N4523A18R1063_Amendment_0001.pdf

PDF 689 KB Posted

Attached to
Utility Float (UF) 3 Marine Hull Preservation Federal contract opportunity
Solicitation number
N4523A18R1063
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Amendment 0001 to solicitation N4523A18R1063

View the file

Other files for this federal contract opportunity

Other files attached to Utility Float (UF) 3 Marine Hull Preservation, newest first.
File Type Posted
Attachment_J-2_Price_Proposal_Worksheet.xls XLS spreadsheet
Exhibit_A_CDRLs_&_DIDs.pdf PDF
Solicitation_-_N4523A18R1063.pdf PDF
Attachment_J-6__BAVR_Instructions.docx DOCX document
References.zip ZIP file
Attachment_J-5_Corporate_Experience_Data_Sheet.docx DOCX document
Attachment_J-4_Contract_Performance_Data_Sheet.docx DOCX document
Attachment_J-1_Statement_of_Work_(SOW).pdf PDF
Attachment_J-3_Request_for_Clarification_(RFC)_Form.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1) Solicitation N4523A18R1063 is hereby re-opened to correct Technical Sub Factor 1.4 (QMP) in sections L & M w ith respect to referencing the correct paragraphs of ISO 9001:2008.

2) Revised proposal due date is 25 June 2018 at 2:00 PM PST.

OFFERORS ARE ENCOURAGED TO RESUBMIT THEIR ENTIRE PROPOSAL.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Jun-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4523A18R1063

X 9B. DATED (SEE ITEM 11)

14-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Jun-2018

CODE

PUGET SOUND NAVAL SHIPYARD CODE 400

1400 FARRAGUT

CONTRACTING CODE 440

BREMERTON WA 98314

N4523A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4523A18R1063

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 13-Jun-2018 02:00 PM to 25-Jun-2018 02:00 PM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS FOR OFFERORS

1. GENERAL:

a. Instructions:

1. Offerors shall submit their proposals in accordance with the following preparation instructions. The Government will consider any failure on the part of an offeror to comply with these instructions to be an indication of the quality of performance it can expect during contract performance. Therefore, the Government encourages offerors to contact the Contracting Officer (KO) in writing in order to request an explanation of any aspect of these instructions.

2. A proposal should not simply rephrase or restate the Government’s requirements but rather provide convincing rationale to address how the offeror meets these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the offeror’s proposal.

3. The overall security classification of the proposal shall be UNCLASSIFIED. If the offeror needs to provide classified material, it shall be separated from the unclassified material and submitted as a supplement to the appropriate volume, and handled in accordance with appropriate security procedures. Any classified supplement will be considered a part of the stated page limitations of the appropriate volume. NO classified material is expected for this solicitation. Please contact Nick Crowell, Contract Specialist, and Gary Binder, Contracting Officer, before any classified material is submitted.

4. If an offeror believes that the requirements in these instructions contain an error, omission or are otherwise unsound, the offeror shall immediately notify the KO in writing with supporting rationale as well as the remedies the offeror is asking the KO to consider as related to the omission or error.

5. Relationship between Instructions and Evaluation: Your attention is directed to the functional relationship between Sections L and M of this solicitation. Section L provides information for the purpose of organizing the proposal and is not intended to be all inclusive. Section M describes evaluation factors for award. Since the Government evaluation of proposals will cover areas identified in section M, proposals should address all such areas of evaluation.

6. ALL INQUIRIES shall be made via email and directed to Nick Crowell, Contract Specialist, and Gary Binder, Contracting Officer, at nicholas.a.crowell@navy.mil and gary.binder@navy.mil. To ensure the Government is able to adequately address and respond to offeror requests for clarification (RFCs) via amendment if applicable, it is requested questions be submitted no later than 6 June 2018 at 2:00 pm Pacific Standard Time (PST). The government reserves the right to not answer any questions received after 6 June 2018 at 2:00 pm PST. Furthermore, offerors should note that the proposal due date will not be extended solely on the basis of questions received. RFCs shall reference the solicitation and specification page and paragraph number and be submitted on a request for clarification form (Attachment J-3) provided with this solicitation. A request for clarification form (Attachment J-3) shall be submitted for each separate question.

b. Proposal Submission Instructions:

1. Time of Submission: Proposals are DUE NOT LATER THAN 2:00 P.M. PST, 25 June 2018. Late proposals will not be considered.

