Amendment 1 - N4215820Q0019.pdf

PDF 568 KB Posted

Attached to
HAZMAT CONTAINER RENTAL Federal contract opportunity
Solicitation number
N42158-20-Q-0019
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to HAZMAT CONTAINER RENTAL, newest first.
File Type Posted
Attachment 1.pdf PDF
Attachment 4.pdf PDF
Attachment 2.pdf PDF
Attachment 3.pdf PDF
N4215820Q0019 FINAL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N4215820Q0019

N4215820RC00171

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 1:

Provide answ ers to bidder's questions, revise the Statement of Work and Period of Performance, and extend the Solicitation Due Date to allow reasonable time for evaluation by prospective offerors.

(See Continuation Page)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4215820Q0019

X 9B. DATED (SEE ITEM 11)

08-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-May-2020

CODE

NORFOLK NAVAL SHIPYARD

ATTN: WILLIAM WEBB

CVN FLEET SUPPORT

C432, BLDG 65, 2ND FLOOR

PORTSMOUTH VA 23709-1022

N42158 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

The purpose of this amendment is to:

I. Address Bidder’s Questions:

The following questions shall be considered when submitting quotes for N4215820Q0019:

1. Q. The sump capacity on a 20 Foot Hazmat Container is typically 400 gallons. Why has the required sump capacity doubled?

A. The sump capacity can be 400 gallons. Please see revised Statement of Work below.

2. Q. The A/C and Heat required is typically rated for a Class 1 Division 2 Hazmat space. Why has the rating been changed to Class 1 Division 1?

A. Please see revised Statement of Work below.

3. Q. What is the purpose of a loose portable fire extinguisher when the unit is equipped with a dry chemical fire suppression system?

A. We are required to have a loose portable fire extinguisher in these HAZMAT boxes by the shipyard fire marshal.

4. Q. Can LED fixtures be substituted for the outdated fluorescent fixture specified?

A. LED fixtures can be substituted for the fluorescent fixtures.

5. Q. Is the receptacle (note: referencing Paragraph 7.11 on the below revised Statement of Work) requested a new requirement? If so, please understand that we are unaware of this item being available in EP model.

A. This is not a new requirement. However, it is not strictly required and will not be reviewed as part of the Technical Acceptability determination.

II. Revise the Statement of Work and Period of Performance. Please review the Statement of Work and Period of Performance for each CLIN below.

III. Extend the Solicitation Due Date. All responses to this Solicitation are due by Tuesday, May 19, 2020, 5:00PM EST.

IV. All other terms and conditions remain unchanged.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 13-May-2020 12:00 PM to 19-May-2020 05:00 PM.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-JUN-2020 TO

30-NOV-2020

N/A NORFOLK NAVAL SHIPYARD

SEE STATEMENT OF WORK

FOR DELIVERY AND CONTACT

INFORMATION

PORTSMOUTH VA 23709

TEL: WITHIN

FOB: Destination

N42158

To:

POP 08-JUN-2020 TO

07-DEC-2020

N/A NORFOLK NAVAL SHIPYARD

SEE STATEMENT OF WORK

FOR DELIVERY AND CONTACT

INFORMATION

PORTSMOUTH VA 23709

TEL: WITHIN

The following Delivery Schedule item for CLIN 0002 has been changed from:

POP 01-JUN-2020 TO

30-NOV-2020

N/A NORFOLK NAVAL SHIPYARD

SEE STATEMENT OF WORK

FOR DELIVERY AND CONTACT

INFORMATION

PORTSMOUTH VA 23709

TEL: WITHIN

POP 08-JUN-2020 TO

07-DEC-2020

N/A NORFOLK NAVAL SHIPYARD

SEE STATEMENT OF WORK

FOR DELIVERY AND CONTACT

INFORMATION

PORTSMOUTH VA 23709

TEL: WITHIN

The following Delivery Schedule item for CLIN 1001 has been changed from:

POP 01-DEC-2020 TO

28-FEB-2021

N/A N/A

POP 08-DEC-2020 TO

08-MAR-2021

N/A N/A

The following have been modified:

INSTRUCTIONS TO OFFERORS

52.212-1 Instructions to Offerors - Commercial Items (Oct 2018) – ADDENDUM

This requirement will be prepared in accordance with the information in FAR Subpart 12.6, using Simplified

Acquisition Procedures as supplemented with the additional information included in this notice. Accordingly, a

Simplified Streamlined acquisition process will be used in the evaluation and award of the contract. Quotes are due on or before May 19, 2020 at 5:00PM EST. Quotations shall be emailed to Contract Specialist, Cheryl Copeland at cheryl.copeland@navy.mil and to USFF_NNSY_C432@navy.mil. Questions for clarification must be submitted via email to Contract Specialist, Cheryl Copeland at cheryl.copeland@navy.mil by May 11, 2020 at 12:00PM EST.

It is the contractor’s responsibility to read all attachments and amendments associated with this solicitation.

*REQUIRED DOCUMENTS

Each contractor providing a quote shall submit the following documents to include:

1. A completed and signed standard form SF1449 with unit prices for each line item.

2. Executed copies of any amendments (if applicable).

3. Completed FAR 52.212-3 Representations and Certifications unless otherwise completed in SAM.

4. Pictures of proposed equipment and Equipment Data Sheet

Award will be made for the technically acceptable item or combination of technically acceptable items that result in the lowest aggregate price to the Government.

Technical Acceptability: Technical Acceptability will be evaluated to determine an overall rating of “acceptable” or “unacceptable”. This will be determined by evaluating the ability of the quoter to provide a sound, compliant approach that meets all requirements and demonstrates a thorough knowledge and understanding of the Specification requirements. It is the contractor’s responsibility to ensure that their quotation clearly demonstrates their ability to perform these requirements. Technical acceptability will be defined as follows:

mailto:cheryl.copeland@navy.mil mailto:USFF_NNSY_C432@navy.mil mailto:cheryl.copeland@navy.mil

Technical Ratings

Rating Description

Acceptable Quote meets all of the requirements identified.

Unacceptable Quote does not meet all of the requirements identified.

Failure to meet any technical requirement for an item (or specification) will make the quotation unacceptable for that item (or that specification).

If an item (or specification) is technically unacceptable, its price will not be considered for award.

Price:

The estimated amount for each line item will be added together to determine the total estimated price which will become the evaluate price. Provide breakout for pricing as follows:

DAILY RATE

WEEKLY RATE

MONTHLY RATE

The vendor’s proposed price will be evaluated on the basis of price reasonableness. All prices must be considered fair and reasonable as determined by the Government. Price quote shall be held firm for sixty (60) days.

The completion and submission of the above items will constitute a quote and will be considered the vendor’s unconditional assent to the terms and conditions of this solicitation and any attachments and/or exhibits.

Failure to provide all of these documents by the required date and time may preclude a quotation from award consideration at the discretion of the Government.

Award may or may not be made without any type of discussions or negotiations. This is based on the Contracting

Officer’s determination after an evaluation has been completed on all quotations.

STATEMENT OF WORK

(6) 20-ft HAZMAT Container for

Harry S. Truman

Contractor shall provide six (6) HAZMAT container with minimum dimensions of 8’ width x 9’ height x 20’ length. Contractor shall provide all labor, materials, equipment, tools, transportation and supervision necessary to provide, install, and remove the HAZMAT container in support of the Truman Project at Pier 5A.

This specification covers the design, fabrication, quality assurance, delivery, removal, and onsite assistance of HAZMAT container for use in Norfolk Naval Shipyard in Portsmouth, VA.

The HAZMAT container shall provide a space that is suitable for the storage of hazardous material. It shall contain a sump to collect leakage and a dry chemical fire suppression system as described in the following sections.

