Solicitation N42158-17-T-N037 closes on 24 March 2017 at 05:00 PM.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| COMBINED_N42158-17-T-N037_AMEND._2.doc | DOC document | |
| 17-T-N037_Attachment_1_-_Technical_Capability_Certs.docx | DOCX document | |
| COMBINED_N42158-17-T-N037_AMEND._1.doc | DOC document | |
| 17-T-N037_Attachment_1_-_Technical_Capability_Certs.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is a COMBINED SYNOPSIS/SOLICITATION for noncommercial services prepared in accordance with the information in FAR Part 15, using Contracting by Negotiation, as supplemented with the additional information included in this notice. This announcement constitutes the only solicitation; a written solicitation will not be issued. PAPER COPIES OF THIS SOLICITATION WILL NOT BE AVAILABLE. This combined synopsis/solicitation SHALL be posted on both FEDBIZOPPS and NECO (http://www.neco.navy.mil/).
The RFQ number is N4215817TN037. This solicitation documents and incorporates provisions and clauses in effect through FAC 2005-95 and DFARS Change Notice 20161222. It is the responsibility of the contractor to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at these addresses: www.acqnet.gov/far and http://www.acq.osd.mil/dpap/dfars/index.htm. The NAICS code is 532490 and the Small Business Standard is $32.5 million. This is a competitive, small business set-aside requirement.
The NAVAL SEA SYSTEMS COMMAND (NAVSEA)/ NORFOLK NAVAL SHIPYARD (NNSY) requests responses from qualified sources capable of providing:
Item 0001 -: Rental of Air Compressors- Rental of Two (2) EA Air Compressors to supply oil free air for dry air layup of Main Engines in accordance with the Performance Work Statement found herein.
Monthly Rental Rate per Unit:
Weekly Rental Rate per Unit:
Daily Rental Rate per Unit:
ITEM 0001 - PRICING TOTAL FOR NEEDED DURATION (01 August 2017 through 01 November 2017) for two (2) EA self-contained Air Compressors:
Period of Performance 01 August 2017 through 01 November 2017 – ITEM 0001 **52.217-8 Price for Potential, Additional Six (6) Months: - ITEM 0001** Item 0002 -: Rental of Air Dryers- Rental of Two (2) EA Regenerative Air Dryers for dry air layup of Main Engines (inclusive of Filter Change out of Regenerative Air Dryers) in accordance with the Performance Work Statement found herein.
Monthly Rental Rate per Unit:
Weekly Rental Rate per Unit:
Daily Rental Rate per Unit:
ITEM 0002 - PRICING TOTAL FOR NEEDED DURATION (01 August 2017 through 03 April 2018) for two (2) EA Regenerative Air Dryers:
Period of Performance 01 August 2017 through 03 April 2017 – ITEM 0002 **52.217-8 Price for Potential, Additional Six (6) Months: - ITEM 0002** Item 0003 -: Freight In and Out- Freight In and Out for Two (2) EA Air Compressors and Two (2) EA Air Dryers to and from Norfolk Naval Base Norfolk, VA 23511.
2 Jobs = $$$ for freight inbound and $$$ for freight outbound LINE ITEM 0001 - Performance Work Statement (Air Compressor Rentals)
SCOPE:
Rental of (2) two self-contained compressed air compressors to supply oil free air for dry air layup of Main Engines
Deliver and retrieve the compressed air system to Norfolk Naval Base, Norfolk, Virginia, 23511
Marked for USS Dwight D. Eisenhower.
Rental Period Is From 8/01/2017 through 11/01/2017
CONSTRUCTION AND LIFTING REQUIREMENTS
The compressed air system shall be wholly contained on one skid. The skid shall be constructed to be portable, capable of being both transported by forklift and crane.
The installed compressed air system, including the compressor and all accessory equipment, shall together occupy a volume with dimensions which do not exceed 8’-0” wide by 12 ’-0” long by 8’-0” high.
The compressed air system shall comply with the applicable OSHA regulations.
The compressed air system shall comply with the applicable ASME Boiler and Pressure Vessel Code.
The compressed air system shall include drip pans or trays to capture and contain fluid leaks.
Relief valves shall have intact wire seals on their adjustment caps and shall bear tags indicating the set point, testing activity and test date.
Pressure gauges shall be in calibration and shall bear labels showing calibration, which will not expire during the contract period.
Power cable end fittings will be lugged and color coded to indicate proper phasing.
End fitting of compressor will be 2” NPT outlet.
The equipment shall be outfitted with suitable attachments for overhead lifting.
One (1) Each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength.
Each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment.
Design of the lifting attachments shall be such that the shackles are not side loaded.
Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1”.
The equipment shall be marked in a prominent location with the gross weight. Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).
The equipment shall be provided with a lifting sketch / rigging diagram.
The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).
CONTRACTOR RESPONSIBILITY:
Equipment delivery and removal at no additional cost to the government
Provide all parts requiring repair or replacement under circumstances of normal equipment wear and tear at no additional charge.
Contractor shall not install any electrical cabling/equipment without notification and approval of Norfolk Naval Shipyard Temporary Services Manager.
The contractor shall dispatch a representative in response to a service request to repair and/or replace an air compressor within four (4) hours of notification by NNSY at no additional charge.
When the equipment is required to be removed to the contractor's facility for repair or replacement, the contractor shall be responsible for loss or damage from the time it leaves the government site until it is returned to the government.
Clean the air compressor prior to delivery to the following requirements:
a. Air compressor shall be cleaned to a degree of cleanliness that results in a surface free of grease, oil, flux, scale, dirt loose particles and any other matter foreign to the base metal. Adherent light superficial rust on steel surfaces, caused by short time exposure to the atmosphere, is acceptable.
b. For uncoated surfaces: Adherent corrosion products typical on surfaces of the type material being considered (e. g. flash rust on steel) are acceptable. Loose corrosion products are not acceptable and must be removed.
GOVERNMENT RESPONSIBILITY:
Provide operators.
Monitor all gauges.
Equipment movement while at NNSY.
Lost items and equipment damage beyond normal wear and tear.
NOTES:
1. New or used equipment may be provided. Used compressors shall not have in excess of 2,500 operating hours at the beginning of the rental period. NNSY reserves the right to inspect the proposed equipment prior to contract award.
2. The compressor will be exposed to everyday weather, and saltwater air. It is the contractor's responsibility to provide any protective coverings for the units.
3. The government reserves the right to return one or all units at any time prior to the expiration of the rental period. The contractor agrees to prorate costs for the time the units are in use by NNSY only. The government agrees to give the contractor twenty-four (24) hours notice for return of units prior to expiration of rental period.
MARKINGS:
The compressed air system shall have the (1) air capacity, (2) maximum supply pressure and (3) the electric horsepower and RPM rating stamped on a metal plate attached to the equipment. Each major component of the system, including, but not limited to the compressor, electric motor and the purification system shall have the manufacturer's name and the manufacturer's serial number stamped on a metal plate attached to the component. No metal stamping is permitted on any surface subjected to high stresses in service, except as permitted by the applicable portions of the ASME Boiler and Pressure Vessel Code.
ADDITIONAL CONTRACTOR SERVICES/REQUIREMENTS:
Deliver and retrieve the compressed air system to Norfolk Naval Base, Norfolk, Virginia 23511.
Provide start up training for compressed air system on-site at Norfolk Naval Base Norfolk VA or Norfolk Naval Shipyard, Portsmouth, VA. The training shall be conducted the day of, or the next day after the compressed air system is delivered. Training shall require no more than one instructor and shall last no longer than 4 hours.
Provide commercial operating instruction manuals for the air compressor and all other major components of the compressed air system.