2. Method of Delivery: Proposal submissions shall only be accepted electronically. Offerors must submit one electronic copy of their proposal, via the Safe Access File Exchange (SAFE) file transfer tool.

Table 1- Required Submission Methods Transmission Method Government POC emails SAFE gary.binder@navy.miland nicholas.a.crowell@navy.mil

NOTICE: The government will not accept any other method of transmission than SAFE. Submittal of proposals via e-mail, CD, or any other method will be rejected. Prospective offerors are hereby cautioned to allow sufficient time to become familiar with the SAFE system well before the proposal due date and to contact the SAFE helpdesk immediately if a system outage is detected. The government accepts no responsibility for the offeror’s e-business systems compatibility with SAFE. Public accessibility to SAFE is well established therefore offerors are responsible for making any alternative arrangements if their specific e-business system software or configuration prevents access to SAFE.

3. Electronic Delivery of Proposals: Proposals are DUE NOT LATER THAN 2:00 P.M. PST, 25 June 2018. Late proposals will not be considered. The timeliness of proposals will be determined in accordance with (IAW) FAR 52.215-1(c)(3)(ii)(A). Proposals shall be submitted via SAFE to both nicholas.a.crowell@navy.mil and gary.binder@navy.mil.

4. Safe Access File Exchange (SAFE) Submission Instructions:

Utilization of the Safe Access File Exchange (SAFE) file transfer tool at https://safe.amrdec.army.mil/safe/Welcome.aspx is a mandatory transmission method.

For an electronic document to be considered as part of the proposal, it must be uploaded to SAFE prior to the closing deadline. Electronic files date-stamped (Central Standard Time) in the SAFE tool after the closing deadline will not be considered as part of the proposal. If any portion of the proposal is unreadable or contains corrupted files, re-submission of such portions shall be handled IAW FAR 15.207(c). IAW FAR 15.208(b)(1)(i), it is highly recommended that offerors upload and transmit their proposal via SAFE at least twenty four (24) hours prior to the solicitation closing deadline as well as read and become familiar with the SAFE user guide located at https://safe.amrdec.army.mil/safe/Guide.aspx. For further questions about the SAFE tool see the help section of the SAFE website.

Proposals submitted via the SAFE tool will be downloaded upon receipt. In accordance with 52.215-1, any proposal sent MUST be completely received via the SAFE tool’s system generated notification email in the Government point of contact’s (POC) email inbox prior to the time the solicitation closes in order to be timely; therefore, please take into consideration the time the electronic transmission process may take, to ensure timely proposal submission. When submitting documents through SAFE, offerors shall reference their company name, CAGE code, and the solicitation number in the “Description of File(s)” block of the SAFE uploading screen.

The SAFE transfer tool provides confirmation of successful upload upon submission of proposal. Offerors can also check the “notify me when file(s) downloads are completed” box within the SAFE submission screen to receive an additional confirmation that the government POCs have fully downloaded all proposal attachments.

Offers that experience technical difficulties accessing the SAFE website should immediately contact the SAFE helpdesk at usarmy.redstone.rdecom-amrdec.mbx.safe-team@mail.mil via email to seek resolution and carbon copy both government POCs.

5. Electronic File Format: Only the following extensions shall be used:

.docx for Microsoft® Word files .xlsx for Microsoft® Excel files .pdf for Adobe® Acrobat™ files

Offeror shall not embed sound or video files into submittals. Graphics, tables, photographs, and other data beyond the capability of Microsoft® Word ™, Microsoft® Excel ™, or not in currently NMCI- supported applications may be submitted in Adobe Acrobat format. Any submission document that requires a “wet signatures” or other data input by hand shall be scanned and formatted in Adobe Acrobat (PDF).

All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious. No fields shall be password protected.