1. Government Responsibility

1.1 Government shall provide contractor ready access to the job location during contractor’s working hours (i.e., weekdays between the hours of 7:30 AM and 4:00 PM). Emergent services outside these hours will require government approval and will be no cost to the government. The government is responsible for the cost of all additional approved or requested maintenance and repairs not specifically covered under this Agreement or any applicable warranties. The government will prevent anyone other than contractor from maintaining, repairing or modifying its product.

1.2 NNSY is an industrial facility, therefore, wear and tear beyond what is normal wear and tear is typical and should be expected

1.3 The government agrees to, upon satisfactory delivery and installation; connect HAZMAT container to temporary services. The government will also have temporary services disconnected upon completion of the contract in order to allow the contractor to remove the container from the shipyard.

1.4 Technical POC: TBA upon award

1.4.1 Phone Number:

1.4.2 Email Address:

1.5 Certifying POC: TBA upon award

1.5.1 Phone Number:

1.5.2 Email Address:

2. Contractor Responsibilities

2.1. Provide all HAZMAT containers on or prior to 8-JUNE-2020 to Norfolk Naval Shipyard in Portsmouth, VA or to an agreed upon location with the Shipyard POC.

2.2. Delivery crew security clearance request is required for shipment offload within the

Controlled Industrial Area at NNSY. Contractor shall arrange the Security clearance request with the pass office at NNSY.

2.3. The contractor shall dispatch a representative within 24 hr. of notification in order to activate fire suppression system after the Government has connected temporary utilities.

2.4. The contractor shall dispatch a representative in response to a service request to repair and/or replace any equipment within 24 hours of notification by Norfolk Naval Shipyard at no additional charge.

2.5. Provide representative within 24 hours in order to modify units in the event the customer determines the units do not meet contract specifications.

2.6. Before any leased/purchased temporary production facility will be accepted by the government an inspection at NNSY will be performed to ensure that the contractor has provided a product that conforms to the agreed upon specifications. If the inspection is not satisfactory, the contractor has 3 business days to correct the discrepancies (at contractor’s cost) or the temporary production facility will not be accepted the government.

2.7. Upon completion of the contract, the contractor will provide all labor, materials, equipment, tools, transportation and supervision necessary to breakdown the HAZMAT containers and remove them from the shipyard.

2.8. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control lAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA's Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer's Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work require the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.8-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.

2.9. Contractors and NNGA's may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the

OSHA 1915.89 web site by using the following link to NNSY's public access web site:

http://www.navsea.navy.mil/shipyards/norfolk/default.aspx

2.10. Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY TPOC and/or CORs set forth elsewhere in this award document."

2.11. The contractor shall set the box in the proper location, designated by the technical POC and provide a representative within 24-hours notification of connection to temporary services to activate the automatic fire suppression system.

3. Guiding Documents

3.1 Resulting project shall comply with all governing codes and Naval Standards including the most recent Unified Facilities Criteria, International Building Code 2012, ADA and Requirements for Lifting Equipment. Guiding Documents:

3.2 United Facilities Criteria (UFC) 1-200-01, 3-301-01, 3-600-01

3.3 National Fire Protection Association (NFPA) 1, Fire Code

3.4 National Fire Protection Association (NFPA) 70, National Electrical Code (NEC)

4. General Requirements

4.1. Shall have a minimum sump capacity of 400 gallons

4.2. A/C and heat required to maintain unit at 70 degrees at all times, year round

4.3. Shall have a dry chemical fire suppression system which meets all NFPA, and OSHA requirements.

4.4. Shall have a minimum 120/240V, 100A, 3 wire, single phase UL listed load center (NEMA 3R) http://www.navsea.navy.mil/shipyards/norfolk/default.aspx

4.5. Shall have exterior camlok connection box feeding a 600V, 40A 2-pole circuit breaker enclosed in a NEMA 3R enclosure feeding a 15kva, 440/240V primary:240/120V secondary, single-phase transformer. This transformer to provide power to load center. See enclosure (1) and (2).

4.6. Shall be in compliance with applicable NFPA and NEC requirements

5. Maintenance Requirements

5.1. Equipment replacement/repair for any item, and or, components other than items and or components damaged by negligence.

5.2. Fire suppression system repair and troubleshoot as needed.

5.3. Door repair/replacement as needed based on normal wear.

5.4. Quarterly A/C filter changes and replacements as needed per periodic maintenance plan

6. HAZMAT Enclosure Requirements

6.1. Provide a decal on each unit with the following information: Contractor company name, contract number and a unique number. The unique number must be different on each unit. The decal shall have the following: minimum of 8.5” x 11” in size, white in color with black writing. The decal is to be located on one of the doors of the unit. If the half of the unit does not have a door, an 11/3” x 4” at minimum label shall be placed on the electrical panel on the inside of the unit.

6.2. Hurricane proof to 110 MPH winds also must be water resistant.

6.3. All doors are to swing outward. Cipher locks are not required for the HAZMAT containers; however, the doors must be capable of being locked. Multiple sets of keys shall be provided to the Shipyard POC and key replacements must be provided upon request from the customer.

6.4. Energy efficient heat pump in each HAZMAT enclosure, in all cases, the unit must be able to maintain 70 degrees

Fahrenheit in summer or winter. The unit shall be energy star rated.

6.5. Provide (1) one fire extinguisher at each door (dry chemical NIIN: 4210-01-467-3616)

6.6. There shall be no windows in the units.

6.7. Floor covering shall be a steel grate allowing the flow of hazardous material directly into the sump. The steel grating shall be designed to withstand the exposure to hazardous material.

6.8. Identification on the box shall clearly identify the enclosure as a hazardous material storage area and entry into the enclosure includes the risk of direct exposure to hazardous material.

7. Electrical Requirements

7.1. One row of surface mount fluorescent twin tube strip type interior light fixtures with energy efficient electronic ballast and 32 watt fluorescent bulbs. Mount in center of enclosure. Light fixtures shall be blast proof.

7.2. All Wire must be THHN or THWN, 75 degrees Celsius (min), size as indicated. Do not substitute wiring type/temperature rating unless the ampacity of wire and conduit fill requirements are evaluated to ensure NEC compliance.

7.3. Electrical Metallic Tubing (EMT) is specified on drawings. The NEC requires EMT to be supported within 3 ft of each box or conduit body and supported every 10 ft (min).

7.4. Liquid Tight Flexible Metal Conduit (LFMC) may be used on the exterior instead of EMT. The NEC requires

LFMC to be supported within 1 ft of each box or conduit body and supported every 4.5 ft (min).

7.5. The NEC requires the following color code:

7.6. Neutral (grounded conductor) = white

7.7. Note: may be phased taped white if larger than #6 AWG

7.8. Ground (Equipment grounding conductor) = green

7.9. Exterior wiring to include a camlok connection box feeding a 600 Volt, 40 amp, 2 pole circuit breaker enclosed in a

NEMA 3R circuit breaker enclosure. This is to feed a 15 kva, 480/240 volt primary, 240/120 volt secondary single phase transformer (see enclosure (2)). See enclosure (4) for a list of exterior equipment. Equivalent material may be substituted.

7.10. Contractor may use a fusible disconnect switch, NEMA 3R with current limiting fuses rated the same size as the circuit breaker in the enclosure (2) ( PC-4 and PC-5).

7.11. Receptacles: 120 volt, 20 Amp Quad type receptacle wired on a #12 AWG (min of two Quad Receptacles per circuit). Provide (1) ea 120 volt, 15 amp duplex GFCI test type receptacle wired on a dedicated circuit mounted on the exterior in a weatherproof box beside the HVAC unit.

7.12. A typical transformer wiring diagram is shown in enclosure (3) in the drawing, use the manufacturers wiring schematic to connect transformer (schematic usually located on front panel of transformer). Transformer size may be adjusted depending on load demand of HAZMAT enclosure.

7.13. Input connections of the HAZMAT container electrical system shall be per NEC requirements and using camlok receptacles (see enclosure (1)).

7.14. Transformer frame shall be bonded to unit frame using appropriate size bonding jumper from NEC table 250.122, per NEC.

