standard item. Execute as written.

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING

OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST

tools, and equipment, and material handling equipment,” the scope of the work issued in section B of the solicitation is as follows:

This work is all shipboard and all pieces/parts to accomplish the work can be procured in the fashion required for installation. Delphinus does not believe that “Provide a current plot/layout of facility” and to “Provide a current list of all plant equipment (type, size, and capacity) including major machine tools, and equipment, and material handling equipment,” is pertinent to this availability and should be considered as a technical evaluation factor. Please provide concurrence and amend the solicitation.

We appreciate any information and clarity that you can provide as we develop our response.

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

TECHNICAL REVIEW: SERIAL NO:

Please submit per RFP.

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING