SOW_SSTG_Turbine_Repairs.doc
DOC document 101 KB Posted
- Attached to
- USS FRANK CABLE SSTG REPAIR Federal contract opportunity
- Solicitation number
- N4044619Q0028
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WD_15-5693_REV_8.docx | DOCX document | |
| 19Q0028_COMBO.docx | DOCX document | |
| TURBOGEN_Service_Report.pdf | ||
| J&A_REDACTED.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USS FRANK CABLE
(AS-40)
MACHINERY, AUXILIARY
N32205-19-R-XXXX
4 JANUARY 2019
WORK ITEM NO. 501 CATEGORY "A"
MSC N754/BARTON/DLB
#2 SSTG TURBINE REPAIRS (ABS) (VR 17-204)
1.0 ABSTRACT:
1.1 This item describes the requirement to reassemble the Steam Turbine and Reduction Gear for the #2 Ship Service Turbine Generator (SSTG) for ABS Special Survey.
2.0
REFERENCES/ENCLOSURES:
2.1 Technical Manual 0961-LP-071-7014, 2,500 AC Ship Service Turbine Generator 2.2 TurboGen Service Report #2 SSTG Turbine & Reduction Gear Repairs (Dated 7 Jan 2018)
2.3 NAVSEA Drawing AS40-845-7362894 (AS-40 NUCLEAR/NON-NUCLEAR INTERFACE BOOKLET – FOUO) 3.0
ITEM LOCATION/DESCRIPTION/QUANTITY:
3.1 Location:
ENGINE ROOM 7-110-0-E
3.2 Description/Quantity:
3.2.1 SSTG Turbine (1 ea.):
Mfr: DeLaval
Type: GJ Serial #: 654270
Speed: 8929 RPM Steam Pressure: 570 PSIG
Steam Temperature: 850 Deg F.
Exhaust Pressure: 4 HgA Overspeed Trip Speed: 9,825-10,000 RPM Nr Turbine Rotor Wheels: 8 Rows Bearing Span: 51-1/4” Rotor Dimension: Approx 26” Dia. x 72” L Rotor Weight: 1,003 lbs Turbine Upper Case with Diaphragms Weight: 2,245 lbs 3.2.2 SSTG Reduction Gear Set (1 ea.):
Mfr: DeLaval
Size: KD Special
Serial #: 654271
Type: Single Reduction, Speed Ratio 7.44:1
Gear Case Upper Half Weight: 750 lbs.
4.0 GOVERRNMENT FURNISHED MATERIAL/SERVICES:
4.1 Government furnished Material:
4.1.1 SSTG Turbine Assembly, Delaval Dwg H-5107, Serial #’s 654270
PIECE#
QTY
DESCRIPTION
PART #
OIL GUARD
GJ-588V U/L
BEARING ASSEMBLY
DWG C-62434
PHILLY GEAR #395-0150
OIL GUARD
GJ-4288B
FLEX GASKET
A-9914
TIGHTENING RING
GJ-141ARX1
TIGHTENING RING
GJ-141ARX2
TIGHTENING RING
GJ-141APX2
SPRING
VSGJ235
BEARING ASSEMBLY
DWG C-62436
PHILLY GEAR #395-0509
OIL GUARD
LJ-588A U/L
THRUST BEARING ASSY
PM-1067F
KINGSBURY 5” JHJ WITH OIL CONTROL RING #4466
SHIM
GJ-298L U/L
BUSHING
RGR-215K
CAPSCREW 60, 55-5-86
1/2”-13-1
TYPE VI COR RES STL
TIGHTENING RING
GJ-141ADX1
COLLAR
MS-555B
OIL GUARD
GJ-201D U/L
LABRYINTH RING
GJ-4241E
GUARD
GJ-588CP
4.1.2 SSTG Turbine Rotor Assembly, PT # 2080B, Dwg E-27816
Parts for Overspeed Trip Unit
PIECE#
QTY
DESCRIPTION
PART #
EMERGENCY RING
M-250C
PIN
M-774DV
SPRING
M-258MT
PLUG
M-170CH
BUSHING
M-215JK
PIN
M-774DH
SLIPPER
M-586GF
RING
M-201A
PINION
GJ-416 H
4.1.3 SSTG Turbine Nozzle & Operating Gear Assy, Dwg F-5795
PIECE#
QTY
DESCRIPTION
PART #
1” VALVE SEAT
