N4215818Q0005_Technical_Capability_Certifications.pdf

PDF 204 KB Posted

Attached to
FREEZER/ REFRIGERATOR RENTAL Federal contract opportunity
Solicitation number
N42158-18-Q-0005
Issued by
Department of the Navy Naval Sea Systems Command

About this file

TECHNCIAL CAPABILITIES CERTIFICATION

View the file

Other files for this federal contract opportunity

Other files attached to FREEZER/ REFRIGERATOR RENTAL, newest first.
File Type Posted
AMEND_0001_N4215818Q0005.pdf PDF
N4215818Q0005_COMBINED_SYNOPSIS_SOLICITATION.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Capability Certifications

Vendor shall shelf-certify that the equipment and services proposed either meets or does not meet the Governments Minimum requirements specified in the associated

Statement of Work (SOW) referenced by initialing in the “YES” or “NO” area of the chart below.

Any deviation to the Government specifications shall be identified as such-A detailed explanation shall be provided for each negative response.

Note: In order to be considered for award, the table must be completed in its entirety and submitted with your quotations in accordance with Instructions of Offerors.

Technical Capabilities Statement

Item: Walk-In Freezer/Refrigerated Box

Shall be provided with the following capabilities, features, and specifications

YES NO

Unit shall be electrically powered and capable of running 24 hours a day/7 days a week

Unit shall be able to connect to NNSY power connections.

Unit shall be rated at 200 amps or less.

Unit shall be capable of keeping a constant temperature of 0 degrees to 42 degrees (f).

Vendor shall be responsible for all repairs / maintenance.

Vendor shall be available within 12 hours of notification for all service related items.

Should a unit breakdown and become inoperable, vendor shall have a replacement box available within 16 hours.

Unit shall comply with the applicable OSHA regulations.

Unit shall be complete and operational after delivery and setup. Setup shall be complete within 24 hours of delivery. The unit shall be highly reliable and shall function without repair or adjustment when set-up is complete.

Gas and fluid leaks are all mechanical failures and shall be corrected by the contractor.

Power cable end fittings will be lugged and color coded to indicate proper phasing.

Unit shall be capable of being moved via fork lift and/or lifting pad eyes..

Unit shall have weight clearly marked for lifting purposes

The equipment shall be outfitted with suitable attachments for overhead lifting.

Each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength

Design of the lifting attachments shall be such that the shackles are not side loaded.

The equipment shall be provided with a lifting sketch / rigging diagram.

The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).).

The equipment shall be marked in a prominent location with vendor Point Of Contact information .

The equipment shall be marked in a prominent location with the gross weight. Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).

In order to be considered technically acceptable, this form must be completed in the entirety.

Vendor shall certify that his product meet or does not meet each specification listed above by signing below. For any response that warrants a no please provide the reason for the exception or deviation.

Print name Signature

File details come from the government source that posted it.