Provide 24 hour a day, seven-day a week on-call repair service during the rental period. The contractor will be responsible for initiating repairs on-site, at Norfolk Naval Base, Norfolk Va. or Norfolk Naval Shipyard, Portsmouth, Virginia, within 4 hours of verbal or written notification that the equipment has malfunctioned. The contractor shall replace the malfunctioning component if the compressed air system cannot be returned to service within 36 hours of being notified of the original malfunction.
PREPARATION FOR DELIVERY:
The compressed air system must be preserved and packaged per the manufacturer's commercial practice. Packing shall be in a manner that will insure acceptance by a common carrier and safe delivery at the destination. The shipping container and method of packing must comply with the Uniform Freight Classification Rules or other carrier regulation as applicable to the mode of transportation. A parts list and a technical/instruction manual shall be provided.
LINE ITEM 0002 - Performance Work Statement (Air Dryer Rentals and Filter Change Out)
SCOPE:
Rental of (2) two regenerative air dryers for dry air layup of Main Engines
Deliver and retrieve the compressed air system to Norfolk Naval Base, Norfolk, Virginia, 23511
Marked for USS Dwight D. Eisenhower.
Rental Period Is From 8/01/2017 through 04/03/2018
CONSTRUCTION AND LIFTING REQUIREMENTS:
Regenerative Air Dryers (2 units) must provide an extra low dew point to -100F.
Must be capable of handling at least 930 cubic feet minute (CFM) at 125 PSIG.
Electrical Requirements: 110/120 VAC, 60 HZ, 1 Phase
Inlet and outlet must be 2” NPT. (If unit is not equipped with 2” Male NPT Inlet and Outlet connections, contractor to provide adapters as required to provide 2” Male NPT inlet and outlet connections on the unit.)
Contractor to adhere to the rigging requirements as outlined below for contractor equipment at Norfolk Naval Base.
Unit must be free standing and must have forklift slots (capable of being moved with a forklift)
The equipment shall be outfitted with suitable attachments for overhead lifting.
For multiple point lifts each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength.
For multiple point lifts each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts the lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.
Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.
Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1”.
The equipment shall be marked in a prominent location with the gross weight. Sand hoppers, tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).
The equipment shall be provided with a lifting sketch / rigging diagram that meets the requirements below.
The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).
The lifting sketch shall include the location of the center of gravity of the equipment (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.
A copy of the lifting sketch shall be permanently posted on the equipment, and a copy shall be forwarded to Code 714 (396-3345, 3346).
If specialized handling gear other than shackles, standard slings, or chainfalls (i.e. spreader beams, special lift rigs, etc.) is required, the contractor shall furnish it. This handling gear shall be provided certified in accordance with NAVFAC P-307, with written documentation of proof testing.
Rigging Sketch Requirements
Rigging sketches, as a minimum, shall identify the following:
1.
The weight of the load.
2.
The location of the center of gravity.
3.
The minimum crane capacity.
4.
The minimum capacity / length of slings.
5.
The minimum capacity of other standard rigging gear.
6.
The attachment (lifting) points for the load.
a.
The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.
b.
The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.
7.
Limitations on allowable orientations for any parts making up the lifting assembly.
8.
For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unlaying the rope.
9.
A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.
a) "D" represents the diameter of the object the sling passes over.
b) "d" represents the diameter of the sling.
c) Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.
10.
Components in each handling assembly shall be sized based on the worst case distribution of loads.
a) When making a two, three, or four point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used.
11.
When non-standard gear is required (i.e. round stock lifting bars) written instructions shall be provided that ensure:
a) The proper material is being used,
b) The item is certified IAW NAVFAC P-307.
c) Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e.
eccentricity of the bearing points).
CONTRACTOR RESPONSIBILITY:
Equipment delivery and removal at no additional cost to the government.
Provide all parts requiring repair or replacement under circumstances of normal equipment wear and tear at no additional charge
The contractor shall dispatch a representative in response to a service request to repair and/or replace the air dryer within four (4) hours of notification by NNSY at no additional charge
When the equipment is required to be removed to the contractor's facility for repair or replacement, the contractor shall be responsible for loss or damage from the time it leaves the government site until it is returned to the government site.