KJ-62BN
1” VALVE
KJ-225SX8
NUT
KJ-402A
25/32” VALVE SEAT
KJ-62BM
25/32 VALVE
KJ-225PX7
WASHER
PD-586
SPACER
NJ-297A
NUT
KJ-402LX1
BUSHING
NC-215 CT
SPINDLE
M-159V
BUSHING
NC-215CTX1
FORK
M-1841AW
SELF ALIGN BUSHING
AB10-9L
FORK
M-1841AWX1
SPRING
DC-235B
BUSHING
GJ-215
4.1.4 SSTG Turbine Lube Oil Pump Drive & Tach Drive Assy, Dwg E-26298
PIECE#
QTY
DESCRIPTION
PART #
BEARING
H-4268
OIL GUARD
GJ-588M U/L
SHIM
GJ-298E
SPACER
GJ-18386
RETAINING RING
COMMERCIAL INTRUARC
N6000-650
BALL BEARING
5209X1A
BUSHING
HD-215P
CHECK NUT
RD-402KX1
SHIM
GJ-298E
BEARING
M-263S
4.1.5 SSTG Turbine Oil Sight Flow Assy, Dwg C-60801
PIECE#
QTY
DESCRIPTION
PART #
GASKET
MS-327
OIL GUARD
RGR-686B
WASHER 1½” ID X 1-13/16”
OD X 0.014” THK, MIL-S-16782
BUSHING
RGR-215K
4.1.6 SSTG Turbine Hydraulic Trip Assy, Dwg P-58985
PIECE#
QTY
DESCRIPTION
PART #
SPRING
C 600-063-1000M
BALL BUSHING
A-61064
OILLITE BEARING
AA-521-1
0-RING
11-012
SPRING
C 240-042-0810M
BEARING BALL ONLY
.25” DIA
4.1.7 SSTG Turbine High Exhaust Pressure Trip Valve, Dwg D-56476
PIECE#
QTY
DESCRIPTION
PART #
BUSHING
MV-215IV
SPRING
M-258NB
BELLOWS
M-738AD
O-RING
7446-70X11-012
4.1.8 SSTG Turbine Trip Throttle Valve, Gimble Machine Dwg S-22 (Page 300)
PIECE#
QTY
DESCRIPTION
PART #
GASKET SPIRAL WOUND
NK-756-1
STUD, STEEL A193 B16
NL-590-4
¾”-10NC X 3½”
NUT, STEEL A193-GR4
¾” 10-NC2
4.1.9 SSTG Turbine Y-Type Steam Strainer, Dwg NP-294 (Page 302)
PIECE#
QTY
DESCRIPTION
PART #
GASKET SPIRAL WOUND
NK-190-1
STUD, STEEL A193-B16
NL 1101-4
NUT, STEEL A194-GR4
NP-294-7
4.1.10 SSTG Turbine Atmospheric Relief Valve, Gimble Machine Dwg S-895(Page 305)
PIECE#
QTY
DESCRIPTION
PART #
STEM BUSHING
NL-540-1
SPRING
NK-738-1
4.1.11 SSTG Turbine Steam Seal Manifold, Gimble Machine Dwg S-920 (Page 308)
PIECE#
QTY
DESCRIPTION
PART #
THREADED BUSHING
S-203-9
GLAND NUT
S-203-11
GLAND
S203-23
BUSHING
S-203-25
VALVE STEM
S-203-10
GASKET INCONEL
S-203-7
YOKE
S-203-12
VALVE STEM
S-203-20
GASKET INCONEL
S-203-35
VALVE STEM
NL-333-1
4.1.12 SSTG Turbine High Speed Coupling, Dwg HR-2764
PIECE#
QTY
DESCRIPTION
PART #
HS COUPLING SPOOL
MR440GGX1
HS COUPLING HUBS
MR4441BX4
HS COUPLING RETAINER RING 321112
4.1.13 SSTG Turbine Attached Lube Oil Pump, Type 3DDX-250 Dwg SF-5325
PIECE#
QTY
DESCRIPTION
PART #
O-RING (BUNA)
023-1
O-RING (BUNA)
023-2
4.1.14 SSTG Turbine Rotor Rotor, Guide Blade Ring and Diaphragms
PIECE#
QTY
DESCRIPTION
PART #
1 1
TURBINE ROTOR ASSEMBLY
GJ2080B
2 1
GUIDE BLADE RING
GJ25BGX1
3 1
TURBINE DIAPHRAGM
GJ52GP
4 1
TURBINE DIAPHRAGM
GJ52GR
5 1
TURBINE DIAPHRAGM
GJ52GS
6 1
TURBINE DIAPHRAGM
GJ52GT
7 1
TURBINE DIAPHRAGM
GJ52GV
8 1
TURBINE DIAPHRAGM
GJ52GW
5.0 NOTES:
5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s, including but not limited to, GTR’s 1 through 7, 22, 23, and 29.