7.15. Wiring of units electrical system shall comply NFPA 70 (National Electric Code) where applicable.

8. Relocation

8.1. In the case that Norfolk Naval Shipyard needs to relocate the unit the following must be provided:

8.1.1. Units shall be stiffened as required to eliminate swaying of the upper units.

8.1.2. Units are to be outfitted with suitable attachments for overhead AND forklift lifting.

8.1.2.1 For multiple point lifts, each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts, the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength..

8.1.2.2. For multiple point lifts, each lifting attachment shall accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment.

For single point lifts, the lifting attachment shall accept a standard anchor shackle (Federal Specification RR-C- 271D, type IVA) which is capable of supporting the gross weight of the equipment.

8.1.2.3. Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane of the attachment unless specified by the manufacturer. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.

8.1.2.4. Each lifting attachment shall be conspicuously marked in a contrasting color “lift here”. Letters shall have a minimum height of 1”. Where multiple lifting attachment points and/or tiedown points exist (i.e., forklifts and aerial platforms), each lifting attachment shall be conspicuously marked or identified.

8.1.2.5. Forklift channels shall be 5”x10” inside dimension the full width of the unit and enclosed on all four sides.

8.2. The equipment shall be marked in a prominent location with the gross weight. Sand hopper tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be in upper case letters of contrasting colors, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”. Etc.).

8.3. The equipment shall be provided with a lifting sketch/rigging diagram that meets the requirements of Section (11).

8.3.1. The lifting sketch shall detail any specific requirements and/or configurations that must be met prior to lifting (i.e., “engage swing lock,” “tilt mast back fully,” “rotate lifting basket over side,” “utilize 10’ minimum length slings,” and “spreader beam required”).

8.3.2. The lifting sketch shall include the location of the equipment center of gravity (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.

8.3.3. A copy of the lifting sketch shall be provided with the equipment and copies shall be forwarded to the government points of contacts and Code 714 (396-3345/3346).

8.4. If specialized handling gear, other than shackles, standard slings, or chain hoists, is required (i.e., spreader beams and special lift rigs), the contractor shall provide it unless NNSY previously agrees to furnish this gear.

8.5. Permanently affixed isometric rigging diagram shall be placed near the gross weight label and shall include:

8.5.1. Show one (1) unit

8.5.2. Show center of gravity location.

8.5.3. List manufacturer and gross weight.

8.5.4. Locate diagram near one of the “gross weight” markings.

8.5.5. Indicate minimum standard anchor shackle size and minimum sling length.

8.6. Provide 3 paper copies of the isometric rigging diagram.

9. Lifting Sketch Requirements

9.1. The HAZMAT container must be capable of being moved by forklift AND crane.

9.2. Lifting sketches, as a minimum, shall identify the following:

9.2.1. The weight of the load.

9.2.2. The location of the center of gravity

9.2.3. The minimum capacity/length of slings

9.2.4. The minimum capacity of other standard rigging gear

9.2.5. The attachment (lifting) points for the load

9.2.5.1. The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.

9.2.5.2. The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.

9.2.6. Limitations on allowable orientations for any parts making up the lifting assembly

9.2.7. For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unraveling the rope.

9.2.8. A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.

9.2.8.1. "D" represents the diameter of the object the sling passes over.

9.2.8.2. "d" represents the diameter of the sling.

9.2.8.3. Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.

9.2.9. Components in each handling assembly shall be sized based on the worst case distribution of loads. Note: When making a two-, three-, or four-point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used

9.2.10. When nonstandard gear is required (i.e., round stock lifting bars) written instructions shall be provided that ensure:

9.2.10.1. The proper material is being used

9.2.10.2. The item is certified

9.2.10.3. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e., eccentricity of the bearing points).

9.2.11. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e., eccentricity of the bearing points).

9.2.12. A load indicating device (LID) and a pre-determined stopping point will be in the rigging configuration; applicable to engineering estimated weights and loads not covered by a technical work document (TWD), unless otherwise approved by C-714.

(End of Summary of Changes)