Clean the air dryer prior to delivery to the following requirements:
Air Dryer shall be cleaned to a degree of cleanliness that results in a surface free of grease, oil, flux, scale, dirt loose particles and any other matter foreign to the base metal. Adherent light superficial rust on steel surfaces, caused by short time exposure to the atmosphere, is acceptable.
For uncoated surfaces: Adherent corrosion products typical on surfaces of the type material being considered (e. g. flash rust on steel) are acceptable. Loose corrosion products are not acceptable and must be removed.
GOVERNMENT RESPONSIBILITY:
Provide operators.
Monitor all gauges.
Equipment movement while at NNSY.
Lost items and equipment damage beyond normal wear and tear.
NOTES:
New or used equipment may be provided. NNSY reserves the right to inspect the proposed equipment prior to contract award at the contractor’s facility.
The air dryer will be exposed to everyday weather, and saltwater air. At the time of delivery, it is the contractor's responsibility to provide any protective coverings for the unit at the time of delivery of the unit.
The government reserves the right to return one or all units at any time prior to the expiration of the rental period. The contractor agrees to prorate costs for the time the units are in use by NNSY only. The government agrees to give the contractor twenty-four (24) hours notice for return of units prior to expiration of rental period.
ADDITIONAL CONTRACTOR SERVICES/REQUIREMENTS:
Deliver and retrieve the compressed air system to Norfolk Naval Base, Norfolk, Virginia.
The rental period shall be from 8/01/17 to 4/03/18 with the option to return the compressed air systems to the contractor prior to 4/03/18 allowing for a contract price reduction prorated per the monthly rate.
Provide start up training for the air drying system on-site at Norfolk Naval Base Norfolk VA or Norfolk Naval Shipyard, Portsmouth, VA. The training shall be conducted the day of, or the next day after the air drying system is delivered. Training shall require no more than one instructor and shall last no longer than 4 hours.
Provide commercial operating instruction manuals for the air dryers.
Provide 24 hour a day, seven-day a week on-call repair service during the rental period. The contractor will be responsible for initiating repairs on-site, at Norfolk Naval Base, Norfolk Va. or Norfolk Naval Shipyard, Portsmouth, Virginia, within 4 hours of verbal or written notification that the equipment has malfunctioned. The contractor shall replace the malfunctioning component if the compressed air system cannot be returned to service within 36 hours of being notified of the original malfunction.
PREPARATION FOR DELIVERY:
The air drying system must be preserved and packaged per the manufacturer's commercial practice. Packing shall be in a manner that will insure acceptance by a common carrier and safe delivery at the destination. The shipping container and method of packing must comply with the Uniform Freight Classification Rules or other carrier regulation as applicable to the mode of transportation.
A parts list and a technical/instruction manual shall be provided.
Interface Requirements for Rental Equipment Hook-up to NNSY Temporary Service or Equal
110-120 VAC Service : Material Manufactured by Duraline
20 Amp or less- 3 foot tail of 12/3 cable w/3MT20 crowsfoot plug
Over 20 Amp and up to 50 Amp : 3 foot tail of 6/3 cable w/3MT50 crowsfoot plug
440 VAC Service: Material Manufactured by Duraline
20 Amp or less- 3 foot tail of 12/4 cable w/ 4MT20 crowsfoot plug
Over 20 Amp and up to 50 Amp- 3 foot tail of 6/4 cable w/ 4MT50 crowsfoot plug above can also be used on 220VAC Any service over 50 Amp requires box cable
440 VAC 50-100 Amp Service: Material manufactured by Crouse Hinds
50-100 Amps 3-5 foot length of 2/4 cable w/male camlock twist connectors:
Part Numbers:
Brass -A200036-2
Black Sleeve- A200706-7
White Sleeve- A200706-12
Red Sleeve-A200706-9
Over 100 and up to 225 Amps: 3- 5 foot length of 3 conductor 3/0 cable with camlock connectors:
Part Numbers:
Brass - A200038-2
Black Sleeve- A2000706-13
White Sleeve-A2000706-18
Red Sleeve- A2000706-15
Over 225 and up to 400 Amps: 5-15 length of 500 MCM cable w/camlock connectors:
Part Numbers :
Brass- A20028-2
Black Sleeve-A200056-1
White Sleeve-A200056-6
Red Sleeve- A200056-3
NOTE: All Rental Equipment received by NNSY must be supplied with proper interface connectors to allow hook-up by NNSY Shop 99. There may be specific equipment that will require NNSY Shop 99 evaluation to determine proper cabling and connectors.