5.2 The contractor and all subcontractors, regardless of tier, are advised to review all other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this Work Item are found in Work Item 001.
5.3 THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL CONTACT THE RADIOLOGICAL CONTROLS OFFICER (RCO) OR HIS DESIGNATED REPRESENTATIVE PRIOR TO PERFORMING ANY REPAIRS IN NAVSEA 08 AREAS OF CONCERN AS OUTLINED IN REFERENCE 2.3. THE RADIOLOGICAL CONTROLS OFFICER (RCO) WILL DETERMINE IF THERE ARE SPECIAL REQUIREMENTS ASSOCIATED WITH THIS REPAIR BASED ON ITS LOCATION AND WORK REQUIRED. THE RADIOLOGICAL CONTROL OFFICER (RCO) SHALL ENSURE ALL RADIOLOGICAL REQUIREMENTS AND PRECAUTIONS OF NAVSEA 0989-058-8000 FIGURE 1A-24 OR 1B-24 (AS APPLICABLE) ARE MET.
5.4 The Rotor, Diaphgrams and Guide Ring have been previously removed from the #2 SSTG Steam Turbine.
5.5 The Guide Blade Ring and Diaphragms provided in Paragraph 4.1.14 were manufactured with an oversize OD and will require machining to fit the existing Lands in the turbine casing prior to installation.
6.0
QUALITY ASSURANCE REQUIREMENTS:
6.1 The requirements of this Work Item shall be accomplished to the satisfaction of the MSCREP.
6.2 The requirements of this Work Item shall be accomplished in accordance with current ABS Regulatory Body rules and regulations.
7.0 STATEMENT OF WORK:
7.1 Arrangement/Outfitting:
7.1.1 Remove all interference items necessary to accomplish the requirements of this Work Item. Mark, protect and properly store all interference items removed. Reinstall interference items and prove them operational when the requirements of this Work Item are complete.
7.1.2 Provide and erect all scaffolding or mechanical staging required to accomplish all requirements of this Work Item. Ensure compliance with all safety standards. Remove the scaffolding or mechanical staging when all requirements of this Work Item are complete.
7.1.3 Provide and maintain temporary lighting and ventilation required to accomplish all requirements of this Work Item. Remove the temporary lighting and ventilation when all requirements of this Work Item are complete.
7.1.4 Remove insulation / lagging required to accomplish the requirements of this Work Item. Upon completion of all repairs, install new insulation / lagging to replace that removed to accomplish the requirements of this Work Item.
7.2 Mechanical:
7.2.1 Prior to disassembly of the #2 SSTG Turbine, accomplish an inventory of the loose parts and items provided in 4.1 in the presence of the MSCREP. Determine that all parts required to reassemble the #2 SSTG are available.
7.2.2.
Submit a typed written report to the MSCREP listing the results of the inventory accomplished in 7.2.1. The report shall provide the “As Found” conditions for all of the parts and identify any items that are missing and required to complete the reassembly of the #2 SSTG Turbine.
7.2.3 Disassemble the #2 SSTG Turbine to the extent necessary to install the Rotor, Guide Blade Ring and Diaphgrams and accomplish the 5 Year ABS Inspection using Reference 2.1 for guidance.
7.2.4 Clean and inspect all Bearings and High Speed Coupling for the #2 SSTG Turbine using Reference 2.1 for guidance.
7.2.4.1 Fit the coupling hubs Provided in 4.1.12 to the corresponding hub on the Trubine Rotor and Reduction Gear. Ream the holes to provide required diameter to fabricate new fitted Coupling Bolts. Take and record measurements required to fabricate new fitted bolts for each coupling hub. Match mark each coupling hub to identify the orientation of each matched set.
7.2.5 Take all clearance measurements required to accomplish the 5 Year ABS Inspection of the #2 SSTG Turbine to include the Rotor, all Bearings and High Speed Coupling using Reference 2.1 for guidance.
7.2.5.1 Take and record the measurements of each Land for the Guide Blade Ring and Diaphragms in the turbine casing. This information is required to accomplish final machining of the Guide Blade Ring and Diaphragms prior to installation. The Guide Blade Ring and Diaphragms provided in Paragraph 4.1.14 were manufactured with an oversize OD and will require machining to fit the existing Lands in the turbine casing prior to installation.