6. SAFE Volume Layout and Page Limitations: Proposals shall be submitted in the following quantities and volume layout.

Volume

Section Title

E-files (Download to

SAFE)

Page Limitations

I

I Technical Proposal, Sub-factor 1.1 Corporate Experience

1 file: Sections I, II, & III

Completed Experience

Worksheet – Atch J-5

II

Technical Proposal, Sub-factor 1.2 Certifications

No Page Limitation

III

Technical Proposal, Sub-factor 1.3 Facilities

No Page Limitation

IV

Technical Proposal, Sub-factor 1.4 QMP 1 file: Section IV

No Page Limitation

II

- Past Performance

1 file

Past Performance Worksheet – Atch

J-4

III

I Cover Letter 1 file 4

II

Completed Solicitation and Applicable Amendments 1 file

No Page Limitation

III

Price Proposal Worksheet Attachment J-2 1 file (.xlsx)

J-2 Attachment

a. Text size shall be no smaller than what is equivalent to Microsoft Word, Times New Roman, 10 point, uncompressed font.

b. Pages shall be single sided, one and one half inch spaced, with a minimum of one inch margins on all sides. Pages shall be dated and numbered sequentially by volume. A header should be present in each volume submission stating the volume number, title, solicitation identification, and the offeror's name.

c. Each volume shall contain a glossary of all abbreviations and acronyms used with an explanation for each.

d. Elaborate format and/or color representations are not desirable. Any pages that are changed (as the result of negotiations) should be of a different color (as specified by the Contracting Officer) and have changed information clearly marked by a vertical line in the right margin of the page and/or circling if changing data in a chart. The offeror shall indicate the new date on revised pages.

e. Legible tables, charts, graphs and figures shall be used when necessary to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 by 17 inches in size. For tables, charts, graphs, and figures, the text shall be no smaller than 8 point, Times New Roman.

NOTE: The Government’s strong preference is for clear, concise proposals that support the evaluation criteria listed in section M of the solicitation.

c. Ship check

Ship checks will conducted from 8:30 A.M. – 11:30 A.M. PST on 31 May 2018 at Naval Submarine Base Bangor (NSBB) in Bangor, WA. Prospective offeror’s shall notify Aaron Peal by email at aaron.k.peal@navy.mil (360) 476-0418, Cell (360) 286-8120 or Christina Tobin christina.tobin@navy.mil (360) 627-3358, Cell (360) 801-8014 by 1:00 P.M. on 18 May 2018, in order to reserve time and submit the names of employees and subcontractors who will attend. Pre-registration in Base Authorization and Visit Request (BAVR) is mandatory to meet security and access requirements prior to arrival at Naval Base Kitsap Bremerton.

Offerors shall send an e-mail with their Company Name, CAGE Code, and Solicitation Number in the subject line.

Offerors shall follow instructions listed in Attachment J-6 to apply for a security badge in Base Authorization and Visit Request (BAVR). If you have any questions regarding these instructions please contact Aaron Peal or Christina Tobin.

Once your information is submitted into BAVR, the Government Point of Contact (POC) Aaron Peal or Christina Tobin will confirm receipt and provide any final security instructions required to attend.

Offerors are encouraged to provide cellular contact numbers for company officials attending to allow for last minute site location or instruction changes if necessary. Pre-registration in BAVR is mandatory to guarantee adequate time for security and access requirements prior to arrival. Failure to pre-register in BAVR before 18 May 2018 may result in the offeror not being able to attend the ship check.

d. Ship Check Requirements and On-Site POC:

Contact Matthew Stubblefield at matthew.c.stubblefie@navy.mil (360)633-9321 or Donald Besaw at donald.besaw@navy.mil (360)551-6451 by 2:00 P.M. on 18 May 2018 to confirm your attendance.

Per OSHA 29 CFR 1915 Occupational Safety and Health Standards for Shipyard Employment, Section 1915.158(a)(1), Contractor personnel attending ship-checks shall wear United States Coast Guard-approved Type I, II, III OR V Personal Floatation Devices (PFDs) i.e. life preservers, life jackets, or work vests while on floats, barges, and finger piers.