LINE ITEM 0002 (cont’d.) - For Service Filter Change Out for Air Dryers
SCOPE:
Rental of (2) two regenerative air dryers for dry air layup of Main Engines
Deliver and retrieve the compressed air system to Norfolk Naval Base, Norfolk, Virginia, 23511
Marked for USS Dwight D. Eisenhower.
Period of Performance: 01 August 2017 through 03 April 2018
· New filters shall be installed upon initial set up / start up for air dryers.
· Filters shall be changed out upon request of NNSY Technical Point of Contact, and at a minimum of once every 8 weeks.
· The cost of this service shall be incorporated into the cost of the air dryer rental ordered under Line Item 0002.
· Vendor shall supply air filters.
· Start date : 08/01/2017
· End date : 04/03/2018
Government Points of Contact:
Subject Matter Expert: TO BE NAMED AT TIME OF AWARD
Invoice Certifier: TO BE NAMED AT TIME OF AWARD Requirements for Lifting of Equipment:
1. The equipment shall be outfitted with suitable attachments for overhead lifting.
1.1. For multiple point lifts each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength.
1.2. For multiple point lifts each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts the lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.
1.3. Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.
1.4. Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1”.
2. The equipment shall be marked in a prominent location with the gross weight. Sand hoppers, tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).
3. The equipment shall be provided with a lifting sketch / rigging diagram that meets the requirements of Attachment B Sheet 2.
3.1. The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).
3.2. The lifting sketch shall include the location of the center of gravity of the equipment (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.
3.3. A copy of the lifting sketch shall be permanently posted on the equipment, and a copy shall be forwarded to Code 714 (396-3345, 3346).
4. If specialized handling gear other than shackles, standard slings, or chainfalls (i.e. spreader beams, special lift rigs, etc.) is required, the contractor shall furnish it. This handling gear shall be provided certified in accordance with NAVFAC P-307, with written documentation of proof testing.
SAFETY
"Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements and Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements or safety requirements for site specific location of the contract.
a. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA’s Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer’s Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name lables and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.
b. Contractors and NNGA’s may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the
OSHA 1915.89 web site by using the following link to NNSY’s public access web site:
http://www.navsea.navy.mil/shipyards/norfolk/default.aspx
c. Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY TPOC and/or CORs set forth elsewhere in this award document.”
Contract POC
On Any Problems Concerning The Order, Please Contact Contract Specialist, Chad Godwin, Code 410, NAVSEA Contracting Department, Bldg. 1500, 2nd Floor, Portsmouth, VA 23709-5000, Telephone: (757) 396-8277.
IMPORTANT NOTE: In the event that service(s) cannot be accomplished as currently described within this PWS, the contractor MUST immediately notify the Contracting Officer, in writing, of the circumstances preventing successful completion. Failure to do so may alleviate the Government for payment of charges deemed to be outside of the scope of contract.
IMPORTANT NOTES
MARKINGS:
In addition to any other marking requirements found herein, the Contractor shall ensure that all equipment supplied under this contract shall bear the following information:
1. Contractor’s Name and Point of Contact information (name, tele# etc)
2. Government Contract Number; Contracting Officer’s information (name, tele# etc)
3. Vessel Name/Code
The above information should be prominently displayed in a manner that will withstand weather conditions under which this equipment may be exposed.