7.2.6 Accomplish all NDT Testing required to accomplish the 5 year ABS Inspection of the #2 SSTG Turbine using Reference 2.1 for guidance.
7.2.7 Accomplish a visual inspection of the #2 SSTG Turbine in the presence of the MSCREP and ABS Surveyor.
7.2.8 When directed by the MSCREP reassemble the #2 SSTG Turbine using using material provided as GFM in 4.1, new gaskets and hardware in accordance with Reference 2.1.
7.2.8.1 Machine the Guide Blade Ring and each Diaphragm provided in 4.1.14 to fit the existing lands in the turbine casing using the measurements taken in 7.2.5.1 and Reference 2.1 for guidance.
7.2.8.2 Fabricate and install new fitted bolts and nuts for each coupling hub using the measurements taken in 7.2.4.1 and Reference 2.1 for guidance.
7.2.9 Accomplish a Hot Oil Flush of the #2 SSTG Turbine, Reduction Gear and Generator Lube oil system by temporarly connecting a contractor furnisted hot oil flush rig to the lube oil sump suction and discharge to the Turbine, Reduction Gear and Generator Lube Oil piping system. Contractor shall provide and install bearing jumper hoses, sump flanges with hose fittings, clean lube oil rig, heater and ten micron filter, (Muslin) bags.
7.2.9.1 Perform a hot lube oil flush at 160-170 degree F temperature until a clean muslin bag is obtained (zero metallic particles) to the satisfaction of the MSCREP and Cheng. Upon completion of flush install sump cover and lube oil piping to restore operational configuration.
7.2.9.2 Prove all new and disturbed joints leak free during initial operation. After 24 hours of turbine operation tighten and torque all casing bolts.
7.2.10 Disasseble, clean and inspect the Nozzle Control Valves for the #2 SSTG Turbine in the presence of the MSCREP and ABS Surveyor using Reference 2.1 for guidance.
7.2.10.1 Accomplish an NDT inspection of the Nozzle Control Valves using Reference 2.1 for guidance.
7.2.10.2 Submit a typed written report to the MSCREP listing the results of the inspections accomplished in 7.2.10.1. The report shall provide the “As Found” conditions for the Nozzle Control Valves and any recommendations for repair.
7.2.10.3 When directed by the MSCREP reassemble the Nozzle Control Valves using new gaskets and hardware in accordance with Reference 2.1.
7.2.11 Upon completion of the 5 Year Inspection of the #2 SSTG Turbine and Reduction Gear and Nozzle Control Valves, when directed by the MSCREP reinstall the insulation and lagging removed in 7.1.4.
7.2.12 Submit a typed written report to the MSCREP providing the “As Found” and “As Released” condition for the #2 SSTG Turbine, Reduction Gear and Nozzle Control Valves(with photographs) recording all conditions, repairs, NDT’s, balancing, alignments, clearances, post repair test results and any recommendations for future repairs.
7.3 Inspection / Test:
7.3.1 Accomplish an operational test of the #2 SSTG Turbine and Reduction Gear during Dock Trial and Sea Trials to the satisfaction of the MSCREP and ABS Surveyor using Reference 2.1 for guidance.
7.4 Paint:
7.4.1 Accomplish surface preparation, prime and paint all new and disturbed surfaces in way of the requirements of this work item to match surrounding areas.
7.5 Manufactures Representative:
7.5.1 Provide the services of an OEM Recogonized Repair Facility to accomplish repairs to to the #2 SSTG Turbine listed in 3.2. ALL WORK TO THE TURBINE AND REDUCTION GEAR IS TO BE ACCOMPLISHED BY A RECOGONIZED REPAIR FACILITY. The following are Recogonized Repair Facilities for the requirements of this work item:
Cutriss-Wright
1101 Cavalier Blvd
Chesapeake, Virginia 23323
POC: Bryan Murphy
Phone: (757) 592-0973
E-mail: bryan.murphy@siemensgovt.com
MI-Tech Inc.
6685 Jet Park Road
North Charleston, SC 29406
POC: Bill Totten
Phone: (843) 553-2743
E-mail: bill@mi-tech.net
PJ Schwalbenberg & Associates Inc
26 Spear Mill Road
Cushing, Maine 04563
POC: Pete Schwalbenberg
Phone: (207) 354-0700
E-mail: office@turbinesandgears.com