18-T-N044_Attachment_1_-_Technical_Capability_Certs.docx
DOCX document 20 KB Posted
- Attached to
- 60 Ton Water Chiller Unit Rental Federal contract opportunity
- Solicitation number
- N4215818TN044
About this file
Technical Capability Certification should be signed and submitted with quote before deadline.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_for_Solicitation_N4215818TN044.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N42158-18-T-N044 ATTACHMENT (1)
TECHNICAL CAPABILITY CERTIFICATIONS
Vendor shall self-certify that the equipment and services proposed either meets or does not meet the Government’s minimum requirements specified in the associated Statement of Work (SOW) reference by initialing in the “YES” or “NO” area of the chart below. .
Any deviation to the Government specifications shall identified as such - A detailed explanation shall be provided for each negative response.
Note: In order to be considered for award, the table must be completed in its entirety and submitted with your quotation in accordance with the Instructions of Offerors.
| SOW Ref |
| Description |
| YES |
| NO |
CLIN 0001 (60 Ton Water Chiller Unit) – Statement of Work – Location Specification 1 through 1.2.
CLIN 0001 (60 Ton Water Chiller Unit) – Statement of Work - General Specifications 3 through 3.15.
CLIN 0001 (60 Ton Water Chiller Unit) – Statement of Work – Period of Performance 4 through 4.1
CLIN 0001 (60 Ton Water Chiller Unit) – Statement of Work – Contractor Requirements 5 through 5.14
CLIN 0001 (60 Ton Water Chiller Unit) – Statement of Work – Options 6 through 6.1.
CLIN 0001 (60 Ton Water Chiller Unit) – Statement of Work – Notes 1 through 3.
CLIN 0001 (60 Ton Water Chiller Unit) – Statement of Work – Requirements for Lifting Equipment 1 through 4.
CLIN 0001 (60 Ton Water Chiller Unit) – Statement of Work – Rigging Sketch Requirements1 through 11.
(Insert full name/title/ date) hereby certifies the equipment/services proposed meet or exceed all Government Minimum Specifications.
(Insert full name/title/ date) hereby certifies the equipment/services proposed meet or exceed the Government Minimum Specifications with the following deviations/exceptions:
(Provide separately detailed explanation for each SOW association)
File details come from the government source that posted it.