The decision by any offeror to not attend the ship check will be construed to mean that the offeror fully understands all requirements of the solicitation. All prospective offerors are advised that at the conclusion of the ship check, unless this solicitation is amended in writing, it will remain unchanged.

If an amendment is issued, normal procedures relating to the acknowledgement and receipt of any such amendment shall be applicable. In no event will failure to attend the ship check constitute grounds for a claim after award of the contract.

There is a short amount of time between ship check date and the close of questions; therefore to allow adequate time to prepare a response submit all questions regarding the Statement of Work (Attachment J-1) as soon as possible.

e. Subcontract Information: In requesting proposals from prospective subcontractors, offerors should provide all necessary information for the contemplated purchase. The Government will not advise prospective subcontractors as to the requirements of their transactions with offerors, nor will the Government respond to direct inquiries from prospective subcontractors concerning clarifications of specification or solicitation requirements.

ALL SUCH REQUESTS FOR CLARIFICATION MUST BE SUBMITTED TO THE GOVERNMENT

THROUGH THE PRIME CONTRACTOR (OFFEROR).

f. SOW reference documentation: Offerors may request SOW reference file access electronically via an email request to nicholas.a.crowell@navy.mil and gary.binder@navy.mil. SOW references file is encrypted via WinZip and require WinZip or a compatible decryption program to access.

3. VOLUME I – FACTOR 1: Technical Capabilities

A. Organization: Volume I shall be organized conforming to the required proposal content. Volume I shall be clearly labeled. At a minimum, each section as outlined below shall constitute a separate file.

Volume I shall not include pricing information.

The Technical volume shall be organized in the following manner:

Section I: Sub-factor 1.1 – Corporate Experience Section II: Sub-factor 1.2 – Certifications Section III: Sub-factor 1.3 – Facility Section IV: Sub-factor 1.4 – Quality Management Plan (QMP)

Submission Requirements:

Evaluated Sub-factor Section L Submission Requirement

Subfactor 1.1, Corporate Experience:

The prospective offeror must demonstrate specific experience providing marine preservation and structural, mechanical repairs of the complexity similar to or exceeding the scope identified in section 1.2 of the statement of work (SOW) to a like vessel as identified in section 1.1 of SOW, through a narrative of three (3) contracts within the last three (3) years.

Offerors shall provide sufficient explanation that the experience provided demonstrate that the offeror has the necessary management, technical personnel and material resources available to successfully complete marine vessel preservation services.

Offerors are required to provide Corporate Experience Data Sheet (Attachment J-5) on three (3) of the firm’s recently completed contracts or task orders (not to exceed three years older than date of solicitation) that demonstrate relevant work as outlined in subfactor 1.1 of Section M of the solicitation .

Narratives must be clear, coherent, and prepared in sufficient detail for effective evaluation of the offeror’s proposal against sub-factor 1.1. Altered or substituted data sheets may not be evaluated. Any supporting documentation included should clearly substantiate claims and be verifiable.

Offeror’s shall include complete contract numbers, to include specific delivery/task order numbers as applicable, within the narrative to allow for the verification of claims. However, copies of contracts referenced are not required as part of the proposal.

If referencing non-government corporate experience contracts, offeror’s shall include an associated point of contact with the customer company which includes:

name, company title, phone number, and email to allow for government verification.

Subfactor 1.2, Certifications:

The prospective offeror has provided current certificates identifying all personnel certified as paint inspectors in accordance with NAVSEA Basic Paint Inspector (NBPI), NACE International Coatings Inspector or SSPC Protective Coating Inspector programs, as required for accomplishing the requirements of the statement of work.

The offeror shall provide copies of current certifications for all paint inspectors that meet at least one of the requirements outlined in evaluation sub-factor 1.2.

Subfactor 1.3, Facility:

The offeror has identified that the facility to be used has adequate lifting and operational capacity to safely dock the vessel per the requirements set forth in Section C of this solicitation. An on-site survey conducted by the Government Docking Observer (GDO) may be required to validate the facility’s capability.

