RFC_-_0002.pdf
PDF 259 KB Posted
- Attached to
- YC- 1625 Federal contract opportunity
- Solicitation number
- N4523A19R1054
About this file
Request for Clarification 0002 - Correspoding SoW ERRATA 1 added
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4523A19R1054_Amendment_0003.pdf | ||
| N4523A19R1054_Attachment_J-4_Contract_Performance_Data_Sheet.docx | DOCX document | |
| SOW_YC_1625_-_19R1054_V2_ERRATA_1.pdf | ||
| N4523A19R1054_Amendment_0002.pdf | ||
| Attachment_J-07__FBO_upload_Guide.pdf | ||
| SOW_YC_1625_-_19R1054_V2.pdf | ||
| N4523A19R1054_Mod_A0001.pdf | ||
| RFC_-_0001.pdf | ||
| N4523A19R1054_Attachment_J-5_Corporate_Experience_Data_Sheet.docx | DOCX document | |
| N4523A19R1054.pdf | ||
| N4523A19R1054_Attachment_J-3_Request_for_Clarification_(RFC)_Form.docx | DOCX document | |
| N4523A19R1054_Attachment_J-2_Price_Proposal_Worksheet.xls.xlsx | XLSX spreadsheet | |
| SOW_YC_1625_-_19R1054_(SOLICITATION).pdf | ||
| N4523A19R1054_Attachment_J-6_References_and_Drawings.zip | ZIP file | |
| N4523A19R1054_Attachment_J-4_Contract_Performance_Data_Sheet.docx | DOCX document | |
| SOW_YC_1625_-_19R1054_DRAFT.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
DATE OF REQUEST: 12/31/18 QUESTION NO: 002
REQUIREMENT: HULL REPAIRS REQUISITION NO.: N4523A19R1054
ITEM NO: 3.2.4
TITLE: Hull Blasting and Preservation
ISSUING OFFICE POC (CODE 440.22):
Scott Kearsley: (360) 476-4452
Scott.kearsley@navy.mil
PARA. NO: PAGE NO: 24 CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: J-1 CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
3.2.4 Hull Blasting and Preservation: Remove existing and install new coating systems to the underwater body, hull, and freeboard surfaces, including appendage and bulwark surfaces.
Can you clarify whether this vessel in fact has bulwarks? The SOW references bulwarks but the referenced drawings do not seem to show bulwarks.
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
There are no bulwarks. See Errata 1 to follow.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.
File details come from the government source that posted it.