PICKUP/REMOVAL OF RENTAL UNITS:
Unless otherwise notified by NAVSEA Contracting, Norfolk Naval Shipyard, Code 410, rental/lease unit(s) shall be picked-up (removed) by Contractor on the morning after expiration of the established contract period of performance. In the event that this date occurs on a Saturday, Sunday, or a recognized Federal Holiday, the contractor may make the appropriate arrangements to pick-up the equipment on the first working day following the expiration of the contract at no additional cost to the Government.
If any difficulty is experienced in picking-up (removing) unit(s), the Contractor MUST immediately request the Contracting Officer’s direction by contacting TO BE NAMED AT TIME OF AWARD..
A Contractor’s failure to follow the above instructions regarding pick-up/removal of rental units will relieve the Government of any liability for further charges for the equipment.
REQUIREMENTS FOR ACCESS TO NAVY INSTALLATIONS
Commander, Navy Installations Command (CNIC), has established the Navy Commercial Access Control System (NCACS), a standardized process for granting unescorted access privileges to vendors, contractors, suppliers and service providers not otherwise entitled to the issuance of a Common Access Card (CAC) who seek access to and can provide justification to enter Navy installations and facilities. Visiting vendors may obtain daily passes directly from the individual Navy Installations by submitting identification credentials for verification and undergoing a criminal screening/ background check. Alternatively, if the vendor so chooses, it may voluntarily elect to obtain long-term credentials through enrollment, registration, background vetting, screening, issuance of credentials, and electronic validation of credentials at its own cost through a designated independent contractor NCACS service provider. Credentials will be issued every five years and access privileges will be reviewed/renewed on an annual basis. The costs incurred to obtain Navy Installation access of any kind are not reimbursable, and the price(s) paid for obtaining long-term NCACS credentials will not be approved as a direct cost of this contract. Further information regarding NCACS can be found at http://cnic.navy.mil/CNIC_HQ_Site/index.htm (under "Popular Links").
Contractor Unclassified Access to Federally Controlled Facilities, Sensitive Information, Information Technology (IT) Systems or Protected Health Information (July 2013)
Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The Deputy Secretary of Defense Directive-Type Memorandum (DTM) 08-006 – “DoD Implementation of Homeland Security Presidential Directive – 12 (HSPD-12)” dated November 26, 2008 (or its subsequent DoD instruction) directs implementation of HSPD-12. This clause is in accordance with HSPD-12 and its implementing directives.
APPLICABILITY
This clause applies to contractor employees requiring physical access to any area of a federally controlled base, facility or activity and/or requiring access to a DoN or DoD computer/network/system to perform certain unclassified sensitive duties. This clause also applies to contractor employees who access Privacy Act and Protected Health Information, provide support associated with fiduciary duties, or perform duties that have been identified by DON as National Security Position, as advised by the command security manager. It is the responsibility of the responsible security officer of the command/facility where the work is performed to ensure compliance.
Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.
ACCESS TO FEDERAL FACILITIES
Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Navy Command’s Security Manager upon arrival to the Navy Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.
ACCESS TO DOD IT SYSTEMS
In accordance with SECNAV M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information Assurance Manager. Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) which is a higher level investigation than the National Agency Check with Law and Credit (NACLC) described below. Due to the privileged system access, a SSBI suitable for High Risk public trusts positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.
Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s Security Manager and Information Assurance Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor”.
The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
INTERIM ACCESS
The Navy Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.
DENIAL OR TERMINATION OF ACCESS
The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.
CONTRACTOR’S SECURITY REPRESENTATIVE
The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE DUTIES
Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Navy recognizes contractor employees under this contract as Non-Critical Sensitive [ADP/IT-II] when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified by DON as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The NACLC consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:
· SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product)
· Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)
· Original Signed Release Statements
Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the Navy Command’s Security Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s Information Assurance Manager. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.