To facilitate proper government oversight, the facility shall be located in the Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA.

The offeror shall provide a narrative illustrating that they satisfy the requirements of sub-factor 1.3. Narratives must be clear, coherent, and prepared in sufficient detail for effective evaluation of the offeror’s proposal against sub-factor 1.3. Any supporting documentation included should clearly substantiate claims and be verifiable.

Subfactor 1.4, Quality Management Plan (QMP) The offeror provided evidence of its Quality Management Plan. The plan addresses, at a minimum, control of documents, controls of records, corrective action plan(s), preventative action plan(s), internal audit, and management review which reference the following International Organization for Standardization (ISO) 9001:2008 standards.

A. Control of documents. A documented procedure that meets or exceeds ISO 9001:2008 paragraph 4.2.3.

B. Control of records. A documented procedure that meets or exceeds ISO 9001:2008 Paragraph 4.2.4

C. Corrective actions. A documented procedure that meets or exceeds ISO 9001:2008 paragraph 8.5.2.

D. Preventative actions. A documented procedure that meets or exceeds ISO 9001:2008 paragraph 8.5.3.

A complete and current copy of the offeror’s written Quality Management Plan (QMP) meeting or exceeding the requirements of sub-factor 1.4.

Plans must, at a minimum, fully address ALL of the ISO 9001:2008 procedures outlined in A-F of sub-factor 1.4.

Note: For offerors possessing an approved and current QMS on file with PSNS&IMF Code 132, submission of a copy of the current and signed approval letter is sufficient to fulfill this submission requirement.

E. Internal Audit. A documented procedure that meets or exceeds ISO 9001:2008 paragraph 8.2.2.

F. Management Review. A documented procedure which meets or exceeds ISO 9001:2008 paragraph 5.6.

Note: If offeror has an approved and current QMS on file with PSNS&IMF Code 132, offeror will be assigned an acceptable rating for this sub-factor.

4 VOLUME II- FACTOR 2: Past Performance

A. Organization: Volume II shall be organized conforming to the required proposal content. Volume II shall not include pricing information.

The Past Performance volume shall be organized in the following manner:

Contractor Performance Data Sheet (Attachment J-4)

Section M Evaluation Criteria Submission Requirements

Evidence of past performance on one (1) contract actions within the last five (5) years that demonstrates performance relevant to preservation projects similar in scope to section 1.2 of the statement of work (SOW).

Offerors are required to provide Contractor Performance Data Sheet (Attachment J-4) on one of the firm’s recently completed contracts or task orders (not to exceed five years since completion) that demonstrate relevant work as outlined in to section 1.2 of the statement of work (SOW) of the solicitation . Altered or substituted questionnaires will not be evaluated.

Offerors may submit performance data regarding current contract performance as long as a minimum of one year of performance has been completed as of the closing date of this RFP. Supporting documentation should clearly substantiate claims and be verifiable.

Offeror’s shall include complete contract number, to include specific delivery/task order numbers as applicable, within the narrative to allow for the verification of claims. However, copies of contracts referenced are not required as part of the proposal.

If referencing a non-government past performance, ensure that the Contractor Performance Data Sheets list a current customer point of contact with name, company title, phone number, and email included for government verification.

Past performance information obtained from established systems such as the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases. Past performance information may also be obtained from other sources available to the Government, such as the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, Fee Determining Officials.

Offeror’s are not required to submit any additional documentation in support of this evaluation criterion.

2. VOLUME III – FACTOR 3: LEGAL/PRICE OFFER

A. Organization: Volume III shall be organized conforming to the required proposal content. Volume III shall be clearly labeled. At a minimum, each section as outlined below shall constitute a separate file.

The legal/price volume shall be organized in the following manner:

Section I Cover Letter

Section 2 Completed solicitation and amendments

Section 3 Completed price proposal worksheet, Attachment J-2

B. Legal/Price Offer: The Legal/Price Volume consists of and must include the following:

1) A cover letter that addresses all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the offeror shall include the following in the cover letter:

Identification of all separate files included in the proposal package, CAGE and Data Universal Numbering System (DUNS) numbers for the prime contractor, Notice of any alterations to the solicitation or attachments/exhibits (except for completing appropriate “fill-in” blocks and certifications).

Period for acceptance of offers. The offeror agrees to hold the prices in its offer for

90 calendar days from the date specified for receipt of offers, unless another time period is specified in an amendment to the solicitation.

2) The completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments (block 14). Block 12 must match the 90 days specified in the provided cover letter. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for CLIN 0001 and be equal to the total price of the price proposal worksheet (attachment J-2). CLIN 0002 and CLIN 0003 are informational CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in section K of the solicitation. Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation.

3) Complete the price proposal worksheet, Attachment J-2 of the Solicitation.

C. Notification/Exceptions: The proper completion and submission to the Government of the above items will constitute an offer. Unless this solicitation expressly authorizes alternate offers with respect to specific terms and conditions of this solicitation, any exception to any of the terms and conditions shall constitute a deficiency which may make the offer unacceptable.

D. Release of Pricing Information: All pricing information submitted is for the exclusive use of Government representatives, and will be treated as business confidential and will not be publicly disclosed, provided that, where a request for disclosure of such cost information is submitted to the Government pursuant to the Freedom of Information Act (FOIA) (5 U.S.C. 552a), the Government will not disclose the offeror’s pricing information if public disclosure of such information would substantially harm the offeror in its competitive position. In order to help ensure non-disclosure, the title page of the cost proposal and other sheets of proposal data should be marked with a restrictive legend stating that the price information is proprietary.

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

EVALUATION FACTORS

EVALUATION FACTORS FOR AWARD

Section M - Evaluation Factors for Award

1. GENERAL:

The Government intends to award a single, firm fixed price contract to the responsible offeror (as defined in FAR Part 9.104) on the basis of the lowest evaluated priced proposal meeting or exceeding the acceptability standards for the below listed factors and sub-factors in accordance with the lowest price technically acceptable (LPTA) source selection process outlined in FAR 15.101-2. This section contains specific evaluation factors for award of a contract pursuant to this solicitation.

Offeror proposals shall be in the format prescribed by, and shall contain a response to, each of the submission requirements identified in Section L of this solicitation.

2. BASIS FOR AWARD AND EVALUATION FACTORS.

In selecting the best overall offer, the following factors will be considered: (1) technical capabilities, (2) past performance, and (3) price. The Offeror must be determined to have acceptable technical and past performance before further consideration will be given; that is, selection of the contractor is to be based on the establishment of minimum requirements to be evaluated on an “acceptable” or “unacceptable” basis. Proposals are evaluated for acceptability, but not ranked using the non-price factors.

To be eligible for award, Offerors proposals must be found acceptable in each of the following factors/sub factors:

Factor Sub factor Description Adjectival Rating 1 Technical Capabilities Acceptable /Unacceptable

1.1 Corporate Experience Acceptable /Unacceptable

1.2 Certifications Acceptable /Unacceptable

1.3 Facility Acceptable /Unacceptable

1.4 Quality Management Plan

(QMP)

Acceptable /Unacceptable

2 Past Performance Acceptable /Unacceptable 3 Price Not Adjectivally Rated

a. Factor 1- Technical Capability.

The acceptability/non-acceptability for this factor is based on receiving an acceptable rating on all of the following sub-factors:

Evaluated Sub-factor Section L Submission Reference Subfactor 1.1, Corporate Experience:

The prospective offeror must demonstrate specific

Volume I experience providing marine preservation and structural, mechanical repairs of the complexity similar to or exceeding the scope identified in section 1.2 of the statement of work (SOW) to a like vessel as identified in section 1.1 of SOW, through a narrative of three (3) contracts within the last three (3) years.

Subfactor 1.2, Certifications:

The prospective offeror shall provide current certificates identifying all personnel certified as paint inspectors in accordance with NAVSEA Basic Paint Inspector (NBPI), NACE International Coatings Inspector or SSPC Protective Coating Inspector programs, as required for accomplishing the requirements of the statement of work.

Volume I

Subfactor 1.3, Facility:

The offeror shall identify that the facility to be used has adequate lifting and operational capacity to safely dock the vessel per the requirements set forth in Section C of this solicitation. An on-site survey conducted by the Government Docking Observer (GDO) may be required to validate the facility’s capability.

To facilitate proper government oversight, the facility shall be located in the Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA.

Volume I

Subfactor 1.4, Quality Management Plan (QMP) The offeror shall provide evidence of its Quality Management Plan. The plan addresses, at a minimum, control of documents, controls of records, corrective action plan(s), preventative action plan(s), internal audit, and management review which comply with the following International Organization for Standardization (ISO) 9001:2008 standards.

A. Control of documents. A documented procedure that meets or exceeds ISO 9001:2008 paragraph 4.2.3.

B. Control of records. A documented procedure that meets or exceeds ISO 9001:2008 Paragraph 4.2.4

C. Corrective actions. A documented procedure that meets or exceeds ISO 9001:2008 paragraph 8.5.2.

D. Preventative actions. A documented procedure that meets or exceeds ISO 9001:2008 paragraph 8.5.3.

E. Internal Audit. A documented procedure that meets or exceeds ISO 9001:2008 paragraph 8.2.2.

F. Management Review. A documented procedure which meets or exceeds ISO 9001:2008 paragraph 5.6.

Volume I

Note: If offeror has an approved and current QMS on file with PSNS&IMF Code 132, offeror will be assigned an acceptable rating for this sub-factor.

Once all sub-factors are evaluated, the government shall rate the offeror’s proposal for factor 1 using Table M-1 below:

Table M-1_Technical Acceptable/Unacceptable Rating Method

b. Factor 2- Past Performance.

Past performance will be evaluated in accordance with FAR 15.305, however a comparative assessment as described in FAR 15.305(a)(2)(i) will not be conducted IAW FAR 15.101-2(b)(1). The past performance evaluation is an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements based on recent, relevant, and satisfactory performance. The acceptability of the offeror’s past performance shall be evaluated. This is done through the establishment of criteria to be evaluated on an “acceptable” or “unacceptable” basis as follows:

Section M Evaluation Criteria Section L Submission Reference Evidence of past performance on one (1) contract actions within the last five (5) years that demonstrates performance relevant to preservation projects similar in scope to section 1.2 of the statement of work (SOW).

Assessment of past performance will be a subjective assessment based on consideration of all relevant facts and circumstances. The Government is seeking to determine whether the offeror has consistently demonstrated a commitment to customer satisfaction and timely delivery of quality goods and services at fair and reasonable prices.

Volume II

Past performance information obtained from established systems such as the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases.

Volume II

Once all past performance criteria are evaluated, the Government shall rate the offeror’s proposal for factor 2 using Table M-2 below:

NOTE: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”

Table M-2_Past Performance Acceptable/Unacceptable Rating Method

c. Factor 3- Price/Cost Reasonableness:

The Government will not evaluate price adjectivally. The Government will analyze the proposed price provided in Section B and attachment J-2 of volume III in accordance with FAR 15.404 using proposal analysis techniques to determine fair and reasonable pricing. The Government may use one or a combination of price analysis techniques and procedures to ensure a fair and reasonable price is received.

Award will be made on the basis of the lowest priced proposal that meets the acceptability standards for all non-price factors and sub-factors, in accordance with FAR 15.101-2. The offeror’s total proposed price of the basic contract line item number (CLIN) 0001 found in Section B shall match the sum of all paragraph line items within the Price Breakdown Spreadsheet (respective to individual tabs) found in attachment J-2. CLIN 0002 and CLIN 0003 are informational only and shall not be priced.

If the Government determines an offeror’s estimates to be inexplicably low or otherwise not fair and reasonable, that offeror may be eliminated from the competition without further discussion.

Completion of the attachment J-2 is REQUIRED to be submitted with your proposal. Failure to submit a price for any line item(s) in the J-2 attachment may result in the offer being rejected as unacceptable.

(End of Summary of Changes)

File details come from the government source that posted it.