FCB19-005_LPAC_PLC_UPGRADE_PERFORMANCE_WORK_STATEMENT_REV1.docx
DOCX document 23 KB Posted
- Attached to
- FCB19-005 LPAC PLC UPGRADE Federal contract opportunity
- Solicitation number
- N4044619Q0005
About this file
FCB19-005 LPAC PLC UPGRADE PERFORMANCE WORK STATEMENT REV1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT_1_N4044619Q0005_COMBINED_SYNOPSIS_SOLICITATION.docx | DOCX document | |
| FCB19-005_LPAC_PLC_UPGRADE_PERFORMANCE_WORK_STATEMENT.docx | DOCX document | |
| N4044619Q0005_COMBINED_SYNOPSIS_SOLICITATION.docx | DOCX document | |
| FCB19-005_LIMITED_SOURCE_MEMO_signed_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SERVICE ORDER REQUEST - MSC SSU GUAM
LPAC PLC UPGRADE
| VESSEL: |
| USS FRANK CABLE (AS-40) |
| Port Engineer: |
| ARSENIO QUEJADO |
| Phone |
| 671-339-5342/480-6500 |
| DATE: |
| 09/21/2018 |
| SSU JOB# |
| FCB19-005 |
VRR#
CASREP#
1.0 ABSTRACT
1.1 This item describes the requirement to accomplish Low Pressure Air Compressor (LPAC) Control Panel GSS-200 Upgrade.
2.0 REFERENCES/ENCLOSURES:
2.1 References:
2.1.1 NAVSEA Technical Manual S6220-EU-MMA-010
| 3.0 | ITEM LOCATION/DESCRIPTION |
| 3.1 | Location/Quantity |
3.1.1 Fire Room (7-123-0-E)
3.2 Item Description/Manufacturer's Data:
3.2.1 (QTY: 3 ea.): Low Pressure Air Compressor
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES/INFO: NONE
5.0 NOTES:
5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs, including but not limited to GTRs 1-7, 21,22,25,26 and 29.
5.2 The contractor and all subcontractors, regardless of tier, are advised to review other work items under this contract to determine their effect on the work required under this work item. Many definitions relating to the performance of this work item are found in Work Item 001.
6.0 QUALITY ASSURANCE REQUIREMENTS:
6.1 The requirements of this Work Item shall be accomplished to the satisfaction of the MSCREP.
6.2 The requirements of this Work Item shall be accomplished in accordance with current Regulatory Body rules and regulations.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Contractor shall provide all labor, tools and materials to accomplish LPAC Control Panel GSS-200 Upgrade.
7.1.1 Provide the services of an Original Equipment Manufacturer (OEM) Field Service Technician to accomplish scope of work.
7.1.2 Upon completion of work, accomplish operational test of the newly installed control panel under normal operating conditions.
7.1.3 Provide new technical manual/publication, deck plate training to 8 ship personnel in proper operation and maintenance of the equipment.
7.1.4 Submit a type written report to the MSCREP listing the results of the work completed in 7.1.1 and 7.1.2.
7.2 Manufacturer Representative:
7.2.1 Known Source:
Curtiss-Wright POC: Mr. Brandon Paston 1675 Brandywine Avenue, Suite F Chula Vista, CA 91911, USA T: 619.482.3410 | M: 619.869.5605 brandon.paston@siemensgovt.com
| 8.0 | GENERAL REQUIREMENTS: |
| 8.1 POP: 22 - 27 October 2018. | |
| 8.2 Location: Sierra Pier, Naval Base Guam. | |
| 8.3 EPIC: Required for access to MSC vessels. Complete the MSC/EPIC Force |
Protection Request Submission Template (Non-Mariner Maintenance Contractor (Rev 8(v4) - 20 September 2017) strictly adhering to format requirements.
Screening requests for personnel requiring access will be submitted by their Parent company via AMRDEC SAFE, https://safe.amrdec.army.mil/safe to the following MSC personnel (Contracting Officer shall select the appropriate Personnel):
| PM1, 4, 6, 7, and 8: | |
| joanne.kim.ctr@navy.mil | |
| david.laden.ctr@navy.mil | |
| francis.lacerna.ctr@navy.mil |
EPIC personnel screening requests are required to be submitted no less than Four (4) working days prior to performance start date. MSC DET EPIC processes requests in the order they are received. (NOTE: Normal work days for personnel involved in the EPIC Screening process are Monday-Friday.) In the event accelerated processing is required, the PM POC should contact the MSC EPIC Program Manager, Pete Lewis (peter.j.lewis@navy.mil) as soon as the requirement is known with justification for the accelerated processing.
Subsequently, appropriate direction will be provided to MSC DET EPIC.
Vendor will be notified by MSC of personnel who are denied access to the Vessel."
FCB19-005-2
File details come from the government source that posted it.