The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Navy Command Security Manager. The Navy Command’s Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM). Suitability/security issues identified by the Navy may render the contractor employee ineligible for the assignment. An unfavorable determination made by the Navy is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Navy Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DON Central Adjudication Facility (CAF) for a determination.
If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the Navy Command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES
Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc ...) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:
· Must be either a US citizen or a US permanent resident with a minimum of 3 years legal residency in the United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and
· Must have a favorably completed National Agency Check with Written Inquiries (NACI) including a FBI fingerprint check prior to installation access.
To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:
· SF-85 Questionnaire for Non-Sensitive Positions
· Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)
· Original Signed Release Statements
The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM
Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
* Consult with your Command Security Manager and Information Assurance Manager for local policy when IT-III (non-sensitive) access is required for non-US citizens outside the United States.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
52.204-2
52.204-3 Security Requirements
Taxpayer Identification
AUG 1996
OCT 1998
| 52.204-13 |
| System for Award Management Maintenance |
| JUL 2013 |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications. |
| DEC 2014 |
| 52.209-2 |
| Prohibition on Contracting with Inverted Domestic Corporations--Representation |
| NOV 2015 |
52.211-15
52.212-1
52.212-4 Defense Priority and Allocation Requirements
Instructions to Offerors – Commercial Items
Contract Terms and Conditions – Commercial Items
APR 2008
OCT 2015
MAY 2015
52.223-2
52.232-1
52.232-39 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
Payments
Unenforceability of Unauthorized Obligations
SEP 2013
APR 1984
JUN 2013
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| NOV 2011 |
252.203-7995 (DEV.)
252.204-7003
252.204-7004 Alt. A Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements
Control Of Government Personnel Work Product
System for Award Management Alternate A
NOV 2016
APR 1992
FEB 2014
252.204-7005
252.204-7009
252.204-7012 Oral Attestation of Security Responsibilities
Limitations on the Use or Disclosure of Third-Party
Safeguarding Covered Defense Information and Cyber Incident Reporting.
NOV 2001
OCT 2016
DEC 2015
252.204-7015
252.211-7003 Disclosure of Information to Litigation Support Contractors
Item Unique Identification and Valuation
FEB 2014
MAR 2016
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| JUN 2013 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.237-7010 |
| Prohibition on Interrogation of Detainees by Contractor Personnel |
| JUN 2013 |
| 252.244-7000 |
| Subcontracts for Commercial Items |
| JUN 2013 |
252.246-7007
252.246-7008
252.247-7023 Contractor Counterfeit Electronic Part Detection and Avoidance Systems Sources of Electronic Parts
Transportation of Supplies by Sea
AUG 2016
OCT 2016
APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.209-11 REPRESENTATION by Corporations Regarding Delinquent Tax Liability or a
Felony Conviction under any Federal Law (FEB 2016)
(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that--
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
(End of provision)
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
The Government will conduct a lowest price technically acceptable source selection process using the policies and procedures of FAR Subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items. This acquisition process will be used in the evaluation and award of the contract.
(a) The Government will award a contract resulting from this solicitation to the responsible vendor whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotations:
· Technical Submission (Technical Capability Certifications Chart per Attachment 1)
· Price
Award(s) will be made for the technically acceptable item or combination of technically acceptable items that result in the lowest aggregate price to the Government.
The quoted prices (including options and FAR 52.217-8 OPTION TO EXTEND SERVICES) of all technically acceptable items will be evaluated and the Contracting Officer shall assume, for the purpose f making multiple awards, that $500 would be the administrative cost to the Government for issuing and administering each contract award under this Request For Quotation.
Technical Acceptability: Will be determined by reviewing the technical capability certifications chart (per Attachment 1) submitted for each item (or specification) to ensure that all of the technical requirements identified are met. Technical acceptability will be defined as follows:
Technical Ratings
| Rating |
| Description |
| Acceptable |
| Quote meets all of the requirements identified. |
| Unacceptable |
| Quote does not meet all of the requirements identified. |
Failure to meet…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .